CN208632958U - 一种有利于实现两端同步控制的桥梁检查装置 - Google Patents
一种有利于实现两端同步控制的桥梁检查装置 Download PDFInfo
- Publication number
- CN208632958U CN208632958U CN201821118758.5U CN201821118758U CN208632958U CN 208632958 U CN208632958 U CN 208632958U CN 201821118758 U CN201821118758 U CN 201821118758U CN 208632958 U CN208632958 U CN 208632958U
- Authority
- CN
- China
- Prior art keywords
- bridge
- running
- truss
- horizontal truss
- advantageously implemented
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821118758.5U CN208632958U (zh) | 2018-07-16 | 2018-07-16 | 一种有利于实现两端同步控制的桥梁检查装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821118758.5U CN208632958U (zh) | 2018-07-16 | 2018-07-16 | 一种有利于实现两端同步控制的桥梁检查装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208632958U true CN208632958U (zh) | 2019-03-22 |
Family
ID=65737860
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821118758.5U Active CN208632958U (zh) | 2018-07-16 | 2018-07-16 | 一种有利于实现两端同步控制的桥梁检查装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208632958U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111535206A (zh) * | 2020-05-14 | 2020-08-14 | 长沙理工大学 | 一种用于frp加固的施工方法及施工系统 |
-
2018
- 2018-07-16 CN CN201821118758.5U patent/CN208632958U/zh active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111535206A (zh) * | 2020-05-14 | 2020-08-14 | 长沙理工大学 | 一种用于frp加固的施工方法及施工系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101514586B (zh) | 吊轨式电动吊船及其施工方法 | |
CN203878472U (zh) | 吊篮式桥梁检修系统 | |
CN103306199B (zh) | 桥梁底幅面检修吊篮安装方法 | |
RU2682122C2 (ru) | Специализированное надземное средство общественного транспорта | |
CN104612044B (zh) | 一种高速铁路桥梁检查车 | |
CN201679222U (zh) | 双桅柱爬升工作平台 | |
CN105293315B (zh) | 一种装配式建筑预制构件的吊装设备 | |
CN204690604U (zh) | 一种应用于悬索桥钢桁加劲梁起吊安装的空中旋转吊具 | |
CN102817317B (zh) | 旋转升降检修平台 | |
CN110004834A (zh) | 一种用于挂索施工的自动爬升平台 | |
CN113202020A (zh) | 一种适用于箱型拱肋检查的拱肋检修车 | |
CN208632958U (zh) | 一种有利于实现两端同步控制的桥梁检查装置 | |
CN103306218B (zh) | 桥梁底幅面检修吊篮 | |
CN208632957U (zh) | 一种新型钢桁桥梁检查装置 | |
CN116768068A (zh) | 一种桥式起重机梁结构 | |
CN201286668Y (zh) | 异型悬吊平台 | |
CN204435221U (zh) | 一种高速铁路桥梁检查车 | |
CN105200918A (zh) | 桥梁检测结构及其检测方法 | |
CN204898521U (zh) | 桥梁检测结构 | |
CN206581139U (zh) | 桥梁检修行走系统 | |
CN202730648U (zh) | 旋转升降检修平台 | |
CN206070370U (zh) | 一种自动行走的桥梁检修设备 | |
CN203452004U (zh) | 桥梁底幅面检修吊篮 | |
CN213328630U (zh) | 一种便于操作的钢箱梁 | |
CN205116006U (zh) | 一种高速铁路桥梁龙门步履式维修检测装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Be favorable to realizing both ends synchro control's bridge inspection device Effective date of registration: 20200117 Granted publication date: 20190322 Pledgee: Agricultural Bank of China Limited Xinjin County sub branch Pledgor: CHENGDU JITONG ROAD AND BRIDGE TECHNOLOGY CO.,LTD. Registration number: Y2020510000006 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20210409 Granted publication date: 20190322 Pledgee: Agricultural Bank of China Limited Xinjin County sub branch Pledgor: CHENGDU JITONG ROAD AND BRIDGE TECHNOLOGY Co.,Ltd. Registration number: Y2020510000006 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A bridge inspection device for realizing synchronous control at both ends Effective date of registration: 20210413 Granted publication date: 20190322 Pledgee: Agricultural Bank of China Limited Chengdu Xinjin sub branch Pledgor: CHENGDU JITONG ROAD AND BRIDGE TECHNOLOGY Co.,Ltd. Registration number: Y2021510000022 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20220621 Granted publication date: 20190322 Pledgee: Agricultural Bank of China Limited Chengdu Xinjin sub branch Pledgor: CHENGDU JITONG ROAD AND BRIDGE TECHNOLOGY CO.,LTD. Registration number: Y2021510000022 |
|
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: No. 669, Xingyuan 10 road, a district, Xinjin Industrial Park, Chengdu, Sichuan 610000 Patentee after: Jitong Intelligent Equipment Co.,Ltd. Address before: No. 669, Xingyuan 10 road, a district, Xinjin Industrial Park, Chengdu, Sichuan 610000 Patentee before: CHENGDU JITONG ROAD AND BRIDGE TECHNOLOGY CO.,LTD. |