CN208653230U - support structure - Google Patents
support structure Download PDFInfo
- Publication number
- CN208653230U CN208653230U CN201821186528.2U CN201821186528U CN208653230U CN 208653230 U CN208653230 U CN 208653230U CN 201821186528 U CN201821186528 U CN 201821186528U CN 208653230 U CN208653230 U CN 208653230U
- Authority
- CN
- China
- Prior art keywords
- stud
- connector
- support construction
- supporting element
- interconnecting piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 claims description 38
- 238000004519 manufacturing process Methods 0.000 abstract description 8
- 230000000694 effects Effects 0.000 abstract description 4
- 238000000137 annealing Methods 0.000 description 5
- 239000000463 material Substances 0.000 description 4
- 239000004696 Poly ether ether ketone Substances 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 229920002530 polyetherether ketone Polymers 0.000 description 3
- 239000004065 semiconductor Substances 0.000 description 3
- 239000011521 glass Substances 0.000 description 2
- 241001391944 Commicarpus scandens Species 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 125000003118 aryl group Chemical group 0.000 description 1
- JUPQTSLXMOCDHR-UHFFFAOYSA-N benzene-1,4-diol;bis(4-fluorophenyl)methanone Chemical compound OC1=CC=C(O)C=C1.C1=CC(F)=CC=C1C(=O)C1=CC=C(F)C=C1 JUPQTSLXMOCDHR-UHFFFAOYSA-N 0.000 description 1
- 238000011982 device technology Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 229920002521 macromolecule Polymers 0.000 description 1
- 125000000843 phenylene group Chemical group C1(=C(C=CC=C1)*)* 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 229920001169 thermoplastic Polymers 0.000 description 1
- 239000004416 thermosoftening plastic Substances 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
An embodiment of the utility model provides a supporting structure, supporting structure includes: a connecting member; a first stud at a first end of the connector; a second stud at a second end of the connector; and the support piece is internally provided with a first threaded hole and is in threaded connection with the second stud through the first threaded hole. The embodiment of the utility model provides a bearing structure, bearing structure's support piece is equivalent to the nut, with double-screw bolt threaded connection on the connecting piece, when the support piece that mechanical strength is lower damages, can only change support piece can, shortened the change time to reach the effect that improves production efficiency.
Description
Technical field
The utility model embodiment is related to semi-conductor device technology field more particularly to a kind of support construction.
Background technique
Array annealing furnace carries out annealing process for completing various semiconductor materials, with improve semiconductor material mechanics and
Electric property.
Support member is located between the motherboard and workpiece on array annealing furnace, is used to support workpiece.Support member includes connecting
Fitting and supporting element, supporting element in the prior art is during practical application, it is easy to be lost, especially work as supporting element
When being broken, will lead to fixed connector on motherboard must also be replaced, due to replacing than relatively time-consuming, production efficiency
It is lower.
Utility model content
In view of this, the utility model embodiment provides a kind of support construction, reduce the Break frequency of support construction,
The replacing construction for shortening support construction, increases the mechanical strength of support construction, to reduce production cost, improves production
Energy.
The utility model embodiment provides a kind of support construction, and the support construction includes:
Connector;
First stud, positioned at the first end of the connector;
Second stud, positioned at the second end of the connector;And
Supporting element, the first threaded hole is provided in the supporting element, and the supporting element passes through first threaded hole and institute
State the threaded connection of the second stud.
It optionally, further include middle interconnecting piece, between first stud and second stud, for connecting
State the first stud and second stud.
Optionally, the middle interconnecting piece of the connector, first stud and second stud are integrally formed.
Optionally, second stud is studs;
The middle interconnecting piece and first stud are integrally formed;
The second threaded hole is provided in the middle interconnecting piece, the middle interconnecting piece passes through second threaded hole and institute
State studs threaded connection.
Optionally, further include the first steel-wire screw-socket, be located in the middle interconnecting piece, connect with the studs screw thread
It connects.
Optionally, further include the second steel-wire screw-socket, be located in the supporting element, be threadedly coupled with second stud.
Optionally, the diameter of second stud is greater than or equal to 4 millimeters, is less than or equal to 5 millimeters.
Optionally, the length of second stud is greater than or equal to 20 millimeters, is less than or equal to 25 millimeters.
It optionally, further include cruciform groove or "-" type groove, setting connects in second stud far from the centre
The surface of one end of socket part, for rotating second stud.
Support construction provided in this embodiment, including supporting element and connector are provided with the first threaded hole in supporting element, prop up
Support member is threadedly coupled by the first threaded hole with the second stud.When supporting element damages, supporting element is only directly replaced, is extended
The service life of connector, avoids the situation in the threaded hole that stud in the prior art breaks in connector, reduces whole
The Break frequency of a support construction shortens the replacing construction of support construction, increases the mechanical strength of support construction, to drop
Low production cost, improves production capacity.
Detailed description of the invention
Illustrate made detailed description of non-limiting embodiments referring to the following drawings by reading, this is practical new
The other features, objects and advantages of type will become apparent.
Fig. 1 is a kind of support construction provided by the embodiment of the utility model;
Fig. 2 is a kind of support construction in the prior art;
Fig. 3 is another support construction provided by the embodiment of the utility model;
Fig. 4 is another support construction provided by the embodiment of the utility model.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples.It is understood that herein
Described specific embodiment is used only for explaining the utility model, rather than the restriction to the utility model.It further needs exist for
It is bright, part relevant to the utility model is illustrated only for ease of description, in attached drawing rather than entire infrastructure.
Fig. 1 is a kind of support construction provided by the embodiment of the utility model.Referring to Fig. 1, which includes: connector
1;First stud 2, positioned at the first end of connector 1;Second stud 3, positioned at the second end of connector 1;And supporting element 4, branch
The first threaded hole is provided in support member 4, supporting element 4 is threadedly coupled by the first threaded hole with the second stud 3.
It should be noted that being provided with disposed thread in motherboard 5 on array annealing furnace, it is threadedly coupled with the first stud 2.
Supporting element 4 is contacted with workpiece 6, is threadedly coupled between the first threaded hole being arranged in the second stud 3 and supporting element 4 by adjusting
Length changes the distance between workpiece 6 and motherboard 5.
Fig. 2 is support construction in the prior art.Referring to fig. 2, which includes: connector 1;First stud 2, position
In the first end of connector 1;Second stud 3, positioned at the first end of supporting element 4;Disposed thread is provided in 1 second end of connector
Hole is threadedly coupled between connector 1 and supporting element 4.The mechanical strength of connector 1 is greater than the mechanical strength of supporting element 4.Existing skill
The problem of art is: the mechanical strength of third stud 3 is lower, is easy to break in 1 internal thread hole of connector.Supporting element 4
Mechanical strength is lower, illustratively uses polyether-ether-ketone (polyetheretherketone, PEEK), it is contained in molecular backbone
There is the Linear aromatic macromolecular compound of chain link.Its component unit be oxygen-to phenylene-oxygen-carbonyl-to phenylene, be half hitch
Crystalline substance, thermoplastic.The process temperatures of array annealing furnace are 230 DEG C, and because of workpiece 6, illustrative is the frequent movement of glass,
The third stud 3 of the supporting element 4 of Peek material, under the action of high temperature and glass gravity, the third stud 3 of supporting element 4 is easy
It is broken, causes the loss of supporting element 4, increase cost;The third stud 3 of supporting element 4 can break in the disposed thread of connector 1
In hole, replacement speed is seriously affected, increases replacing construction.
Support construction provided in this embodiment, the first threaded hole is provided in supporting element 4, and supporting element 4 passes through the first screw thread
Hole is threadedly coupled with the second stud 3 of 1 second end of connector, and the first stud 2 of 1 first end of connector is threadedly coupled with motherboard 5,
Come so that being fixedly linked between supporting element 4 and motherboard 5.Compared to the prior art, the second stud 3 of 4 first end of supporting element and company
The threaded hole being arranged in 1 second end of fitting is threadedly coupled, and the first stud 2 of 1 first end of connector is threadedly coupled with motherboard 5, is come
So that being fixedly linked between supporting element 4 and motherboard 5, the second end of connector 1, the machinery of the second stud 3 is arranged in the second stud 3
Intensity is higher than the mechanical strength of supporting element 4, when supporting element damages, only directly replaces supporting element 4, extends connector 1
Service life, avoid the situation in the threaded hole that stud breaks in connector, reduce the Break frequency of support construction, from
And production cost is reduced, the replacing construction of support construction is shortened, the mechanical strength of support construction is increased, improves production
Energy.
Optionally, referring to Fig. 1, the diameter of the second stud 3 is greater than or equal to 4 millimeters, is less than or equal to 5 millimeters.It needs
Bright, the diameter of the second stud 3 refers to the major diameter of the second stud 3.Optionally, referring to Fig. 1, the length of the second stud 3 is big
In or be equal to 20 millimeters, be less than or equal to 25 millimeters.Increase diameter appropriate reduces length, can increase the machine of the second stud 3
Tool intensity.
Optionally, referring to Fig. 1, which further includes middle interconnecting piece 7, be located at the first stud 2 and the second stud 3 it
Between, for connecting the first stud 2 and the second stud 3.
Wherein, it should be noted that the connection relationship of the second stud 3 and middle interconnecting piece 7 has following two situation.It is optional
, referring to Fig. 1, the middle interconnecting piece 7 of connector 1, the first stud 2 and the second stud 3 are integrally formed.
Optionally, referring to Fig. 3, the second stud 3 is studs;Middle interconnecting piece 7 and the first stud 2 are integrally formed;In
Between the second threaded hole is provided in interconnecting piece 7, middle interconnecting piece 7 is threadedly coupled by the second threaded hole with studs 3.Double end
The material of stud is generally stainless steel, increases the mechanical strength of connector and supporting element.
Optionally, referring to fig. 4, further include the first steel-wire screw-socket 8, be located in middle interconnecting piece, connect with studs screw thread
It connects.It is similar that the effect of the second threaded hole is provided in one of effect of first steel-wire screw-socket 8 and middle interconnecting piece 7, so that intermediate
Interconnecting piece 7 is threadedly coupled by the second threaded hole with studs 3.The effect of first steel-wire screw-socket 8 second is that when the first steel wire
After swivel nut 8 damages, it is easily changed, and increase the mechanical strength of middle interconnecting piece 7.
Optionally, referring to fig. 4, further include the second steel-wire screw-socket 9, be located in supporting element, be threadedly coupled with the second stud, increase
The mechanical strength of supporting element is added.It optionally, further include cruciform groove or "-" type groove, setting is in the second stud far from
Between interconnecting piece one end surface, for rotate the second stud 3.
Note that above are only the preferred embodiment and institute's application technology principle of the utility model.Those skilled in the art's meeting
Understand, the utility model is not limited to specific embodiment here, is able to carry out for a person skilled in the art various apparent
Change, readjust, be combined with each other and substitutes without departing from the protection scope of the utility model.Therefore, although more than passing through
Embodiment is described in further detail the utility model, but the utility model is not limited only to above embodiments,
It can also include more other equivalent embodiments in the case where not departing from the utility model design, and the scope of the utility model
It is determined by the scope of the appended claims.
Claims (10)
1. a kind of support construction, which is characterized in that the support construction includes:
Connector;
First stud, positioned at the first end of the connector;
Second stud, positioned at the second end of the connector;And
Supporting element, is provided with the first threaded hole in the supporting element, and the supporting element passes through first threaded hole and described the
Two studs are threadedly coupled.
2. support construction according to claim 1, which is characterized in that
It further include middle interconnecting piece, between first stud and second stud, for connecting first stud
With second stud.
3. support construction according to claim 2, which is characterized in that
The middle interconnecting piece of the connector, first stud and second stud are integrally formed.
4. support construction according to claim 2, which is characterized in that
Second stud is studs;
The middle interconnecting piece and first stud are integrally formed;
The second threaded hole is provided in the middle interconnecting piece, the middle interconnecting piece passes through second threaded hole and described pair
Header stud is threadedly coupled.
5. support construction according to claim 4, which is characterized in that
Further include the first steel-wire screw-socket, is located in the middle interconnecting piece, is threadedly coupled with the studs.
6. support construction according to claim 1, which is characterized in that
Further include the second steel-wire screw-socket, is located in the supporting element, is threadedly coupled with second stud.
7. support construction according to claim 1, which is characterized in that
The diameter of second stud is greater than or equal to 4 millimeters, is less than or equal to 5 millimeters.
8. support construction according to claim 3, which is characterized in that
The length of second stud is greater than or equal to 20 millimeters, is less than or equal to 25 millimeters.
9. support construction according to claim 2, which is characterized in that
Further include cruciform groove or "-" type groove, the described one end of second stud far from the middle interconnecting piece is set
Surface, for rotating second stud.
10. a kind of support construction, which is characterized in that the support construction includes:
Connector;
First stud, positioned at the first end of the connector, for being threadedly coupled with fixed motherboard;
Second stud, positioned at the second end of the connector;And
Supporting element is threadedly coupled with second stud, is used to support workpiece;
Middle interconnecting piece, between first stud and second stud, for connecting first stud and described
Second stud;
The middle interconnecting piece of the connector, first stud and second stud are integrally formed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821186528.2U CN208653230U (en) | 2018-07-25 | 2018-07-25 | support structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821186528.2U CN208653230U (en) | 2018-07-25 | 2018-07-25 | support structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208653230U true CN208653230U (en) | 2019-03-26 |
Family
ID=65786341
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821186528.2U Active CN208653230U (en) | 2018-07-25 | 2018-07-25 | support structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208653230U (en) |
-
2018
- 2018-07-25 CN CN201821186528.2U patent/CN208653230U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104713774B (en) | Spring assembly limiting type rock specimen fixing device for direct tensile test | |
CN103837420B (en) | Pulse fatigue testing machine fatigue experimental device and pulse fatigue testing machine | |
CN103252700B (en) | Polishing disk is brushed automatically | |
CN104746935A (en) | Power transmission tower | |
CN208653230U (en) | support structure | |
CN204213483U (en) | The anti-broken line frame of a kind of self adaption | |
CN105058083A (en) | Multi-wedge-face sliding type clamping mechanism | |
CN202391717U (en) | Self-aligning piston rod | |
CN104191394B (en) | The anti-bending fixture of a kind of single-ride joint | |
CN108798553B (en) | A kind of height-adjustable oil pumping rod centering device | |
CN201855822U (en) | Ultrasonic cleaning clamp | |
CN102705346A (en) | Novel bolt | |
KR101116225B1 (en) | Probe pin for semiconductor testing equipment | |
CN103016911B (en) | Looseness prevention ground foot | |
CN205325452U (en) | Inside clamping jig of sheathed tube | |
CN107478872A (en) | A kind of spring tests probe | |
CN105750351A (en) | Extruding machine pecker support guide structure | |
CN103954497B (en) | A kind of multi-functional to grinding jig for on-line measurement material friction-abrasion tester | |
CN104466858A (en) | Pull ring | |
CN208280920U (en) | A kind of height-adjustable oil pumping rod centering device | |
CN204358667U (en) | Ceiling lamp overhauls specialized tool | |
CN205228944U (en) | Novel screw tensile test machine | |
CN205066801U (en) | Sensor erection support | |
CN204866601U (en) | Suction nozzle structure of test sorter | |
CN103983826A (en) | Full-contact wiring rod head for electric energy meter testing meter stand |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |