CN208586634U - A kind of Strengthening of Bridge Pile Foundation device - Google Patents

A kind of Strengthening of Bridge Pile Foundation device Download PDF

Info

Publication number
CN208586634U
CN208586634U CN201820698649.9U CN201820698649U CN208586634U CN 208586634 U CN208586634 U CN 208586634U CN 201820698649 U CN201820698649 U CN 201820698649U CN 208586634 U CN208586634 U CN 208586634U
Authority
CN
China
Prior art keywords
pile foundation
fixedly connected
bridge pile
extension board
fixed plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820698649.9U
Other languages
Chinese (zh)
Inventor
焦彦亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Upper Sea Route Port Construction Engineering Corp Ltd
Original Assignee
Upper Sea Route Port Construction Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Upper Sea Route Port Construction Engineering Corp Ltd filed Critical Upper Sea Route Port Construction Engineering Corp Ltd
Priority to CN201820698649.9U priority Critical patent/CN208586634U/en
Application granted granted Critical
Publication of CN208586634U publication Critical patent/CN208586634U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of Strengthening of Bridge Pile Foundation devices, including bottom plate, the upper surface of the bottom plate is fixedly connected with bridge pile foundation ontology, the left and right sides of bridge pile foundation ontology is placed with the first fixed plate, two the first fixed plates one side close to each other offers the first through slot, the inside of each first through slot is placed with the first extension board, and the one side wall that two the first through slots are located remotely from each other offers the first guide rail.The Strengthening of Bridge Pile Foundation device, by being provided with sliding slot, with the use of sliding block, it can effectively avoid the second extension board from the phenomenon that Caton occur during sliding, by being provided with third pin shaft, the 4th pin shaft, the second pin shaft and the first pin shaft, first movement bar and the second mobile bar can be made to stretch more convenient, the second extension board and the first extension plate stretching can be made more convenient, the bearing area for improving the device ensure that the safety and stability of the device, keep bridge pile foundation stronger.

Description

A kind of Strengthening of Bridge Pile Foundation device
Technical field
The utility model relates to bridge technology field, specially a kind of Strengthening of Bridge Pile Foundation device.
Background technique
With the development of economic construction, deep-water bridge engineering is increasing, and bridge pile foundation is as main in science of bridge building Foundation pattern, very widely used, bridge pile foundation is nearby due to the influence of water flow, and nearby hydrodynamic characterisitic is complicated for pile foundation, and And the souring that water flow forms bridge pile foundation, over time, bridge single pile or a clump of piles are due to souring stabilization Property reduce, and then the structure for the pile foundation that destroys a bridge makes entire bridge there are security risk, bridge pile foundation Common Diseases mainly have two Class, channel scour reduce effective length, insufficient so as to cause pile foundation bearing capacity, stake caused by the mass defect of pile body section Body cross-sectional strength is insufficient.
During use, often there is the poor problem of reinforcement performance, has seriously affected bridge in existing highway bridge pile foundation There are security risks for the normal use of beam.
Utility model content
The purpose of this utility model is exactly in order to make up for the deficiencies of the prior art, to provide a kind of Strengthening of Bridge Pile Foundation dress It sets, it has the advantages that reinforcement performance is stronger, solves the problems, such as that existing highway bridge pile foundation reinforcement performance is poor.
The utility model is in order to solve the above technical problems, provide the following technical solutions: a kind of Strengthening of Bridge Pile Foundation device, packet Bottom plate is included, the upper surface of the bottom plate is fixedly connected with bridge pile foundation ontology, and the left and right sides of the bridge pile foundation ontology is put It is equipped with the first fixed plate, two first fixed plate one sides close to each other offer the first through slot, and each described The inside of one through slot is placed with the first extension board, and the one side wall that two first through slots are located remotely from each other offers first and leads Rail, the one side that two first extension boards are located remotely from each other is fixedly connected to the first guide block, and the first guide block is connected to The inside of one guide rail, the one side that two first fixed plates are located remotely from each other are fixedly connected to the second fixed plate, Mei Gesuo The bottom surface for stating the second fixed plate offers the second through slot, and the inside of each second through slot is placed with the second extension board, The inner roof wall of each second through slot offers the second guide rail, and the upper surface of each second extension board is fixedly connected with There is the second guide block, and the second guide block is connected to the inside of the second guide rail, the upper surface of each second fixed plate is fixed to be connected It is connected to the locating piece in triangular shape, the one side that two locating pieces are located remotely from each other fixation is inlaid with bearing, each described The upper surface of second extension board is fixedly connected to push-and-pull block, and the outer surface on each push-and-pull block top passes through the first pin shaft It is fixedly hinged with first movement bar, the outer surface on each first movement bar top passes through the second pin shaft and is fixedly hinged with cunning Movable plate, the one side that each first extension board is located remotely from each other are fixedly connected to the second push-and-pull block, and two described second push away One end that pulling block is located remotely from each other passes through third pin shaft and is fixedly hinged with the second mobile bar, the bottom end of two second mobile bars Respectively by one end fixed hinge of the 4th pin shaft and two sliding panels far from first movement bar, two sliding panels are mutually remote From one side fixation be inlaid with screwed pipe, threaded rod, two institutes are placed with described in every group between sliding panel and locating piece The outer surface for stating threaded rod one end close to each other is fixedly connected with the inner ring of two bearings respectively, and two threaded rods are mutually remote From one end extend through two screwed pipes and extend to the side that two sliding panels are located remotely from each other, and screwed pipe and threaded rod spiral shell Line connection, the upper surface of each second fixed plate offers mounting hole.
Further, the upper surface of each first guide block is fixed and is inlaid with the first connecting tube, and each described first The inner roof wall of guide rail is fixedly connected to the first slide bar, and the first connecting tube socket-connects with the first slide bar.
By using above-mentioned technical proposal, the first extension board can effectively be avoided inclined ask occur when mobile Topic, ensure that the stability and safety of the device.
Further, the right side of each second guide block is fixed and is inlaid with the second connecting tube, and each described second The inner sidewall of guide rail is fixedly connected to the second litter, and the second litter socket-connects with the second connecting tube.
By using above-mentioned technical proposal, the second extension board can effectively be avoided inclined ask occur when mobile Topic, improves the support effect of the second extension board.
Further, the upper surface of the bottom plate is opened up there are two symmetrical sliding slot, each second extension board Bottom surface is fixedly connected to sliding block, and sliding block is connected to the inside of sliding slot.
By using above-mentioned technical proposal, the sliding of the second extension board can be made more convenient, the second extension board can be made to exist Occurs the phenomenon that Caton during sliding.
Further, one end that two threaded rods are located remotely from each other is fixedly connected to handle, each handle Appearance is fixedly connected to non-slip mat.
By using above-mentioned technical proposal, keeps staff's rotation threaded rod more convenient, staff is avoided to rotate During there is the problem of rubber sleeve.
Further, the vertical plane where first fixed plate is parallel with the vertical plane where bridge pile foundation ontology, The perpendicular shape of vertical plane where horizontal plane and the first fixed plate where second fixed plate.
Make the first extension board and the second extension board to bridge using the characteristic of triangle by using above-mentioned technical proposal Pile foundation ontology is reinforced more convenient.
Compared with prior art, the Strengthening of Bridge Pile Foundation device have it is following the utility model has the advantages that
1, the utility model can make the device whole more stable, by being provided with peace by being provided with the second guide block Hole is filled, the device can be made easier for installation, by being provided with handle, non-slip mat is used cooperatively, can effectively avoid work There is the phenomenon that rubber sleeve in the course of rotation in personnel, by being provided with the second litter, connect with the use of the second guide block and second Adapter tube, can effectively avoid the second extension board from shaking during sliding, can effectively enhance the safety of the device Property and stability.
2, the utility model is used cooperatively sliding block, can effectively avoid the second extension board from sliding by being provided with sliding slot During there is the phenomenon that Caton, by being provided with third pin shaft, the 4th pin shaft, the second pin shaft and the first pin shaft, can make First movement bar and the stretching, extension of the second mobile bar are more convenient, and the second extension board and the first extension plate stretching can be made more convenient, The bearing area for improving the device ensure that the safety and stability of the device, keep bridge pile foundation stronger.
Detailed description of the invention
Fig. 1 is the sectional view of the first fixed plate of the utility model main view;
Fig. 2 is structure enlargement diagram at A in the utility model Fig. 1
Fig. 3 is structure enlargement diagram at B in the utility model Fig. 1.
In figure: 1- third pin shaft, the second mobile bar of 2-, 3- handle, 4- screwed pipe, the second pin shaft of 5-, 6- first movement Bar, the first pin shaft of 7-, the second extension board of 8-, 9- sliding slot, the second guide block of 10-, 11- mounting hole, the first fixed plate of 12-, 13- bridge Beam pile foundation ontology, the first extension board of 14-, the second fixed plate of 15-, 16- push-and-pull block, 17- sliding panel, 18- threaded rod, 19- are anti-skidding Pad, 20- second push and pull block, the 4th pin shaft of 21-, 22- bearing, 23- locating piece, 24- locating piece, the first guide block of 25-, 26- first Slide bar, the first guide rail of 27-, the first through slot of 28-, 29- bottom plate, the second guide rail of 30-, 31- sliding block, the second through slot of 32-, 33- second Connecting tube, the second litter of 34-.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of Strengthening of Bridge Pile Foundation device, including bottom plate 29, the upper surface of bottom plate 29 is fixedly connected with bridge pile foundation ontology 13, and the left and right sides of bridge pile foundation ontology 13 is placed with One fixed plate 12, two the first fixed plate 12 one sides close to each other offer the first through slot 28, each first through slot 28 Inside be placed with the first extension board 14, the one side wall that two the first through slots 28 are located remotely from each other offers the first guide rail 27, The one side that two the first extension boards 14 are located remotely from each other is fixedly connected to the first guide block 25, and the first guide block 25 is connected to first The inside of guide rail 27, the one side that two the first fixed plates 12 are located remotely from each other are fixedly connected to the second fixed plate 15, Mei Ge The bottom surface of two fixed plates 15 offers the second through slot 32, and the inside of each second through slot 32 is placed with the second extension board 8, often The inner roof wall of a second through slot 32 offers the second guide rail 30, and the upper surface of each second extension board 8 is fixedly connected to Two guide blocks 10, and the second guide block 10 is connected to the inside of the second guide rail 30, the upper surface of each second fixed plate 15 is fixed to be connected It is connected to the locating piece 23 in triangular shape, the one side that two locating pieces 23 are located remotely from each other fixation is inlaid with bearing 22, Mei Ge The upper surface of two extension boards 8 is fixedly connected to push-and-pull block 16, and the outer surface on each push-and-pull 16 top of block passes through the first pin shaft 7 It is fixedly hinged with first movement bar 6, the outer surface on each 6 top of first movement bar passes through the second pin shaft 5 and is fixedly hinged with cunning Movable plate 17, the one side that each first extension board 14 is located remotely from each other are fixedly connected to the second push-and-pull block 20, two second push-and-pulls One end that block 20 is located remotely from each other passes through third pin shaft 1 and is fixedly hinged with the second mobile bar 2, the bottom end of two the second mobile bars 2 Pass through one end fixed hinge of the 4th pin shaft 21 and two sliding panels 17 far from first movement bar 6, two 17 phases of sliding panel respectively Mutually separate one side fixation is inlaid with screwed pipe 4, is placed with threaded rod 18 between every group of sliding panel 17 and locating piece 23, The outer surface of two one end close to each other of threaded rod 18 is fixedly connected with the inner ring of two bearings 22 respectively, two 18 phases of threaded rod Mutually separate one end extends through two screwed pipes 4 and extends to the side that two sliding panels 17 are located remotely from each other, and screwed pipe 4 It is threadedly coupled with threaded rod 18, the upper surface of each second fixed plate 15 offers mounting hole 11.
Further, the upper surface of each first guide block 25 fixation is inlaid with the first connecting tube 24, each first guide rail 27 inner roof wall is fixedly connected to the first slide bar 26, and the first connecting tube 24 socket-connects with the first slide bar 26, can effectively keep away Exempt from the problem of the first extension board 14 tilts when mobile, ensure that the stability and safety of the device.
Further, the right side of each second guide block 10 fixation is inlaid with the second connecting tube 33, each second guide rail 30 inner sidewall is fixedly connected to the second litter 34, and the second litter 34 socket-connects with the second connecting tube 33, can effectively keep away Exempt from the problem of the second extension board 8 tilts when mobile, improves the support effect of the second extension board 8.
Further, the upper surface of bottom plate 29 is opened up there are two symmetrical sliding slot 9, the bottom surface of each second extension board 8 It is fixedly connected to sliding block 31, and sliding block 31 is connected to the inside of sliding slot 9, the second extension board 8 can be made to slide more convenient, energy The second extension board 8 is enough set the phenomenon that Caton occur during sliding.
Further, one end that two threaded rods 18 are located remotely from each other is fixedly connected to handle 3, the appearance of each handle 3 It is fixedly connected to non-slip mat 19, keeps staff's rotation threaded rod 18 more convenient, avoids staff in the process of rotation In there is the problem of rubber sleeve.
Further, the vertical plane where the first fixed plate 12 is parallel with the vertical plane where bridge pile foundation ontology 13, The perpendicular shape of vertical plane at 12 place of horizontal plane and the first fixed plate where the second fixed plate 15, using the characteristic of triangle, Reinforce the first extension board 14 and the second extension board 8 to bridge pile foundation ontology 13 more convenient.
Working principle: catching handle 3 by staff, threaded rod 18 is rotated under the action of bearing 22, in screwed pipe 4 Under effect, keep sliding panel 17 mobile, under the action of the second pin shaft 5 and the first pin shaft 7, makes first movement bar 6 and the second movement Bar 2 opens, and under the action of the first guide block 25, the first guide rail 27, the second guide block 10 and the second guide rail 30, makes the first extension board 14 and second extension board 8 it is mobile, so that the device is increased contact area, according to the characteristic of triangle, improve the steady of the device It is qualitative.
The terms "include", "comprise" or its any other variant are intended to non-row in the description of the present invention, His property includes, so that the process, method, article or equipment for including a series of elements not only includes those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or equipment institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence " including a reference structure ", it is not excluded that wrapping Include in the process, method, article or equipment of the element that there is also other identical elements.It should be noted that herein In, the relational terms of such as " first ", " second " or the like be used merely to by an entity or operation with another entity or Operation distinguishes, without necessarily requiring or implying between these entities or operation there are any this actual relationship or Sequentially.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. the upper surface of a kind of Strengthening of Bridge Pile Foundation device, including bottom plate (29), the bottom plate (29) is fixedly connected with Bridge Pile Basic body (13), it is characterised in that: the left and right sides of the bridge pile foundation ontology (13) is placed with the first fixed plate (12), and two A first fixed plate (12) one side close to each other offers the first through slot (28), each first through slot (28) Inside be placed with the first extension board (14), the one side wall that two first through slots (28) are located remotely from each other offers first Guide rail (27), the one side that two first extension boards (14) are located remotely from each other are fixedly connected to the first guide block (25), and the One guide block (25) is connected to the inside of the first guide rail (27), and the one side that two first fixed plates (12) are located remotely from each other is solid Surely it is connected with the second fixed plate (15), the bottom surface of each second fixed plate (15) offers the second through slot (32), each The inside of second through slot (32) is placed with the second extension board (8), and the inner roof wall of each second through slot (32) is opened Equipped with the second guide rail (30), the upper surface of each second extension board (8) is fixedly connected to the second guide block (10), and second Guide block (10) is connected to the inside of the second guide rail (30), and the upper surface of each second fixed plate (15), which is fixedly connected to, is in The locating piece (23) of triangular shape, the one side that two locating pieces (23) are located remotely from each other fixation are inlaid with bearing (22), often The upper surface of a second extension board (8), which is fixedly connected to, pushes and pulls block (16), outside each described push-and-pull block (16) top Surface passes through the first pin shaft (7) and is fixedly hinged with first movement bar (6), the appearance on each first movement bar (6) top Face passes through the second pin shaft (5) and is fixedly hinged with sliding panel (17), the side that each first extension board (14) is located remotely from each other Face is fixedly connected to the second push-and-pull block (20), and one end that two second push-and-pulls block (20) are located remotely from each other passes through third pin Axis (1) is fixedly hinged with the second mobile bar (2), and the bottom end of two second mobile bars (2) passes through the 4th pin shaft (21) respectively One end fixed hinge with two sliding panels (17) far from first movement bar (6), what two sliding panels (17) were located remotely from each other One side fixation is inlaid with screwed pipe (4), is placed with threaded rod between sliding panel described in every group (17) and locating piece (23) (18), the outer surface of two threaded rod (18) one end close to each other is fixedly connected with the inner ring of two bearings (22) respectively, One end that two threaded rods (18) are located remotely from each other extends through two screwed pipes (4) and extends to two sliding panel (17) phases Mutually separate side, and screwed pipe (4) is threadedly coupled with threaded rod (18), the upper surface of each second fixed plate (15) is equal Offer mounting hole (11).
2. a kind of Strengthening of Bridge Pile Foundation device according to claim 1, it is characterised in that: each first guide block (25) Upper surface fixation be inlaid with the first connecting tube (24), the inner roof wall of each first guide rail (27) is fixedly connected to the One slide bar (26), and the first connecting tube (24) socket-connects with the first slide bar (26).
3. a kind of Strengthening of Bridge Pile Foundation device according to claim 1, it is characterised in that: each second guide block (10) Right side fixation be inlaid with the second connecting tube (33), the inner sidewall of each second guide rail (30) is fixedly connected to the Two litter (34), and the second litter (34) socket-connects with the second connecting tube (33).
4. a kind of Strengthening of Bridge Pile Foundation device according to claim 1, it is characterised in that: the upper surface of the bottom plate (29) It opening up there are two symmetrical sliding slot (9), the bottom surface of each second extension board (8) is fixedly connected to sliding block (31), and Sliding block (31) is connected to the inside of sliding slot (9).
5. a kind of Strengthening of Bridge Pile Foundation device according to claim 1, it is characterised in that: two threaded rod (18) phases Mutually separate one end is fixedly connected to handle (3), and the appearance of each handle (3) is fixedly connected to non-slip mat (19).
6. a kind of Strengthening of Bridge Pile Foundation device according to claim 1, it is characterised in that: the first fixed plate (12) institute Vertical plane it is parallel with the vertical plane where bridge pile foundation ontology (13), horizontal plane where second fixed plate (15) With the perpendicular shape of vertical plane where the first fixed plate (12).
CN201820698649.9U 2018-05-11 2018-05-11 A kind of Strengthening of Bridge Pile Foundation device Expired - Fee Related CN208586634U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820698649.9U CN208586634U (en) 2018-05-11 2018-05-11 A kind of Strengthening of Bridge Pile Foundation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820698649.9U CN208586634U (en) 2018-05-11 2018-05-11 A kind of Strengthening of Bridge Pile Foundation device

Publications (1)

Publication Number Publication Date
CN208586634U true CN208586634U (en) 2019-03-08

Family

ID=65534412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820698649.9U Expired - Fee Related CN208586634U (en) 2018-05-11 2018-05-11 A kind of Strengthening of Bridge Pile Foundation device

Country Status (1)

Country Link
CN (1) CN208586634U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112413313A (en) * 2020-11-19 2021-02-26 王栋 Multifunctional intracardiac detection equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112413313A (en) * 2020-11-19 2021-02-26 王栋 Multifunctional intracardiac detection equipment

Similar Documents

Publication Publication Date Title
CN207194416U (en) A kind of scaffold for building for being easy to assembling
CN208586634U (en) A kind of Strengthening of Bridge Pile Foundation device
CN214834620U (en) Supporting platform for lighting well
CN210813600U (en) Fixing device for construction operation safety belt
CN201162337Y (en) Adjustable cliff security operation compartment
CN207361725U (en) A kind of municipal inspection shaft easy to use takes lid equipment
CN213898218U (en) Anti-falling building fence net for engineering construction
CN203039301U (en) A high-fall pipeline device
CN206590765U (en) A kind of steel hanging apparatus of building yard
CN212154065U (en) Engineering construction equipment for building construction
CN212908794U (en) Slide chair of being qualified for next round of competitions convenient to brake is fixed
CN205128445U (en) Steel pipe detects sorter
CN211256726U (en) Sound barrier steel stand
CN208631992U (en) A kind of Pipe installing lifting device of building installation engineering
CN106121353B (en) Hydraulic vertical lever apparatus
CN207375669U (en) The electronic lifting bracket of cable tunnel inner column formula cable
CN208721046U (en) Depth detection apparatus is used in a kind of grouting of Bridge Piles deep hole
CN209211915U (en) A kind of high-altitude wire frame installation system
CN210459989U (en) Vertical pump line conversion auxiliary device of superelevation layer
CN207158743U (en) A kind of portable manhole cover opener
CN208485519U (en) A kind of subway work handling device
CN209429019U (en) A kind of construction of the highway firm cushioning guard fence easy to assemble
CN207003985U (en) A kind of Architectural Equipment hanging basket being moved easily
CN207672981U (en) A kind of bottom support frame of climbing frame
CN209212049U (en) A kind of safe enclosure device of engineering detecting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190308

Termination date: 20200511