CN204080880U - A kind of prior-warning device of monitoring foundation pit deformation - Google Patents

A kind of prior-warning device of monitoring foundation pit deformation Download PDF

Info

Publication number
CN204080880U
CN204080880U CN201420391289.XU CN201420391289U CN204080880U CN 204080880 U CN204080880 U CN 204080880U CN 201420391289 U CN201420391289 U CN 201420391289U CN 204080880 U CN204080880 U CN 204080880U
Authority
CN
China
Prior art keywords
tensiometer
steel sheet
sheet pile
wire rope
alarm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420391289.XU
Other languages
Chinese (zh)
Inventor
常浩宇
刘宝生
尹世伍
韩向东
贾清水
李振华
曹涛
王全
宫颜君
位赛男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin MCC20 Construction Co Ltd
Original Assignee
Tianjin MCC20 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin MCC20 Construction Co Ltd filed Critical Tianjin MCC20 Construction Co Ltd
Priority to CN201420391289.XU priority Critical patent/CN204080880U/en
Application granted granted Critical
Publication of CN204080880U publication Critical patent/CN204080880U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of prior-warning device of monitoring foundation pit deformation, comprise Support Steel sheet pile, draw anchor steel sheet pile and draw anchor wire rope, the described anchor wire rope that draws is two, steel cable one end connects tensiometer, the other end connects Support Steel sheet pile and encloses purlin place, second wire rope one end connects tensiometer, anchor steel sheet pile is drawn in other end connection, described tensiometer is provided with fixed touch plate and slip contact, slip contact is connected with alarm zero line, the live wire of alarm is connected with transformer positive pole, and transformer negative pole is connected with fixed touch plate.The utility model saves construction cost, report to the police rapidly in time, safe and reliable, a whole set of warning system adopts 24V safe voltage, and tensiometer increases contact, when value of thrust reaches design load through repacking, the contact generation current that contacts is reported to the police immediately, after alarm sends the sound, in foundation ditch, operating personnel withdraws rapidly, greatly can improve working security.

Description

A kind of prior-warning device of monitoring foundation pit deformation
Technical field
The utility model relates to a kind of monitoring device, particularly a kind of deep foundation pit support monitoring device.
Background technology
Pit retaining monitoring technology has become the important leverage means of deep foundation pit construction, how effectively, difficult point and the key point that deep pit monitor monitoring and warning becomes deep foundation pit construction is carried out rapidly, domestic generally adopt total powerstation, GPS fix a point coordinate survey manage displacement calculating deviation, comparatively advanced employing hand-held laser rangefinder observation offset deviation, abroad have and carry out safety monitoring by Fibre Optical Sensor embedded concrete structure, stayed-cable bridge in bridge construction, drag-line adopts Vibratory transducer monitoring drag-line intensity and stressing conditions.But currently used monitoring method can not react the state residing for Practical Project accurately, timely, for each dangerous position of foundation ditch can not Real-Time Monitoring, Timeliness coverage dangerous matter sources, in time early warning.
Utility model content
In order to solve problems of the prior art, the utility model provides a kind of prior-warning device of monitoring foundation pit deformation, overcomes monitoring method in prior art inaccurate, can not the problem of Real-Time Monitoring, in time early warning.
The technical solution of the utility model is:
A kind of prior-warning device of monitoring foundation pit deformation, comprise Support Steel sheet pile, draw anchor steel sheet pile and draw anchor wire rope, it is characterized in that, the described anchor wire rope that draws is two, steel cable one end connects tensiometer, the other end connects Support Steel sheet pile and encloses purlin place, second wire rope one end connects tensiometer, anchor steel sheet pile is drawn in other end connection, described tensiometer is provided with contact and scale, and can preset warning threshold, tensiometer is connected with alarm by circuit, when tensiometer is subjected to displacement and reaches threshold, contact pad can be reported to the police.
Describedly draw anchor wire rope every section of junction to be all provided with six buckles firmly to fix.
Described transformer is voltage is 24V.
Described alarm circuit is connected to transformer.
Described tensiometer is provided with fixed touch plate and slip contact, slip contact is connected with alarm zero line, and the live wire of alarm is connected with transformer positive pole, and transformer negative pole is connected with fixed touch plate.
The beneficial effects of the utility model are:
(1) construction cost is saved
After autoalarm is communicated with, only need make regular check on, reduce monitoring person works amount, during work, one people can operate, and has saved construction cost.
(2) safe and reliable
A whole set of warning system adopts 24V safe voltage, and tensiometer increases contact through repacking, and when value of thrust reaches design load, the contact generation current that contacts is reported to the police immediately, and after alarm sends the sound, in foundation ditch, operating personnel withdraws rapidly, greatly can improve working security.
(3) report to the police rapidly in time
Common pit retaining monitoring cannot make warning rapidly, but judged by data analysis, this cover foundation ditch prior-warning device, by setting warning value of thrust in advance, when reaching the work of warning value of thrust alarm device turn-on current, send the sound, pre-warning time shortens greatly, reaches Real-Time Monitoring deep pit monitor state.
The utility model is applicable to drawing outside steel sheet pile the deep foundation ditch of anchor Support types to monitor, foundation ditch adopts steel sheet pile supporting, anchor is drawn outside wire rope, it is solid that hoisting cable anchorage section sets isosceles triangle piled anchor, Real-Time Monitoring steel sheet pile deflection deformation situation and wire rope can draw anchor axle power situation of change, deep foundation ditch safety monitoring is required that work items controlled continuously can be applicable.
Accompanying drawing explanation
Fig. 1 is the utility model monitoring device sectional drawing;
Fig. 2 is monitoring device Circuits System plan view;
Fig. 3 is tensiometer structural representation;
Wherein, 1-dial; 2-power line; 3-slip contact connector lug; 4-fixed touch plate connector lug; 5-insulating slab; 6-slip contact; 7-fixed touch plate; 8-chute; 9-slip contact support; 10-fixed touch plate support; 11-draw ring; Axle tension spring in 12-tensiometer; 13-tensiometer shell; 14-draws anchor steel sheet pile; 15-draws anchor wire rope; 16-steel buckle; 17-tensiometer; 18-Support Steel sheet pile; 19-encloses purlin; 20-shelf bracket; 21-power line; 22-alarm; 23-transformer; 24-switch; 25-power supply.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in detail.
As Figure 1-3, the prior-warning device of monitoring foundation pit deformation of the present utility model, comprise Support Steel sheet pile 18, draw anchor steel sheet pile 14 and draw anchor wire rope 15, the described anchor wire rope 15 that draws is two, steel cable one end connects tensiometer 17, and the other end connects Support Steel sheet pile and encloses purlin 19 place, and second wire rope one end connects tensiometer 17, anchor steel sheet pile 14 is drawn in other end connection, draws anchor wire rope 15 every section of junction to be all provided with six steel buckles 16 and firmly fixes; Tensiometer 17 is provided with fixed touch plate 7 and slip contact 6, slip contact connector lug 3 is connected with alarm 22 zero line, and the live wire of alarm 22 is connected with transformer 23 positive pole, and transformer 23 negative pole is connected with fixed touch plate connector lug 4, transformer 23 for voltage be 24V.Described tensiometer is provided with dial 1, can preset warning threshold, and when tensiometer 17 is subjected to displacement and reaches threshold, fixed touch plate 7 contacts can report to the police with slip contact 6.
Work progress of the present utility model is as follows:
(1) surveying setting-out: technician carries out survey according to the plane coordinates point of drawing requirement and absolute altitude dominating pair of vertices job site and establishes, and release excavation line, steel sheet pile sets center line.
(2) soil excavation: soil excavation is high to steel sheet pile scope of operation top mark, and the soil excavation gradient is not less than safe sloping coefficient.
(3) steel sheet pile construction: set steel sheet pile along steel sheet pile center line, welding shelf bracket, installs and encloses purlin, enclose purlin and steel sheet pile, bracket contact site all adopt full weld, set and draw anchor steel sheet pile.
(4) anchor wire rope, tensiometer is drawn to install: to connect tensiometer with steel cable one end, purlin place is enclosed in the stake of other end junction steel plate, second wire rope connects tensiometer, and anchor steel sheet pile is drawn in other end connection, and wire rope every section junction has six buckles firmly to fix.
(5) warning system is installed: by transformer, 220V voltage is down to 24V safe voltage, the live wire of alarm is connected with transformer positive pole, zero line connects tensiometer slip contact joint, tensiometer fixed end contact connector lug is connected with transformer negative pole, such tensiometer slip contact and fixed end contact pad will produce closed path, and alarm will power alarm.
Above with reference to drawings and Examples, schematically describe the utility model, this description is not restricted.Those of ordinary skill in the art will be understood that in actual applications, and in the utility model, some change all may occur the set-up mode of each parts, and other staff also may make the similar Design of various ways under its enlightenment.It is pointed out that only otherwise depart from design aim of the present utility model, all apparent changes and similar Design thereof, be all included within protection domain of the present utility model.

Claims (5)

1. monitor the prior-warning device of foundation pit deformation for one kind, comprise Support Steel sheet pile, draw anchor steel sheet pile and draw anchor wire rope, it is characterized in that, the described anchor wire rope that draws is two, and steel cable one end connects tensiometer, and the other end connects Support Steel sheet pile and encloses purlin place, second wire rope one end connects tensiometer, anchor steel sheet pile is drawn in other end connection, and described tensiometer is provided with contact and scale, and tensiometer is connected with alarm by circuit.
2. monitor the prior-warning device of foundation pit deformation according to claim 1, it is characterized in that, described in draw every section of link place of anchor wire rope to be all provided with six buckles firmly to fix.
3. monitor the prior-warning device of foundation pit deformation according to claim 1, it is characterized in that, described transformer is voltage is 24V.
4. monitor the prior-warning device of foundation pit deformation according to claim 1, it is characterized in that, described alarm circuit is connected to transformer.
5. monitor the prior-warning device of foundation pit deformation according to claim 1, it is characterized in that, described tensiometer is provided with fixed touch plate and slip contact, slip contact is connected with alarm zero line, the live wire of alarm is connected with transformer positive pole, and transformer negative pole is connected with fixed touch plate.
CN201420391289.XU 2014-07-15 2014-07-15 A kind of prior-warning device of monitoring foundation pit deformation Active CN204080880U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420391289.XU CN204080880U (en) 2014-07-15 2014-07-15 A kind of prior-warning device of monitoring foundation pit deformation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420391289.XU CN204080880U (en) 2014-07-15 2014-07-15 A kind of prior-warning device of monitoring foundation pit deformation

Publications (1)

Publication Number Publication Date
CN204080880U true CN204080880U (en) 2015-01-07

Family

ID=52173615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420391289.XU Active CN204080880U (en) 2014-07-15 2014-07-15 A kind of prior-warning device of monitoring foundation pit deformation

Country Status (1)

Country Link
CN (1) CN204080880U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672375A (en) * 2016-03-31 2016-06-15 广州市城市建设工程监理公司 Automatic monitoring system and method for pit displacement
CN106705831A (en) * 2017-03-15 2017-05-24 山西建筑工程有限公司 Monitoring formwork system deformation device
CN107524152A (en) * 2017-10-13 2017-12-29 中建八局第三建设有限公司 A kind of foundation pit enclosure structure stress bringing device and its construction method
CN108343098A (en) * 2018-02-11 2018-07-31 江苏中路工程检测有限公司 A kind of automatic monitoring system of deep basal pit
CN108917536A (en) * 2018-04-20 2018-11-30 中国十七冶集团有限公司 A kind of deep basal pit horizontal displacement monitoring warning device and its operating method
CN111676981A (en) * 2020-06-05 2020-09-18 浙江新中源建设有限公司 Foundation pit supporting structure and construction method thereof
CN112211201A (en) * 2020-09-29 2021-01-12 中铁第四勘察设计院集团有限公司 Anti-falling and early warning device for foundation pit steel pipe cross brace
CN112942369A (en) * 2021-02-04 2021-06-11 平煤神马建工集团有限公司 Steel shotcrete autoalarm
CN117095511A (en) * 2023-07-14 2023-11-21 长江生态环保集团有限公司 Simple side slope and trench pre-collapse safety early warning device and method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672375A (en) * 2016-03-31 2016-06-15 广州市城市建设工程监理公司 Automatic monitoring system and method for pit displacement
CN106705831A (en) * 2017-03-15 2017-05-24 山西建筑工程有限公司 Monitoring formwork system deformation device
CN106705831B (en) * 2017-03-15 2023-03-07 山西建筑工程有限公司 Device for monitoring deformation of die carrier system
CN107524152A (en) * 2017-10-13 2017-12-29 中建八局第三建设有限公司 A kind of foundation pit enclosure structure stress bringing device and its construction method
CN108343098A (en) * 2018-02-11 2018-07-31 江苏中路工程检测有限公司 A kind of automatic monitoring system of deep basal pit
CN108917536A (en) * 2018-04-20 2018-11-30 中国十七冶集团有限公司 A kind of deep basal pit horizontal displacement monitoring warning device and its operating method
CN108917536B (en) * 2018-04-20 2020-08-21 中国十七冶集团有限公司 Deep foundation pit horizontal displacement monitoring and alarming device and operation method thereof
CN111676981A (en) * 2020-06-05 2020-09-18 浙江新中源建设有限公司 Foundation pit supporting structure and construction method thereof
CN112211201A (en) * 2020-09-29 2021-01-12 中铁第四勘察设计院集团有限公司 Anti-falling and early warning device for foundation pit steel pipe cross brace
CN112942369A (en) * 2021-02-04 2021-06-11 平煤神马建工集团有限公司 Steel shotcrete autoalarm
CN117095511A (en) * 2023-07-14 2023-11-21 长江生态环保集团有限公司 Simple side slope and trench pre-collapse safety early warning device and method

Similar Documents

Publication Publication Date Title
CN204080880U (en) A kind of prior-warning device of monitoring foundation pit deformation
CN204456242U (en) Existing building foundation pile static loading test device
CN102733615B (en) Unsymmetrical integral lifting construction method
CN204177381U (en) A kind of fiber bragg grating inclinometer device
CN103257644A (en) Method for online monitoring of tailings pond safe state
CN105806311B (en) A kind of optical fiber slope dam is displaced sedimentation monitoring system
CN102799193B (en) Arm frame position control device, concrete mixer
CN102433880A (en) Simply-support guide frame of sinking steel protecting barrel and construction method for sinking steel protecting barrel
CN110189503A (en) A kind of geo-hazard early-warning straggly and guard system
CN107907167A (en) A kind of bridge cable hanging apparatus safety monitoring method and system
CN102367158B (en) Method for determining tower crane roll-over critical state base on rigidity of tower body
CN103953052A (en) Pile-beam-arch steel pipe column construction method
CN204479065U (en) A kind of High Precision Traverses formula tunneling boring stability of slope monitor and early warning system
CN105756334A (en) High-rise building shape steel cantilever scaffold and unloading platform deflection safety monitoring pre-warning device and pre-warning method thereof
CN103604408A (en) Method, device and system for detecting working state parameters of booms and engineering machine
CN110595342A (en) Automatic measuring device for side slope crack displacement
CN203561387U (en) Power-transmission iron-tower safety monitoring system
CN103321468A (en) Guyed triangular truss wind measuring tower
TWM464474U (en) Full optic fiber type entire bridge security monitoring integration system
CN104404888A (en) Large hoisting system allowing gradient to be adjusted in air and application
CN103398706A (en) Concrete pole straightening assisting device
CN211552804U (en) Underground soil deformation measurement packaging module and underground soil deformation measurement system
CN106197235B (en) A kind of bracket for integral hoisting of ship superstructure stress and deformation monitoring method
CN208223472U (en) A kind of falsework settlement monitoring automatic alarm device
CN209723226U (en) A kind of large span steel structure roof entirety lift structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant