CN208650075U - A kind of construction stage catch pit precipitation construction - Google Patents

A kind of construction stage catch pit precipitation construction Download PDF

Info

Publication number
CN208650075U
CN208650075U CN201820888732.2U CN201820888732U CN208650075U CN 208650075 U CN208650075 U CN 208650075U CN 201820888732 U CN201820888732 U CN 201820888732U CN 208650075 U CN208650075 U CN 208650075U
Authority
CN
China
Prior art keywords
construction
drainpipe
catch pit
discharge portion
waterproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820888732.2U
Other languages
Chinese (zh)
Inventor
徐晓平
夏恩磊
季先胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao East Construction Co Ltd
Original Assignee
Qingdao East Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao East Construction Co Ltd filed Critical Qingdao East Construction Co Ltd
Priority to CN201820888732.2U priority Critical patent/CN208650075U/en
Application granted granted Critical
Publication of CN208650075U publication Critical patent/CN208650075U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model relates to catch pit precipitation technical fields, especially a kind of construction stage catch pit precipitation construction, dewatering well including being set to catch pit bottom, filled layer is equipped in dewatering well, drainpipe is equipped in the middle part of dewatering well, drainpipe includes the discharge portion stretched out in above well head, and the water collecting part below well head, discharge portion overhead height is located at the 1/3 of raft plate height, water collecting part is equipped with multiple filtration holes, seal ring is equipped in discharge portion, waterproof layer is equipped in catch pit bottom surface and discharge portion outer wall, the ring pipe for waling waterproof layer is equipped on discharge portion outer wall, self priming pump is connected in drainpipe, after the completion of being equipped at the top of drainpipe for draining, by the closed steel plate of drainpipe, the utility model is easy for construction, it is high-efficient, level of ground water is effectively reduced in the construction process, guarantee waterproof Construction, and can effectively ensure that waterproof effect, construction efficiency is effectively improved, is speeded up the work.

Description

A kind of construction stage catch pit precipitation construction
Technical field
The utility model relates to catch pit precipitation technical field, especially a kind of construction stage catch pit precipitation construction.
Background technique
Recently as the development of construction technology, building foundation pit is constantly extended downwardly.Level of ground water is with foundation excavation depth The increase of degree and it is higher and higher, in order to create anhydrous construction environment after the completion of deep pit digging, the Yield rainfall relation of deep basal pit is aobvious It obtains particularly important.Therefore, effectively Yield rainfall relation is the key that guarantee sole plate waterproof and basic engineering construction quality to catch pit. General precipitation mode water level cannot be down to basement raft plate hereinafter, catch pit position is because absolute altitude is lower, and hydraulic pressure is larger, it is difficult to protect Drainage effect is demonstrate,proved, not can guarantee bottom of foundation ditch moisture content, influences waterproof construction, and it is complicated to construct, and reduces construction quality, delays Project progress.
Summary of the invention
In view of the deficienciess of the prior art, providing a kind of construction stage catch pit precipitation construction, construction is simple, efficiency Level of ground water is effectively reduced in height in the construction process, guarantees waterproof construction, and can effectively ensure that waterproof effect, effectively improves and apply Work efficiency rate, speeds up the work.
Technical problem to be solved in the utility model adopts the technical scheme that, a kind of construction stage catch pit precipitation Construction, the dewatering well that the diameter including being set to catch pit bottom is 1 meter, the dewatering well is interior to be filled with partial size 30mm-50mm Rubble composition for filling the filled layer of dewatering well, the drainpipe that a diameter is 100mm is equipped in the middle part of dewatering well, it is described Drainpipe includes the discharge portion stretched out in above well head, and the water collecting part below well head, discharge portion overhead height position At the 1/3 of raft plate height, water collecting part is equipped with multiple filtration holes for impurity screening, and the drainage bore dia is 5mm, Discharge portion is equipped with seal ring, and the seal ring is away from catch pit bottom 30cm, in catch pit bottom surface and discharge portion outer wall Equipped with waterproof layer, it is equipped with the ring pipe for waling waterproof layer on discharge portion outer wall, is connected with one in drainpipe and is used for The self priming pump that the water of water collecting part is sucked and discharged, it is after the completion of being equipped at the top of drainpipe for draining, drainpipe is closed Steel plate.
A kind of above-mentioned construction stage catch pit precipitation construction, the waterproof layer are polymer cement waterproof paint layer, prevent Water sand pulp layer or waterproof roll layer.
A kind of beneficial effect of construction stage catch pit precipitation construction of the utility model is, by the straight of catch pit bottom Diameter is 1 meter of dewatering well, can be effectively reduced the level of ground water of catch pit, good work surface is provided for waterproof construction, in well The filled layer for being used to fill dewatering well of rubble composition filled with partial size 30mm-50mm, is equipped with a diameter in the middle part of dewatering well For the drainpipe of 100mm, filtration hole is set, and top tube wall is equipped with seal ring, in catch pit bottom on the tube wall of drainpipe bottom Tube wall is equipped with waterproof layer at the top of surface and drainpipe, and tube wall is equipped with the annular for waling waterproof layer at the top of drainpipe Pipe effectively prevents concrete water-permeating, and constructs raft plate without influence, ensure that the globality and intensity of structure, in drainpipe It is inside connected with a self priming pump for sucking and discharging the water of water collecting part, after the completion of being equipped at the top of drainpipe for draining, By the closed steel plate of drainpipe, the utility model is easy for construction, high-efficient, and level of ground water is effectively reduced in the construction process, protects Waterproof construction is demonstrate,proved, and can effectively ensure that waterproof effect, construction efficiency is effectively improved, speeds up the work.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Specific embodiment
With reference to the accompanying drawing and specific embodiment elaborates to the utility model.
As shown in Figure 1, a kind of construction stage catch pit precipitation construction, the diameter including being set to catch pit bottom is 1 meter Dewatering well 1, can be effectively reduced the level of ground water of catch pit, provide good work surface, the dewatering well for waterproof construction The filled layer 2 for being used to fill dewatering well of the interior rubble composition filled with partial size 30mm-50mm, guarantees to catchment smooth, in precipitation The drainpipe 3 that a diameter is 100mm is equipped in the middle part of well, drainpipe includes the discharge portion stretched out in above well head, and is located at well head The water collecting part of lower section, the discharge portion overhead height are located at the 1/3 of raft plate height, and water collecting part is equipped with multiple miscellaneous for filtering The filtration hole 4 of matter, the drainage bore dia be 5mm, effective impurity screening, in discharge portion be equipped with seal ring 5, seal ring 5 away from Catch pit bottom 30cm, is equipped with waterproof layer in catch pit bottom surface and discharge portion outer wall, and the waterproof layer is asphalt felt Layer, at low cost, service life is long, easy for construction, and the ring pipe 6 for waling waterproof layer is equipped on discharge portion outer wall, Concrete water-permeating is effectively prevented, and constructs raft plate without influence, the globality and intensity of structure is ensure that, connects in drainpipe Being connected to a self priming pump for sucking and discharging the water of water collecting part will arrange after the completion of being equipped at the top of drainpipe for draining The closed steel plate 7 of water pipe.
Specific construction process are as follows:
1. in the dewatering well of catch pit inner excavation diameter 1m.
2. pre-buried diameter 100 is with seal ring steel pipe (surrounding is 5mm filtration hole).
3. partial size is used to be filled for 30mm-50mm rubble.
4. cushion construction, waterproof construction, waterproof protective layer are constructed.
5. after use microlith water-proof concrete filling drainpipe after the completion of precipitation and use steel plate solder up.
Certainly, above description is not limitation of the utility model, and the utility model is also not limited to the example above, this The variations, modifications, additions or substitutions that the those of ordinary skill of technical field is made in the essential scope of the utility model, It should belong to the protection scope of the utility model.

Claims (2)

1. a kind of construction stage catch pit precipitation construction, which is characterized in that the diameter including being set to catch pit bottom is 1 meter Dewatering well, the filled layer for being used to fill dewatering well that the interior rubble filled with partial size 30mm-50mm of the dewatering well forms, is dropping The drainpipe that a diameter is 100mm is equipped in the middle part of well, the drainpipe includes the discharge portion stretched out in above well head, and is located at Water collecting part below well head, the discharge portion overhead height are located at the 1/3 of raft plate height, and water collecting part is equipped with multiple be used for The filtration hole of impurity is filtered, the drainage bore dia is 5mm, seal ring is equipped in discharge portion, the seal ring is away from catch pit bottom Portion 30cm is equipped with waterproof layer in catch pit bottom surface and discharge portion outer wall, is equipped on discharge portion outer wall for by waterproof The ring pipe that layer is waled is connected with a self priming pump for sucking and discharging the water of water collecting part, in drainpipe in drainpipe After the completion of top is equipped with for draining, by the closed steel plate of drainpipe.
2. a kind of construction stage catch pit precipitation construction according to claim 1, characterized in that the waterproof layer is pitch Coiled material layer.
CN201820888732.2U 2018-06-08 2018-06-08 A kind of construction stage catch pit precipitation construction Expired - Fee Related CN208650075U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820888732.2U CN208650075U (en) 2018-06-08 2018-06-08 A kind of construction stage catch pit precipitation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820888732.2U CN208650075U (en) 2018-06-08 2018-06-08 A kind of construction stage catch pit precipitation construction

Publications (1)

Publication Number Publication Date
CN208650075U true CN208650075U (en) 2019-03-26

Family

ID=65779807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820888732.2U Expired - Fee Related CN208650075U (en) 2018-06-08 2018-06-08 A kind of construction stage catch pit precipitation construction

Country Status (1)

Country Link
CN (1) CN208650075U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236283A (en) * 2020-01-06 2020-06-05 南通八建集团有限公司 Local continuous precipitation method for deep foundation pit water collection pit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236283A (en) * 2020-01-06 2020-06-05 南通八建集团有限公司 Local continuous precipitation method for deep foundation pit water collection pit

Similar Documents

Publication Publication Date Title
CN103088836A (en) Sedimentation control method for pumping water and performing reinjection in well casing simultaneously
CN111691425B (en) Water conservancy project foundation pit and pipe well combined light well point dewatering and drainage method
CN109736340A (en) A kind of sole plate reserves the dewatering device and method of dewatering well guarantee bed course integrality
CN105569094A (en) Water discharge and drainage system and construction method adopting basement bottom plate water buoyant force releasing method
CN101691840B (en) Water level observation well and construction method thereof
CN111456055A (en) Foundation pit dewatering construction method
CN208650075U (en) A kind of construction stage catch pit precipitation construction
CN208803479U (en) A kind of tube pile structure as dewatering well
CN212772427U (en) Building construction foundation ditch drainage device
CN110670613B (en) Foundation pit elevator shaft water seepage prevention structure and construction method thereof
CN205077527U (en) Drainage system is dredged to basement bottom plate release water buoyancy method
CN209114425U (en) A kind of irrigation canals and ditches that can normally use in a variety of contexts
CN111733894A (en) Anti-floating system of deep foundation pit underground structure and construction process
CN218148458U (en) Deep water deep foundation pit drainage system of fissure development rock stratum
CN103726514B (en) The anti-leakage structure of diaphragm wall and anti-seepage construction method
CN103114605B (en) Anti-seepage drainage layer structure and construction method
CN206859091U (en) A kind of coarse-grained soil high-fill roadbed discharge structure
CN216379604U (en) Foundation pit high-temperature bedrock crack water drainage and plugging structure
CN111549807B (en) Water lowering and draining method combining water conservancy project foundation pit and pipe well with light well point
CN210946854U (en) Anti-seepage structure of foundation pit elevator shaft
CN106013046B (en) Varying stress path well point plastic strip vacuum preloading seepage consolidation hierarchical loading method
CN212175794U (en) Deep basal pit falls and arranges two unification sump pit structures
CN103306299A (en) Comprehensive waterproof and drainage construction method of basement exterior wall of super-high-rise building
CN204435321U (en) A kind of steam power station water intaking open channel
CN107178043A (en) A kind of coarse-grained soil high-fill roadbed discharge structure and its construction technology

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190326

Termination date: 20200608