CN208632969U - High speed railway box girder is unpowered to change the outfit frame - Google Patents
High speed railway box girder is unpowered to change the outfit frame Download PDFInfo
- Publication number
- CN208632969U CN208632969U CN201820971721.0U CN201820971721U CN208632969U CN 208632969 U CN208632969 U CN 208632969U CN 201820971721 U CN201820971721 U CN 201820971721U CN 208632969 U CN208632969 U CN 208632969U
- Authority
- CN
- China
- Prior art keywords
- supporting leg
- box girder
- beam car
- unpowered
- high speed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
A kind of high speed railway box girder is unpowered to change the outfit frame, includes supporting leg I and supporting leg II, is the road that drives into of beam car between supporting leg I and supporting leg II, pin joint flange is equipped at the top of supporting leg I, the top of supporting leg II is connected with revolution crossbeam by revolution turntable;Before beam car drives into, revolution crossbeam is located at and road parallel direction, after beam car drives into, gap of the rotation revolution crossbeam across beam car and box girder body;Beam car jacks up revolution crossbeam upwards and the supporting leg I and supporting leg II of two sides is driven to rise, and passes through the height of bolt and pin hole positioning support leg I and supporting leg II.The utility model passes through above structure, it is at high cost to solve large lifting equipment early period existing in the prior art, working service is difficult, the larger technical problem of hoisting and hanging risk, provides a kind of unpowered frame that changes the outfit of high speed railway box girder low in cost, easy to use, for ease of maintenaince.
Description
Technical field
The invention is related to a kind of unpowered frame that changes the outfit of high speed railway box girder, devise the beam structure that quickly splits and
Liftable box supporting leg, using low level supporting way, the frame that changes the outfit uses no-power way, utilizes the elevating function of beam car, energy
Enough realize that the box beam in high speed railway box girder transportational process between different beam cars changes the outfit operation.
Background technique
The most common prefabricated case beam of high-speed railway bridge, the mode set up after beam car transports bridge location by Bridge Erector,
It generally requires more beam cars to meet construction period under the operating condition of long-distance transportation while transporting, due to beam car and build bridge
There are matching problems for machine, change the outfit for a Bridge Erector for generally requiring centre when beam for different size beam car, general to change
Dress mode is exactly that two 450t gantry crane integrations of operation are arranged, with complete 900t box beam unload and entrucking.Such large-scale
Heavy equipment investment is more than ten million, and manufacturing cost is huge, and field work is difficult in maintenance, and hoisting and hanging risk is higher, needs a kind of letter
Easily safe changes the outfit structure to substitute.
Summary of the invention
In view of the above problems, the utility model proposes a kind of unpowered frame that changes the outfit of high speed railway box girder, high speed railway box
Beam is unpowered to change the outfit frame, it is characterised in that: includes supporting leg I and supporting leg II, driving into for beam car between supporting leg I and supporting leg II
Road, the supporting leg I and supporting leg II are drawing and pulling type liftable cabinet framework, are equipped with pin joint flange, supporting leg at the top of supporting leg I
The top of II is connected with revolution crossbeam by turning round turntable;Before beam car drives into, revolution crossbeam is located at and road parallel direction, fortune
After beam vehicle drives into, gap of the rotation revolution crossbeam across beam car and box girder body, and will revolution crossbeam and pin joint flange
It is connected;Beam car jacks up revolution upwards and crossbeam and the supporting leg I and supporting leg II of two sides is driven to rise, by setting supporting leg I with
The height of bolt and pin hole positioning support leg I and supporting leg II on supporting leg II.The utility model solves existing by above structure
Large lifting equipment present in technology is at high cost early period, and working service is difficult, the larger technical problem of hoisting and hanging risk.
To achieve the goals above, the technical solution adopted in the utility model are as follows: high speed railway box girder is unpowered to change the outfit frame,
It is characterized by comprising having supporting leg I and supporting leg II, road, the supporting leg are driven into for beam car between supporting leg I and supporting leg II
I and supporting leg II is drawing and pulling type liftable cabinet framework, and pin joint flange is equipped at the top of supporting leg I, passes through revolution at the top of supporting leg II
Turntable is connected with revolution crossbeam;Before beam car drives into, revolution crossbeam is located at and road parallel direction, after beam car drives into, rotation
Gap of the crossbeam across beam car and box girder body is turned round, and revolution crossbeam is connected with pin joint flange;Beam car to
Upper jack-up revolution crossbeam simultaneously drives the supporting leg I and supporting leg II of two sides to rise, the bolt by being arranged on supporting leg I and supporting leg II and
The height of pin hole positioning support leg I and supporting leg II.
The supporting leg I and supporting leg II is arranged in concrete foundation.
The supporting leg I and supporting leg II can be provided with multiple groups, every group of supporting leg I and supporting leg along the road that drives into of beam car
Revolution crossbeam is equipped on II.
The supporting leg I is identical with supporting leg II structure, is divided into inside and outside two box portions, and inner bin is nested in external case
In vivo, and it can rise or decline in vertical direction, the corresponding position of internal box and outer case is provided with the pin hole of vertical setting of types,
After internal box rises, corresponding pin hole is inserted by using bolt, can will be positioned between inside and outside cabinet.
The revolution beam surface upper is equipped with rubber bearing relatively at box girder body footing.
Detailed description of the invention
Fig. 1: preceding status diagram is driven into for the utility model beam vehicle.
Fig. 2: for the utility model beam vehicle in place after status diagram.
Fig. 3: status diagram during changing the outfit for the utility model.
Fig. 4: status diagram after changing the outfit for the utility model.
Specific embodiment
High speed railway box girder is unpowered to change the outfit frame, includes supporting leg I5 and supporting leg II2, is between supporting leg I5 and supporting leg II2
Beam car 9 drives into road, and the supporting leg I5 and supporting leg II2 are drawing and pulling type liftable cabinet framework, sets at the top of supporting leg I5
There is pin joint flange 4, the top of supporting leg II2 is connected with revolution crossbeam 1 by turning round turntable 3;Before beam car 9 drives into, crossbeam 1 is turned round
Positioned at road parallel direction, after beam car 9 drives into, rotation revolution crossbeam 1 across beam car 9 and box girder body 10
Gap, and revolution crossbeam 1 is connected with pin joint flange 4;Beam car 9 jacks up revolution crossbeam 1 upwards and drives the supporting leg of two sides
I5 and supporting leg II2 rise, the bolt by being arranged on supporting leg I5 and supporting leg II2 and pin hole 6 positioning support leg I5's and supporting leg II2
Highly.
The supporting leg I5 and supporting leg II2 is arranged in concrete foundation 7.
The supporting leg I5 and supporting leg II2 can be provided with multiple groups along the road that drives into of beam car 9, every group of supporting leg I5 and
Revolution crossbeam 1 is equipped on supporting leg II2.
The supporting leg I5 is identical with supporting leg II2 structure, is divided into inside and outside two box portions, and inner bin is nested in outside
In cabinet, and it can rise or decline in vertical direction, the corresponding position of internal box and outer case is provided with the pin of vertical setting of types
Hole 6 is inserted into corresponding pin hole 6 by using bolt, can will be positioned between inside and outside cabinet after internal box rises.
1 upper surface of revolution crossbeam is equipped with rubber bearing 8 relatively at 10 footing of box girder body.
Claims (5)
1. high speed railway box girder is unpowered to change the outfit frame, it is characterised in that: include supporting leg I (5) and supporting leg II (2), supporting leg I (5)
Road is driven into for beam car (9) between supporting leg II (2), the supporting leg I (5) and supporting leg II (2) are that drawing and pulling type can rise
Cabinet framework is dropped, is equipped with pin joint flange (4) at the top of supporting leg I (5), the top of supporting leg II (2) is connected with back by turning round turntable (3)
Turn crossbeam (1);Before beam car (9) drives into, revolution crossbeam (1) is located at and road parallel direction, after beam car (9) drives into, rotation
The gap of crossbeam (1) across beam car (9) and box girder body (10) is turned round, and will revolution crossbeam (1) and pin joint flange (4)
It is connected;Beam car (9) jacks up revolution crossbeam (1) upwards and the supporting leg I (5) and supporting leg II (2) of two sides is driven to rise, by setting
Set the height of the bolt and pin hole (6) positioning support leg I (5) and supporting leg II (2) on supporting leg I (5) and supporting leg II (2).
2. high speed railway box girder according to claim 1 is unpowered to change the outfit frame, it is characterised in that: the supporting leg I (5) and
Supporting leg II (2) is arranged on concrete foundation (7).
3. high speed railway box girder according to claim 1 is unpowered to change the outfit frame, it is characterised in that: the supporting leg I (5) and
Supporting leg II (2) can be provided with multiple groups along the road that drives into of beam car (9), be all provided on every group of supporting leg I (5) and supporting leg II (2)
There is revolution crossbeam (1).
4. high speed railway box girder according to claim 1 is unpowered to change the outfit frame, it is characterised in that: the supporting leg I (5) and
Supporting leg II (2) structure is identical, is divided into inside and outside two box portions, and inner bin is nested in external box of microvave, and can be vertical
Direction is risen or decline, and the corresponding position of internal box and outer case is provided with the pin hole (6) of vertical setting of types, when internal box rises
Afterwards, corresponding pin hole (6) is inserted by using bolt, can will be positioned between inside and outside cabinet.
5. high speed railway box girder according to claim 1 is unpowered to change the outfit frame, it is characterised in that: the revolution crossbeam
(1) upper surface is equipped with rubber bearing (8) relatively at box girder body (10) footing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820971721.0U CN208632969U (en) | 2018-06-23 | 2018-06-23 | High speed railway box girder is unpowered to change the outfit frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820971721.0U CN208632969U (en) | 2018-06-23 | 2018-06-23 | High speed railway box girder is unpowered to change the outfit frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208632969U true CN208632969U (en) | 2019-03-22 |
Family
ID=65734665
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820971721.0U Active CN208632969U (en) | 2018-06-23 | 2018-06-23 | High speed railway box girder is unpowered to change the outfit frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208632969U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110904810A (en) * | 2019-06-27 | 2020-03-24 | 李新亚 | Rapid erecting system for high-speed railway box girder |
CN111576218A (en) * | 2020-04-28 | 2020-08-25 | 中交二航局第四工程有限公司 | Method for rapidly transferring segment box girder on land |
CN114411572A (en) * | 2021-12-31 | 2022-04-29 | 中铁十四局集团青岛工程有限公司 | Novel precast box girder beam mounting operation method |
-
2018
- 2018-06-23 CN CN201820971721.0U patent/CN208632969U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110904810A (en) * | 2019-06-27 | 2020-03-24 | 李新亚 | Rapid erecting system for high-speed railway box girder |
CN110904810B (en) * | 2019-06-27 | 2021-08-06 | 李新亚 | Rapid erecting system for high-speed railway box girder |
CN111576218A (en) * | 2020-04-28 | 2020-08-25 | 中交二航局第四工程有限公司 | Method for rapidly transferring segment box girder on land |
CN111576218B (en) * | 2020-04-28 | 2021-10-15 | 中交二航局第四工程有限公司 | Method for rapidly transferring segment box girder on land |
CN114411572A (en) * | 2021-12-31 | 2022-04-29 | 中铁十四局集团青岛工程有限公司 | Novel precast box girder beam mounting operation method |
CN114411572B (en) * | 2021-12-31 | 2024-03-01 | 中铁十四局集团青岛工程有限公司 | Beam loading operation method for prefabricated box beam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208632969U (en) | High speed railway box girder is unpowered to change the outfit frame | |
CN201619997U (en) | Crawler-type hydraulic elevating platform | |
CN205501818U (en) | Steel truss arch bridge maintenance car | |
CN204875552U (en) | Frame bridge crane vertical lift structure | |
CN110528405A (en) | Bridge big height lifting and translocating equipment and its construction method based on vehicle group | |
CN102134043B (en) | Crawler hydraulic support assembling machine | |
CN203021883U (en) | Wheel-track railway track laying unit | |
CN101916974A (en) | Cable laying engineering truck | |
CN207361651U (en) | Aircushion vehicle jack up unit | |
CN206953907U (en) | The dual-purpose fire fighting truck railway walking system elevating mechanism of rail | |
CN201825652U (en) | Cart running and steering mechanism of beam hoisting machine | |
CN201943062U (en) | Walking type dynamic compactor | |
CN205099247U (en) | Novel twin columns elevator | |
CN2928797Y (en) | Energy saving bucket wheel material fetching machine | |
CN201873499U (en) | Mobile swinging boom type girder turnover machine | |
CN204552759U (en) | A kind of tunnel construction trolley horizontal mobile device | |
CN108439266B (en) | Jacking device for crane | |
CN207596356U (en) | A kind of device for facilitating crawler crane entrucking and unloading | |
CN207156865U (en) | A kind of hydraulic-driven bogie of combined sweeper | |
CN204823646U (en) | Gantry crane gyration hoist | |
CN201980887U (en) | Crawler-type hydraulic-bracket crane trolley | |
CN105293278A (en) | Electric block type double-rail and single-main-beam crane | |
CN204873583U (en) | Portable gantry crane | |
CN208454328U (en) | A kind of novel track turning lifting beam machine | |
CN207904776U (en) | Cross tunnel beam car |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |