CN208586511U - A kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure - Google Patents

A kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure Download PDF

Info

Publication number
CN208586511U
CN208586511U CN201821124436.1U CN201821124436U CN208586511U CN 208586511 U CN208586511 U CN 208586511U CN 201821124436 U CN201821124436 U CN 201821124436U CN 208586511 U CN208586511 U CN 208586511U
Authority
CN
China
Prior art keywords
several
pier
muscle section
cap
bent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821124436.1U
Other languages
Chinese (zh)
Inventor
邱发强
朱三凡
夏樟华
林友勤
孙明松
陈树辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Research Group Co Ltd
Original Assignee
Research Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Research Group Co Ltd filed Critical Research Group Co Ltd
Priority to CN201821124436.1U priority Critical patent/CN208586511U/en
Application granted granted Critical
Publication of CN208586511U publication Critical patent/CN208586511U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure and its construction methods, including an at least bent cap, at least a cushion cap, at least a pier stud and an at least prestressing force drawing mechanism, the upper end of pier stud, which has, indulges muscle section on several pier studs stretched out, lower end, which has, indulges muscle section under several pier studs stretched out, there are bent cap several bent caps stretched out to indulge muscle section, and there are cushion cap several cushion caps stretched out to indulge muscle section;Cushion cap and bent cap are embedded with grout pipe respectively, it is indulged on several pier studs and indulges muscle section under muscle section, several pier studs, several bent caps indulge muscle section and several cushion caps are indulged muscle Duan Jun and are set in above-mentioned grout pipe, and it is indulged on several pier studs and indulges that muscle section indulges muscle section by the ultra-high performance concrete UHPC that is poured into above-mentioned grout pipe and several bent caps respectively and several cushion caps indulge muscle section and are connected so that an at least bent cap, at least a cushion cap and at least a pier stud shape is integral, above-mentioned pier stud and bent cap pass through the tensioning of prestressing force drawing mechanism to have self-resetting capability under muscle section and several pier studs.

Description

A kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure
Technical field
The utility model is specifically related to a kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure.
Background technique
Packaged type bridges have the characteristics that quick, the small and reliable in quality of environment influence of constructing, in the big city of traffic pressure Bridge and short Oversea bridge of effective construction time are built and are widely applied, including the developed countries such as the U.S., New Zealand and South east asia and China Taiwan.The application of country's packaged type bridges and research concentrate on superstructure substantially at present, assemble The research of formula bridge pier is started late, and relatively difficult Offshore Bridges construction of constructing is applied to more, as Donghai Bridge, Hangzhou Gulf Great Bridge and Bridge spanning the seas such as port Zhuhai and Macao bridge etc. and Urban Bridge Construction, such as Shanghai Shanghai Fujian overpass, good Min overpass and Shenyang Fourth Ring Overpass etc..
As modern bridge is higher and higher to green, environmental protection and industrial requirement, the bridge of assembled pier bearing will be city The development trend of city's bridge construction.Meanwhile there is a large amount of grade separations and ring road bridge, the songs of assembled pier bearing in bridge construction Line beam bridge will be widely applied, especially to environment protection zone, require the city of rapid construction and construction time short Offshore Bridges. For the Curved Beam Bridge of assembled pier bearing, one side assembled pier globality is relatively weak, lateral stiffness is smaller, multi-purpose at present Yu Zhong, low intensity in quake zone.On the other hand, damage collapse probability occurs in macroseism for Curved Beam Bridge big.In historical earthquake, greatly Amount Curved Beam Bridge is destroyed, and bending destruction, bending failure and superstructure including bridge pier are collapsed.
China is in mass transportation construction period, and Curved Beam Bridge is exactly the suitable application area of assembled pier construction technology. It is therefore proposed that the assembly concrete Pier Design scheme of the energy-dissipating type with landmark, carries out existing connecting structure excellent Change, preventing assembled pier Curved Beam Bridge collapsing in macroseism is to promote it using an important and crucial project.
Utility model content
The purpose of this utility model is to provide a kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structures.
The technical solution of the utility model is as follows:
A kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure, including an at least bent cap, an at least cushion cap, at least one Pier stud and at least a prestressing force drawing mechanism, the upper end of pier stud, which has, indulges muscle section on several pier studs stretched out, lower end, which has, to be stretched out Several pier studs under indulge muscle section, bent cap have stretch out several bent caps indulge muscle section, cushion cap have stretch out several cushion caps indulge muscle section;
An at least pier stud is located on an at least cushion cap, which is located on an at least pier stud, cushion cap with Bent cap is embedded with grout pipe respectively, indulges on several pier studs and indulges muscle section under muscle section, several pier studs, several bent caps indulge muscle section and several hold Platform is indulged muscle Duan Jun and is set in above-mentioned grout pipe, and indulges vertical muscle section under muscle section and several pier studs on several pier studs and pass through perfusion respectively Ultra-high performance concrete UHPC in above-mentioned grout pipe indulges muscle section with several bent caps and several cushion caps indulge muscle section and are connected so that extremely Lack a bent cap, at least a cushion cap and at least a pier stud shape is integral, above-mentioned pier stud and bent cap pass through prestressing force drawing mechanism It draws to have self-resetting capability.
In a preferred embodiment of the utility model, comprising:
An at least bent cap, is inside embedded with bent cap prestress pipe, and there are several bent caps to indulge muscle for lower surface Section;
An at least cushion cap, is inside embedded with cushion cap prestress pipe, and there are several cushion caps to indulge muscle for upper surface Section;
An at least pier stud is inside embedded with pier stud prestress pipe, and the upper end, which has, indulges muscle on several pier studs Section, lower end, which has, indulges muscle section under several pier studs;
An at least prestressing force drawing mechanism, including fixing end anchorage, stretching end anchorage and presstressed reinforcing steel group, prestressing force The both ends of muscle group are separately connected fixing end anchorage and stretching end anchorage;
The fixing end anchorage is set to the bottom of cushion cap, and stretching end anchorage is set to the top of bent cap, the bent cap prestressing force Pipeline, cushion cap prestress pipe and pier stud prestress pipe are sequentially communicated, and presstressed reinforcing steel group passes through bent cap prestress pipe, cushion cap Prestress pipe and pier stud prestress pipe.
In a preferred embodiment of the utility model, it is inverted L-shaped reinforcing bar, the inverted L-shaped steel that the bent cap, which indulges muscle section, The horizontal segment of muscle is fixed in bent cap by concreting, and the top of vertical section is fixed in bent cap by concreting, Bent cap is stretched out to be connected with muscle section vertical on the pier stud in lower part.
In a preferred embodiment of the utility model, it is L shape reinforcing bar that the cushion cap, which indulges muscle section, the L shape reinforcing bar Horizontal segment is fixed in cushion cap by concreting, and the lower part of vertical section is fixed in cushion cap by concreting, top Cushion cap is stretched out to be connected with muscle section vertical under the pier stud.
In a preferred embodiment of the utility model, muscle section is indulged on the pier stud and lower vertical muscle section is from pier stud The steel reinforcement cage being made of several reinforcing bars extended.
In a preferred embodiment of the utility model, the grout pipe is grout sleeve or grouting bellows.
The beneficial effects of the utility model are:
1, a kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure of the utility model has good anti-fall collapsing property Can, cushion cap, pier stud and bent cap are component, are made in factory, and construction quality and construction precision can be improved, and reduce field operation Amount, the influence to environment is smaller, and speed of application is fast.
2, the utility model locally uses UHPC material to replace normal concrete, improves crack resistance and durability.
3, the cushion cap of the utility model, pier stud and bent cap are integral by UHPC shape, pass through prestressing force drawing mechanism Drawing makes bridge pier have certain self-resetting capability, keeps residual deformation after shake small, is conducive to the disaster relief after shake.
Detailed description of the invention
Fig. 1 is the facade organigram of the utility model;
Fig. 2 is the pier stud of the utility model and the attachment structure schematic diagram of cushion cap.
Fig. 3 is the pier stud of the utility model and the attachment structure schematic diagram of bent cap.
Specific embodiment
The technical solution of the utility model is further detailed below by way of specific embodiment combination attached drawing and Description.
As shown in Figure 1, a kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure, including a bent cap 1, a cushion cap 2, two Pier stud 3 and two prestressing force drawing mechanisms 4, bent cap 1, cushion cap 2 and pier stud 3 are component, are made in factory, can improve construction matter Amount and construction precision reduce field operation amount, and the influence to environment is smaller, and speed of application is fast.
Bent cap 1, is inside embedded with bent cap prestress pipe 10, and lower surface is equipped with several bent caps and indulges muscle section 110;
Cushion cap 2, is inside embedded with cushion cap prestress pipe 20, and upper surface has at least once preformed groove 21, this is lower pre- It stays and is equipped with the vertical muscle section 210 of several cushion caps in slot 21, the notch of lower preformed groove 21 is handled by dabbing;
Pier stud 3 is inside embedded with pier stud prestress pipe 30, and the upper end, which has, indulges muscle section 31, lower end on several pier studs With muscle section 32 vertical under several pier studs, it is preferred that indulge muscle section 31 on the pier stud and lower vertical muscle section is to extend from pier stud 3 The steel reinforcement cage being made of several reinforcing bars;
One prestressing force drawing mechanism 4 corresponds to a pier stud 3, including fixing end anchorage 41, stretching end anchorage 42 and presstressed reinforcing steel Group 43, the both ends of presstressed reinforcing steel group 43 are separately connected fixing end anchorage 41 and stretching end anchorage 42;
Muscle section 31 is indulged on pier stud to be connected by grout pipe 5 (grout sleeve or grouting bellows) with the vertical muscle section 110 of bent cap;Pier The lower end of column 3 is adapted to the lower preformed groove 21 of cushion cap 2, and muscle section 32 is indulged under pier stud and is connected by grout pipe 5 with the vertical muscle section 210 of cushion cap. Specifically, indulged on pier stud muscle section 31, indulge muscle section 32 under pier stud, bent cap indulges muscle section 110 and cushion cap indulge muscle section 210 be set in it is above-mentioned It is indulged in grout pipe 5, and on pier stud and indulges the superelevation by being poured into above-mentioned grout pipe 5 respectively of muscle section 32 under muscle section 31 and pier stud Energy concrete UHPC indulges muscle section 110 with bent cap and cushion cap indulges muscle section 210 and is connected so that bent cap 1, cushion cap 2 and the formation one of pier stud 3 are whole Body;The fixing end anchorage 41 of prestressing force drawing mechanism 4 is set to the bottom of cushion cap 2, and stretching end anchorage 42 is set to the top of bent cap 1, The bent cap prestress pipe 10, cushion cap prestress pipe 20 and pier stud prestress pipe 30 are sequentially communicated, presstressed reinforcing steel group 43 Across bent cap prestress pipe 10, cushion cap prestress pipe 20 and pier stud prestress pipe 30;Bent cap 1, cushion cap 2 and pier stud 3 are logical The tensioning for crossing prestressing force drawing mechanism 4 makes bridge pier have certain self-resetting capability, keeps residual deformation after shake small, is conducive to shake The disaster relief afterwards.
As shown in Fig. 2, it is inverted L-shaped reinforcing bar that the bent cap, which indulges muscle section 110, the horizontal segment of the inverted L-shaped reinforcing bar passes through concrete Pour and be fixed in bent cap 1, the top of vertical section is fixed in bent cap 1 by concreting, lower part stretch out bent cap 1 with institute Vertical muscle section 31 on pier stud is stated to be connected.
As shown in figure 3, it is L shape reinforcing bar that the cushion cap, which indulges muscle section 210, the horizontal segment of the L shape reinforcing bar passes through concreting It is fixed in cushion cap 2, the lower part of vertical section is fixed in cushion cap 2 by concreting, and top is located at the lower preformed groove 21 It is interior and stretch out the cushion cap 2 with under the pier stud indulge muscle section 32 be connected.
The construction method of above-mentioned soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure, includes the following steps:
(1) the production cushion cap 2, bent cap 1 and pier stud 3 are poured respectively, and the preset lower preformed groove 21, bent cap indulge muscle section 110, cushion cap indulges muscle section 210, indulges on pier stud and indulge muscle section 32 under muscle section 31 and pier stud, and pre-buried in cushion cap 2, bent cap 1 and pier stud 3 Cushion cap prestress pipe 20, bent cap prestress pipe 10 and the pier stud prestress pipe 30 interconnected after assembly;
(2) the vertical muscle section 110 of the bent cap is connected by the grout pipe 5, cushion cap indulges muscle section 210, indulges muscle section 31 on pier stud With muscle section 32 vertical under pier stud;
(3) by the way that ultra-high performance concrete (UHPC) is perfused into grout pipe 5, realize that pier stud 3 and cushion cap 2 and bent cap 1 connect It is integral to connect shape;
(4) the stretching end anchorage 42 is set at the top of bent cap 1, the fixing end anchorage is set in the bottom of cushion cap 2 41, presstressed reinforcing steel group 43 is passed through to cushion cap prestress pipe 20, bent cap prestress pipe 10 and the pier stud prestressing force interconnected Pipeline 30;
(5) tensioning is carried out to presstressed reinforcing steel group 43 at stretching end anchorage 42 with tensioning equipment, has bent cap 1 and pier stud 3 Each self-resetting capability.
The above, the only preferred embodiment of the utility model, therefore, it cannot be limited according to, and the utility model is implemented Range, i.e., equivalent changes and modifications made according to the scope of the patent of the utility model and the content of the manual should still belong to practical It is novel cover in the range of.

Claims (6)

1. a kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure, it is characterised in that: held including an at least bent cap, at least one Platform, at least a pier stud and at least a prestressing force drawing mechanism, the upper end of pier stud, which has, indulges muscle section, lower end on several pier studs stretched out There are several bent caps stretched out to indulge muscle section for vertical muscle section under several pier studs with stretching, bent cap, and there are cushion cap the several of stretching to hold Platform indulges muscle section;
An at least pier stud is located on an at least cushion cap, which is located on an at least pier stud, cushion cap and bent cap It is embedded with grout pipe respectively, is indulged on several pier studs and indulges muscle section under muscle section, several pier studs, several bent caps indulge muscle section and several cushion caps are vertical Muscle Duan Jun is set in above-mentioned grout pipe, and indulged on several pier studs indulged under muscle section and several pier studs muscle section respectively by being poured on The ultra-high performance concrete UHPC stated in grout pipe is connected with the vertical muscle section of several bent caps and the vertical muscle section of several cushion caps so that at least one Bent cap, at least a cushion cap and at least a pier stud shape is integral, above-mentioned pier stud and bent cap by the tensioning of prestressing force drawing mechanism with Has self-resetting capability.
2. a kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure as described in claim 1, it is characterised in that: include:
An at least bent cap, is inside embedded with bent cap prestress pipe, and there are several bent caps to indulge muscle section for lower surface;
An at least cushion cap, is inside embedded with cushion cap prestress pipe, and there are several cushion caps to indulge muscle section for upper surface;
An at least pier stud is inside embedded with pier stud prestress pipe, and the upper end, which has, indulges muscle section on several pier studs, Lower end, which has, indulges muscle section under several pier studs;
An at least prestressing force drawing mechanism, including fixing end anchorage, stretching end anchorage and presstressed reinforcing steel group, presstressed reinforcing steel group Both ends be separately connected fixing end anchorage and stretching end anchorage;
The fixing end anchorage be set to cushion cap bottom, stretching end anchorage be set to bent cap top, the bent cap prestress pipe, Cushion cap prestress pipe and pier stud prestress pipe are sequentially communicated, and presstressed reinforcing steel group passes through bent cap prestress pipe, cushion cap is answered in advance Hydraulic piping and pier stud prestress pipe.
3. a kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure as described in claim 1, it is characterised in that: the lid It is inverted L-shaped reinforcing bar that beam, which indulges muscle section, and the horizontal segment of the inverted L-shaped reinforcing bar is fixed in bent cap by concreting, vertical section it is upper Portion is fixed in bent cap by concreting, and bent cap is stretched out to be connected with muscle section vertical on the pier stud in lower part.
4. a kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure as described in claim 1, it is characterised in that: described to hold It is L shape reinforcing bar that platform, which indulges muscle section, and the horizontal segment of the L shape reinforcing bar is fixed in cushion cap by concreting, and the lower part of vertical section is logical It crosses concreting to be fixed in cushion cap, cushion cap is stretched out to be connected with muscle section vertical under the pier stud in top.
5. a kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure as described in claim 1, it is characterised in that: the pier Muscle section is indulged on column and lower vertical muscle section is the steel reinforcement cage being made of several reinforcing bars extended from pier stud.
6. a kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure as described in claim 1, it is characterised in that: the filling Slurry pipe is grout sleeve or grouting bellows.
CN201821124436.1U 2018-07-16 2018-07-16 A kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure Active CN208586511U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821124436.1U CN208586511U (en) 2018-07-16 2018-07-16 A kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821124436.1U CN208586511U (en) 2018-07-16 2018-07-16 A kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure

Publications (1)

Publication Number Publication Date
CN208586511U true CN208586511U (en) 2019-03-08

Family

ID=65541059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821124436.1U Active CN208586511U (en) 2018-07-16 2018-07-16 A kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure

Country Status (1)

Country Link
CN (1) CN208586511U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110331656A (en) * 2018-07-16 2019-10-15 健研检测集团有限公司 A kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure and its construction method
CN111021237A (en) * 2020-01-23 2020-04-17 福州大学 Prefabricated assembled solid single-column pier based on root-enlarged section and construction method thereof
CN112359709A (en) * 2020-11-20 2021-02-12 北方工业大学 Steel pipe concrete pier stud and bent cap assembled node

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110331656A (en) * 2018-07-16 2019-10-15 健研检测集团有限公司 A kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure and its construction method
CN111021237A (en) * 2020-01-23 2020-04-17 福州大学 Prefabricated assembled solid single-column pier based on root-enlarged section and construction method thereof
CN112359709A (en) * 2020-11-20 2021-02-12 北方工业大学 Steel pipe concrete pier stud and bent cap assembled node

Similar Documents

Publication Publication Date Title
CN105908621B (en) It is a kind of to damage controllable Self-resetting precast segment steel-pipe assembly concrete pier and the practice
CN106758786B (en) A kind of prefabricated assembled concrete-filled double skin steel tube lattice bridge pier
CN208586511U (en) A kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure
CN108589514A (en) Load-bearing and earth-quake resistant mechanism separate type precast assembly bridge pier system
CN103074941B (en) Assembling regeneration concrete node and the practice of steel bar girder beam are contained in a kind of end
CN107190635B (en) Dumbbell type steel pipe concrete combined bridge pier and connecting structure and method of dumbbell type steel pipe concrete combined bridge pier and bearing platform
CN209619858U (en) A kind of combination assembled bridge framed bent pier system of steel-concrete
CN102877407B (en) Concrete continuous box girder of corrugated steel web for curved bridge
CN203270457U (en) Suspension bar anchoring structure capable of initiatively reinforcing concrete tied-arch bridge
CN105672134A (en) Through concrete-filled steel tube tied-arch bridge erection construction method
CN204185755U (en) A kind of Wavelike steel webplate post-stressed concrete T beam
CN103266574A (en) Simply-supported box girder bridge strengthening method with oblique cables
CN109457599A (en) Hollow pier and cushion cap splicing construction and construction method
CN104612036A (en) Unbonded post-tensioning prestress concrete-filled double-wall steel pipe prefabricated assembly piers with additional dampers
CN103966956A (en) Hooped concrete-filled steel tube reinforced single-pole bridge pier constructing device and construction method
CN106120542B (en) It can be applied to the assembled pier and its construction technology of seismic fortification intensity upper zone
CN208293400U (en) A kind of ultra-high performance concrete-part girder steel combination bent cap
CN110700082A (en) Column base node of SMA-ECC self-resetting circular steel tube restrained reinforced concrete pier
CN110331656A (en) A kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure and its construction method
CN106320165A (en) Prefabricated concrete-filled steel tube overlapped pier
CN112796198A (en) Hollow arch bridge system connected by UHPC wet joints and construction method
CN206467580U (en) A kind of reinforced bridge pier
CN206941372U (en) Concrete-filled steel tube with dumbbell sections assembled pier and the attachment structure with cushion cap
CN210917030U (en) Bridge construction support bracket
CN113718634A (en) A full precast bridge sways from restoring to throne shock-absorbing structure system for falling T bent cap

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant