CN208635862U - A kind of fairing of fluid flowmeter automatic adjustment circulation area - Google Patents

A kind of fairing of fluid flowmeter automatic adjustment circulation area Download PDF

Info

Publication number
CN208635862U
CN208635862U CN201821465865.5U CN201821465865U CN208635862U CN 208635862 U CN208635862 U CN 208635862U CN 201821465865 U CN201821465865 U CN 201821465865U CN 208635862 U CN208635862 U CN 208635862U
Authority
CN
China
Prior art keywords
orifice plate
level
rectifier cell
shell
rectification
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821465865.5U
Other languages
Chinese (zh)
Inventor
王贵周
刘萍
孙大力
冯志玉
殷明华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Start Measurement Control Equipment Co Ltd
Original Assignee
Shandong Start Measurement Control Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Start Measurement Control Equipment Co Ltd filed Critical Shandong Start Measurement Control Equipment Co Ltd
Priority to CN201821465865.5U priority Critical patent/CN208635862U/en
Application granted granted Critical
Publication of CN208635862U publication Critical patent/CN208635862U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measuring Volume Flow (AREA)

Abstract

The utility model discloses a kind of fluid flowmeter fairings of automatic adjustment circulation area, including shell, one end of shell is equipped with liquid-inlet, the other end of shell is equipped with liquid outlet, level-one rectifier cell and second level rectifier cell are equipped in the shell, level-one rectifier cell is arranged at liquid-inlet, and second level rectifier cell is arranged between liquid outlet, level-one rectifier cell, second level rectifier cell and shell along water (flow) direction is formed with liquid chamber.It has the advantage that the problem for overcoming the metering inaccuracy that flow disturbance in the prior art causes flowmeter, automatically adjusts circulation area, the precision and accuracy of flowmeter detection fluid flow rate can be improved.

Description

A kind of fairing of fluid flowmeter automatic adjustment circulation area
Technical field
The utility model relates to a kind of fluid flowmeter fairings, specifically, are related to a kind of suitable for liquid flow Meter, to the device of the rectification of liquid and automatic adjustment circulation area, belongs to automation instrument technology field in metering.
Background technique
In measurement technology, flowmeter is the important component of metering Instrument equipment, and flowmeter obtains in each field It is widely applied, and pushes and support the continuous development of national economy.But much all there is a defect in installation flowmeter, It is exactly the size disunity at the positions such as fluid-transporting tubing and flowmeter entrance, leads to the reduction of fluid measurement accuracy, especially When big flow flows through, the disturbance of fluid directly affects detection sensitivity and precision.
Summary of the invention
Problem to be solved in the utility model is against the above deficiency, to provide a kind of fluid flowmeter automatic adjustment circulation The fairing of area overcomes the problem that flow disturbance in the prior art causes the metering inaccuracy of flowmeter, automatic adjustment stream The precision and accuracy of flowmeter detection fluid flow rate can be improved in logical area.
To solve the above-mentioned problems, the utility model uses following technical scheme:
A kind of fairing of fluid flowmeter automatic adjustment circulation area, including shell, one end of shell are equipped with liquid Body import, the other end of shell are equipped with liquid outlet, are equipped with level-one rectifier cell and second level rectifier cell, level-one in the shell Rectifier cell is arranged at liquid-inlet, and second level rectifier cell is arranged along water (flow) direction in liquid outlet, level-one rectifier cell, Liquid chamber is formed between second level rectifier cell and shell.
Further, the level-one rectifier cell includes adjustable screens, and one end of adjustable screens is equipped with baffle, adjustable The other end of screens is connected with first flange disk, and baffle is closed at one end by adjustable screens.
Further, the baffle is equipped with fixing axle, and First elastic component covers in fixing axle, and First elastic component connects The both ends of baffle are connect, baffle is slided along fixing axle.
Further, the adjustable screens are telescopic cylindricals, and adjustable screens are equipped with several adjustable screens Hole, adjustable screens be it is telescopic, the bores of adjustable screens is less than the bore of shell.
Further, the second level rectifier cell include preposition rectification orifice plate, postposition rectification orifice plate, preposition rectification orifice plate with Postposition is rectified and is connected between orifice plate by second elastic component, and preposition rectification orifice plate and postposition rectification orifice plate are equipped with marshalling Axially extending bore, preposition rectification orifice plate, postposition rectification orifice plate be closely arranged, preposition rectification orifice plate is positioned close to housing outlets one End, postposition rectification orifice plate are arranged far from housing outlets one end.
Further, the edge of the preposition rectification orifice plate is equipped with thread spindle, and the inner tubal wall of shell is sliding equipped with screw thread Slot, thread spindle are arranged in screw thread sliding slot.
Further, the rotation that the preposition rectification orifice plate is carried out by thread spindle, preposition rectification orifice plate and horizontal direction Angle be it is adjustable, when rectification preposition rectification orifice plate and horizontal direction angle be 22.5 ° -45 °.
Further, the postposition rectification orifice plate is equipped with translation shaft, and shell is equipped with slideway, and translation shaft is inserted into slideway In, translation shaft is slided along slideway, and postposition rectification orifice plate can be moved by translation shaft along slideway, and postposition rectifies orifice plate energy It is enough mobile by translation direction of own axes, and self adjustment is carried out by second elastic component.
Further, the both ends of the shell are respectively provided with first flange disk and second flange disk, and second level rectifier cell also wraps Include tube bank, tube bank is mounted on second flange disk, is restrained as tubular, and tube bank is equipped with several pores.
Further, the level-one rectifier cell is adjustable cylindrical body, and level-one rectifier cell is equipped with radial through-hole, passes through Radial through-hole size in the water flow size self-control cylindrical body flowed through.
Further, the second level rectifier cell is rectification orifice plate, and second level rectifier cell is equipped with several axially extending bores, Pass through axially extending bore size in the water flow velocity size self-control cylindrical body that flows through.
The utility model is had the following technical effect that compared with prior art using above technical scheme
Liquid is entered by liquid-inlet, carries out the tubular screens of self adjustment by water flow size into one, regardless of How is flow rate of liquid before liquid-inlet, and when tubular screens bore is less than housing cross-sectional, only tubular screens can be for Fluid circulation, baffle can play the role of stopping fluid, the area of fluid circulation be reduced, then the feelings that the flow of fluid is certain Under condition, flow velocity is necessarily increased, and washing away for fluid convection meter detecting element becomes apparent from, and the detecting element of flowmeter can be sensitiveer Ground detects the flowing of fluid, and such fairing significantly improves the sensitivity of fluid detection, not only reduces waste and damage It loses and energy-saving.
Liquid enters another part shell after the adjustable rectifier cell of level-one, and liquid flows through second level rectifier cell, second level Rectifier cell rectifies liquid again, and after second level rectifies, flow velocity is higher more stable, so that the measurement accuracy of flowmeter It is high, error is small, strong antijamming capability.
The utility model is described in detail with reference to the accompanying drawings and examples.
Detailed description of the invention
Attached drawing 1 is the structural schematic diagram of the adjustable fairing of liquid in the utility model embodiment;
Attached drawing 2 is the structural schematic diagram that postposition rectifies orifice plate in the utility model embodiment;
Attached drawing 3 is preposition rectification AND DEWATERING FOR ORIFICE STRUCTURE schematic diagram in the utility model embodiment;
Attached drawing 4 is the left view of level-one rectifier cell in attached drawing 1;
Partial sectional view of the attached drawing 5 for screens compression power adjustable in attached drawing 1 when smaller;
Partial sectional view of the attached drawing 6 for screens compression power adjustable in attached drawing 1 when larger;
Attached drawing 7 is the preposition rectification orifice plate of second level rectifier cell in attached drawing 1 from the horizontal by 0 ° of angle schematic diagram;
Attached drawing 8 is the preposition rectification orifice plate of second level rectifier cell in attached drawing 1 from the horizontal by 15 ° of angle schematic diagrames;
Attached drawing 9 is the preposition rectification orifice plate of second level rectifier cell in attached drawing 1 from the horizontal by 22.5 ° of angle schematic diagrames;
Attached drawing 10 is the preposition rectification orifice plate of second level rectifier cell in attached drawing 1 from the horizontal by 30 ° of angle schematic diagrames;
Attached drawing 11 is the preposition rectification orifice plate of second level rectifier cell in attached drawing 1 from the horizontal by 45° angle schematic diagram;
Attached drawing 12 is the left view of tubular tube bank in second level rectifier cell in attached drawing 1;
Attached drawing 13 is the schematic diagram of preposition rectification orifice plate running track;
In figure,
1- shell, 2- First elastic component, 3- is adjustable screens, 4- baffle, the preposition rectification orifice plate of 5-, 6- postposition rectification hole Plate, 7- is adjustable screens hole, 8- translation shaft, 9- thread spindle, 10- liquid chamber, 11- liquid-inlet, 12- axially extending bore, 13- level-one Rectifier cell, 14- second level rectifier cell, 15- slideway, 16- second elastic component, 17- pore, 18- tube bank, 19- first flange Disk, 20- second flange disk.
Specific embodiment
Embodiment 1, as shown in Fig. 1-Figure 13, a kind of fairing of fluid flowmeter automatic adjustment circulation area, packet Shell 1 is included, one end of shell 1 is equipped with liquid-inlet 11, and the other end of shell 1 is equipped with liquid outlet, and it is whole to be equipped with level-one in shell 1 Fluid element 13 and second level rectifier cell 14, level-one rectifier cell 13 are arranged at liquid-inlet 11, and second level rectifier cell 14 is along water Direction is flowed to be arranged in liquid outlet.
Liquid chamber 10, level-one rectification member are formed between the level-one rectifier cell 13, second level rectifier cell 14 and shell 1 Part 13 includes adjustable screens 3, and one end of adjustable screens 3 is equipped with baffle 4, and the other end of adjustable screens 3 is connected with first Ring flange 19, baffle 4 is closed at one end by the adjustable rectification 3 of tubular, and baffle 4 is equipped with fixing axle 21, and 2 sets of First elastic component exists In fixing axle 21, First elastic component 2 connects the both ends of baffle 4, and baffle 4 is slided along fixing axle 21.
The adjustable screens 3 are telescopic cylindricals, and adjustable screens 3 are equipped with several adjustable screens holes 7, adjustable Screens 3 be it is telescopic, the bores of adjustable screens 3 is less than the bore of shell 1.
Shown in the amount of tension of the First elastic component 2, the following formula of relationship of adjustable screens 3 and water flow velocity v:
Formula 1
Wherein: the spring ratio of First elastic component;V: water flow velocity;K: according to the parameter of each bore actual measurement, (k is normal Number);L: the length of screens when First elastic component original state;X: the amount of tension of First elastic component;D: the diameter of baffle.
From formula 1 as can be seen that water flow velocity v increases, the amount of tension x of First elastic component increases, and the circulation of water just increases Greatly, to realize the relationship of automatic adjustment flow velocity and screens circulation, achieve the effect that steadily to rectify.
When water flow is smaller, water flow is smaller to the pressure of baffle 4, and 2 elongation of First elastic component is smaller, so that adjustable The mesh of screens 3 is stretched smaller (as shown in Figure 5), so that water flow is also smaller;Similarly, when water flow is larger When, water flow is larger to the pressure of baffle 4, and 2 elongation of First elastic component is bigger, so that the mesh of adjustable screens 3 is drawn That stretches is bigger (as shown in Figure 6), so that water flow is also bigger.
The second level rectifier cell 14 includes preposition rectification orifice plate 5, postposition rectification orifice plate 6, preposition rectification orifice plate 5 and postposition It is connected between rectification orifice plate 6 by second elastic component 16, preposition rectification orifice plate 5 and postposition rectification orifice plate 6 are whole equipped with arranging Neat axially extending bore 12, preposition rectification orifice plate 5, postposition rectification orifice plate 6 are closely arranged, and preposition rectification orifice plate 5 is positioned close to shell Body exit end, postposition rectification orifice plate 6 are arranged far from housing outlets one end.
The edge of the preposition rectification orifice plate 5 is equipped with thread spindle 9, and the inner tubal wall of shell 1 is equipped with screw thread sliding slot, screw thread Axis 9 is arranged in screw thread sliding slot, and as shown in fig.7-12, preposition rectification orifice plate 5 passes through the rotation that thread spindle 9 carries out, preposition rectification Orifice plate 5 with horizontal direction angle be it is adjustable, when rectification preposition rectification orifice plate 5 and horizontal direction angle be 22.5 ° -45 °, currently Set rectification orifice plate 5 and horizontal direction angle once at 0 °, 15 °, 22.5 ° when, water by it is preposition rectify orifice plate 5 circulation area be Be gradually reduced, when preposition rectification hole plate 5 with horizontal direction angle once at 22.5 °, 30 °, 45 ° when, water is in preposition rectification hole The circulation area of plate 5 is gradually increased, so during installation, the original state of elastomeric element is preposition rectification orifice plate 5 and water Flat angular separation is at 22.5 ° of states.
The postposition rectification orifice plate 6 is equipped with translation shaft 8, and shell is equipped with slideway 15, and translation shaft 8 is inserted into slideway 15 In, translation shaft 8 is slided along slideway 15, and postposition rectification orifice plate 6 can be moved by translation shaft 8 along slideway 15, and postposition is whole Discharge orifice plate 6 can be mobile by translation direction of own axes, and self adjustment is carried out by second elastic component 16.
Shown in the following formula of relationship of the second elastic component 16, preposition rectification orifice plate 5 and water flow velocity v:
Formula 2
Wherein: the spring ratio of second elastic component;A: the angle of thread spindle and translation shaft;D: rectification hole board diameter;D: Rectify the diameter in hole on orifice plate;X: the amount of tension of second elastic component.
From formula 2 it can be seen that when water flow velocity v increases, the amount of tension x of second elastic component increases, to realize certainly The dynamic relationship for adjusting flow velocity and rectifying orifice plate circulation, achievees the effect that steadily to rectify.
The both ends of the shell are respectively provided with first flange disk 19 and second flange disk 20, and second level rectifier cell 14 further includes pipe Beam 18, tube bank 18 are mounted on second flange disk 20, and tube bank 18 is tubular, and tube bank 18 is equipped with several pores 17.
A kind of prioritization scheme, the level-one rectifier cell 13 are adjustable cylindrical body, and level-one rectifier cell 13 is equipped with radial Through-hole passes through radial through-hole size in the water flow size self-control cylindrical body that flows through.
Another prioritization scheme, the second level rectifier cell 14 are rectification orifice plate, and second level rectifier cell 14 is equipped with several A axially extending bore passes through axially extending bore size in the water flow velocity size self-control cylindrical body that flows through.
The postposition rectification orifice plate 6 generates it with the shifting of own axes translation direction since water flow is to its pressure It is dynamic, and self adjustment is carried out by second elastic component, track of the axis on preposition rectification orifice plate on shell is slided. When water flow velocity is bigger, the distance that second elastic component drives postposition rectification orifice plate to move along water (flow) direction is bigger;Phase When flow velocity of turning one's coat is smaller, the distance that second elastic component drives postposition rectification orifice plate to move along water (flow) direction is with regard to smaller. There is screw thread on the axis of the postposition rectification orifice plate of shell end, the different of orifice plate are rectified to postposition by preposition rectification orifice plate and are pressed Power, so that preposition rectification orifice plate is moved by the thread tracks on shell, which is fixed on 0 °~45 ° (currently Set rectification orifice plate and horizontal direction angle once at water at 0 °, 15 °, 22.5 ° by it is preposition rectify orifice plate circulation area be by It is decrescence small, when preposition rectification hole plate and horizontal direction angle once at 22.5 °, 30 °, 45 ° when water in preposition rectification orifice plate Circulation area is gradually increased), water flow sets rectification orifice plate later and enters tubular tube bank, by restrain water flow is carried out it is last whole Stream.
In practical applications, the adjustable fairing of liquid is mounted on to the upstream of fluid flowmeter, liquid can be nestled up Flowmeter installation, can also (distance can determine according to site space size) spaced apart, filled in the adjustable rectification of liquid It sets the liquid that upstream comes and passes through the thicker conveyance conduit of size, the flow velocity for causing fluid to flow is just smaller and unstable, works as liquid Body enters inside fairing shell 1, and successively passes through level-one rectifier cell 13, liquid chamber 10, second level rectifier cell 14, herein In the process, liquid passes through level-one rectifier cell 13, since tubular screens bore is less than shell mouth in level-one rectifier cell 13 Diameter, and only tubular screens can circulate for fluid, and baffle can play the role of stopping fluid, reduce fluid circulation Area, then flow velocity necessarily increases in the case where the flow of fluid is certain;Liquid travels from liquid room 10 enters second level rectification Element 14, the flow velocity of liquid becomes higher more stable, so that the detection of flowmeter is more acurrate.
Liquid after the filtering of the adjustable fairing of liquid, speed-raising and rectification, caused by deviation be up to state standards, When being measured using fluid flowmeter, it is ensured that its measurement accuracy and long-term work.
The above is the citing of the utility model preferred forms, wherein the part that do not address in detail is this field The common knowledge of those of ordinary skill.The protection scope of the utility model is based on the contents of the claims, any to be based on this reality The equivalent transformation carried out with novel technical inspiration, is also within the protection scope of the utility model.

Claims (10)

1. a kind of fluid flowmeter is set with the fairing of automatic adjustment circulation area, including shell (1), one end of shell (1) Have liquid-inlet (11), the other end of shell (1) is equipped with liquid outlet, it is characterised in that: it is whole that level-one is equipped in the shell (1) Fluid element (13) and second level rectifier cell (14), level-one rectifier cell (13) are arranged at liquid-inlet (11), second level rectification member Part (14) is arranged along water (flow) direction in liquid outlet, level-one rectifier cell (13), second level rectifier cell (14) and shell (1) it Between be formed with liquid chamber (10).
2. a kind of fairing of fluid flowmeter automatic adjustment circulation area as described in claim 1, it is characterised in that: The level-one rectifier cell (13) includes adjustable screens (3), and one end of adjustable screens (3) is equipped with baffle (4), adjustable rectification The other end of net (3) is connected with first flange disk (19), and baffle (4) is closed at one end by adjustable screens (3).
3. a kind of fairing of fluid flowmeter automatic adjustment circulation area as claimed in claim 2, it is characterised in that: The baffle (4) is equipped with fixing axle (21), and First elastic component (2) covers on fixing axle (21), and First elastic component (2) is even The both ends of baffle (4) are connect, baffle (4) is slided along fixing axle (21).
4. a kind of fairing of fluid flowmeter automatic adjustment circulation area as claimed in claim 2, it is characterised in that: The adjustable screens (3) are telescopic cylindricals, and adjustable screens (3) are equipped with several adjustable screens holes (7), be can adjust Drift net (3) be it is telescopic, the bores of adjustable screens (3) is less than the bore of shell (1).
5. a kind of fairing of fluid flowmeter automatic adjustment circulation area as described in claim 1, it is characterised in that: The second level rectifier cell (14) includes preposition rectification orifice plate (5), postposition rectification orifice plate (6), preposition rectification orifice plate (5) and postposition It rectifies and is connected between orifice plate (6) by second elastic component (16), set in preposition rectification orifice plate (5) and postposition rectification orifice plate (6) There is the axially extending bore (12) of marshalling, preposition rectification orifice plate (5), postposition rectification orifice plate (6) are closely arranged, preposition rectification orifice plate (5) it is positioned close to housing outlets one end, postposition rectification orifice plate (6) is arranged far from housing outlets one end.
6. a kind of fairing of fluid flowmeter automatic adjustment circulation area as claimed in claim 5, it is characterised in that: The edge of preposition rectification orifice plate (5) is equipped with thread spindle (9), and the inner tubal wall of shell (1) is equipped with screw thread sliding slot, thread spindle (9) it is arranged in screw thread sliding slot.
7. a kind of fairing of fluid flowmeter automatic adjustment circulation area as claimed in claim 6, it is characterised in that: Preposition rectification orifice plate (5) passes through the rotation that thread spindle (9) carry out, and preposition rectification orifice plate (5) and horizontal direction angle are can Adjust, when rectification preposition rectification orifice plate (5) and horizontal direction angle be 22.5 ° -45 °.
8. a kind of fairing of fluid flowmeter automatic adjustment circulation area as claimed in claim 5, it is characterised in that: Postposition rectification orifice plate (6) is equipped with translation shaft (8), and shell is equipped with slideway (15), and translation shaft (8) is inserted into slideway (15) In, translation shaft (8) is slided along slideway (15), and postposition rectification orifice plate (6) can be moved by translation shaft (8) along slideway (15) Dynamic, postposition rectifies orifice plate (6) can be mobile by translation direction of own axes, and is carried out certainly by second elastic component (16) I adjusts.
9. a kind of fairing of fluid flowmeter automatic adjustment circulation area as described in claim 1, it is characterised in that: The both ends of the shell are respectively provided with first flange disk (19) and second flange disk (20), and second level rectifier cell (14) further includes tube bank (18), tube bank (18) is mounted on second flange disk (20), and tube bank (18) is tubular, and tube bank (18) is equipped with several pores (17).
10. a kind of fairing of fluid flowmeter automatic adjustment circulation area as described in claim 1, feature exist In: the level-one rectifier cell (13) is adjustable cylindrical body, and level-one rectifier cell (13) is equipped with radial through-hole, passes through what is flowed through Radial through-hole size in water flow size self-control cylindrical body;
The second level rectifier cell (14) is rectification orifice plate, and second level rectifier cell (14) is equipped with several axially extending bores, passes through Axially extending bore size in the water flow velocity size self-control cylindrical body flowed through.
CN201821465865.5U 2018-09-07 2018-09-07 A kind of fairing of fluid flowmeter automatic adjustment circulation area Active CN208635862U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821465865.5U CN208635862U (en) 2018-09-07 2018-09-07 A kind of fairing of fluid flowmeter automatic adjustment circulation area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821465865.5U CN208635862U (en) 2018-09-07 2018-09-07 A kind of fairing of fluid flowmeter automatic adjustment circulation area

Publications (1)

Publication Number Publication Date
CN208635862U true CN208635862U (en) 2019-03-22

Family

ID=65743781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821465865.5U Active CN208635862U (en) 2018-09-07 2018-09-07 A kind of fairing of fluid flowmeter automatic adjustment circulation area

Country Status (1)

Country Link
CN (1) CN208635862U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110186528A (en) * 2018-09-07 2019-08-30 山东思达特测控设备有限公司 A kind of fairing of fluid flowmeter automatic adjustment circulation area
CN110209210A (en) * 2019-07-01 2019-09-06 北京七星华创流量计有限公司 Filling member and mass flow controller for mass flow controller
CN110374564A (en) * 2019-07-25 2019-10-25 东北石油大学 A kind of pressure and viscosity can survey the bleeder mechanism and its measurement method of tune in real time

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110186528A (en) * 2018-09-07 2019-08-30 山东思达特测控设备有限公司 A kind of fairing of fluid flowmeter automatic adjustment circulation area
CN110209210A (en) * 2019-07-01 2019-09-06 北京七星华创流量计有限公司 Filling member and mass flow controller for mass flow controller
CN110374564A (en) * 2019-07-25 2019-10-25 东北石油大学 A kind of pressure and viscosity can survey the bleeder mechanism and its measurement method of tune in real time
CN110374564B (en) * 2019-07-25 2021-08-17 东北石油大学 Pressure dividing device capable of measuring and adjusting pressure and viscosity in real time and measuring method thereof

Similar Documents

Publication Publication Date Title
CN208635862U (en) A kind of fairing of fluid flowmeter automatic adjustment circulation area
WO2004101161A1 (en) A adjustable gas-liquid centrifugal separator and separating method
CN107063629B (en) A kind of underwater drag reduction surface performance testing device
CN110487508B (en) Experimental device for be used for studying horizontal pipe gas-liquid two-phase spiral flow
CN103471685B (en) A kind of gas-liquid separator proving installation and method of testing thereof
CN109141562A (en) Based on the natural gas moisture measuring device and method for being mutually separated in pipe with mutually separating
CN201748942U (en) Heat distribution type gas mass flow meter
CN110186528A (en) A kind of fairing of fluid flowmeter automatic adjustment circulation area
CN209196393U (en) A kind of anti-whirlpool fairing of pump intake
CN206300801U (en) A kind of experimental system for the test of demisting and water saving device performance
CN207866298U (en) A kind of novel central symmetry multi-hole orifice flow throttling set
CN203848890U (en) Card type ultrasonic fluid flow measuring device
CN108106870B (en) A kind of experimental system for the test of demisting and water saving device performance
CN103091376B (en) A kind of liquid constant flow velocity on-line analysis monitoring device
CN109708710A (en) A kind of ultrasonic gas flowmeter noise reduction fairing
CN208398948U (en) It is a kind of for measuring the throttling set pressure vessel of flux of moisture
CN209623800U (en) A kind of flow instrument
CN203053910U (en) Online liquid constant flow velocity analysis monitoring device
CN209167113U (en) A kind of total nitrogen analysis measuring device based on data acquisition with internal calculation correction
CN206562540U (en) A kind of air cushion pressure adjusting means of head box
CN204852912U (en) Circulating cryogenic liquids gasification equipment
CN206945075U (en) Fairing
CN212988488U (en) Flowmeter pipeline convenient to installation
CN106758470B (en) A kind of air cushion pressure regulating device of head box
CN212180557U (en) Tracing device for particle quantity concentration

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: The utility model relates to a rectifying device for automatically adjusting the flow area of a liquid flowmeter

Effective date of registration: 20220427

Granted publication date: 20190322

Pledgee: Weifang Bank Co.,Ltd. Xincheng sub branch

Pledgor: SHANDONG START MEASUREMENT CONTROL EQUIPMENT Co.,Ltd.

Registration number: Y2022980004904