CN208633113U - Based on the direct self-insulation system of severe cold area concreting in cold weather - Google Patents

Based on the direct self-insulation system of severe cold area concreting in cold weather Download PDF

Info

Publication number
CN208633113U
CN208633113U CN201821272424.3U CN201821272424U CN208633113U CN 208633113 U CN208633113 U CN 208633113U CN 201821272424 U CN201821272424 U CN 201821272424U CN 208633113 U CN208633113 U CN 208633113U
Authority
CN
China
Prior art keywords
water
water supply
concrete
hole
rear end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821272424.3U
Other languages
Chinese (zh)
Inventor
朱耿志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shipbuilding Heavy Industry Group International Engineering Co Ltd
Original Assignee
China Shipbuilding Heavy Industry Group International Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shipbuilding Heavy Industry Group International Engineering Co Ltd filed Critical China Shipbuilding Heavy Industry Group International Engineering Co Ltd
Priority to CN201821272424.3U priority Critical patent/CN208633113U/en
Application granted granted Critical
Publication of CN208633113U publication Critical patent/CN208633113U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model provide it is a kind of based on the direct self-insulation system of severe cold area concreting in cold weather, including water circulating pump, front end for water conduit tube, front end water supply branch pipe, front end water supply hose, in advance open hole, mass concrete, rear end water supply hose, rear end water supply branch pipe, rear end for water conduit tube, external thermal insulation pipe and return water main pipe.Advantage are as follows: (1) water supply hose can extract recycling out, save lot of materials and water resource.And the construction water after heating up realizes the abundant effective and reasonable utilization to energy directly to keeping the temperature outside concrete.(2) the directly cooling hole surrounding concrete in advance of construction water, when can be avoided indirect cooling, moisturizing not in time, causes pre- hole cracking or abrasion in hole in advance.(3) therefore, temperature difference between inside and outside concrete can be effectively reduced to heat preservation operation is carried out outside mass concrete due to carrying out warming temperature to mass concrete inside simultaneously, to prevent concrete cracking and frostbite, improves concrete curing quality.

Description

Based on the direct self-insulation system of severe cold area concreting in cold weather
Technical field
The utility model belongs to concrete curing technical field, and in particular to one kind is applied based on severe cold area concrete winter The direct self-insulation system of work.
Background technique
Architectural engineering mass concrete is conserved after the completion of pouring, so that concrete internal temperature is reduced, Reduce temperature difference between inside and outside concrete, prevents concrete cracking.China's mass concrete maintenance used at present reduces in concrete The method of portion's temperature is main are as follows: uses recirculated cooling water method, it may be assumed that buries a large amount of cooling cycle water pipe in concrete, leads to It crosses and conveys cooling water into cooling cycle water pipe, achieve the effect that cool down to inside concrete.
The above method is primarily present following problems: concrete domestic demand buries a large amount of cooling cycle water pipe, cooling circulating water Pipe cannot take out again and recycle, and cause construction cost expensive.Part cold district winter because temperature is too low can not use it is cold But recirculated water carries out maintenance construction.
Utility model content
In view of the defects existing in the prior art, the utility model provides a kind of straight based on severe cold area concreting in cold weather It is connected to heat-insulation system, can effectively be solved the above problems.
The technical solution adopted in the utility model is as follows:
The utility model provides a kind of based on the direct self-insulation system of severe cold area concreting in cold weather, including recirculated water Pump (1), front end for water conduit tube (2), front end water supply branch pipe (3), front end water supply hose (4), open hole (5), mass concrete in advance (6), rear end water supply hose (7), rear end water supply branch pipe (8), rear end are for water conduit tube (9), external thermal insulation pipe (10) and return water main pipe (11);
The mass concrete (6) is formed the pre- hole (5) at multiple perforation concrete both ends by construction technology;Described Mass concrete (6) is externally wrapped with the installation external thermal insulation pipe (10);
The discharge ends of the water circulating pump (1) are connected to the front end water supply branch pipe for water conduit tube (2) by the front end (3) water inlet end, the front end water supply branch pipe (3) have discharge ends identical with hole (5) quantity in advance, and each front end supplies The discharge ends of water branch pipe (3) are connected to the water inlet end of a front end water supply hose (4), the front end water supply hose (4) Discharge ends are inserted into the import of a corresponding pre- hole (5), also, the front end water supply hose (4)) discharge ends and The water inlet end of the pre- hole (5) is only tightly connected in entry position, and the front end water supply hose (4) does not extend to described pre- Open the inside of hole (5);
The rear end water supply branch pipe (8) has and the identical water inlet end of hole (5) quantity and a discharge ends in advance;After described The water inlet end at end water supply branch pipe (8) is connect with the discharge ends of a rear end water supply hose (7), the rear end water supply hose (7) water inlet end is inserted into the discharge ends of corresponding one described pre- hole (5), also, the rear end water supply hose (7) into The discharge ends of water end (W.E.) and the pre- hole (5) are only tightly connected in outlet port, and the rear end water supply hose (7) does not extend to The inside of the pre- hole (5);
Water inlet end of the discharge ends of the rear end water supply branch pipe (8) with the rear end for water conduit tube (9) is connected to;The rear end It is connected to for the discharge ends of water conduit tube (9) with the water inlet end of the external thermal insulation pipe (10);The discharge ends of the external thermal insulation pipe (10) with The water inlet end of the return water main pipe (11) is connected to;The discharge ends of the return water main pipe (11) are communicated to the water circulating pump (1) Water circulation path is consequently formed in water inlet end.
It preferably, further include temperature sensitive probe (12), display and controller;
It is each to bury multiple temperature sensitive probes (12) in the inside and outer surface of the mass concrete (6), each temperature Sense probe (12) is furnished with signal wire, which is all connected to the input terminal of the controller;The output end of the controller with The display connection.
It is provided by the utility model to be had the advantage that based on the direct self-insulation system of severe cold area concreting in cold weather
(1) water supply hose of the application can extract recycling out, and water supply hose only has a very short segment pipe to exist In advance in hole, lot of materials and water resource are saved.And the construction water after heating up outside concrete directly to keeping the temperature, it is real The abundant effective and reasonable utilization to energy is showed.
(2) moisturizing is abundant in hole in advance, and the concrete around the directly cooling pre- hole of construction water can be avoided indirectly cold When but, moisturizing not in time, causes pre- hole cracking or abrasion, directly cooling more indirect good cooling results in hole in advance.
(3) recirculated water water temperature after heat exchange increases, and to extraneous function of environment heat emission in outer insulating tube, that is, eliminates substantially Product inside concrete heat, while again to winter construction when concrete keep the temperature, economical environment-protective.In addition, due to simultaneously Therefore carry out warming temperature to mass concrete inside, can effectively reduce to heat preservation operation is carried out outside mass concrete Temperature difference between inside and outside concrete improves concrete curing quality to prevent concrete cracking and frostbite.
Detailed description of the invention
Fig. 1 is that the structure provided by the utility model based on the direct self-insulation system of severe cold area concreting in cold weather is shown It is intended to.
Specific embodiment
The technical issues of in order to keep the utility model solved, technical solution and beneficial effect are more clearly understood, below In conjunction with accompanying drawings and embodiments, the present invention will be further described in detail.It should be appreciated that specific implementation described herein Example only to explain the utility model, is not used to limit the utility model.
The utility model provides one kind based on the direct self-insulation system of severe cold area concreting in cold weather, is mainly used for trembling with fear Cryogenic region architectural engineering winter construction of mass concrete, when maintenance, reduce concrete internal temperature, while on the outside of concrete Heat preservation reduces concrete internal temperature, improves concrete external temperature, therefore, to concrete while cooling down inside concrete It is kept the temperature, prevents concrete cracking and frostbite, belong to building engineering construction field.
It include water circulating pump 1, front end confession based on the direct self-insulation system of severe cold area concreting in cold weather with reference to Fig. 1 Water conduit tube 2, front end water supply branch pipe 3, front end water supply hose 4, in advance hole 5, mass concrete 6, rear end water supply hose 7, rear end Water supply branch pipe 8, rear end are for water conduit tube 9, external thermal insulation pipe 10 and return water main pipe 11;
Mass concrete 6 is formed the pre- hole 5 at multiple perforation concrete both ends by construction technology;In mass concrete External thermal insulation pipe 10 is installed in 6 be externally wrapped with;
The discharge ends of water circulating pump 1 are connected to the water inlet end of front end water supply branch pipe 3 by front end for water conduit tube 2, and front end supplies Water branch pipe 3 has discharge ends identical with 5 quantity of hole in advance, and the discharge ends of each front end water supply branch pipe 3 supply water with a front end The water inlet end of hose 4 is connected to, and the discharge ends of front end water supply hose 4 are inserted into the import in a corresponding pre- hole 5, also, preceding The water inlet end of the discharge ends and pre- hole 5 of holding water supply hose 4 is only tightly connected in entry position, and front end water supply hose 4 does not prolong Reach the inside in pre- hole 5;
Rear end water supply branch pipe 8 has and the identical water inlet end of 5 quantity of hole and a discharge ends in advance;Rear end water supply branch pipe 8 Water inlet end connect with the discharge ends of a rear end water supply hose 7, the water inlet end of rear end water supply hose 7 is inserted into corresponding one The discharge ends in pre- hole 5, also, the discharge ends in the water inlet end of rear end water supply hose 7 and pre- hole 5 only seal in outlet port and connect It connects, rear end water supply hose 7 does not extend to the inside in pre- hole 5;
Water inlet end of the discharge ends of rear end water supply branch pipe 8 with rear end for water conduit tube 9 is connected to;Draining of the rear end for water conduit tube 9 End is connected to the water inlet end of external thermal insulation pipe 10;The discharge ends of external thermal insulation pipe 10 are connected to the water inlet end of return water main pipe 11;Return water is dry The discharge ends of pipe 11 are communicated to the water inlet end of water circulating pump 1, and water circulation path is consequently formed.
It further include temperature sensitive probe 12, display and controller;
Each to bury multiple temperature sensitive probes 12 in the inside and outer surface of mass concrete 6, each temperature sensitive probe 12 is furnished with Signal wire, the signal wire are all connected to the input terminal of controller;The output end of controller is connect with display.
Its principle are as follows:
The utility model utilizes the pipeline core-drawing pore-creating principle in the prestressed concrete post stretching of building engineering construction field, Reserve multiple pre- holes 5 using the concrete of final set, the inside in each pre- hole is cavity structure, the front end in each pre- hole and Rear end respectively connects front end water supply hose and rear end water supply hose;After front end water supply hose is pooled to front end water supply branch pipe, then pass through Front end is connected for one end of water conduit tube and water circulating pump;After rear end water supply hose is pooled to rear end water supply branch pipe, then pass through rear end One end of external thermal insulation pipe is connected to for water conduit tube, the other end of external thermal insulation pipe is connected by the other end of return water main pipe and water circulating pump It connects.
Therefore, after recirculated water is recycled by water circulating pump 1, by front end for water conduit tube 2, front end water supply branch pipe 3 is flowed into, then It is flowed into inside pre- hole 5 by each front end water supply branch pipe 3, so that water be made directly to contact with mass concrete, is realized Direct heat exchange, since water is directly contacted with concrete in the application, it is a kind of direct cooling mode;Water pass through with it is big After volume concrete heat exchange, temperature rises, and the water after heating is pooled to rear end water supply branch pipe by rear end water supply hose, then flows Enter rear end for water conduit tube, be then flowed into external thermal insulation pipe 10, outwardly function of environment heat emission, heat dissipation are laggard while to concrete heat-insulating Enter return water main pipe 11, completes cyclic process.As it can be seen that recirculated water absorbs the heat of hydration of concrete, reaches and reduce temperature inside and outside concrete The purpose for spending difference, prevents mass concrete from cracking, and the required heat of heat preservation is provided outside concrete, reduces winter Construction site is the heat of concrete heat-insulating.
In the application, a hole 5 is one group of heat exchanger in advance, and construction water is by the way that it is big to reach reduction after opening 5 heat exchange of hole in advance The purpose of volume concrete internal temperature.
Temperature sensitive probe is embedded in concrete and equipped with signal wire, and signal wire is connected with display, can measure and show The temperature of concrete.
Relative to the method for the cooling mass concrete of recirculated cooling water, the water supply hose of the application can extract repetition benefit out With saving lot of materials and water resource, and the recirculated water after heating up is used for concrete heat-insulating.
Need to illustrate: water supply hose can be the tubing of steel pipe, plastic tube or other materials, have no effect on the essence of this patent Property content;
When Specific construction, first temperature sensitive probe 12 and signal wire are embedded in concrete blinding by design requirement, warming is visited First 12 is generally embedded at concrete core position and external packet, in order to measure the temperature difference inside and outside concrete;It is poured coagulation Soil simultaneously constantly rotates drawing core pipe, until concrete final set, concrete no longer slump, drawing core pipe is extracted out, in this way in concrete Inside it is formed the pre- hole 5 by design requirement;The signal wire of temperature sensitive probe 12 is connected to display and observes each warming The concrete temperature that probe 12 transmits, while water circulating pump 1, front end are connected for water conduit tube 2, front end water supply branch pipe 3, front end water supply Hose 4, rear end water supply hose 7, rear end water supply branch pipe 8, rear end are for water conduit tube 9, external thermal insulation pipe 10 and return water main pipe 11;Wherein, Front end water supply hose 4 and rear end water supply hose 7 only have one small section of both ends for being inserted into pre- hole, and hole main body is interior in advance and is not present Water supply hose.Then, water circulating pump 1 is connected to cool down to inside concrete, if the temperature difference inside and outside concrete is greater than 25 degree, Need to increase the flow of water circulating pump 1, temperature difference of the fast cooling inside and outside concrete splashs coagulation less than 25 degree Native external temperature, if 5 degree of external temperature <, Ying Kaiqi water circulating pump, cool down terminated until the concrete curing phase in aforementioned manners, It also needs thoroughly to prevent mass concrete from opening in this way in conjunction with the concrete curing method of other coverings, moisturizing, heat preservation simultaneously It splits, finally when concrete curing is completed, with pre- hole 5 of cement slurry closure.
Need to illustrate: such mode is not required to the deliberately moisturizing in hole 5 in advance, and construction water directly contacts with concrete cooling pre- Concrete around hole 5, when can be avoided indirect cooling, in advance in hole 5 moisturizing not in time, partial interior hydration heat of concrete Fail to discharge completely, heat exchange efficiency is done, and concrete integrally cools under hygrometric state, directly cooling more direct good cooling results.
It is provided by the utility model to be had the advantage that based on the direct self-insulation system of severe cold area concreting in cold weather
(1) water supply hose of the application can extract recycling out, and water supply hose only has a very short segment pipe to exist In advance in hole, lot of materials and water resource are saved.And the construction water after heating up outside concrete directly to keeping the temperature, it is real The abundant effective and reasonable utilization to energy is showed.
(2) moisturizing is abundant in hole in advance, and the concrete around the directly cooling pre- hole of construction water can be avoided indirectly cold When but, moisturizing not in time, causes pre- hole cracking or abrasion, directly cooling more indirect good cooling results in hole in advance.
(3) recirculated water water temperature after heat exchange increases, and to extraneous function of environment heat emission in outer insulating tube, that is, eliminates substantially Product inside concrete heat, while again to winter construction when concrete keep the temperature, economical environment-protective.In addition, due to simultaneously Therefore carry out warming temperature to mass concrete inside, can effectively reduce to heat preservation operation is carried out outside mass concrete Temperature difference between inside and outside concrete improves concrete curing quality to prevent concrete cracking and frostbite.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art For art personnel, without departing from the principle of this utility model, several improvements and modifications can also be made, these improve and Retouching should also regard the protection scope of the utility model.

Claims (2)

1. one kind is based on the direct self-insulation system of severe cold area concreting in cold weather, which is characterized in that including water circulating pump (1), front end for water conduit tube (2), front end water supply branch pipe (3), front end water supply hose (4), open hole (5), mass concrete in advance (6), rear end water supply hose (7), rear end water supply branch pipe (8), rear end are for water conduit tube (9), external thermal insulation pipe (10) and return water main pipe (11);
The mass concrete (6) is formed the pre- hole (5) at multiple perforation concrete both ends by construction technology;It is described substantially Product concrete (6) is externally wrapped with the installation external thermal insulation pipe (10);
The discharge ends of the water circulating pump (1) are connected to the front end water supply branch pipe (3) for water conduit tube (2) by the front end Water inlet end, the front end water supply branch pipe (3) have discharge ends identical with hole (5) quantity in advance, and supply water branch for each front end The discharge ends of pipe (3) are connected to the water inlet end of a front end water supply hose (4), the draining of the front end water supply hose (4) End is inserted into the import of a corresponding pre- hole (5), also, discharge ends of the front end water supply hose (4) and described Pre- hole (5) water inlet end is only tightly connected in entry position, and the front end water supply hose (4) does not extend to the pre- hole (5) inside;
The rear end water supply branch pipe (8) has and the identical water inlet end of hole (5) quantity and a discharge ends in advance;The rear end supplies The water inlet end of water branch pipe (8) is connect with the discharge ends of a rear end water supply hose (7), the rear end water supply hose (7) Water inlet end is inserted into the discharge ends of corresponding one described pre- hole (5), also, the water inlet end of the rear end water supply hose (7) It is only tightly connected in outlet port with the discharge ends of the pre- hole (5), the rear end water supply hose (7) does not extend to described Pre- hole (5) inside;
Water inlet end of the discharge ends of the rear end water supply branch pipe (8) with the rear end for water conduit tube (9) is connected to;It supplies water the rear end The discharge ends of main pipe (9) are connected to the water inlet end of the external thermal insulation pipe (10);The discharge ends of the external thermal insulation pipe (10) with it is described The water inlet end of return water main pipe (11) is connected to;The discharge ends of the return water main pipe (11) are communicated to the water inlet of the water circulating pump (1) End, is consequently formed water circulation path.
2. according to claim 1 be based on the direct self-insulation system of severe cold area concreting in cold weather, which is characterized in that It further include temperature sensitive probe (12), display and controller;
Each to bury multiple temperature sensitive probes (12) in the inside and outer surface of the mass concrete (6), each warming is visited Head (12) is furnished with signal wire, which is all connected to the input terminal of the controller;The output end of the controller with it is described Display connection.
CN201821272424.3U 2018-08-08 2018-08-08 Based on the direct self-insulation system of severe cold area concreting in cold weather Expired - Fee Related CN208633113U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821272424.3U CN208633113U (en) 2018-08-08 2018-08-08 Based on the direct self-insulation system of severe cold area concreting in cold weather

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821272424.3U CN208633113U (en) 2018-08-08 2018-08-08 Based on the direct self-insulation system of severe cold area concreting in cold weather

Publications (1)

Publication Number Publication Date
CN208633113U true CN208633113U (en) 2019-03-22

Family

ID=65739996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821272424.3U Expired - Fee Related CN208633113U (en) 2018-08-08 2018-08-08 Based on the direct self-insulation system of severe cold area concreting in cold weather

Country Status (1)

Country Link
CN (1) CN208633113U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110259110A (en) * 2019-06-26 2019-09-20 中交第二航务工程局有限公司 Composite shuttering structure and construction method suitable for mass concrete Winter protection
CN114370052A (en) * 2021-12-29 2022-04-19 厦门中宸集团有限公司 System for efficiently controlling large-volume concrete cracks and control method thereof
CN115125986A (en) * 2022-07-04 2022-09-30 中铁建电气化局集团第一工程有限公司 Wind power equipment foundation concrete intelligent maintenance device and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110259110A (en) * 2019-06-26 2019-09-20 中交第二航务工程局有限公司 Composite shuttering structure and construction method suitable for mass concrete Winter protection
CN114370052A (en) * 2021-12-29 2022-04-19 厦门中宸集团有限公司 System for efficiently controlling large-volume concrete cracks and control method thereof
CN114370052B (en) * 2021-12-29 2023-07-21 厦门中宸集团有限公司 System for efficiently controlling mass concrete cracks and control method thereof
CN115125986A (en) * 2022-07-04 2022-09-30 中铁建电气化局集团第一工程有限公司 Wind power equipment foundation concrete intelligent maintenance device and method

Similar Documents

Publication Publication Date Title
CN208633113U (en) Based on the direct self-insulation system of severe cold area concreting in cold weather
CN106285726B (en) A kind of tunnel inner lining concrete insulated curing constructing device and its construction method
CN208668990U (en) Based on the indirect self-insulation system of severe cold area concreting in cold weather
CN208633115U (en) The direct cooling device of compressed air throttle effect based on mass concrete maintenance
CN101338958B (en) Air conditioner heat exchange type condensator and spray evaporative cooling system
CN205909384U (en) Adopt salt -free formula to assist heat source tower heat pump that defrosting device is prevented to heat outward
CN104533462B (en) Tunnel lining concrete thermal insulation system and construction method thereof
CN201449061U (en) Anti-freezing and rapid hot water output control system of solar water heater
CN109235441A (en) A kind of temperature automatically controlled technique of the circulation fluid of mass concrete construction
CN208844948U (en) Compressed air throttle effect indirect cooling device based on mass concrete maintenance
CN104833110A (en) Efficient solar water heater
CN208686126U (en) Mass concrete system is cooled down indirectly based on construction water
CN201607021U (en) Gas-heating water heater system provided with domestic water circulating device
CN208718408U (en) Based on the directly cooling mass concrete system of construction water
CN105937814B (en) A kind of building passive cooling and solar water comprehensive utilization device
CN108120038A (en) The nearly zero temperature drop heat-exchange system of geothermal deep well
CN211714597U (en) Concrete cooling system based on pulsating heat pipe
CN203375723U (en) Water pipe anti-freezing structure and directly-heated type heat pump water heater unit with same
CN203454397U (en) Instantly heated water supply device
CN207907339U (en) A kind of solar energy heating system in building
CN206737426U (en) Hot environment lower concrete pouring building mould servicing unit
CN206504390U (en) A kind of air source heat pump ceiling radiant heating plant
CN211316532U (en) Energy-saving heat pump water heater performance laboratory
CN203924732U (en) Concrete pumping pipe, concrete pumping pipe assembly and the cooling system containing this assembly
CN216308279U (en) Automatic temperature control device of ground source heat pump

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190322

Termination date: 20200808

CF01 Termination of patent right due to non-payment of annual fee