CN208631992U CN201820929274.2U CN201820929274U CN208631992U CN 208631992 U CN208631992 U CN 208631992U CN 201820929274 U CN201820929274 U CN 201820929274U CN 208631992 U CN208631992 U CN 208631992U
Authority
CN
China
Prior art keywords
pedestal
fixed pulley
level
bracket
center pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820929274.2U
Other languages
Chinese (zh)
Inventor
李长义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820929274.2U priority Critical patent/CN208631992U/en
Application granted granted Critical
Publication of CN208631992U publication Critical patent/CN208631992U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of Pipe installing lifting devices of building installation engineering, including bracket, bracket middle-end is fixedly welded with center pillar, and two hoist engines are symmetrically installed on the inside of bracket, it is symmetrically installed with level-one fixed pulley on the inside of pedestal upper end, and center pillar upper end is symmetrically installed with second level fixed pulley, center pillar lower end is symmetrically fixedly welded there are two pedestal, and pedestal is equipped with spring stack, pedestal upper ends have pedestal, and pedestal upper end is rotatably connected to Ka Gai.The utility model realizes the promotion to pipeline by bracket, hoist engine and fixed pulley, it is advantageously implemented the control to Pipeline lift process, it reduces manpower and time cost is put into, improve construction installation work efficiency, and the stability by center pillar and clamping device realization to pipeline in lifting process, to avoid the accident of shedding from occurring, is changed simultaneously by height with position, can further improve pipeline short distance transportation efficiency.

Description

A kind of Pipe installing lifting device of building installation engineering
Technical field
The utility model relates to a kind of pipeline of building installation engineering technical field more particularly to building installation engineering peaces Fill lifting device.
Background technique
The engineering entity completed to create, extending, reconstructing the construction working that building and structures are carried out is building Installing engineering.It is to be sought unity of standard with the appearance of each construction unit monomer according to GB50300-2001 in engineering project, Mei Gedan Position engineering is made of nine branches such as ground and basis, main structure, decorations and building intelligence.Wherein, Pipe installing is One of most common project in architectural engineering.Because can all offer sewer pipe in existing building structure, and in resident day A large amount of waste water spots can be generated in life often with Other Waste, these house refuses largely need high-rise pipeline to be transported It is defeated, but in construction projects, larger heavier pipeline is difficult to move.Story height is the important of progress Pipeline lift Influence factor makes large-scale movable lifting tool be difficult to use in smaller range because urban architecture is crowded many and diverse, so through Frequently with manpower transport, but there are problems that human cost is larger and inefficiency.Existing Pipeline lift tool is in Pipeline lift In the process because the fixed length not in place that occurs often in position rocks seismism, or even it will appear the thing that pipeline falls off in high-altitude Therefore serious building accident is caused, so needing to carry out Pipeline lift equipment related improvement, further increases Pipeline lift and set Standby practicability and safety.
Utility model content
Position is difficult to realize purpose of the utility model is to solve pipeline during construction and installation in the prior art to mention Rise and and the lower problem of stability, and a kind of Pipe installing lifting device of the building installation engineering proposed.
To achieve the goals above, the utility model adopts the technical scheme that
A kind of Pipe installing lifting device of building installation engineering, including bracket, the bracket middle-end are fixedly welded with Center pillar, and be symmetrically installed with two hoist engines on the inside of bracket, is symmetrically installed with level-one fixed pulley on the inside of the pedestal upper end, and in Column upper end is symmetrically installed with second level fixed pulley, and the center pillar lower end is symmetrically fixedly welded that there are two pedestals, and pedestal is equipped with bullet Spring column, the pedestal upper ends have pedestal, and pedestal upper end is rotatably connected to Ka Gai, the pedestal upper end and the lower end pair Ka Gai Title offers hemisphere groove, and card lid middle-end offers through-hole, and screw thread is offered in through-hole, and installation is limited in the through-hole Position bolt, and caging bolt lower end is fixedly welded with curved surface intermediate plate, the pedestal is fixedly welded with slot on the side of center pillar Type sliding rail, and card covers end and is fixedly welded with draw bar.
Preferably, the hoist engine, level-one fixed pulley are connected with second level fixed pulley by cable wire, and cable wire is far from elevator Hook, the level-one fixed pulley vertical direction installation are fixedly connected on one end of machine, and second level fixed pulley parallel direction is installed, The level-one fixed pulley height is higher than second level fixed pulley.
Preferably, upper end is symmetrically opened up there are two groove in the pedestal, and is symmetrically installed that there are two L-types to limit in groove Block, and L-type limited block lower end offsets with spring stack upper end.
Preferably, hinge is installed, and card covers the other side and is equipped with fixed spiral shell between the pedestal and the same side Ka Gai Bolt, and pedestal corresponds to the upper end of fixing bolt side and offers screw thread hole slot.
Preferably, two sides symmetrically offer four sliding slots on the center pillar, and the one end of groove profile sliding rail far from pedestal is embedded In in sliding slot.
Preferably, the pedestal lower end is symmetrically installed with pulley, and hoist engine product type is JK0.5-JK12.5 single drum At a slow speed.
Compared with prior art, the utility model has following advantages:
(1) the utility model is used cooperatively by hoist engine and dual fixed pulley structure, protects pipeline in vertical direction At the uniform velocity steady promotion is held, is realized by control hoist engine to the real time monitoring of Pipeline lift process, advantageously reduces construction and installation Contingency occurrence probability;
(2) the utility model is slided in sliding slot by using groove profile sliding rail and is moved up and down, and is stablized pipeline by center pillar and is existed Horizontal stability in lifting process is to realize that the position of pipeline is fixed by base, Ka Gai and clamping device, avoids shedding Risk;
In conclusion the utility model realizes the promotion to pipeline by bracket, hoist engine and fixed pulley, be conducive to It realizes control to Pipeline lift process, reduces manpower and time cost is put into, improve construction installation work efficiency, and pass through Column and clamping device realize that the stability to pipeline in lifting process passes through height so that the accident of shedding be avoided to occur Degree changes simultaneously with position, can further improve pipeline short distance transportation efficiency.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of building installation engineering Pipe installing lifting device structural representation Figure;
Fig. 2 be the utility model proposes a kind of building installation engineering Pipe installing lifting device part A structure Enlarged diagram;
Fig. 3 be the utility model proposes a kind of building installation engineering Pipe installing lifting device center pillar part knot Structure stereoscopic schematic diagram;
Fig. 4 be the utility model proposes a kind of building installation engineering Pipe installing lifting device groove profile sliding rail portion Separation structure stereoscopic schematic diagram.
In figure: 1 bracket, 2 center pillars, 3 hoist engines, 4 level-one fixed pulleys, 5 second level fixed pulleys, 6 pedestals, 7 spring stacks, 8 pedestals, 9 Ka Gai, 10 hinges, 11 fixing bolts, 12 hemisphere grooves, 13 caging bolts, 14 curved surface intermediate plates, 15 groove profile sliding rails, 16 tractions Bar, 17 sliding slots, 18 pulleys.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
In the description of the present invention, it should be understood that term " on ", "lower", "front", "rear", "left", "right", The orientation or positional relationship of the instructions such as "top", "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
Referring to Fig.1-4, the Pipe installing lifting device of a kind of building installation engineering, including including bracket 1, therefore device Need to carry out two associated working, so 1 two sides upper end of bracket is achieved a fixed connection by welding, to improve whole stabilization Property, 1 middle-end of bracket is fixedly welded with center pillar 2, and two hoist engines 3 are symmetrically installed on the inside of bracket 1, right on the inside of 1 upper end of bracket Title is equipped with level-one fixed pulley 4, and 2 upper end of center pillar is symmetrically installed with second level fixed pulley 5, hoist engine 3, level-one fixed pulley 4 and two Grade fixed pulley 5 is connected by support frame with bracket 1 and center pillar respectively, and second level fixed pulley 5 turns because playing cable wire Impact direction Change, so using triangular support bracket to second level fixed pulley 5, convenient for improving its stability, 2 lower end of center pillar is symmetrically fixedly welded with two A pedestal 6, pedestal 6 is used to support pedestal 8, and pedestal 6 is equipped with spring stack 7, and spring stack 7 is made convenient for reducing when pedestal 8 declines At impact force, 6 upper ends of pedestal have a pedestal 8, and pedestal 8 with card lid 9 is whole combine as fixed device, thus realization pair The position of pipeline itself is fixed, and 8 upper end of pedestal is rotatably connected to card lid 9, and 8 upper end of pedestal is symmetrically offered with 9 lower end of card lid Hemisphere groove 12, two hemisphere grooves 12 can carry out rough location restriction to pipeline, prevent pipeline position in a parallel direction It moves, and 9 middle-end of card lid offers through-hole, and screw thread is offered in through-hole, and caging bolt 13, and caging bolt are equipped in through-hole 13 lower ends are fixedly welded with curved surface intermediate plate 14, by tightening or unscrewing caging bolt 13, to realize to the elastic of pipeline, pedestal 7 are fixedly welded with groove profile sliding rail 15 on the side of center pillar 2, and groove profile sliding rail 15 is an integral molding structure with pedestal 8, to protect The stability of pedestal 8 is demonstrate,proved, and 9 upper end of card lid is fixedly welded with draw bar 16, draw bar 16 is for the hook and pipeline on cable wire Fixed device is attached.
Hoist engine 3, level-one fixed pulley 4 are connected with second level fixed pulley 5 by cable wire, and cable wire far from hoist engine 3 one Hook, the installation of 4 vertical direction of level-one fixed pulley are fixedly connected on end, and 5 parallel direction of second level fixed pulley is installed, level-one is slided surely 4 height are taken turns higher than second level fixed pulley 5, the transformation of Impact direction is carried out during the motion convenient for cable wire, reduces cable wire itself Vibration, upper end symmetrically opens up that there are two grooves in pedestal 6, and is symmetrically installed that there are two L-type limited blocks in groove, and L-type limits Block lower end offsets with 7 upper end of spring stack, and when pedestal upper end stress squeezes, spring stack 7 is condensed downwards, and L-type fixture block is on spring stack 7 End offset lifting, and so that spring stack 7 is returned power reset, to play cushioning buffer effect.
Pedestal 8 and card lid are equipped with hinge 10 between 9 the same side, and the other side is equipped with fixing bolt 11 on card lid 9, and The upper end of corresponding 11 side of fixing bolt of pedestal 8 offers screw thread hole slot, can reach shear-blade lid by fixed disassembly bolt 11 Effect, two sides symmetrically offer four sliding slots 17 on center pillar 2, and groove profile sliding rail 15 is embedded in sliding slot far from one end of pedestal 8 In 17, groove profile sliding rail 15 is slidably connected with sliding slot 17, and 17 outside diameter of sliding slot is less than 15 one end size of groove profile sliding rail, avoids groove profile Sliding rail 15 is detached from out of sliding slot 17, and 1 lower end of bracket is symmetrically installed with pulley 18, can carry out position to lifting device in relatively short distance Move, consequently facilitating the installation and removal of pipeline, 3 product type of hoist engine be JK0.5-JK12.5 single drum at a slow speed, convenient for preventing The pipeline rate of climb is too fast and leads to safety problem.
When the utility model is used, it needs two lifting devices to be used in combination, fixing bolt 11 is unscrewed by manpower, It rotates card lid 9 with 10 fulcrum of hinge to open, then pipeline is steadily placed in the hemisphere groove 12 on pedestal 8, then will Card lid 9 closes, and fixed by fixing bolt 11, then tightens caging bolt 13 by manpower, makes caging bolt 13 with moving surface Intermediate plate 14 moves downward, and curved surface intermediate plate 14 is made to offset in pipeline outer wall, and realizes pipeline in two hemisphere grooves 12 Position is fixed, then the hook of cable wire one end is connected with draw bar 16, while opening elevator ipsilateral on two lifting devices Machine 3 makes cable wire pass sequentially through level-one fixed pulley 4 and gradually winds with second level fixed pulley 5 and on hoist engine 3, so that cable wire be made to draw Dynamic 9 elevated height of card lid, simultaneously, the groove profile sliding rail 15 on pedestal 8 is moved up in sliding slot 17, is improved pipeline and is existed Stability in lifting process, until Pipeline lift to proper height is closed into hoist engine 3, it can be by pushing bracket 1 to make pulley Pipeline location adjustment is realized in 18 rotations, consequently facilitating pipeline is dismantled.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (6)

1. a kind of Pipe installing lifting device of building installation engineering, including bracket (1), which is characterized in that the bracket (1) Middle-end is fixedly welded with center pillar (2), and two hoist engines (3) are symmetrically installed on the inside of bracket (1), in bracket (1) upper end Side is symmetrically installed with level-one fixed pulley (4), and center pillar (2) upper end is symmetrically installed with second level fixed pulley (5), under the center pillar (2) It holds there are two being symmetrically fixedly welded pedestal (6), and pedestal (6) is equipped with spring stack (7), pedestal (6) upper ends have base Seat (8), and pedestal (8) upper end is rotatably connected to Ka Gai (9), pedestal (8) upper end and Ka Gai (9) lower end symmetrically offer half Sphere groove (12), and Ka Gai (9) middle-end offers through-hole, and screw thread is offered in through-hole, and limit is equipped in the through-hole Bolt (13), and caging bolt (13) lower end is fixedly welded with curved surface intermediate plate (14), the one of the pedestal (8) close center pillar (2) It is fixedly welded on side groove profile sliding rail (15), and Ka Gai (9) upper end is fixedly welded with draw bar (16).
2. a kind of Pipe installing lifting device of building installation engineering according to claim 1, which is characterized in that described Hoist engine (3), level-one fixed pulley (4) are connected with second level fixed pulley (5) by cable wire, and cable wire far from hoist engine (3) one Hook, level-one fixed pulley (4) the vertical direction installation are fixedly connected on end, and second level fixed pulley (5) parallel direction is installed, The level-one fixed pulley (4) is highly higher than second level fixed pulley (5).
3. a kind of Pipe installing lifting device of building installation engineering according to claim 1, which is characterized in that described Pedestal (6) interior upper end is symmetrically opened up there are two groove, and is symmetrically installed that there are two L-type limited blocks in groove, and under L-type limited block End offsets with spring stack (7) upper end.
4. a kind of Pipe installing lifting device of building installation engineering according to claim 1, which is characterized in that described It is equipped with hinge (10) between pedestal (8) and Ka Gai (9) the same side, and the other side is equipped with fixing bolt (11) on Ka Gai (9), And the upper end of corresponding fixing bolt (11) side of pedestal (8) offers screw thread hole slot.
5. a kind of Pipe installing lifting device of building installation engineering according to claim 1, which is characterized in that described Two sides symmetrically offer four sliding slots (17) on center pillar (2), and groove profile sliding rail (15) is embedded in sliding slot far from the one end of pedestal (8) (17) in.
6. a kind of Pipe installing lifting device of building installation engineering according to claim 1, which is characterized in that described Bracket (1) lower end is symmetrically installed with pulley (18), hoist engine (3) product type be JK0.5-JK12.5 single drum at a slow speed.
CN201820929274.2U 2018-06-15 2018-06-15 A kind of Pipe installing lifting device of building installation engineering Expired - Fee Related CN208631992U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820929274.2U CN208631992U (en) 2018-06-15 2018-06-15 A kind of Pipe installing lifting device of building installation engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820929274.2U CN208631992U (en) 2018-06-15 2018-06-15 A kind of Pipe installing lifting device of building installation engineering

Publications (1)

Publication Number Publication Date
CN208631992U true CN208631992U (en) 2019-03-22

Family

ID=65733683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820929274.2U Expired - Fee Related CN208631992U (en) 2018-06-15 2018-06-15 A kind of Pipe installing lifting device of building installation engineering

Country Status (1)

Country Link
CN (1) CN208631992U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115285834A (en) * 2022-09-29 2022-11-04 黑龙江省建筑安装集团有限公司 Pipeline installation hoisting device for building installation engineering

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115285834A (en) * 2022-09-29 2022-11-04 黑龙江省建筑安装集团有限公司 Pipeline installation hoisting device for building installation engineering

Similar Documents

Publication Publication Date Title
CN210214559U (en) High-safety gantry crane
CN208329288U (en) A kind of building curtain wall support construction
CN206783167U (en) A kind of safe climbing device of tower crane
CN209193427U (en) A kind of boom hoisting for building intellectualization
CN108560510B (en) Movable overhaul platform for surface runner of hydropower station
CN208631992U (en) A kind of Pipe installing lifting device of building installation engineering
CN207158741U (en) A kind of lowering or hoisting gear for being used for electromechanical installation
CN206887789U (en) Bridge strengthening device
CN108560478A (en) A kind of movable charging type catches up with fish corral device
CN205934983U (en) Cable well cover opening device
CN111119058A (en) Green's municipal bridge construction strutting arrangement
CN206128775U (en) Bistable state structure parking stall lock
CN205839628U (en) A kind of safety barrier plate being easily installed dismounting
CN208932801U (en) Tower crane stake bracing means
CN110409339B (en) Moment balance weight mechanism of intelligent barrier gate machine
CN202467388U (en) Door lock of box-type substation
CN108175977A (en) A kind of convenient and strength-saving fire plant of flexible structure and access for wisdom piping lane
CN108442798A (en) A kind of safety-type communication steel tower with foundation bolt antirust function
CN208491963U (en) A kind of vertical rails wind-proof device
CN207647451U (en) A kind of water conservancy work climbing ladder being easily installed dismounting
CN106400831A (en) Prefabricated equipment foundation inertia block
CN204826821U (en) A carry a sweep and prevent shaking device for lifting and horizontal moving stereo garage
CN107974974A (en) A kind of municipal works fence that can adjust height
CN221118272U (en) Bridge cantilever pouring construction hanging basket with high stability
CN214828564U (en) Tower crane stop device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190322

Termination date: 20190615