- Publication number
- CN208583745U CN208583745U CN201820968604.9U CN201820968604U CN208583745U CN 208583745 U CN208583745 U CN 208583745U CN 201820968604 U CN201820968604 U CN 201820968604U CN 208583745 U CN208583745 U CN 208583745U
- Authority
- CN
- China
- Prior art keywords
- liquidometer
- suction side
- rinse
- negative
- gasification furnace
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to a kind of rinse-systems of gasification installation gasification furnace liquidometer suction side, including the negative-pressure irrigation ring for being rinsed to liquidometer suction side measurement pipe, it is communicated with the inflatable body that can input purge gass on the negative-pressure irrigation ring, is communicated with the flushing machine that can input flushing water on the negative-pressure irrigation ring.The utility model is installed on gasification furnace liquidometer suction side pressure pipeline blows afloat mechanism and flushing machine, and the cinder being deposited in suction side is made to keep moisture state, is rinsed, can effectively be washed away cinder using the method that flushing water plus purge gass are rinsed simultaneously.
Description
Technical field
The utility model relates to a kind of rinse-systems of gasification installation gasification furnace liquidometer suction side.
Background technique
The gasification furnace of coal gasification apparatus is the core equipment of entire coal chemical industry gasification installation, the liquidometer measurement in the equipment
Whether accurate, the peace of gasification installation, steady, long running are directly affected.In order to guarantee the accurate of liquidometer measurement, in design,
Every gasification furnace measures liquid level using three liquidometers, and participates in interlocking by the way of two from three;Meanwhile in every liquidometer
Positive pressure survey be equipped with flushing water, negative pressure survey be equipped with purging device of air, prevent because liquidometer pressure pipeline block measure liquidometer
It is not allowed that gasification furnace is caused to jump vehicle.
In technologist's actual mechanical process, gasification furnace generates a large amount of cinder, coal ash after the reaction.It is negative in liquidometer
Side is pressed, is easy to dry up the cinder not blown away for being deposited in pressure tappings under the action of purge gass, so that liquidometer be caused to take
Pressure pipe pipeline is frequently occluded.Every liquidometer a couple of days just blocks up once, since the liquidometer is interlocked with level-one, every liquidometer
When failure, just it must handle and dredge in time, eliminate and jump vehicle hidden danger.
Numerous in large-scale coal chemical engineering equipment gasification furnace number of units, the workload for opening and inspecting dredging pressure tappings daily is very big, occupies
A large amount of manpower and material resources.Simultaneously as gasification furnace pressure and temperature are higher (pressure is that 4.5MPa reaction gas temperature is 2150 DEG C),
Contain a large amount of CO in reaction gas, makes to dredge work danger coefficient height.The work of the maintenance personnel thus greatly reduced
Efficiency increases the security risk of instrument personnel.
Utility model content
It, can be with the purpose of this utility model is to provide a kind of rinse-system of gasification installation gasification furnace liquidometer suction side
Well solve the problem of cinder exsiccation causes liquidometer pressure pipe line clogging.
To achieve the goals above, the utility model provides following technical scheme:
The utility model provides a kind of rinse-system of gasification installation gasification furnace liquidometer suction side, including for liquid level
The negative-pressure irrigation ring that suction side measurement pipe is rinsed is counted, is communicated with the inflatable body that can input purge gass on negative-pressure irrigation ring,
The flushing machine that can input flushing water is communicated on negative-pressure irrigation ring.
Further, it is provided with first through hole on negative-pressure irrigation ring, to be connected to inflatable body.
Further, inflatable body includes snorkel and blower, and blower is logical by snorkel and negative-pressure irrigation ring first
Hole connection.
Further, it is provided with the second through-hole on negative-pressure irrigation ring, to be connected to flushing machine.
Still further, flushing machine includes water pipe and water pump, water pump is connected by water pipe and the second through-hole of negative-pressure irrigation ring
It is logical.
As an option, be additionally provided with guide pipe on the inside of negative-pressure irrigation ring, guide pipe be set to the second through hole with water
Pipe is connected.
Compared with prior art, the utility model has the advantage that
The rinse-system of the gasification installation gasification furnace liquidometer suction side of the utility model, in gasification furnace liquidometer suction side
Installation blows afloat mechanism and flushing machine on pressure pipeline, so that the cinder being deposited in suction side is kept moisture state, using flushing
Water adds purge gass while the method rinsed is rinsed, and can effectively wash away cinder.
Detailed description of the invention
Fig. 1 is the installation schematic diagram of the gasification installation gasification furnace liquidometer of the utility model;
Fig. 2 is the structural schematic diagram of the utility model;
Fig. 3 is the structural schematic diagram of the negative-pressure irrigation ring of the utility model;
Fig. 4 is the structural schematic diagram of the guide pipe of the utility model.
Specific embodiment
As shown in Figure 1, the installation principle of the gasification furnace liquidometer of gasification installation, including gasification furnace 100, suction side measuring machine
Structure 101, positive pressure side measuring mechanism 102 and pressure difference transmitter 103 measure the differential pressure of positive and negative pressure side by differential pressure transmitter 103,
Gasification burner liquid level 1001 can be gone out by Conversion Calculation.
As shown in Figure 2 and Figure 3, the rinse-system of gasification installation gasification furnace liquidometer suction side provided in this embodiment, as
The rinse-system of suction side measuring mechanism 101, including the negative-pressure irrigation ring for being rinsed to liquidometer suction side measurement pipe 1
2, the inflatable body that can input purge gass is communicated on negative-pressure irrigation ring 2, and flushing water can be inputted by being communicated on negative-pressure irrigation ring 2
Flushing machine.
Wherein, 2 one end of negative-pressure irrigation ring is connected to pressure with 100 inner cavity of gasification furnace by measurement pipe 1, is arranged in measurement pipe 1
There is valve;Suction side pressure is delivered to pressure difference transmitter by capillary 3 by 2 other end of negative-pressure irrigation ring.
It is provided with first through hole on negative-pressure irrigation ring 2, to be connected to inflatable body.Inflatable body includes snorkel 4 and blower,
Blower is connected to by snorkel 4 with 2 first through hole of negative-pressure irrigation ring.It is provided with air valve on snorkel 4, to control the big of tolerance
It is small.Air blower etc. can be used to blast purge gas in blower.
The second through-hole is provided on negative-pressure irrigation ring 2, to be connected to flushing machine.Flushing machine includes water pipe 5 and water pump, water
Pump is connected to by water pipe 5 with 2 second through-hole of negative-pressure irrigation ring.It is provided with water valve on water pipe 5, to control the size of water.Water pump
General delivery pump etc. can be used to input flushing water.It is of course also possible to directly be connected to tap water pipeline by water pipe 5.
In use, unlatching water valve and air valve, flushing water enter suction side washing ring by pipeline, to instrument negative pressure measurement pipe
Line is rinsed, and so that the cinder being deposited in suction side is kept moisture state, is rinsed, had simultaneously by flushing water and purge gass
Effect washes away cinder, substantially reduces and opens and inspect frequency (every liquidometer substantially monthly handle primary it is ensured that liquidometer measured
Accurately), the workload that can exempt a large amount of flange dismounting block clearings, is greatly reduced the security risk of instrument maintenance personnel, improves
The working efficiency of instrument maintenance personnel, ensure that the normal production of device.
As an option, on that basi of the above embodiments, guide pipe 51, guide pipe are provided on the inside of negative-pressure irrigation ring 2
51 are set to the second through hole to be connected with water pipe 5, referring to Fig. 3.Guide pipe 51 is a bend pipe, can be oriented to flushing water
Effect, so that flushing water is directed at susceptible to plugging position, promote the effect of flushing.Certainly, referring to fig. 4, the end of guide pipe 51 with
By proximal port gradually to contract, form contraction mouth 52, the contraction mouth 52 of guide pipe 51 projects water by gradually becoming smaller outside interior cause
Stream is more concentrated, and flushing effect is further promoted.A certain number of apertures are drilled on the end of guide pipe 51, aperture is set to guiding
51 end of pipe makes a part of water flow perpendicular in guide pipe close to the position of contraction mouth 52, the arrangement of aperture circular array
It is axial to project, to reduce the surveyed gas phase of part the rear portion of guide pipe is entered with coal ash, forming dry cinder can not rinse.
Claims (10)
1. a kind of rinse-system of gasification installation gasification furnace liquidometer suction side, which is characterized in that including for negative to liquidometer
The negative-pressure irrigation ring that is rinsed of pressure side measurement pipe is communicated with the inflatable body that can input purge gass on the negative-pressure irrigation ring,
The flushing machine that can input flushing water is communicated on the negative-pressure irrigation ring.
2. the rinse-system of gasification installation gasification furnace liquidometer suction side according to claim 1, which is characterized in that described negative
It is provided with first through hole on pressure washing ring, to be connected to inflatable body.
3. the rinse-system of gasification installation gasification furnace liquidometer suction side according to claim 2, which is characterized in that described to blow
Mechanism of qi structure includes snorkel and blower, and blower is connected to by snorkel with negative-pressure irrigation ring first through hole.
4. the rinse-system of gasification installation gasification furnace liquidometer suction side according to claim 3, which is characterized in that described logical
Air valve is provided on tracheae, to control the size of tolerance.
5. the rinse-system of gasification installation gasification furnace liquidometer suction side according to claim 1, which is characterized in that described negative
It is provided with the second through-hole on pressure washing ring, to be connected to flushing machine.
6. the rinse-system of gasification installation gasification furnace liquidometer suction side according to claim 5, which is characterized in that the punching
Washing machine structure includes water pipe and water pump, and water pump is connected to by water pipe with the second through-hole of negative-pressure irrigation ring.
7. the rinse-system of gasification installation gasification furnace liquidometer suction side according to claim 6, which is characterized in that the water
Water valve is provided on pipe, to control the size of water.
8. the rinse-system of gasification installation gasification furnace liquidometer suction side according to claim 7, which is characterized in that described negative
It is additionally provided with guide pipe on the inside of pressure washing ring, guide pipe is set to the second through hole to be connected with water pipe.
9. the rinse-system of gasification installation gasification furnace liquidometer suction side according to claim 8, which is characterized in that described to lead
To Guan Weiyi bend pipe.
10. the rinse-system of gasification installation gasification furnace liquidometer suction side according to claim 8, which is characterized in that described
Be provided with aperture on guiding tube end, and be oriented to tube end with by proximal port gradually to contract.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820968604.9U CN208583745U (en) | 2018-06-22 | 2018-06-22 | The rinse-system of gasification installation gasification furnace liquidometer suction side |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820968604.9U CN208583745U (en) | 2018-06-22 | 2018-06-22 | The rinse-system of gasification installation gasification furnace liquidometer suction side |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208583745U true CN208583745U (en) | 2019-03-08 |
Family
ID=65537268
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820968604.9U Active CN208583745U (en) | 2018-06-22 | 2018-06-22 | The rinse-system of gasification installation gasification furnace liquidometer suction side |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208583745U (en) |
-
2018
- 2018-06-22 CN CN201820968604.9U patent/CN208583745U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106595948A (en) | Coke oven bridge pipe raw gas pressure detection device | |
CN208583745U (en) | The rinse-system of gasification installation gasification furnace liquidometer suction side | |
CN201819860U (en) | Device for on-line measuring density and pH of gypsum slurry through wet FGD (Flue Gas Desulfurization) method | |
CN208254996U (en) | A kind of flue gas wet flue gas desulfurization gypsum slurries are in line density and pH value combined measurement device | |
CN207096272U (en) | A kind of anti-blocking resistant wear wind speed and wind system for measuring quantity | |
CN211921615U (en) | Blast furnace tuyere belly pipe airtightness detection device | |
CN207727521U (en) | A kind of water conservancy gate with water quality detection | |
CN209014064U (en) | A kind of flue gas measurement Special wear-resistant block-resistant type pitot tube flowmeter | |
CN203295530U (en) | Anti-blocking device of pressure guide pipe | |
CN212963526U (en) | Anti-blocking cleaning device of flow meter | |
CN204188215U (en) | A kind of level gauging cylinder continuously with online self-cleaning function | |
CN113155671A (en) | Measuring method of continuous automatic measuring and sampling device for density and pH value of slurry of desulfurization absorption tower | |
CN208595431U (en) | Buckle-type pipe water outlet pressure test device | |
CN209918496U (en) | Quick cleaning device of pressure transmitter connecting pipe | |
CN209656494U (en) | Slurry density measurement device in a kind of desulfurizing tower suitable for calcium method desulfurization | |
CN112082605A (en) | Throttling type flue gas flow measuring system and using method thereof | |
CN207197620U (en) | A kind of batch meter | |
CN215179396U (en) | Periodic sampling differential pressure densimeter for desulfurization system of thermal power plant | |
CN219178673U (en) | Liquid level detection device for dehydrator of blast furnace gas cleaning system | |
CN217032644U (en) | Gas flowmeter backwash device | |
CN212275001U (en) | Throttle formula flue gas flow measurement system | |
CN215762485U (en) | Vacuum generator for degassing in water meter | |
CN208003914U (en) | Scrubbing tower disperses inlet duct with multi-pipeline | |
CN215889988U (en) | A converge ware device for haplopore flow measurement | |
CN208296910U (en) | A kind of improved plug-in type double-venturi tube |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |