CN208620330U - A kind of horizontal three return-stroke biomass fuel boiler - Google Patents
A kind of horizontal three return-stroke biomass fuel boiler Download PDFInfo
- Publication number
- CN208620330U CN208620330U CN201821093544.7U CN201821093544U CN208620330U CN 208620330 U CN208620330 U CN 208620330U CN 201821093544 U CN201821093544 U CN 201821093544U CN 208620330 U CN208620330 U CN 208620330U
- Authority
- CN
- China
- Prior art keywords
- explosion
- proof
- boiler
- return
- adapter tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Solid-Fuel Combustion (AREA)
Abstract
The utility model relates to steam boiler fields, specifically a kind of horizontal three return-stroke biomass fuel boiler, including boiler barrel, access hole cylinder, explosion vent apparatus includes explosion-proof door closure, explosion-proof doorframe, explosion-proof adapter tube, explosion-proof adapter tube is docked on access hole cylinder, explosion-proof doorframe is mounted on explosion-proof adapter tube outlet, explosion-proof door closure is mounted on explosion-proof doorframe, partition is installed in explosion-proof adapter tube, partition is equipped with buffer mouth, cushioning fender covers buffer mouth, a vacuum chamber is formed in explosion-proof adapter tube between partition and explosion-proof door closure, vacuum pump is installed on the outside of tube wall at explosion-proof adapter tube vacuum chamber.The shock wave that explosion proof door pressure release comes out is effectively reduced in the utility model, while high-temperature flue gas passes through the round-trip heat exchange of three backhauls, has the advantages that heat exchange efficiency is high, smoke medicining dust-removing effect is good.
Description
Technical field
The utility model relates to field of boilers, in particular to a kind of horizontal three return-stroke biomass fuel boilers.
Background technique
Boiler is a kind of energy conversion, and the energy inputted to boiler has chemical energy, electric energy, high-temperature flue gas in fuel
The forms such as thermal energy, and pass through boiler and convert, output has steam, high-temperature water or the organic heat carrier of certain thermal energy outward.?
It is that structure is simple mostly that China, which is especially used as coal-fired, burning firewood boiler product, low production cost, boiler tail smoke evacuation
Very high " Washdown type " boiler of temperature.Waste of fuel is very big, and the thermal efficiency is not high.Energy Efficiency Ratio is extremely unreasonable at most of vertical boilers
The common fault of furnace.
Steam boiler can be divided into electric steam boiler, oil-fired steam boiler, combustion and steam pot according to fuel (electricity, oil, gas)
Three kinds of furnace;Vertical steam boiler, horizontal steam boiler can be divided into according to construction.Horizontal steam boiler generally by boiler body,
The composition such as front smoke box, rear smoke box, burner, explosion vent apparatus, explosion proof door is a kind of safety device to protect boiler setting, when
When misoperation, it may cause burner hearth or tail in igniting or operation using coal dust, oil or fuel gas as the room-fired boiler of fuel
Detonation or second-time burning occur for portion's flue, and furnace pressure is caused to increase, and when pressure rise to certain value, anti-explosive door for boiler can be certainly
Row opens pressure release to protect boiler setting.
Explosion proof door used in water heater has explosion membrane type and two kinds of swing type, and explosion membrane type explosion proof door is by rupture disk and clamping
Device composition.Rupture disk is generally made of sheet metals such as asbestos, aluminium and stainless steels.When explosion time occurs in burner hearth or flue,
When the gas shock wave pressure of generation destroys rupture disk, play the role of pressure release, explosion membrane type explosion proof door once after, just
Will not self-resetting, and be switched on clamping device and reappose rupture disk.Rotary opening type anti-explosion door is installed on the furnace of combustion chamber more
On wall.It is divided into tilting and two kinds rectilinear by its installation site, is made of components such as doorframe, door closure and hinges.Work as burner hearth
Or when gas burst occurring in flue, door closure opens pressure release around axis automatically, then and voluntarily closes.The sealed pressure of explosion proof door
The downward pressure generated by door closure tilt angle (being usually no more than 30 °) or the weight acquisition by weight.
Currently, the mode that two kinds of explosion proof doors are the directly pressure release after detonation or second-time burning occurs carry out it is explosion-proof, it is explosion-proof
Door draw off pressure it is larger when will generate biggish sonic impinging to ambient enviroment, damage on-site producing devices, also to production operation
Personnel cause life threat, generate serious production accident.Therefore, design contains the one kind that can buffer detonation shock wave explosion proof door
Fuel boiler has realistic meaning very much for a person skilled in the art.
Utility model content
Based on problem above, the utility model provides a kind of horizontal three return-stroke biomass fuel boiler.The utility model
The shock wave progress generated is increased using level 2 buffering and to boiler furnace pressure by the way of setting vacuum chamber between level 2 buffering
Buffering is effectively reduced the shock wave that explosion proof door pressure release comes out, avoids shock wave from damaging on-site producing devices, to production operation personnel
Life threat is caused, generates serious production accident, while the high-temperature flue gas after burning passes through the round-trip heat exchange of three backhauls, greatly
The exhaust gas temperature of boiler tail and the smoke content of flue gas are reduced greatly, has effects that energy-saving and environmental protection are double, designs reasonable, thermal effect
The advantage that rate is high, smoke medicining dust-removing effect is good.
In order to solve the above technical problems, the technical solution adopted in the utility model is as follows:
A kind of horizontal three return-stroke biomass fuel boiler, including pedestal, boiler barrel, ripple combine flue, and burner connects
Pipe, boiler front tube sheet, boiler back tube sheet, explosion vent apparatus, short smoke pipe, long smoke pipe, return combustion chamber, return combustion chamber backboard, return combustion chamber pipe
Plate, water inlet adapter tube, main-steam outlet nozzle, access hole cylinder, boiler barrel are mounted on the base, and ripple combination flue is mounted on
In boiler barrel, ripple combination flue one end is connected to burner adapter tube, and other end is docked with return combustion chamber, and return combustion chamber is a steel plate
Volume is bent into, and is welded with return combustion chamber tube sheet towards one end of ripple combination flue, one end backwards to ripple combination flue is welded with
Return combustion chamber backboard, short smoke pipe are mounted on boiler front tube sheet and return combustion chamber tube sheet, and long smoke pipe is mounted on boiler front tube sheet and boiler
On back tube sheet, access hole cylinder is mounted on boiler back tube sheet, and and combustion chamber, main-steam outlet nozzle and water inlet adapter tube
It is located on boiler barrel, explosion vent apparatus includes explosion-proof door closure, explosion-proof doorframe, explosion-proof adapter tube, and explosion-proof adapter tube is docked at access hole
On cylinder, explosion-proof doorframe is mounted on the outlet of explosion-proof adapter tube, and explosion-proof door closure is mounted on explosion-proof doorframe, be equipped in explosion-proof adapter tube every
Plate, partition are equipped with perforation, are installed with the second slide post in perforation, second slide post one end towards explosion-proof door closure stretch out perforation it is outer with
Cushioning fender connection, other end is stretched out outside perforation backwards to explosion-proof door closure to be connect with the second spacing head, the second spacing head and partition
Between the second slide post on be installed with buffer spring, partition is equipped with buffer mouth, and cushioning fender covers buffer mouth, partition and explosion proof door
A vacuum chamber is formed in explosion-proof adapter tube between lid, and vacuum pump is installed on the outside of the tube wall at explosion-proof adapter tube vacuum chamber.
In the present invention, boiler feed water is added into boiler barrel by adapter tube of intaking, burner passes through burner
Take over to ripple combination flue in spray combustion flame generate it is a large amount of cross hot fume, cross hot fume come through ripple combination flue cylinder
It exchanges heat with boiler feed water, this is the first backhaul heat exchange;Cross hot fume and enter return combustion chamber, enter back into installed on return combustion chamber tube sheet it is short
It in smoke pipe, crosses hot fume and is exchanged heat again by short smoke pipe and the intracorporal boiler feed water of boiler drum, this is the second backhaul heat exchange;Overheat
Flue gas enters back into boiler front smoke box from the outlet of short smoke pipe and is deflected into long smoke pipe, crosses hot fume and passes through long smoke pipe and boiler barrel
Interior boiler feed water exchanges heat again, this is third backhaul heat exchange;Subsequent flue gas comes through the long smoke pipe on boiler back tube sheet by boiler
Smoke box is discharged afterwards, and the intracorporal boiler feed water of boiler drum generates steam through three backhaul heat exchange, and defeated by main-steam outlet nozzle
Out.The vacuum pump of explosion vent apparatus covers vacuum chamber on the second slide post
The buffer spring connect is in compressive state, and the elastic force of spring pulls cushioning fender to seal buffer mouth, works as boiler internal
Ripple combination flue or detonation occurs for return combustion chamber or when second-time burning, the pressure difference of furnace pressure and vacuum chamber increases, pressure
Difference promotes cushioning fender that the second spacing head is pulled to continue to compress buffer spring, and the buffer mouth that cushioning fender covers is opened, in furnace
The high pressure gas that detonation or second-time burning generate enters in vacuum chamber, since vacuum chamber is evacuated, detonation or secondary combustion in furnace
It burns the high pressure gas generated to spread in vacuum chamber, pressure reduction, when the pressure in vacuum chamber is identical as furnace pressure and is greater than
After ambient pressure, gas washes door closure pressure release open again, completes after buffering the process of pressure release again.The utility model using level 2 buffering and
The mode that vacuum chamber is arranged between level 2 buffering increases the shock wave generated to boiler furnace pressure and buffers, and is effectively reduced anti-
The shock wave that quick-fried door pressure release comes out avoids shock wave from damaging on-site producing devices, causes life threat to production operation personnel, produces
Raw serious production accident, while the high-temperature flue gas after burning passes through the round-trip heat exchange of three backhauls, greatly reduces boiler tail
The exhaust gas temperature in portion and the smoke content of flue gas have effects that energy-saving and environmental protection are double, and design is reasonable, the thermal efficiency is high, smoke abatement and dust control effect
The good advantage of fruit.
As a preferred mode, explosion-proof doorframe is equipped with perforation, is installed with the first slide post, the first slide post in perforation
One end stretches out that perforation is outer connect with explosion-proof door closure towards explosion-proof door closure, and other end is stretched out outside perforation and first backwards to explosion-proof door closure
Spacing head connects, and is installed with pressure release spring on the first slide post between the first spacing head and explosion-proof doorframe.
As a preferred mode, gauge manifold is installed on boiler barrel.
As a preferred mode, boiler barrel upper end is equipped with lifting lug.
As a preferred mode, safety valve tube socket is installed on boiler barrel.
As a preferred mode, boiler barrel is equipped with manhole.
As a preferred mode, cylinder lower end is equipped with blowdown valve tube socket.
As a preferred mode, water-level gauge is installed on boiler barrel.
Compared with prior art, the utility model has the beneficial effects that
(1) the utility model using level 2 buffering and between level 2 buffering be arranged vacuum chamber by the way of to boiler furnace pressure
It increases the shock wave generated to be buffered, the shock wave that explosion proof door pressure release comes out is effectively reduced, avoid shock wave damage scene raw
Equipment is produced, personnel cause life threat to production operation, generate serious production accident, while the high-temperature flue gas after burning passes through
The round-trip heat exchange of three backhauls, greatly reduces the exhaust gas temperature of boiler tail and the smoke content of flue gas, has energy-saving and environmental protection
Double effects, the advantage that design is reasonable, the thermal efficiency is high, smoke medicining dust-removing effect is good;
(2) the explosion-proof doorframe of the utility model is equipped with perforation, is installed with the first slide post, first slide post one end court in perforation
It is connect to outside the stretching perforation of explosion-proof door closure with explosion-proof door closure, other end is stretched out outside perforation backwards to explosion-proof door closure and the first spacing head
It connects, is installed with pressure release spring on the first slide post between the first spacing head and explosion-proof doorframe, gas is washed explosion-proof door closure open while being drawn
Dynamic first spacing head compresses pressure release spring, and after completing pressure release, pressure release spring force pulls door closure to reset, relative to traditional explosion
Membrane type explosion proof door has the characteristics that reusability is high, small to the impact force of doorframe relative to the explosion proof door of revolving type, resets
When noise it is small, service using life is long;
(3) gauge manifold is installed on the utility model boiler barrel, water-level gauge is installed on boiler barrel, convenient for pair
The intracorporal water level of boiler drum checked, while after gauge manifold installs pressure gauge, convenient for carrying out to the pressure in boiler
Real-time detection prevents the pressure in boiler excessive;
(4) safety valve tube socket, when pressure is excessive in boiler barrel, safety valve are installed on the utility model boiler barrel
Discharge medium releases stress, and avoids having an accident;
(5) the utility model boiler barrel upper end is equipped with lifting lug, convenient for the lifting of boiler;
(6) the utility model boiler barrel is equipped with manhole, convenient for manually being overhauled after parking;
(7) the utility model cylinder lower end is equipped with blowdown valve tube socket, generates after parking maintenance cleaning, in boiler barrel big
Dirt is measured, after sewage draining valve is installed on blowdown valve tube socket, the intracorporal sewage of cylinder can be discharged, sewage is avoided to be deposited in boiler drum
In vivo.
Detailed description of the invention
Fig. 1 is the front view of the utility model.
Fig. 2 is the left view of the utility model.
Fig. 3 is the top view of the utility model.
Fig. 4 is the structural schematic diagram of explosion vent apparatus.
Wherein, 1 pedestal, 2 ripples combine flue, and 3 burners are taken over, 4 boiler front tube sheets, 5 short smoke pipes, 6 long smoke pipes, and 7 pots
Furnace tube, 8 gauge manifolds, 9 lifting lugs, 10 safety valve tube sockets, 11 manholes, 12 main-steam outlet nozzles, 13 boiler back tube sheets, 14
Explosion vent apparatus, 14-1 partition, the explosion-proof adapter tube of 14-2, the first spacing head of 14-3,14-4 pressure release spring, the first slide post of 14-5,
The explosion-proof doorframe of 14-6, the explosion-proof door closure of 14-7,14-8 vacuum chamber, 14-9 vacuum pump, 14-10 cushioning fender, 14-11 buffer spring,
The second spacing head of 14-12,14-13 buffer mouth, the second slide post of 14-14,15 access hole cylinders, 16 return combustion chamber backboards, 17 strile-back
Room, 18 blowdown valve tube sockets, 19 return combustion chamber tube sheets, 20 water-level gauges, 21 water inlet adapter tubes.
Specific embodiment
The utility model will be further described below with reference to the accompanying drawings.The embodiments of the present invention includes but unlimited
In the following example.
Embodiment 1:
Referring to Fig. 1~4, a kind of horizontal three return-stroke biomass fuel boiler, including pedestal 1, boiler barrel, ripple combination stove
Gallbladder 2, burner adapter tube 3, boiler front tube sheet 4, boiler back tube sheet 13, explosion vent apparatus 14, short smoke pipe 5, long smoke pipe 6, return combustion chamber
17, return combustion chamber backboard 16, return combustion chamber tube sheet 19, adapter tube 21 of intaking, main-steam outlet connects 12 pipes, access hole cylinder 15, boiler drum
Body is mounted on pedestal 1, and ripple combination flue 2 is mounted in boiler barrel, and ripple combination flue 2 is terminated with burner adapter tube
3, other end is docked with return combustion chamber 17, and return combustion chamber 17 is that a roll of steel plate is bent into, and is welded towards one end of ripple combination flue 2
There is return combustion chamber tube sheet 19, one end backwards to ripple combination flue 2 is welded with return combustion chamber backboard 16, before short smoke pipe 5 is mounted on boiler
On tube sheet 4 and return combustion chamber tube sheet 19, long smoke pipe 6 is mounted on boiler front tube sheet 4 and boiler back tube sheet 13, and access hole cylinder 15 is pacified
On boiler back tube sheet 13, and and combustion chamber, main-steam outlet connects 12 pipes and water inlet adapter tube 21 is located on boiler barrel,
Explosion vent apparatus 14 includes explosion-proof door closure 14-7, explosion-proof doorframe 14-6, explosion-proof adapter tube 14-2, and explosion-proof adapter tube 14-2 is docked at maintenance
On mouth cylinder 15, explosion-proof doorframe 14-6 is mounted on the explosion-proof outlet adapter tube 14-2, and explosion-proof door closure 14-7 is mounted on explosion-proof doorframe 14-6
On, partition 14-1 is installed in explosion-proof adapter tube 14-2, partition 14-1 is equipped with perforation, is installed with the second slide post 14-14 in perforation,
Second one end slide post 14-14 is stretched out outside perforation towards explosion-proof door closure 14-7 to be connect with cushioning fender 14-10, and other end is backwards
Explosion-proof door closure 14-7 stretches out outside perforation to be connect with the second spacing head 14-12, second between the second spacing head 14-12 and partition 14-1
Buffer spring 14-11 is installed on slide post 14-14, partition 14-1 is equipped with buffer mouth 14-13, and cushioning fender 14-10 covers slow
Blurt out 14-13, and a vacuum chamber 14-8, explosion-proof adapter tube are formed in the explosion-proof adapter tube 14-2 between partition 14-1 and explosion-proof door closure 14-7
Vacuum pump 14-9 is installed on the outside of tube wall at 14-2 vacuum chamber 14-8.
In this example, boiler feed water is added into boiler barrel by adapter tube 21 of intaking, burner is connect by burner
Pipe 3 to ripple combination flue 2 in spray combustion flame generate it is a large amount of cross hot fume, cross hot fume come through ripple combine flue 2
Body and boiler feed water exchange heat, this is the first backhaul heat exchange;It crosses hot fume and enters return combustion chamber 17, enter back on return combustion chamber tube sheet 19 and pacify
It in the short smoke pipe 5 of dress, crosses hot fume and is exchanged heat again by short smoke pipe 5 and the intracorporal boiler feed water of boiler drum, this is the second backhaul
Heat exchange;It crosses hot fume to enter back into boiler front smoke box from the outlet of short smoke pipe 5 and be deflected into long smoke pipe 6, crosses hot fume and pass through long cigarette
Pipe 6 exchanges heat again with the intracorporal boiler feed water of boiler drum, this is third backhaul heat exchange;Subsequent flue gas comes through on boiler back tube sheet 13
Long smoke pipe 6 be discharged by smoke box after boiler, the intracorporal boiler feed water of boiler drum generates steam through three backhauls heat exchange, and passes through master
Steam (vapor) outlet connects the output of 12 pipes.The vacuum pump 14-9 of explosion vent apparatus 14 vacuumizes vacuum chamber 14-8, the second slide post 14-14
The buffer spring 14-11 of upper socket is in compressive state, and the elastic force of spring pulls cushioning fender 14-10 to seal buffer mouth 14-13,
When the ripple of boiler internal combines flue 2 or detonation or second-time burning occur for return combustion chamber 17, furnace pressure and vacuum chamber 14-8
Pressure difference increase, pressure difference promote cushioning fender 14-10 pull the second spacing head 14-12 continue compress buffer spring 14-11,
The buffer mouth 14-13 that cushioning fender 14-10 is covered is opened, and the high pressure gas that detonation or second-time burning generate in furnace enters vacuum
In the 14-8 of room, since vacuum chamber 14-8 is evacuated, the high pressure gas that detonation or second-time burning generate in furnace is in vacuum chamber 14-8
Interior diffusion, pressure reduction, after the pressure in vacuum chamber 14-8 is identical as furnace pressure and is greater than ambient pressure, gas is washed open again
The process of pressure release again after buffering is completed in door closure pressure release.The utility model is using level 2 buffering and vacuum is arranged between level 2 buffering
The mode of room 14-8 to boiler furnace pressure increase generate shock wave buffer, be effectively reduced explosion proof door pressure release come out rush
Wave is hit, avoids shock wave from damaging on-site producing devices, personnel cause life threat to production operation, generate serious production thing
Therefore while the high-temperature flue gas after burning by the round-trip heat exchange of three backhauls, greatly reduce boiler tail exhaust gas temperature and
The smoke content of flue gas has effects that the advantage that energy-saving and environmental protection are double, and design is reasonable, the thermal efficiency is high, smoke medicining dust-removing effect is good.
Embodiment 2:
Referring to Fig. 1~4, a kind of horizontal three return-stroke biomass fuel boiler, including pedestal 1, boiler barrel, ripple combination stove
Gallbladder 2, burner adapter tube 3, boiler front tube sheet 4, boiler back tube sheet 13, explosion vent apparatus 14, short smoke pipe 5, long smoke pipe 6, return combustion chamber
17, return combustion chamber backboard 16, return combustion chamber tube sheet 19, adapter tube 21 of intaking, main-steam outlet connects 12 pipes, access hole cylinder 15, boiler drum
Body is mounted on pedestal 1, and ripple combination flue 2 is mounted in boiler barrel, and ripple combination flue 2 is terminated with burner adapter tube
3, other end is docked with return combustion chamber 17, and return combustion chamber 17 is that a roll of steel plate is bent into, and is welded towards one end of ripple combination flue 2
There is return combustion chamber tube sheet 19, one end backwards to ripple combination flue 2 is welded with return combustion chamber backboard 16, before short smoke pipe 5 is mounted on boiler
On tube sheet 4 and return combustion chamber tube sheet 19, long smoke pipe 6 is mounted on boiler front tube sheet 4 and boiler back tube sheet 13, and access hole cylinder 15 is pacified
On boiler back tube sheet 13, and and combustion chamber, main-steam outlet connects 12 pipes and water inlet adapter tube 21 is located on boiler barrel,
Explosion vent apparatus 14 includes explosion-proof door closure 14-7, explosion-proof doorframe 14-6, explosion-proof adapter tube 14-2, and explosion-proof adapter tube 14-2 is docked at maintenance
On mouth cylinder 15, explosion-proof doorframe 14-6 is mounted on the explosion-proof outlet adapter tube 14-2, and explosion-proof door closure 14-7 is mounted on explosion-proof doorframe 14-6
On, partition 14-1 is installed in explosion-proof adapter tube 14-2, partition 14-1 is equipped with perforation, is installed with the second slide post 14-14 in perforation,
Second one end slide post 14-14 is stretched out outside perforation towards explosion-proof door closure 14-7 to be connect with cushioning fender 14-10, and other end is backwards
Explosion-proof door closure 14-7 stretches out outside perforation to be connect with the second spacing head 14-12, second between the second spacing head 14-12 and partition 14-1
Buffer spring 14-11 is installed on slide post 14-14, partition 14-1 is equipped with buffer mouth 14-13, cushioning fender
14-10 covers buffer mouth 14-13, and it is true that one is formed in the explosion-proof adapter tube 14-2 between partition 14-1 and explosion-proof door closure 14-7
Vacuum pump 14-9 is installed on the outside of tube wall at empty room 14-8, explosion-proof adapter tube 14-2 vacuum chamber 14-8.
Explosion-proof doorframe 14-6 is equipped with perforation, is installed with the first slide post 14-5, first one end slide post 14-5 court in perforation
It stretches out outside perforation to explosion-proof door closure 14-7 and is connect with explosion-proof door closure 14-7, other end is stretched out outside perforation backwards to explosion-proof door closure 14-7
It is connect with the first spacing head 14-3, is installed with pressure release on the first slide post 14-5 between the first spacing head 14-3 and explosion-proof doorframe 14-6
Spring 14-4, gas wash explosion-proof door closure 14-7 open while pulling the first spacing head 14-3 compression pressure release spring 14-4, complete pressure release
Afterwards, pressure release spring 14-4 elastic force pulls door closure to reset, relative to traditional explosion membrane type explosion proof door, with the high spy of reusability
Point, small to the impact force of doorframe relative to the explosion proof door of revolving type, noise is small when reset, and service using life is long.
The other parts of the present embodiment are same as the previously described embodiments, just repeat no more here.
Embodiment 3:
Referring to Fig. 1~4, a kind of horizontal three return-stroke biomass fuel boiler, including pedestal 1, boiler barrel, ripple combination stove
Gallbladder 2, burner adapter tube 3, boiler front tube sheet 4, boiler back tube sheet 13, explosion vent apparatus 14, short smoke pipe 5, long smoke pipe 6, return combustion chamber
17, return combustion chamber backboard 16, return combustion chamber tube sheet 19, adapter tube 21 of intaking, main-steam outlet connects 12 pipes, access hole cylinder 15, boiler drum
Body is mounted on pedestal 1, and ripple combination flue 2 is mounted in boiler barrel, and ripple combination flue 2 is terminated with burner adapter tube
3, other end is docked with return combustion chamber 17, and return combustion chamber 17 is that a roll of steel plate is bent into, and is welded towards one end of ripple combination flue 2
There is return combustion chamber tube sheet 19, one end backwards to ripple combination flue 2 is welded with return combustion chamber backboard 16, before short smoke pipe 5 is mounted on boiler
On tube sheet 4 and return combustion chamber tube sheet 19, long smoke pipe 6 is mounted on boiler front tube sheet 4 and boiler back tube sheet 13, and access hole cylinder 15 is pacified
On boiler back tube sheet 13, and and combustion chamber, main-steam outlet connects 12 pipes and water inlet adapter tube 21 is located on boiler barrel,
Explosion vent apparatus 14 includes explosion-proof door closure 14-7, explosion-proof doorframe 14-6, explosion-proof adapter tube 14-2, and explosion-proof adapter tube 14-2 is docked at maintenance
On mouth cylinder 15, explosion-proof doorframe 14-6 is mounted on the explosion-proof outlet adapter tube 14-2, and explosion-proof door closure 14-7 is mounted on explosion-proof doorframe 14-6
On, partition 14-1 is installed in explosion-proof adapter tube 14-2, partition 14-1 is equipped with perforation, is installed with the second slide post 14-14 in perforation,
Second one end slide post 14-14 is stretched out outside perforation towards explosion-proof door closure 14-7 to be connect with cushioning fender 14-10, and other end is backwards
Explosion-proof door closure 14-7 stretches out outside perforation to be connect with the second spacing head 14-12, second between the second spacing head 14-12 and partition 14-1
Buffer spring 14-11 is installed on slide post 14-14, partition 14-1 is equipped with buffer mouth 14-13, and cushioning fender 14-10 covers slow
Blurt out 14-13, and a vacuum chamber 14-8, explosion-proof adapter tube are formed in the explosion-proof adapter tube 14-2 between partition 14-1 and explosion-proof door closure 14-7
Vacuum pump 14-9 is installed on the outside of tube wall at 14-2 vacuum chamber 14-8.
Gauge manifold 8 is installed on boiler barrel, water-level gauge 20 is installed on boiler barrel, convenient for in boiler barrel
Water level checked, while gauge manifold 8 install pressure gauge after, convenient for being measured in real time to the pressure in boiler,
Prevent the pressure in boiler excessive.
Safety valve tube socket 11 is installed, when pressure is excessive in boiler barrel, safety valve discharge medium is released on boiler barrel
Power is bled off pressure, avoids having an accident.
Boiler barrel upper end is equipped with lifting lug 9, convenient for the lifting of boiler.
The other parts of the present embodiment are same as the previously described embodiments, just repeat no more here.
Embodiment 4:
Referring to Fig. 1~4, a kind of horizontal three return-stroke biomass fuel boiler, including pedestal 1, boiler barrel, ripple combination stove
Gallbladder 2, burner adapter tube 3, boiler front tube sheet 4, boiler back tube sheet 13, explosion vent apparatus 14, short smoke pipe 5, long smoke pipe 6, return combustion chamber
17, return combustion chamber backboard 16, return combustion chamber tube sheet 19, adapter tube 21 of intaking, main-steam outlet connects 12 pipes, access hole cylinder 15, boiler drum
Body is mounted on pedestal 1, and ripple combination flue 2 is mounted in boiler barrel, and ripple combination flue 2 is terminated with burner adapter tube
3, other end is docked with return combustion chamber 17, and return combustion chamber 17 is that a roll of steel plate is bent into, and is welded towards one end of ripple combination flue 2
There is return combustion chamber tube sheet 19, one end backwards to ripple combination flue 2 is welded with return combustion chamber backboard 16, before short smoke pipe 5 is mounted on boiler
On tube sheet 4 and return combustion chamber tube sheet 19, long smoke pipe 6 is mounted on boiler front tube sheet 4 and boiler back tube sheet 13, and access hole cylinder 15 is pacified
On boiler back tube sheet 13, and and combustion chamber, main-steam outlet connects 12 pipes and water inlet adapter tube 21 is located on boiler barrel,
Explosion vent apparatus 14 includes explosion-proof door closure 14-7, explosion-proof doorframe 14-6, explosion-proof adapter tube 14-2, and explosion-proof adapter tube 14-2 is docked at maintenance
On mouth cylinder 15, explosion-proof doorframe 14-6 is mounted on the explosion-proof outlet adapter tube 14-2, and explosion-proof door closure 14-7 is mounted on explosion-proof doorframe 14-6
On, partition 14-1 is installed in explosion-proof adapter tube 14-2, partition 14-1 is equipped with perforation, is installed with the second slide post 14-14 in perforation,
Second one end slide post 14-14 is stretched out outside perforation towards explosion-proof door closure 14-7 to be connect with cushioning fender 14-10, and other end is backwards
Explosion-proof door closure 14-7 stretches out outside perforation to be connect with the second spacing head 14-12, second between the second spacing head 14-12 and partition 14-1
Buffer spring 14-11 is installed on slide post 14-14, partition 14-1 is equipped with buffer mouth 14-13, and cushioning fender 14-10 covers slow
Blurt out 14-13, and a vacuum chamber 14-8, explosion-proof adapter tube are formed in the explosion-proof adapter tube 14-2 between partition 14-1 and explosion-proof door closure 14-7
Vacuum pump 14-9 is installed on the outside of tube wall at 14-2 vacuum chamber 14-8.
Boiler barrel is equipped with manhole 11, convenient for manually being overhauled after parking.
Cylinder lower end is equipped with blowdown valve tube socket 18 and generates a large amount of dirts in boiler barrel after parking maintenance cleaning, arranging
After sewage draining valve is installed on dirty valve tube socket 18, the intracorporal sewage of cylinder can be discharged, sewage is avoided to be deposited in boiler barrel.
The other parts of the present embodiment are same as the previously described embodiments, just repeat no more here.
It as above is the embodiments of the present invention.Design parameter in above-described embodiment and embodiment is merely to clear
Utility model verification process is stated by Chu, not to limit the scope of patent protection of the utility model, the patent of the utility model
Protection scope is still subject to the claims, equivalent made by all specifications and accompanying drawing content with the utility model
Structure change similarly should be included in the protection scope of the utility model.
Claims (8)
1. a kind of horizontal three return-stroke biomass fuel boiler, including pedestal (1), boiler barrel (7), ripple combine flue (2), combustion
Burner takes over (3), boiler front tube sheet (4), boiler back tube sheet (13), explosion vent apparatus (14), short smoke pipe (5), long smoke pipe (6),
Return combustion chamber (17), return combustion chamber backboard (16), return combustion chamber tube sheet (19), water inlet adapter tube (21), main-steam outlet nozzle (12), maintenance
Mouth cylinder (15), it is characterised in that: the explosion vent apparatus (14) includes explosion-proof door closure (14-7), explosion-proof doorframe (14-6), is prevented
Quick-fried adapter tube (14-2), the explosion-proof adapter tube (14-2) are docked on access hole cylinder (15), explosion-proof doorframe (14-6) installation
It is exported in explosion-proof adapter tube (14-2), the explosion-proof door closure (14-7) is mounted on explosion-proof doorframe (14-6), the explosion-proof adapter tube
It is equipped with partition (14-1) in (14-2), the partition (14-1) is equipped with perforation, is installed with the second slide post in the perforation
(14-14), described second slide post one end (14-14) is stretched out outside perforation towards explosion-proof door closure (14-7) and cushioning fender (14-
10) it connecting, other end is stretched out outside perforation backwards to explosion-proof door closure (14-7) to be connect with the second spacing head (14-12), and described second
Buffer spring (14-11), the partition are installed on the second slide post (14-14) between spacing head (14-12) and partition (14-1)
(14-1) is equipped with buffer mouth (14-13), and the cushioning fender (14-10) covers buffer mouth (14-13), the partition (14-1)
A vacuum chamber (14-8) is formed in explosion-proof adapter tube (14-2) between explosion-proof door closure (14-7), described explosion-proof adapter tube (14-2) vacuum
Vacuum pump (14-9) is installed on the outside of tube wall at room (14-8).
2. the horizontal three return-stroke biomass fuel boiler of one kind according to claim 1, it is characterised in that: the explosion-proof doorframe
(14-6) is equipped with perforation, is installed with the first slide post (14-5) in the perforation, described first slide post (14-5) one end direction
Explosion-proof door closure (14-7) is stretched out outside perforation to be connect with explosion-proof door closure (14-7), and other end is worn backwards to explosion-proof door closure (14-7) stretching
It is connect outside hole with the first spacing head (14-3), the first slide post between first spacing head (14-3) and explosion-proof doorframe (14-6)
Pressure release spring (14-4) is installed on (14-5).
3. the horizontal three return-stroke biomass fuel boiler of one kind according to claim 1, it is characterised in that: the boiler barrel
(7) gauge manifold (8) are installed on.
4. the horizontal three return-stroke biomass fuel boiler of one kind according to claim 1, it is characterised in that: the boiler barrel
(7) upper end is equipped with lifting lug (9).
5. the horizontal three return-stroke biomass fuel boiler of one kind according to claim 1, it is characterised in that: the boiler barrel
(7) safety valve tube socket (10) are installed on.
6. the horizontal three return-stroke biomass fuel boiler of one kind according to claim 1, it is characterised in that: the boiler barrel
(7) manhole (11) are equipped with.
7. the horizontal three return-stroke biomass fuel boiler of one kind according to claim 1, it is characterised in that: the cylinder lower end
Blowdown valve tube socket (18) are installed.
8. the horizontal three return-stroke biomass fuel boiler of one kind according to claim 1, it is characterised in that: the boiler barrel
(7) water-level gauge (20) are installed on.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821093544.7U CN208620330U (en) | 2018-07-10 | 2018-07-10 | A kind of horizontal three return-stroke biomass fuel boiler |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821093544.7U CN208620330U (en) | 2018-07-10 | 2018-07-10 | A kind of horizontal three return-stroke biomass fuel boiler |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208620330U true CN208620330U (en) | 2019-03-19 |
Family
ID=65703697
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821093544.7U Active CN208620330U (en) | 2018-07-10 | 2018-07-10 | A kind of horizontal three return-stroke biomass fuel boiler |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208620330U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110043883A (en) * | 2019-04-26 | 2019-07-23 | 中原工学院 | A kind of biogas steam generator |
CN110566924A (en) * | 2019-09-26 | 2019-12-13 | 中国恩菲工程技术有限公司 | Explosion-proof door of waste heat boiler and waste heat boiler |
CN110630996A (en) * | 2019-05-20 | 2019-12-31 | 秦月云 | Water immersion type biomass fuel steam pressure boiler |
CN117450493A (en) * | 2023-12-13 | 2024-01-26 | 武汉船舶职业技术学院 | Marine boiler with explosion-proof protection |
-
2018
- 2018-07-10 CN CN201821093544.7U patent/CN208620330U/en active Active
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110043883A (en) * | 2019-04-26 | 2019-07-23 | 中原工学院 | A kind of biogas steam generator |
CN110043883B (en) * | 2019-04-26 | 2020-02-18 | 中原工学院 | Biomass gas steam generator |
CN110630996A (en) * | 2019-05-20 | 2019-12-31 | 秦月云 | Water immersion type biomass fuel steam pressure boiler |
CN110566924A (en) * | 2019-09-26 | 2019-12-13 | 中国恩菲工程技术有限公司 | Explosion-proof door of waste heat boiler and waste heat boiler |
CN110566924B (en) * | 2019-09-26 | 2024-06-11 | 中国恩菲工程技术有限公司 | Explosion-proof door of waste heat boiler and waste heat boiler |
CN117450493A (en) * | 2023-12-13 | 2024-01-26 | 武汉船舶职业技术学院 | Marine boiler with explosion-proof protection |
CN117450493B (en) * | 2023-12-13 | 2024-05-03 | 武汉船舶职业技术学院 | Marine boiler with explosion-proof protection |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208620330U (en) | A kind of horizontal three return-stroke biomass fuel boiler | |
CN201819195U (en) | Atmospheric steam boiler | |
CN208606200U (en) | A kind of fuel vapor vacuum hot water furnace vacuum anti-explosion door | |
CN205048407U (en) | Horizontal full -automatic steam boiler | |
CN204593835U (en) | Vertical and horizontal oil-burning gas-fired boiler | |
CN212585212U (en) | Biomass gasification furnace | |
CN109630999A (en) | A kind of efficient supplementary fired Waste Heat Boiler | |
CN201795466U (en) | Vertical coal-fired gas boiler | |
CN211204037U (en) | Air supply device of circulating fluidized bed boiler | |
CN208846463U (en) | Combustion boiler with good smoke discharging and sealing performance | |
CN207214028U (en) | The boiler of coal in a kind of convenience | |
CN2380797Y (en) | Environment-protective energy-saved stream boiler | |
CN208154816U (en) | Combusting coal fines energy-saving hot-water boiler | |
CN202835317U (en) | Vertical type boiler with towering pipe | |
CN209588089U (en) | Combustion boiler that smoke extraction efficiency is high | |
CN2773486Y (en) | Separated hot-piping tailed heat boiler | |
CN209399348U (en) | A kind of gas fired-boiler waste-heat recovery device | |
CN202613419U (en) | Novel energy saver for boilers | |
CN212618210U (en) | Steam boiler for burning natural gas | |
CN201476074U (en) | Cooking water heating energy-saving boiler | |
CN202470399U (en) | Seawater energy-saving boiler | |
CN107327826A (en) | Horizontal single drum uses fuel boiler | |
CN2500964Y (en) | Pipe network type environmental protection heating boiler | |
CN205481726U (en) | Vertical water tube boiler | |
CN107355773B (en) | Boiler convenient for feeding coal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |