CN208650011U - A kind of anti-skid structure of rock-fill dams spillway on dam body - Google Patents
A kind of anti-skid structure of rock-fill dams spillway on dam body Download PDFInfo
- Publication number
- CN208650011U CN208650011U CN201821152472.9U CN201821152472U CN208650011U CN 208650011 U CN208650011 U CN 208650011U CN 201821152472 U CN201821152472 U CN 201821152472U CN 208650011 U CN208650011 U CN 208650011U
- Authority
- CN
- China
- Prior art keywords
- bottom slab
- chute bottom
- spillway
- skid
- rock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model provides a kind of anti-skid structure of rock-fill dams spillway on dam body, including upper chute bottom slab, armored concrete anchor beam, lets out slot transverse joint and lower chute bottom slab;The upper chute bottom slab and the alignment setting of lower chute bottom slab upstream face, upper chute bottom slab are connected by junction of the edges of two sheets of paper reinforcing bar with lower chute bottom slab, are equipped in the side of upper chute bottom slab and lower chute bottom slab and let out trough rim wall, and the other side is equipped with anti-skid foot;The slot transverse joint of letting out is fold-type, and the upper section for letting out slot transverse joint, which is vertically arranged in, lets out trough rim within the walls, and the lower section for letting out slot transverse joint is vertical with upper chute bottom slab, is arranged in upper chute bottom slab;One side of the anti-skid foot is connect with upper chute bottom slab, and another side is connect with lower chute bottom slab;The armored concrete anchor beam is connect by anchor lacing wire with lower chute bottom slab.The utility model cancels aeration slot structure, and for small flow, the spillway required without cavitation prevention, structure is relatively easy, can reduce construction investment by reducing aeration slot and anti-skid plate.
Description
Technical field
The utility model relates to a kind of anti-skid structures of rock-fill dams spillway on dam body, belong to hydraulic and hydroelectric engineering hydro-structure skill
Art field.
Background technique
Rock-fill dams spillway on dam body can effectively avoid bank slope formula spillway heavy excavation and issuable high slope treatment from asking
Topic, while construction investment is reduced, how to solve the problems, such as that its antiskid is particularly significant.
Slot segmentation mainly will be let out using aeration slot both at home and abroad at present, each section of bottom plate uses stacked tile type construction to connect in the longitudinal direction
It connects, i.e., upper section bottom plate and lower section bottom plate are overlapped in aeration slot and choose under bank and form transverse joint.Slot is let out for reinforcement to connect with rockfill,
A horizontal anti-slide slab is set on the top of every section of aeration slot, and level gos deep into enrockment dam body, then with the reinforcing bar for being surrounded by fines concrete, anchor
It is fixed in rockfill, specific structure is as shown in Figure 1;Its main feature is that by horizontal anchor structure by chute bottom slab " suspension " in enrockment
On the dam slope of downstream.
In the prior art, many medium and small project vent flows are small, and flow velocity is little, consider from hydraulics merely, no
It will appear cavitation corrosion, do not need setting aeration slot, one kind as disclosed in the Chinese patent application No. is 2016214517893 is overflow big vast
Road.And it is current let out slot stacked tile type segmentation connection need to be using aeration slot, therefore the effect of aeration slot fails to make full use of, and being arranged should
Structure can also improve difficulty of construction, while the anti-skid plate being arranged is thin-slab structure, and enrockment in its vicinity rolls need to be using artificial
It is backfilling and compacted, is not easy to construct, be easy to produce weak link in the area, such as application No. is 2005200147197 Chinese patent public affairs
The reinforced concrete face rockfill dam spillway on dam body opened.
Utility model content
In order to solve the above technical problems, the utility model provides a kind of anti-skid structure of rock-fill dams spillway on dam body, the heap
The anti-skid structure of masonry dam spillway on dam body is not provided with aeration slot, reduces the difficulty of construction of spillway on dam body, while guaranteeing that enrockment fills
Compactness, avoid above-mentioned various problems.
The utility model is achieved by the following technical programs.
A kind of anti-skid structure of rock-fill dams spillway on dam body provided by the utility model, including upper chute bottom slab, reinforced concrete
Native anchor beam lets out slot transverse joint and lower chute bottom slab;The upper chute bottom slab and the alignment setting of lower chute bottom slab upstream face, above let out slot bottom
Plate is connected with lower chute bottom slab by junction of the edges of two sheets of paper reinforcing bar, is equipped in the side of upper chute bottom slab and lower chute bottom slab and is let out trough rim wall, separately
Side is equipped with anti-skid foot;The slot transverse joint of letting out is fold-type, and the upper section for letting out slot transverse joint, which is vertically arranged in, lets out trough rim within the walls, lets out slot transverse joint
Lower section it is vertical with upper chute bottom slab, be arranged between upper chute bottom slab and lower chute bottom slab;One side of the anti-skid foot with it is upper
Chute bottom slab connection, another side is connect with lower chute bottom slab;The armored concrete anchor beam passes through anchor lacing wire and lower chute bottom slab
Connection.
The anti-skid foot is the anti-skid foot of V-groove, and anti-skid foot is on one side vertical plane, is connect with upper chute bottom slab, another side
For horizontal plane, it is connect with lower chute bottom slab.
The side length of the anti-skid foot horizontal plane is equal with the thickness of upper chute bottom slab, lower chute bottom slab.
The connecting portion on one side that the upper chute bottom slab is connect with anti-skid foot is filled with pitch.
The anchor lacing wire is that " [" shape, one end of anchor lacing wire and lower chute bottom slab reinforcement welding, the other end are inserted into reinforced concrete
In native anchor beam.
The surface of the anchor lacing wire is socketed with stainless steel tube, and there are gaps between anchor lacing wire and stainless steel tube.
Mortar is filled in the gap.
The junction of the edges of two sheets of paper reinforcing bar not with let out slot contraction joint contact.
The utility model has the beneficial effects that:
1. cancelling aeration slot structure, for small flow, the spillway required without cavitation prevention, structure is relatively easy;
2. upper and lower chute bottom slab upstream face flushes, flow condition is preferable;
3. construction investment can be reduced by reducing aeration slot and anti-skid plate.
Detailed description of the invention
Fig. 1 is the structural schematic diagram in the utility model background technique;
Fig. 2 is the structural schematic diagram of the utility model;
Fig. 3 is the utility model anchor lacing wire drawing in side sectional elevation;
In figure: the upper chute bottom slab of 1-, chute bottom slab under 11-, 2- anchor lacing wire, 3- armored concrete anchor beam, 4- let out trough rim wall,
5- lets out slot transverse joint, 6- junction of the edges of two sheets of paper reinforcing bar, 7- stainless steel tube, 8-M30 mortar.
Specific embodiment
Be described further below the technical solution of the utility model, but claimed range be not limited to it is described.
As shown in Fig. 2, a kind of anti-skid structure of rock-fill dams spillway on dam body, including upper chute bottom slab 1, armored concrete anchor beam
3, slot transverse joint 5 and lower chute bottom slab 11 are let out;The upper chute bottom slab 1 and the alignment setting of lower 11 upstream face of chute bottom slab, above let out slot
Bottom plate 1 and lower chute bottom slab 11 make chute bottom slab 1 and lower chute bottom slab 11 form entirety by 6 anchor connection of junction of the edges of two sheets of paper reinforcing bar
Structure will not be equipped in the side of upper chute bottom slab 1 and lower chute bottom slab 11 because of local bottom plate unstability caused by flowing pressure and let out slot
Abutment wall 4, the other side are equipped with anti-skid foot;The slot transverse joint 5 of letting out is fold-type, and the upper section for letting out slot transverse joint 5, which is vertically arranged in, lets out trough rim wall 4
Interior, the lower section for letting out slot transverse joint 5 is vertical with upper chute bottom slab 1, and the lower section setting for letting out slot transverse joint 5 lets out slot under in upper chute bottom slab 1
Between bottom plate 11;One side of the anti-skid foot is connect with upper chute bottom slab 1, and another side is connect with lower chute bottom slab 11;The steel
Reinforced concrete anchor beam 3 is connect by anchor lacing wire 2 with lower chute bottom slab 11.
The anti-skid foot is the anti-skid foot of V-groove, and anti-skid foot is on one side vertical plane, is connect with upper chute bottom slab 1, another side
For horizontal plane, it is connect with lower chute bottom slab 11.
The side length of the anti-skid foot horizontal plane is equal with upper chute bottom slab 1, the thickness of lower chute bottom slab 11.
The connecting portion on one side that the upper chute bottom slab 1 is connect with anti-skid foot is filled with pitch.
The anchor lacing wire 2 is that " [" shape, the short one end of anchor lacing wire 2 and lower 11 reinforcement welding of chute bottom slab, the short other end are inserted
Enter in armored concrete anchor beam 3.
The surface of the anchor lacing wire 2 is socketed with stainless steel tube 7, and there are gaps between anchor lacing wire 2 and stainless steel tube 7, such as
Shown in Fig. 3.
Mortar 8 is filled in the gap.
The junction of the edges of two sheets of paper reinforcing bar 6 not with let out slot transverse joint 5 and contact, i.e., junction of the edges of two sheets of paper reinforcing bar 6 lets out slot bottom in connection across slot transverse joint 5 is let out
Plate 1 and lower chute bottom slab 11.
Preferably, anchor lacing wire 2, armored concrete anchor beam 3 carry out simultaneously with dam filing, after dam body settlement is stablized, office
Portion's slot digs out the anti-skid foot vertical plane of V-groove and horizontal plane, then pours lower chute bottom slab 11, the anti-skid foot of V-groove and lets out under
Trough floor 11 lets out trough rim wall 4, and default junction of the edges of two sheets of paper reinforcing bar 6, then pours chute bottom slab 1 and let out slot close to upper chute bottom slab 1
Abutment wall 4.
Embodiment
As described above, the overall length of anchor lacing wire 2 be 9m, housing diameter be 100mm stainless steel tube 7, it is interior with M30 mortar 8 into
Row filling, a length of 0.38m of the hook of one end that anchor lacing wire 2 is connect with armored concrete anchor beam 3, the length anchored into is 0.45m, under
The a length of 0.2m of hook of one end that chute bottom slab 11 connects;Upper chute bottom slab 1 and lower chute bottom slab 11 with a thickness of 60cm, let out trough rim
The vertical height of wall is 2m;The width for letting out slot transverse joint is 5mm, and the length of junction of the edges of two sheets of paper reinforcing bar 6 is 1.2m, and junction of the edges of two sheets of paper reinforcing bar 6 is apart from above letting out
The top 0.15m of trough floor 1, the bottom end .15m apart from lower chute bottom slab 11, anti-skid foot overlap the length into upper chute bottom slab 1 and are
1.36m takes pitch the thickness 2cm, the anti-skid high 1.5m of foot vertical plane, the long 2.5m of horizontal plane of access section filling.
Claims (8)
1. a kind of anti-skid structure of rock-fill dams spillway on dam body, including upper chute bottom slab (1), armored concrete anchor beam (3), let out slot cross
Stitch (5) and lower chute bottom slab (11), it is characterised in that: the upper chute bottom slab (1) and the alignment of lower chute bottom slab (11) upstream face
Setting, upper chute bottom slab (1) and lower chute bottom slab (11) by junction of the edges of two sheets of paper reinforcing bar (6) connection, upper chute bottom slab (1) and under let out slot
The side of bottom plate (11) is equipped with and lets out trough rim wall (4), and the other side is equipped with anti-skid foot;Described let out slot transverse joint (5) are fold-type, let out slot transverse joint
(5) upper section, which is vertically arranged in, to be let out in trough rim wall (4), and the lower section for letting out slot transverse joint (5) is vertical with upper chute bottom slab (1), and setting exists
Between upper chute bottom slab (1) and lower chute bottom slab (11);One side of the anti-skid foot is connect with upper chute bottom slab (1), another side
It is connect with lower chute bottom slab (11);The armored concrete anchor beam (3) is connect by anchor lacing wire (2) with lower chute bottom slab (11).
2. the anti-skid structure of rock-fill dams spillway on dam body as described in claim 1, it is characterised in that: the anti-skid foot is V-groove
Anti-skid foot, anti-skid foot is on one side vertical plane, is connect with upper chute bottom slab (1), another side is horizontal plane, with lower chute bottom slab
(11) it connects.
3. the anti-skid structure of rock-fill dams spillway on dam body as claimed in claim 2, it is characterised in that: the anti-skid foot horizontal plane
Side length is equal with the thickness of upper chute bottom slab (1), lower chute bottom slab (11).
4. the anti-skid structure of rock-fill dams spillway on dam body as described in claim 1, it is characterised in that: the upper chute bottom slab (1)
The connecting portion on the one side connecting with anti-skid foot is filled with pitch.
5. the anti-skid structure of rock-fill dams spillway on dam body as described in claim 1, it is characterised in that: the anchor lacing wire (2) be " ["
Shape, one end of anchor lacing wire (2) and lower chute bottom slab (11) reinforcement welding, the other end are inserted into armored concrete anchor beam (3).
6. the anti-skid structure of rock-fill dams spillway on dam body as described in claim 1, it is characterised in that: the table of the anchor lacing wire (2)
Surface cover is connected to stainless steel tube (7), and there are gaps between anchor lacing wire (2) and stainless steel tube (7).
7. the anti-skid structure of rock-fill dams spillway on dam body as claimed in claim 6, it is characterised in that: be filled with sand in the gap
It starches (8).
8. the anti-skid structure of rock-fill dams spillway on dam body as described in claim 1, it is characterised in that: the junction of the edges of two sheets of paper reinforcing bar (6) is no
It is contacted with slot transverse joint (5) is let out.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821152472.9U CN208650011U (en) | 2018-07-20 | 2018-07-20 | A kind of anti-skid structure of rock-fill dams spillway on dam body |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821152472.9U CN208650011U (en) | 2018-07-20 | 2018-07-20 | A kind of anti-skid structure of rock-fill dams spillway on dam body |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208650011U true CN208650011U (en) | 2019-03-26 |
Family
ID=65785215
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821152472.9U Active CN208650011U (en) | 2018-07-20 | 2018-07-20 | A kind of anti-skid structure of rock-fill dams spillway on dam body |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208650011U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114032850A (en) * | 2021-11-05 | 2022-02-11 | 中水珠江规划勘测设计有限公司 | Anti-sliding anchoring structure of spillway at top of rock-fill dam and construction method of anti-sliding anchoring structure |
-
2018
- 2018-07-20 CN CN201821152472.9U patent/CN208650011U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114032850A (en) * | 2021-11-05 | 2022-02-11 | 中水珠江规划勘测设计有限公司 | Anti-sliding anchoring structure of spillway at top of rock-fill dam and construction method of anti-sliding anchoring structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104695380B (en) | The shore protection structure of a kind of plastic-steel sheet pile and concrete combination | |
CN108385627A (en) | Power station diversion tunnel plugging construction method based on karst landform | |
CN112695809A (en) | Structure and method for preventing downward-lying tunnel from floating upwards due to river channel excavation | |
CN208650011U (en) | A kind of anti-skid structure of rock-fill dams spillway on dam body | |
CN108677891A (en) | A kind of anti-skid structure of rock-fill dams spillway on dam body | |
CN212153472U (en) | Underground continuous wall water stop structure | |
CN210887094U (en) | Gravity wharf upgrading structure | |
CN207987930U (en) | One kind exempting from precipitation foundation pit supporting construction | |
CN110725717A (en) | Water plugging structure for ore body roadway | |
CN205475098U (en) | Panel rock -fill dam seepage prevention structure | |
CN205296164U (en) | Fill ability of swimming slip form construction device | |
CN207934019U (en) | A kind of steel reinforcement cage of the diaphram wall with grouting device | |
CN201406678Y (en) | Linkage structure of gravity dam and unfavorable geological bank slope | |
CN210737471U (en) | Broken line type concrete face dam connection plate structure | |
CN211036890U (en) | Narrow toe board structure of ultrahigh panel dam for narrow river valley deep and thick silt covering layer | |
CN206428864U (en) | A kind of inner wall structure | |
CN106192909A (en) | A kind of rock reducing panel stress strain level and method | |
CN111379251A (en) | Controllable rigid pile and compacted gravel pile combined composite foundation and construction method thereof | |
CN104863085A (en) | Guide wall adopting steel structure | |
CN110029635A (en) | A kind of rock-fill dams spillway based on concrete-pile support | |
CN206570767U (en) | The case base analysis on aqueduct structure being arranged in parallel suitable for double flute | |
CN205804278U (en) | A kind of assembled long piled wharf superstructure system | |
CN205421329U (en) | Contrary coincide underground continuous wall that does of a core section of thick bamboo | |
CN205421332U (en) | Contrary coincide underground continuous wall that does of a core section of thick bamboo | |
CN212582925U (en) | Water retaining ridge antiseep system between kitchen and bathroom |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |