A kind of New Cycle cooling water system
Technical field
This application involves field of chemical equipment more particularly to a kind of New Cycle cooling water systems.
Background technique
Building a conservation-minded society and make low-carbon life is always the topic that the whole society advocates jointly, in many industrial departments
Production process in, generate a large amount of waste heat, need be transferred into natural environment with heat transfer medium in time, to guarantee production process
Middle normal operation.It is resourceful and be used as industrial waste heat since natural water has an excellent heat transfer property and low-cost
Heat transfer medium, referred to as cooling water, industrial colling but in the maximum user that each state is all industry water, are removed and are increased in the industrial production
The physicochemical property of cooling water is handled outside temperature without very significant changes, if taking appropriate cooling measure, is allowed to form circulating and recovering system
System is the important channel for saving industrial water.
In chemical field, recirculating cooling water system be cooling water heat exchange and through cooling down, recycled water supply system, packet
Open type and closed two types are included, is made of cooling equipment, first pump housing and pipeline.The principle of recirculated cooling water is with water
As cooling medium, and a kind of cooling water system being recycled, mainly it is made of cooling equipment, first pump housing and pipeline.It is cold
But after water flows through the production equipment for needing to cool down, temperature rises, if discharged at once, cold water is only used once, flows through heating water
Then water temperature returns drop to cooling equipment, can be reused with pumped back production equipment, the dosage of cold water substantially reduces, and can often save 95%
More than, cooling water accounts for 70% of industrial water consumption or so, because recirculating cooling water system has played a large amount of industrial waters of saving.
The prior art mainly adopts hot wind pump, the devices such as fan electromotor carry out recirculated cooling water, one side energy consumption
Amount is big, in the case where huge electricity consumption need to be consumed by needing, cannot guarantee that circulating cooling function reaches optimum state.
Utility model content
This application provides a kind of New Cycle cooling water system, low energy consumption solves cooling water circulation and is not thorough, and recycles
The bad problem of cooling effect.
A kind of New Cycle cooling water system, including circulating water pool, first pump housing, moisture separator, heat exchanger, cooling
Device, second pump housing, refrigeration machine and bypass valve.Partition is provided in the circulating water pool, the partition separates circulating water pool
At feed cistern and back pool, adsorption layer is provided at the top end opening of the circulating water pool, the adsorption layer setting is followed described
The both ends in ring pond;The inlet end of first pump housing is provided with first pipe, first pump housing by first pipe with
The feed cistern connection, the water outlet of first pump housing are provided with second pipe, and the second pipe is separated with the aqueous vapor
The input terminal of device connects, and the moisture separator output end is separately connected the heat exchanger and described by third pipeline
The input terminal of cooling device, the output end of the cooling device are provided with the 4th pipeline, and the output end of the cooling device passes through
4th pipeline is connect with the input end of second pump housing and the refrigeration machine respectively, and the outlet end of the refrigeration machine is set
It is equipped with the 5th pipeline, the refrigeration machine outlet end is connect by the 5th pipeline with the back pool, outside the refrigeration machine
Side is provided with the 6th pipeline, and the bypass valve is connect with the input end of refrigeration machine, outlet end respectively by the 6th pipeline.
Preferably, the bottom of the partition is provided with filter screen.
Preferably, the refrigeration machine input end, outlet end are provided with bypass valve, and the bypass valve passes through the 6th pipeline
It is connect respectively with the input end of refrigeration machine, outlet end.
Preferably, the side of cooling device is provided with thermometer, and the other side of the cooling device is provided with pressure gauge.
Preferably, the position in the first pipe close to first pump housing is provided with throttle valve.
Preferably, a side bottom of the circulating water pool is provided with sewage draining exit.
Preferably, the adsorption layer includes screen layer, active carbon layer and scrim cloth, and the active carbon layer is arranged described
The top of the active carbon layer is arranged in the top of screen layer, the scrim cloth.
Above scheme discloses a kind of New Cycle cooling water system, including circulating water pool, first pump housing, aqueous vapor separation dress
It sets, heat exchanger, cooling device, second pump housing, refrigeration machine and bypass valve;Partition, the partition are provided in the circulating water pool
Circulating water pool is separated into feed cistern and back pool, adsorption layer, the absorption are provided at the top end opening of the circulating water pool
The both ends of the circulating water pool are arranged in layer, and the inlet end of first pump housing is provided with first pipe, first pump housing
It is connect by first pipe with the feed cistern, the water outlet of first pump housing is provided with second pipe, the second pipe
It is connect with the input terminal of the moisture separator, the moisture separator output end is separately connected described by third pipeline
The input terminal of heat exchanger and the cooling device, the output end of the cooling device are provided with the 4th pipeline, the cooling dress
The output end set is connect with the input end of second pump housing and the refrigeration machine respectively by the 4th pipeline, the system
The outlet end of cold is provided with the 5th pipeline, and the refrigeration machine outlet end is connect by the 5th pipeline with the back pool,
Be provided with the 6th pipeline on the outside of the refrigeration machine, the bypass valve by the 6th pipeline respectively with the import of refrigeration machine
End, outlet end connection.By removal of impurities absorption and multistage cooling treatment, such as exchange heat, it is cooling, then the processes such as cooling, by circulating cooling
Process accomplishes that most preferably, circulating cooling effect is more thorough, sufficiently meets production requirement.
Detailed description of the invention
In order to illustrate more clearly of the technical solution of the application, letter will be made to attached drawing needed in the embodiment below
Singly introduce, it should be apparent that, for those of ordinary skills, without any creative labor,
It is also possible to obtain other drawings based on these drawings.
Fig. 1 is a kind of structural schematic diagram of New Cycle cooling water system provided by the present application.
Fig. 2 is the structural schematic diagram of adsorption layer provided by the present application.
It illustrates: 1- circulating water pool, first pump housing of 2-, 3- moisture separator, 4- heat exchanger, 5- cooling device, 6-
Second pump housing, 7- refrigeration machine, 8- bypass valve, 11- partition, 12- feed cistern, 13- back pool, 14- adsorption layer, 15- sewage draining exit,
21- first pipe, 22- second pipe, 23- third pipeline, the 4th pipeline of 24-, the 5th pipeline of 25-, the 6th pipeline of 26-, 51- temperature
Degree meter, 52- pressure gauge, 111- filter screen, 141- screen layer, 142- active carbon layer, 143- scrim cloth, 211- throttle valve.
Specific embodiment
It is a kind of New Cycle provided by the present application that this application discloses a kind of New Cycle cooling water systems referring to Fig. 1
The structural schematic diagram of cooling water system.
A kind of New Cycle cooling water system, including circulating water pool 1, first pump housing 2, moisture separator 3, heat exchanger 4,
Cooling device 5, second pump housing 6, refrigeration machine 7 and bypass valve 8.
Partition 11 is provided in the circulating water pool 1, circulating water pool 1 is separated into feed cistern 12 and return water by the partition 11
Pond 13, adsorption layer 14 is provided at the top end opening of the circulating water pool 1, and the adsorption layer 14 is arranged in the circulating water pool 1
Both ends.Circulating water pool 1 is divided into two regions by the partition 11, wherein the feed cistern 12 is water supply source, that is,
At the material supply of the entire circulatory system, the back pool 13 is to store the water source after circulating cooling, is recycled with reaching
Purpose.
The inlet end of first pump housing 2 is provided with first pipe 21, first pump housing 2 by first pipe 21 with
The feed cistern 12 connects, and the water outlet of first pump housing 2 is provided with second pipe 22, the second pipe 22 and the water
The input terminal of air separation 3 connects, and 3 output end of moisture separator is separately connected the heat exchange by third pipeline 23
The input terminal of device 4 and the cooling device 5, the output end of the cooling device 5 are provided with the 4th pipeline 24, the cooling dress
5 output end is set to connect with the input end of second pump housing 6 and the refrigeration machine 7 respectively by the 4th pipeline 24,
The outlet end of the refrigeration machine 7 is provided with the 5th pipeline 25,7 outlet end of refrigeration machine by the 5th pipeline 25 with it is described
Back pool 13 connects, and the outside of the refrigeration machine 7 is provided with the 6th pipeline 26, and the bypass valve 8 passes through the 6th pipeline 26
It is connect respectively with the input end of refrigeration machine 7, outlet end.
The course of work of the system: the water source that first pump housing 2 extracts in feed cistern 12 can be mixed in water due to chemical field
Miscellaneous pernicious gas, such as the compound of sulphur phosphorus, the water pulled out will carry out the separation of gas and water by moisture separator 3,
Under the action of moisture separator 3, pernicious gas is separated from the water processing, is discharged the aqueous vapor point after pernicious gas separation
Except device 3, water moisture separator separate gas when the temperature of water can be made to increase, next by the heat exchanger 4 into
Row heat exchange processing, water is further cooled down, and heat exchanger selects duplex tube helix formula heat exchanger, and heat transfer effect is reached higher level,
Water is flowed through by third pipeline 23 to the cooling device 5 after the processing of the heat exchanger 4, after cooling device 5 is cooling
Water a part be discharged in second pump housing 6 by the 4th pipeline, a part fallen back to by the lower mouth of cooling device 5
In the feed cistern 12, cooling cycle process can be constantly participated in this way, to obtain the low water of big amount temperature enough, described second
6 pairs of the pump housing detach by water after cooling, and it is cooling also to again pass by refrigeration machine 7 according to observed temperature and production requirement selection
It is directly to be returned in the back pool 13 from bypass, that is, when temperature measurement meets oneself demand, open bypass valve 8, water
It is flowed out from bypass valve, conversely, bypass valve is closed, water again passes by refrigeration machine and carries out refrigeration processing.
Preferably, the bottom of the partition 11 is provided with filter screen 111.The setting of filter screen 111 is conveniently used to clearing house
The water source of feed cistern 12 and the back pool 13 is stated, the water in back pool 13 will can just return to feed cistern 12 by filter screen 111
In.
Preferably, the side of the cooling device 5 is provided with thermometer 51, and the other side of the cooling device 5 is provided with
Pressure gauge 52.Thermometer 51 is set and facilitates temperature change of the monitoring water in the cooling device 5, after according to temperature selection
Continuous work step.Since in water flowing circulation regulation, water flow is bigger, it will cause device and pipeline load, pass through the pressure
Meter 52 facilitates monitoring pressure value, guarantees that cooling procedure carries out safely.
Preferably, the position in the first pipe 21 close to first pump housing 2 is provided with throttle valve 211.Throttle valve is set
211 be in order to be used cooperatively with the above-mentioned pressure gauge 52 referred to, when pressure value is shown it is excessive when, by adjust throttle valve 211, into
And adjust the load in the speed and unit area of water flow to pipeline.
Preferably, a side bottom of the circulating water pool 1 is provided with sewage draining exit 15.Water is detached from the feed cistern 12
It waits, water flow velocity is big, and the accumulation of pollutants in water or in pond can also be accelerated, and post-depositional sundries can pass through 15 row of sewage draining exit
Out, waste is discharged in time, avoids impurity in water excessive.
Preferably, the adsorption layer 14 includes screen layer 141, active carbon layer 142 and scrim cloth 143, the active carbon
The top of the screen layer 141 is arranged in layer 142, and the top of the active carbon layer 142 is arranged in the scrim cloth 143, inhales
The setting of attached layer 14 is the purified treatment completed at the initial stage detached in water to water, and the top of circulating water pool 1 is arranged in adsorption layer 14
The screen layer 141 of opening, 14 bottom end of adsorption layer carries active carbon layer 142 as base, while tiny network interface may filter that
Fine impurities in water, so that contamination precipitation is discharged, active carbon layer 142 is the main body of the adsorption layer 14, is adsorbed thin in water
Small impurity improves the cleanliness for the water being pulled out, and mitigating follow-up process also needs the burden to clean again, and scrim cloth 143 is for covering
Lid and the fixed active carbon layer 142.Keep total more stable.
Above scheme discloses a kind of New Cycle cooling water system, including the separation of circulating water pool 1, first pump housing 2, aqueous vapor
Device 3, heat exchanger 4, cooling device 5, second pump housing 6, refrigeration machine 7 and bypass valve 8;Partition is provided in the circulating water pool 1
11, circulating water pool 1 is separated into feed cistern 12 and back pool 13 by the partition 11, is set at the top end opening of the circulating water pool 1
It is equipped with adsorption layer 14, the both ends of the circulating water pool 1 are arranged in the adsorption layer 14, and the inlet end of first pump housing 2 is set
It is equipped with first pipe 21, first pump housing 2 is connect by first pipe 21 with the feed cistern 12, first pump housing 2
Water outlet is provided with second pipe 22, and the second pipe 22 is connect with the input terminal of the moisture separator 3, the aqueous vapor
3 output end of separator is separately connected the input terminal of the heat exchanger 4 and the cooling device 5, institute by third pipeline 23
The output end for stating cooling device 5 is provided with the 4th pipeline 24, and the output end of the cooling device 5 is divided by the 4th pipeline 24
It is not connect with the input end of second pump housing 6 and the refrigeration machine 7, the outlet end of the refrigeration machine 7 is provided with the 5th pipe
Road 25,7 outlet end of refrigeration machine are connect by the 5th pipeline 25 with the back pool 13, the outside of the refrigeration machine 7
It is provided with the 6th pipeline 26, the bypass valve 8 is connected with the input end of refrigeration machine 7, outlet end respectively by the 6th pipeline 26
It connects.By removal of impurities absorption and multistage cooling treatment, such as exchange heat, it is cooling, then the processes such as cooling, circulating cooling process is accomplished most
Good, circulating cooling effect is more thorough, sufficiently meets production requirement.
It is practical new to will readily occur to this after considering specification and practicing utility model disclosed herein by field technical staff
Other embodiments of type.This application is intended to cover any variations, uses, or adaptations of the utility model, these changes
Type, purposes or adaptive change follow the general principle of the utility model and including the undocumented this technologies of the utility model
Common knowledge or conventional techniques in field.The description and examples are only to be considered as illustrative, the utility model it is true
Positive scope and spirit are indicated by the following claims.
It should be understood that the utility model is not limited to the accurate knot for being described above and being shown in the accompanying drawings
Structure, and various modifications and changes may be made without departing from the scope thereof.The scope of the utility model is only wanted by appended right
It asks to limit.