CN208650792U - Construction drill verticality control device - Google Patents
Construction drill verticality control device Download PDFInfo
- Publication number
- CN208650792U CN208650792U CN201821404499.2U CN201821404499U CN208650792U CN 208650792 U CN208650792 U CN 208650792U CN 201821404499 U CN201821404499 U CN 201821404499U CN 208650792 U CN208650792 U CN 208650792U
- Authority
- CN
- China
- Prior art keywords
- control
- pointer
- drilling machine
- annulus
- verticality
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a kind of construction drill verticality control devices; including the device noumenon being connected by the connecting plate that insulate with drilling machine mast; device noumenon includes protection shell, be provided in protective shell body with protection inner walls mutually fixed control annulus, the pointer that is suspended in protection housing tip and is arranged concentrically with control annulus and for pointer with control the control system for voluntarily controlling drilling machine when annulus mutually touches and stopping operating and issuing buzzing of alarming.The utility model control annulus and drilling machine mast remain plumbness, when drilling machine mast run-off the straight, control annulus consequently also can run-off the straight, pointer remains state straight down due to the gravity of itself;When the inner ring that the inclined degree of drilling machine mast reaches control annulus collides with pointer to be contacted, control system work can voluntarily control drilling machine and stop operating and issue alarm buzzing, very intelligently realize the case where detecting drilling machine mast run-off the straight.
Description
Technical field
The utility model relates to technical field of building construction, especially a kind of construction drill verticality control device.
Background technique
With the continuous development of urban construction and the continuous intensification of structure base, to foundation pit slope protection stake and constructs basis and apply
The vertical precision control requirement of work machinery is also higher and higher, if the degree control of enclosed structure is not in place, will lead to stake
With steel purlin cannot closely connected, enclosed structure intrusion main structure or bearing pile tilt well the problems such as, to the main body in later period
Structure construction causes a hidden trouble, while increasing material utilization amount and the manual labor of gunite concrete.It is tied sometimes for preventing from safeguarding
Structure invades main structure, need to increase the land used amount of extending out or reduce the space that main structure comes increased care structure and main structure.
For the safety for guaranteeing main structure construction quality and enclosed structure, the waste of land area and material is reduced, it is necessary to reinforce to dimension
It is the most key to the control of drilling machine mast verticality in the degree control of protection structure, especially pore forming process.
The method that traditional drilling well adjusting process uses artificial messenger wire pendant, it is true by the angle between measurement messenger wire and drilling rod
The tilt angle for determining drilling rod, is then adjusted drilling rod.But this method is complicated for operation, needs to carry out angle by messenger wire length
The conversion of degree, artifact influence greatly, and deviation is big;Inefficiency needs to measure when equal messenger wires are totally stationary, when measurement also
Should ensure that will not touch messenger wire, in case messenger wire generates wobble effects measurement result;Situations such as being frequently encountered messenger wire winding, influences
The Fast Installation and use of regulator at the scene.
Currently, it is each in drilling machine mast X, Y-direction for checking or preventing the whether vertical Normal practice of construction drill mast
The verticality pointer for installing an about 50cm long welds a upward triangle, below pointer with pointer and triangle hanging
Indicate whether drilling machine mast is vertical, but this method measurement accuracy is not high;Vertical computer detection is either installed on drilling machine
System, but since computer detecting system is there are deviation, verticality pointer away from staff's sight farther out or direction and work people
Not the defects of member's sight is not inconsistent, so that the detection system for only relying on machinery itself is unable to satisfy into the requirement of hole perpendicularity.
Utility model content
There is provided a kind of construction drill verticality control devices for the utility model technical issues that need to address, to solve
Traditional artificial messenger wire drop method is complicated for operation, inefficiency, installs inconvenient, the method for installation verticality pointer on drilling machine mast
Measurement accuracy is not high, and carries out detection using computer detecting system and there are problems that deviation, to save material, reduces loss.
In order to solve the above technical problems, technical solution adopted in the utility model is as follows.
Construction drill verticality control device, including be connected with drilling machine mast for being bored to construction by insulation connecting plate
The device noumenon that the verticality of machine is monitored, device noumenon include protection shell, are provided in protective shell body and protection shell
Control annulus that inner wall is mutually fixed is suspended in protection housing tip and is arranged concentrically with control annulus for occurring in drilling machine mast
With the pointer that mutually touches of control annulus and for voluntarily controlling drilling machine stopping when pointer is mutually touched with control annulus when inclination
Operate and issue the control system of alarm buzzing.
Technical solution is advanced optimized, the upper end of the pointer is provided with the fixed hook being suspended in protection inner walls
And the connection ring for being arranged and being fixedly connected with pointer top with hook mounting.
Technical solution is advanced optimized, fixed setting one is for so that pointer is more delicately felt on the outer wall of the pointer
Answer the counterweight steel plate of drilling machine mast run-off the straight state.
Technical solution is advanced optimized, the bottom end of the control annulus is fixedly installed to be fixedly connected with protection inner walls
Insulating support plate, the circular hole for wearing pointer is offered on insulating support plate.
Advanced optimize technical solution, the control system include power supply for providing electric energy for control system and with
Positive pole is connected and is connect with pointer circuit for the intermediate relay that control drilling machine stops operating in the case where obtaining electricity condition, intermediate
Relay circuit be connected in the case where intermediate relay obtains electricity condition issue alarm buzzing alarm, the control annulus and
The cathode traces of power supply connect.
Due to using above technical scheme, technological progress acquired by the utility model is as follows.
The utility model structure is simple, ingenious in design, practical, and device noumenon passes through insulation connecting plate and drilling machine mast
It is fixedly connected, the relative position of shell and drilling machine mast is protected to remain unchanged, control annulus is mutually fixed with protection inner walls, is made
Annulus must be controlled and drilling machine mast remains plumbness, and pointer is suspended from protection shell, so that working as drilling machine mast
When bar run-off the straight, control annulus consequently also can run-off the straight, deviate initial position, pointer due to itself gravity always
Keep state straight down;It is contacted when the inner ring that the inclined degree of drilling machine mast reaches control annulus collides with pointer
When, i.e., inclined degree is more than setting value, and control system work can voluntarily control drilling machine and stop operating and issue alarm buzzing,
The case where very intelligently realizing detection drilling machine mast run-off the straight, method very simple, research and development, maintenance cost are low, easily
Operation, it is noiseless, labor intensity is greatly reduced, the construction time has been saved, is improved work efficiency, ensure that pile body is vertical
The advantages that spending quality.
When the utility model control system works, intermediate relay starts operation, automatically cuts off the power head of construction drill
Power supply, and alarm is powered, alarm issue alarm buzzing, remind staff need to the verticality of drilling machine mast into
Row adjustment.After the completion of adjusting verticality, pointer is disengaged with control annulus, intermediate relay power loss, and turn on automatically construction is bored
The power head power supply of machine, alarm power-off, releases alarm.So that can be realized construction drill run-off the straight exceeded for the utility model
When automatically power off, prevent the functions such as quality accident.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is control annulus described in the utility model and pointer relative position structural schematic diagram.
Wherein: 1, device noumenon, 2, insulation connecting plate, 3, protection shell, 4, fixing bolt, 5, hook, 6, connection ring, 7,
Pointer, 8, counterweight steel plate, 9, insulating support plate, 10, control annulus, 11, drilling machine mast.
Specific embodiment
Below in conjunction with specific utility model, the present invention will be further described in detail.
A kind of construction drill verticality control device, in conjunction with shown in Fig. 1 to Fig. 2, including device noumenon 1 and insulation connecting plate
2.Device noumenon 1 is connected by the connecting plate 2 that insulate with drilling machine mast 11, is monitored for the verticality to construction drill.
Insulation connecting plate 2 is connected with drilling machine mast 11, efficiently avoids the feelings damaged when electric leakage in device noumenon 1 to drilling machine
Condition.
Device noumenon 1 includes protection shell 3, control annulus 10, pointer 7, hook 5, connection ring 6, counterweight steel plate 8, insulation
Supporting plate 9 and control system.Wherein, annulus 10, pointer 7, hook 5, connection ring 6, counterweight steel plate 8, insulating support plate 9 and control are controlled
System is arranged at the inside of protection shell 3.The bottom end of control annulus 10 is fixedly installed insulating support plate 9, and passes through fixed spiral shell
Bolt 4 is attached, and insulating support plate 9 is fixedly connected with the inner wall of protection shell 3, is offered on insulating support plate 9 for wearing pointer 7
Circular hole, the shape size of circular hole is more bigger than the inner ring shape for controlling annulus 10, and setting is so that drilling machine mast 11 inclines in this way
When oblique, inner ring of the pointer 7 first with control annulus 10 is in contact.The upper end of pointer 7 is arranged in hook 5, and fixation is suspended on protection
On the inner wall of shell 3.Connection ring 6 is arranged with 5 mounting of hook and is fixedly connected with 7 top of pointer.Pointer 7 is suspended in protection shell
3 top is arranged concentrically with control annulus 10, for touching in 11 run-off the straight of drilling machine mast with control 10 phase of annulus, is referred to
It is provided with binding post on needle 7 and control annulus 10, binding post with control system for being electrically connected.Counterweight steel plate 8 is solid
It is arranged on the outer wall of pointer 7 calmly, for increasing the weight of pointer 7, so that pointer 7 more delicately incudes the hair of drilling machine mast 11
Raw heeling condition.Bottom end of the installation site of annulus 10 apart from pointer is controlled to control in the range of 5cm or so.
Counterweight steel plate 8 is shaped to circular plate in the utility model, may be alternatively provided as rectangular plate-like or other knots
Structure.
Control system is used to voluntarily control drilling machine when pointer 7 is touched with control 10 phase of annulus and stops operating and issue alarm
Buzzing.Control system includes power supply, intermediate relay and alarm.Power supply is used to provide electric energy for control system.Control annulus
10 connect with the cathode traces of power supply.Intermediate relay connect with positive pole and with 7 circuit connection of pointer, for electric shape
Drilling machine is controlled under state to stop operating.Alarm and centre are after circuit connection, for issuing report in the case where intermediate relay obtains electricity condition
Alert buzzing.
The utility model should use theodolite to be corrected drilling machine mast, will control when actually being installed before installation
Rounding ring 10 is fixed on insulating support plate 9 by fixing bolt, and to control on inner ring and the insulating support plate 9 of annulus 10
Circular hole be arranged concentrically;Pointer 7 is hanging on hook 5, and pointer 7 is made to sequentially pass through control annulus 10 and insulating support plate 9,
Respective flag is done in pointer lower end after errorless.Carrying out after installation prevents rainforest facility and shield.
The working principle of the utility model is as follows.
Since the device noumenon 1 in the utility model is fixedly connected by insulation connecting plate 2 with drilling machine mast 11, protective shell
Body 3 and the relative position of drilling machine mast 11 remain unchanged.Insulating support plate 9 is fixedly connected with the inner wall of protection shell 3, controls annulus
10 are fixed on insulating support plate 9, so that control annulus 10 and drilling machine mast 11 remain plumbness, and relative position
It remains unchanged.And pointer 7 is suspended from protection shell 3 so that when 11 run-off the straight of drilling machine mast, control annulus 10 with
Also can run-off the straight, deviate initial position, pointer 7 remains state straight down due to the gravity of itself.When
The inclined degree of drilling machine mast 11 reaches the inner ring of control annulus 10 and pointer 7 collides when contacting, i.e., inclined degree is more than
Setting value, intermediate relay start operation, automatically cut off the power head power supply of construction drill, and alarm is powered, alarm
Device issues alarm buzzing, and staff is reminded to need to be adjusted the verticality of drilling machine mast.
After the completion of adjusting verticality, pointer 7 is disengaged with control annulus 10, and intermediate relay power loss, turn on automatically is applied
The power head power supply of work drilling machine, alarm power-off, releases alarm.So that the utility model can be realized construction drill run-off the straight
It is automatically powered off when exceeded, prevents the functions such as quality accident.
Claims (5)
1. construction drill verticality control device, it is characterised in that: including passing through insulation connecting plate (2) and drilling machine mast (11) phase
The device noumenon (1) being monitored for the verticality to construction drill is connected, device noumenon (1) includes protection shell (3), is protected
It is provided with the control annulus (10) mutually fixed with protection shell (3) inner wall in protective case body (3), is suspended in protection shell (3) top
And the finger for mutually touching in drilling machine mast (11) run-off the straight with control annulus (10) is arranged concentrically with control annulus (10)
Needle (7) and for pointer (7) with control annulus (10) mutually touch when voluntarily control drilling machine stop operating and issue alarm bee
The control system of ring.
2. construction drill verticality control device according to claim 1, it is characterised in that: the upper end of the pointer (7)
It is provided with the fixed hook (5) being suspended on protection shell (3) inner wall and mounts setting with hook (5) and pushed up with pointer (7)
Hold the connection ring (6) being fixedly connected.
3. construction drill verticality control device according to claim 1 or 2, it is characterised in that: outside the pointer (7)
Fixed setting one is for so that pointer (7) more delicately incudes the counterweight steel plate of drilling machine mast (11) run-off the straight state on wall
(8).
4. construction drill verticality control device according to claim 1, it is characterised in that: control annulus (10)
Bottom end is fixedly installed the insulating support plate (9) being fixedly connected with protection shell (3) inner wall, offers and is used on insulating support plate (9)
Wear the circular hole of pointer (7).
5. construction drill verticality control device according to claim 1, it is characterised in that: the control system includes using
It connect in the power supply for providing electric energy for control system and with positive pole and is used to obtain electricity condition with pointer (7) circuit connection
The intermediate relay that lower control drilling machine stops operating, intermediate relay circuit connection have in the case where intermediate relay obtains electricity condition
The alarm of alarm buzzing is issued, the control annulus (10) connect with the cathode traces of power supply.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821404499.2U CN208650792U (en) | 2018-08-29 | 2018-08-29 | Construction drill verticality control device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821404499.2U CN208650792U (en) | 2018-08-29 | 2018-08-29 | Construction drill verticality control device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208650792U true CN208650792U (en) | 2019-03-26 |
Family
ID=65791583
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821404499.2U Active CN208650792U (en) | 2018-08-29 | 2018-08-29 | Construction drill verticality control device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208650792U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113026705A (en) * | 2021-03-16 | 2021-06-25 | 镇江市工程勘测设计研究院有限公司 | Static penetrometer capable of reducing downward-sounding inclination and inclination alarming method thereof |
CN114152171A (en) * | 2021-11-25 | 2022-03-08 | 北京建工国际建设工程有限责任公司 | Rectification engineering monitoring structure and detection method thereof |
CN115014291A (en) * | 2022-06-29 | 2022-09-06 | 北京工业大学 | Waiting type high formwork pier column 360-degree inclination torsion monitoring and early warning device |
-
2018
- 2018-08-29 CN CN201821404499.2U patent/CN208650792U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113026705A (en) * | 2021-03-16 | 2021-06-25 | 镇江市工程勘测设计研究院有限公司 | Static penetrometer capable of reducing downward-sounding inclination and inclination alarming method thereof |
CN114152171A (en) * | 2021-11-25 | 2022-03-08 | 北京建工国际建设工程有限责任公司 | Rectification engineering monitoring structure and detection method thereof |
CN114152171B (en) * | 2021-11-25 | 2023-09-12 | 北京建工国际建设工程有限责任公司 | Engineering side-tipping detection structure and measuring method thereof |
CN115014291A (en) * | 2022-06-29 | 2022-09-06 | 北京工业大学 | Waiting type high formwork pier column 360-degree inclination torsion monitoring and early warning device |
CN115014291B (en) * | 2022-06-29 | 2023-05-12 | 北京工业大学 | 360 degrees inclinations of waiting formula high formwork pier stud torsion monitoring early warning device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208650792U (en) | Construction drill verticality control device | |
CN204080880U (en) | A kind of prior-warning device of monitoring foundation pit deformation | |
CN101118687A (en) | System and method for real time remote wireless monitoring slope landslide | |
CN211291830U (en) | High-efficient safe earth's surface settlement monitoring devices | |
CN205404856U (en) | Integration water level monitoring station | |
CN206161011U (en) | Regulation formula reversed pendulum equipment supporting structure | |
CN208477704U (en) | A kind of simple source of early warning of side slope inclination | |
CN210370617U (en) | Verticality monitoring device for drilling process of drilling machine | |
CN211346780U (en) | Subway foundation pit envelope monitoring devices | |
CN111721273A (en) | Laser plumb line measuring device and laser plumb line measuring system | |
CN208039996U (en) | A kind of electric pole that power engineering uses | |
CN205619903U (en) | Deformation monitoring system | |
CN214219715U (en) | Pile foundation construction device capable of preventing deviation | |
CN107907068A (en) | It is a kind of to be suitable for anchor pole and the double monitoring device of slope anchorage engineering | |
CN216159889U (en) | Vertical detection device for constructional engineering | |
CN215573111U (en) | Integrated vibration displacement inclination angle monitoring terminal | |
CN215639263U (en) | Tower crane perpendicularity real-time detection system | |
CN201280722Y (en) | Suspension type steel upright post hoisting guiding rail | |
CN217690259U (en) | Roof abnormal movement alarm device | |
CN215107836U (en) | Base for tower | |
CN214692984U (en) | Hydrology monitoring support | |
CN216130622U (en) | Support arrangement for steel house building | |
CN206450348U (en) | A kind of monitoring device of hydraulic support top beam load distribution | |
CN215368789U (en) | Slope finding tool for concrete surface in circular sedimentation tank | |
CN214822720U (en) | Contact net is anchor compensation arrangement down |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: Room 326, Jun Shangyuan Business Building, No. 2, West Second Ring South Road, Qiaoxi District, Shijiazhuang City, Hebei Province, 050000 Patentee after: Hebei Taihang Hongye Construction Group Co., Ltd. Address before: Room 326, Jun Shangyuan Business Building, No. 2, West Second Ring South Road, Qiaoxi District, Shijiazhuang City, Hebei Province, 050000 Patentee before: Hebei Jian Hui Hui line of Civil Engineering Co., Ltd. |
|