Prior art keywords
switch
phase line
line cable
resistance
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821179303.4U
Other languages
Chinese (zh)
Inventor
赵法强
欧阳健
袁汉凯
余国忠
赵晓晖
郝苓羽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Power Supply Bureau Co Ltd
Original Assignee
Shenzhen Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Power Supply Bureau Co Ltd filed Critical Shenzhen Power Supply Bureau Co Ltd
Priority to CN201821179303.4U priority Critical patent/CN208568962U/en
Application granted granted Critical
Publication of CN208568962U publication Critical patent/CN208568962U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The utility model provides a kind of 10KV high voltage cable fault simulation test circuit and device, including U phase line cable, V phase line cable, W phase line cable and GND ground cable;Wherein, the both ends of each phase line cable are equipped with connecting terminal, intermediate position is equipped with switch, and and is connected to the branch formed by a capacitor between each phase line cable and GND ground cable, the branch formed is concatenated by two resistance, being switched by a switch and the branch that is formed of a capacitor series and independent one;Two-by-two between phase line cable and be connected to a resistance and one switch.Implement the utility model, can comprehensively simulate the impedance of each phase line occurs in 10KV high voltage cable failure and each phase line cable.

Description

A kind of 10KV high voltage cable fault simulation test circuit and device
Technical field
The utility model relates to cable fault analog detection technical field more particularly to a kind of 10KV high voltage cable failure moulds Quasi- test circuit and device.
Background technique
10KV high voltage cable is usually used on the overhead transmission line of electric system.Since the fault detection of 10KV high voltage cable is compared Danger, so that staff can not specifically know the fault condition of 10KV high voltage cable, to have no way of in maintenance process to event Barrier reason is determined, brings many inconvenience to work, and cause the repair time too long.
Therefore, in order to allow staff can intuitive, safety the fault condition to 10KV high voltage cable recognize, Hen Duoqi Industry, which all designs, corresponding failure simulation device, but above-mentioned failure simulation device and not perfect, so that 10KV high voltage cable There are one-sidedness for fault simulation.For example, the failure of single phase line can only be simulated;For another example, it can only simulate between two phase lines Impedance.Therefore, a kind of 10KV high voltage cable fault simulation test circuit is needed, can comprehensively be simulated in 10KV high voltage cable The impedance of failure and each phase line cable that each phase line occurs.
Utility model content
The technical problem to be solved by the embodiment of the utility model is, providing a kind of 10KV high voltage cable fault simulation survey Circuit and device are tried, the resistance of each phase line occurs in 10KV high voltage cable failure and each phase line cable can be comprehensively simulated It is anti-.
In order to solve the above-mentioned technical problem, the utility model embodiment provides a kind of 10KV high voltage cable fault simulation survey Try circuit and device, comprising: U phase line cable, V phase line cable, W phase line cable and GND ground cable;Wherein,
The U phase line cable be equipped with positioned at both ends connecting terminal J1 and connecting terminal J2 and be located in the middle first Switch S1;Between the U phase line cable and the GND ground cable and be connected to the first branch formed by first capacitor device C1, The second branch formed is concatenated by first resistor R1 and the tenth resistance R10, shape is concatenated by the tenth switch S10 and the 4th capacitor C4 At third branch and the 14th switch S14;It is gone back on the first resistor R1 and is connected to the 4th switch S4;
The V phase line cable be equipped with positioned at both ends connecting terminal J3 and connecting terminal J4 and be located in the middle second Switch S2;Between the V phase line cable and the GND ground cable and be connected to the second capacitor C2 formation the 4th branch, by Second resistance R2 and eleventh resistor R11 concatenates the 5th branch to be formed, is concatenated by the 11st switch S11 and the 5th capacitor C5 The 6th branch and the 15th switch S15 formed;It is gone back on the second resistance R2 and is connected to the 5th switch S5;
The W phase line cable is equipped with the connecting terminal J5 and connecting terminal J6 for being located at both ends and is located in the middle third Switch S3;Between the W phase line cable and the GND ground cable and be connected to third capacitor C3 formation the 7th branch, by 3rd resistor R3 and twelfth resistor R12 concatenates the 8th branch to be formed, is concatenated by the 12nd switch S12 and the 6th capacitor C6 The 9th branch and sixteenmo formed closes S16;It is gone back on the 3rd resistor R3 and is connected to the 6th switch S6;
Wherein, between the U phase line cable and the V phase line cable and the 4th resistance R4, and the 4th resistance are connected to R4 is upper and is connected to the 7th switch S7;
Wherein, between the V phase line cable and the W phase line cable and the 5th resistance R5, and the 5th resistance are connected to R5 is upper and is connected to the 8th switch S8;
Wherein, between the W phase line cable and the U phase line cable and the 6th resistance R6, and the 6th resistance are connected to R6 is upper and is connected to the 9th switch S9.
Wherein, it when the first switch S1 is disconnected, simulates U phase line cable and open-circuit fault occurs;It opens when described second When closing S2 disconnection, simulates V phase line cable and open-circuit fault occur;When the third switch S3 is disconnected, W phase line cable is simulated There is open-circuit fault.
Wherein, as the first switch S1 and the 4th switch S4 is closed and the 7th switch S7, the tenth opens When pass S10 and the 14th switch S14 is disconnected, U phase line cable low resistive state over the ground is simulated, and impedance value is the tenth electricity Hinder the resistance value of R10;As the first switch S1 and the 14th switch S14 is closed and the 7th switch S7, the tenth When switch S10 and the 4th switch S4 are disconnected, simulates U phase line cable and short trouble occur;When the first switch S1 be closed, And the 4th switch S4, the 7th switch S7, the tenth switch S10 and the 14th switch S14 simulate U phase line when disconnecting Cable high-impedance state over the ground, and impedance value is the sum of the resistance value of the first resistor R1 and the tenth resistance R10;
As the second switch S2 and the 5th switch S5 is closed and the 8th switch S8, the 11st switch When S11 and the 15th switch S15 are disconnected, V phase line cable low resistive state over the ground is simulated, and impedance value is the 11st electricity Hinder the resistance value of R11;As the second switch S2 and the 15th switch S15 is closed and the 8th switch S8, the tenth When one switch S11 and the 5th switch S5 are disconnected, simulates V phase line cable and short trouble occur;When the second switch S2 is closed When conjunction and the 5th switch S5, the 8th switch S8, the 11st switch S11 and the 15th switch S15 are disconnected, V is simulated Phase line cable high-impedance state over the ground, and impedance value is the sum of the resistance value of the second resistance R2 and the eleventh resistor R11;
As the third switch S3 and the 6th switch S6 is closed and the 9th switch S9, the 12nd switch When S12 and sixteenmo pass S16 are disconnected, W phase line cable low resistive state over the ground is simulated, and impedance value is the 12nd electricity Hinder the resistance value of R12;As the third switch S3 and sixteenmo pass S16 is closed and the 9th switch S9, the tenth When two switch S12 and the 6th switch S6 are disconnected, simulates W phase line cable and short trouble occur;When the three switches S3 be closed, And the 6th switch S6, the 9th switch S9, the 12nd switch S12 and sixteenmo simulate W phase when closing S16 and disconnecting Line cable high-impedance state over the ground, and impedance value is the sum of the resistance value of the 3rd resistor R3 and the twelfth resistor R12.
Wherein, when the first switch S1, second switch S2 and the 7th switch S7 are closed and third switch S3, the 4th switch S4, the 5th switch S5, the 8th switch S8, the 9th switch S9, the tenth switch S10, the 11st switch S11, the tenth When four switch S14 and the 15th switch S15 are disconnected, simulates between U phase line cable and V phase line cable and phase fault occur Failure;When the first switch S1 and the second switch S2 are closed and the third switch S3, the 4th switch S4, Five switch S5, the 7th switch S7, the 8th switch S8, the 9th switch S9, the tenth switch S10, the 11st switch S11, the 14th are opened It closes S14 and the 15th switch S15 and disconnects the interphase impedance constantly simulated between U phase line cable and V phase line cable, and hinder The resistance value that anti-value is the 4th resistance R4;
When the second switch S2, third switch S2 and the 8th switch S8 are closed and the first switch S1, the 5th Switch S5, the 6th switch S6, the 7th switch S7, the 9th switch S9, the 11st switch S11, the 12nd switch S12, the 15th are opened When pass S15 and sixteenmo pass S16 are disconnected, simulates between V phase line cable and W phase line cable and the event of phase fault occur Barrier;As the second switch S2 and the third switch S3 is closed and the first switch S1, the 5th switch S5, the 6th Switch S6, the 7th switch S7, the 8th switch S8, the 9th switch S9, the 11st switch S11, the 12nd switch S12, the 15th are opened It closes S15 and sixteenmo closes S16 and disconnects the interphase impedance constantly simulated between V phase line cable and W phase line cable, and hinder The resistance value that anti-value is the 5th resistance R5;
When the first switch S1, third switch S3 and the 9th switch S9 are closed and the second switch S2, the 4th Switch S4, the 6th switch S6, the 7th switch S7, the 8th switch S8, the tenth switch S10, the 12nd switch S12, the 14th switch When S14 and sixteenmo pass S16 are disconnected, simulates between W phase line cable and U phase line cable and the failure of phase fault occur; As the first switch S1 and the third switch S3 is closed and the second switch S2, the 4th switch S4, the 6th switch S6, the 7th switch S7, the 8th switch S8, the 9th switch S9, the tenth switch S10, the 12nd switch S12, the 14th switch S14 and Sixteenmo closes S16 and disconnects the interphase impedance constantly simulated between W phase line cable and U phase line cable, and impedance value is institute State the resistance value of the 6th resistance R6.
Wherein, as the first switch S1 and the tenth switch S10 is closed and the 7th switch S7 and the 9th When switch S9 is disconnected, the ground capacitance of U phase line cable is simulated, and capacitance is the first capacitor device C1 and described the The sum of the capacitance of four capacitor C4;As first switch S1 closure and the 7th switch S7, the 9th switch S9 and the When ten switch S10 are disconnected, the ground capacitance of U phase line cable is simulated, and capacitance is the electricity of the first capacitor device C1 Capacity;
When the second switch S2 and the 11st switch S11 are closed and the 7th switch S7 and the 8th is opened When pass S8 is disconnected, the ground capacitance of V phase line cable is simulated, and capacitance is the second capacitor C2 and the described 5th The sum of the capacitance of capacitor C5;As second switch S2 closure and the 7th switch S7, the 8th switch S8 and the tenth When one switch S11 is disconnected, the ground capacitance of V phase line cable is simulated, and capacitance is the electricity of the second capacitor C2 Capacity;
When the third switch S3 and the 12nd switch S12 are closed and the 8th switch S8 and the 9th is opened When pass S9 is disconnected, the ground capacitance of W phase line cable is simulated, and capacitance is the third capacitor C3 and the described 6th The sum of the capacitance of capacitor C6;As third switch S3 closure and the 8th switch S8, the 9th switch S9 and the tenth When two switch S12 are disconnected, the ground capacitance of W phase line cable is simulated, and capacitance is the electricity of the third capacitor C3 Capacity.
It wherein, further include the 7th resistance R7, the 8th resistance R8, the 9th resistance R9 and the 13rd switch S13;Wherein,
One end of the 7th resistance R7 is connected on the U phase line cable, and the one of the other end and the 8th resistance R8 The one end at end, one end of the 9th resistance R9 and the 13rd switch S13 is connected;
The other end of the 8th resistance R8 is connected with the V phase line cable;
The other end of the 9th resistance R9 is connected with the W phase line cable;
The other end of the 13rd switch S13 is grounded.
Wherein, as the 13rd switch S13, the U phase line cable, V phase line cable and W phase line cable are put in realization Electric treatment.
The utility model embodiment additionally provides a kind of 10KV high voltage cable fault simulation test device, including above-mentioned 10KV high voltage cable fault simulation tests circuit.
Implement the utility model embodiment, has the following beneficial effects:
The utility model only need to be under experimental situation, by setting three-phase phase line cable and GND ground cable, and in phase Different resistance, switch and capacitor are set in line cable, and the open and-shut mode for then controlling different switches simulates each phase line line Cable different failure and impedance, to comprehensively simulate each phase line occurs in 10KV high voltage cable failure and each phase line line The impedance of cable.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, before not making the creative labor property It puts, obtains other drawings based on these drawings the scope for still falling within the utility model.
Fig. 1 is the connection signal that the 10KV high voltage cable fault simulation that the utility model embodiment one provides tests circuit Figure.
Specific embodiment
It is practical new to this below in conjunction with attached drawing to keep the purpose of this utility model, technical solution and advantage clearer Type is described in further detail.
As shown in Figure 1, a kind of 10KV high voltage cable fault simulation test provided is electric in the utility model embodiment one Road, comprising: U phase line cable, V phase line cable, W phase line cable and GND ground cable;Wherein,
U phase line cable is equipped with the connecting terminal J1 and connecting terminal J2 for being located at both ends and is located in the middle first switch S1;Between U phase line cable and GND ground cable and it is connected to the first branch formed by first capacitor device C1, by first resistor R1 The second branch to be formed is concatenated with the tenth resistance R10, the third branch formed is concatenated by the tenth switch S10 and the 4th capacitor C4 And the 14th switch S14;It is gone back on first resistor R1 and is connected to the 4th switch S4;
V phase line cable is equipped with the connecting terminal J3 and connecting terminal J4 for being located at both ends and is located in the middle second switch S2;Between V phase line cable and GND ground cable and be connected to the 4th branch of the second capacitor C2 formation, by second resistance R2 and Eleventh resistor R11 concatenates the 5th branch to be formed, concatenates the formed the 6th by the 11st switch S11 and the 5th capacitor C5 Road and the 15th switch S15;It is gone back on second resistance R2 and is connected to the 5th switch S5;
W phase line cable is equipped with the connecting terminal J5 and connecting terminal J6 for being located at both ends and is located in the middle third switch S3;Between W phase line cable and GND ground cable and be connected to the 7th branch of third capacitor C3 formation, by 3rd resistor R3 and Twelfth resistor R12 concatenates the 8th branch to be formed, concatenates the formed the 9th by the 12nd switch S12 and the 6th capacitor C6 Road and sixteenmo close S16;It is gone back on 3rd resistor R3 and is connected to the 6th switch S6;
Wherein, between U phase line cable and V phase line cable and it is connected to the 4th resistance R4, and on the 4th resistance R4 and is connected to Seven switch S7;
Wherein, between V phase line cable and W phase line cable and it is connected to the 5th resistance R5, and on the 5th resistance R5 and is connected to Eight switch S8;
Wherein, between W phase line cable and U phase line cable and it is connected to the 6th resistance R6, and on the 6th resistance R6 and is connected to Nine switch S9.
10KV high voltage cable fault simulation in the utility model embodiment one tests circuit, and physical simulation process is as follows:
(1) it when first switch S1 is disconnected, simulates U phase line cable and open-circuit fault occurs.
(2) it when second switch S2 is disconnected, simulates V phase line cable and open-circuit fault occurs.
(3) it when third switch S3 is disconnected, simulates W phase line cable and open-circuit fault occurs.
(4) as first switch S1 and the 4th switch S4 is closed and the 7th switch S7, the tenth switch S10 and the 14th When switch S14 is disconnected, U phase line cable low resistive state over the ground is simulated, and impedance value is the resistance value of the tenth resistance R10.
(5) as first switch S1 and the 14th switch S14 is closed and the 7th switch S7, the tenth switch S10 and the 4th When switch S4 is disconnected, simulates U phase line cable and short trouble occur.
(6) when first switch S1 closure and the 4th switch S4, the 7th switch S7, the switch of the tenth switch S10 and the 14th When S14 is disconnected, U phase line cable high-impedance state over the ground is simulated, and impedance value is the resistance of first resistor R1 and the tenth resistance R10 The sum of value.
(7) as second switch S2 and the 5th switch S5 is closed and the 8th switch S8, the 11st switch S11 and the tenth When five switch S15 are disconnected, V phase line cable low resistive state over the ground is simulated, and impedance value is the resistance value of eleventh resistor R11.
(8) as second switch S2 and the 15th switch S15 is closed and the 8th switch S8, the 11st switch S11 And the 5th switch S5 when disconnecting, it simulates V phase line cable and short trouble occurs.
(9) when second switch S2 closure and the 5th switch S5, the 8th switch S8, the 11st switch S11 and the 15th are opened When pass S15 is disconnected, V phase line cable high-impedance state over the ground is simulated, and impedance value is second resistance R2 and eleventh resistor R11 The sum of resistance value.
(10) as third switch S3 and the 6th switch S6 is closed and the 9th switch S9, the 12nd switch S12 and the tenth When six switch S16 are disconnected, W phase line cable low resistive state over the ground is simulated, and impedance value is the resistance value of twelfth resistor R12.
(11) it is closed and the 9th switch S9, the 12nd switchs when third switch S3 and the sixteenmo close S16 When S12 and the 6th switch S6 are disconnected, simulates W phase line cable and short trouble occur.
(12) when three switch S3 closure and the 6th switch S6, the 9th switch S9, the 12nd switch S12 and sixteenmo When pass S16 is disconnected, W phase line cable high-impedance state over the ground is simulated, and impedance value is 3rd resistor R3 and twelfth resistor R12 The sum of resistance value.
(13) when first switch S1, second switch S2 and the 7th switch S7 are closed and third switch S3, the 4th switch S4, the 5th switch S5, the 8th switch S8, the 9th switch S9, the tenth switch S10, the 11st switch S11, the 14th switch S14 and When 15th switch S15 is disconnected, simulates between U phase line cable and V phase line cable and the failure of phase fault occur.
(14) when first switch S1 and second switch S2 are closed and third switch S3, the 4th switch S4, the 5th switch S5, the 7th switch S7, the 8th switch S8, the 9th switch S9, the tenth switch S10, the 11st switch S11, the 14th switch S14 and 15th switch S15 disconnects the interphase impedance constantly simulated between U phase line cable and V phase line cable, and impedance value is the The resistance value of four resistance R4.
(15) as second switch S2, third switch S2 and the 8th switch S8 is closed and first switch S1, the 5th switch S5, the 6th switch S6, the 7th switch S7, the 9th switch S9, the 11st switch S11, the 12nd switch S12, the 15th switch S15 And sixteenmo closes S16 when disconnecting, and simulates between V phase line cable and W phase line cable and the failure of phase fault occurs.
(16) as second switch S2 and third switch S3 is closed and first switch S1, the 5th switch S5, the 6th switch S6, the 7th switch S7, the 8th switch S8, the 9th switch S9, the 11st switch S11, the 12nd switch S12, the 15th switch S15 And sixteenmo closes S16 and disconnects the interphase impedance constantly simulated between V phase line cable and W phase line cable, and impedance value is The resistance value of 5th resistance R5.
(17) as first switch S1, third switch S3 and the 9th switch S9 is closed and second switch S2, the 4th switch S4, the 6th switch S6, the 7th switch S7, the 8th switch S8, the tenth switch S10, the 12nd switch S12, the 14th switch S14 and When sixteenmo pass S16 is disconnected, simulates between W phase line cable and U phase line cable and the failure of phase fault occur.
(18) as first switch S1 and third switch S3 is closed and second switch S2, the 4th switch S4, the 6th switch S6, the 7th switch S7, the 8th switch S8, the 9th switch S9, the tenth switch S10, the 12nd switch S12, the 14th switch S14 and Sixteenmo closes S16 and disconnects the interphase impedance constantly simulated between W phase line cable and U phase line cable, and impedance value is the The resistance value of six resistance R6.
(19) as first switch S1 and the tenth switch S10 is closed and the 7th switch S7 and the 9th switch S9 is equal When disconnection, the ground capacitance of U phase line cable is simulated, and capacitance is the capacitor of first capacitor device C1 and the 4th capacitor C4 The sum of amount.
(20) when first switch S1 closure and the 7th switch S7, the 9th switch S9 and the tenth switch S10 are disconnected, The ground capacitance of U phase line cable is simulated, and capacitance is the capacitance of first capacitor device C1.
(21) when second switch S2 and the 11st switch S11 are closed and the 7th switch S7 and the 8th switch S8 is disconnected When opening, the ground capacitance of V phase line cable is simulated, and capacitance is the capacitance of the second capacitor C2 and the 5th capacitor C5 The sum of.
(22) when second switch S2 closure and the 7th switch S7, the 8th switch S8 and the 11st switch S11 are disconnected When, the ground capacitance of V phase line cable is simulated, and capacitance is the capacitance of the second capacitor C2.
(23) when third switch S3 and the 12nd switch S12 are closed and the 8th switch S8 and the 9th switch S9 is disconnected When opening, the ground capacitance of W phase line cable is simulated, and capacitance is the capacitance of third capacitor C3 and the 6th capacitor C6 The sum of.
(24) when third switch S3 closure and the 8th switch S8, the 9th switch S9 and the 12nd switch S12 are disconnected When, the ground capacitance of W phase line cable is simulated, and capacitance is the capacitance of third capacitor C3.
It further include the 7th to realize to the electricity release on U, V, W phase line cable in the utility model embodiment one Resistance R7, the 8th resistance R8, the 9th resistance R9 and the 13rd switch S13;Wherein,
One end of 7th resistance R7 is connected on U phase line cable, one end of the other end and the 8th resistance R8, the 9th resistance R9 One end and the 13rd switch S13 one end be connected;
The other end of 8th resistance R8 is connected with V phase line cable;
The other end of 9th resistance R9 is connected with W phase line cable;
The other end of 13rd switch S13 is grounded.
(25) it as the 13rd switch S13, realizes to U phase line cable, V phase line cable and W phase line cable discharge treatment.
Circuit is tested corresponding to the 10KV high voltage cable fault simulation in the utility model embodiment one, the utility model is real It applies example two and additionally provides a kind of 10KV high voltage cable fault simulation test device, including the 10KV in the utility model embodiment one High voltage cable fault simulation tests circuit.Since the 10KV high voltage cable fault simulation in the utility model embodiment two tests electricity Road tests circuit structure having the same with the 10KV high voltage cable fault simulation in the utility model embodiment one and connect pass System specifically refers to the related content of the 10KV high voltage cable fault simulation test circuit in the utility model embodiment one, This is no longer repeated one by one.
Implement the utility model embodiment, has the following beneficial effects:
The utility model only need to be under experimental situation, by setting three-phase phase line cable and GND ground cable, and in phase Different resistance, switch and capacitor are set in line cable, and the open and-shut mode for then controlling different switches simulates each phase line line Cable different failure and impedance, to comprehensively simulate each phase line occurs in 10KV high voltage cable failure and each phase line line The impedance of cable.
Above disclosures are merely preferred embodiments of the utility model, the utility model cannot be limited with this certainly Interest field, therefore equivalent variations made according to the claim of the utility model still fall within the scope of the utility model.

Claims (8)

1. a kind of 10KV high voltage cable fault simulation tests circuit characterized by comprising U phase line cable, V phase line cable, W Phase line cable and GND ground cable;Wherein,
The U phase line cable is equipped with the connecting terminal J1 and connecting terminal J2 for being located at both ends and is located in the middle first switch S1;Between the U phase line cable and the GND ground cable and it is connected to the first branch formed by first capacitor device C1, by One resistance R1 and the tenth resistance R10 concatenates the second branch to be formed, is concatenated and is formed by the tenth switch S10 and the 4th capacitor C4 Third branch and the 14th switch S14;It is gone back on the first resistor R1 and is connected to the 4th switch S4;
The V phase line cable is equipped with the connecting terminal J3 and connecting terminal J4 for being located at both ends and is located in the middle second switch S2;Between the V phase line cable and the GND ground cable and it is connected to the 4th branch of the second capacitor C2 formation, by second Resistance R2 and eleventh resistor R11 concatenates the 5th branch to be formed, is concatenated and formed by the 11st switch S11 and the 5th capacitor C5 The 6th branch and the 15th switch S15;It is gone back on the second resistance R2 and is connected to the 5th switch S5;
The W phase line cable is equipped with the connecting terminal J5 and connecting terminal J6 for being located at both ends and is located in the middle third switch S3;Between the W phase line cable and the GND ground cable and it is connected to the 7th branch of third capacitor C3 formation, by third Resistance R3 and twelfth resistor R12 concatenates the 8th branch to be formed, is concatenated and formed by the 12nd switch S12 and the 6th capacitor C6 The 9th branch and sixteenmo close S16;It is gone back on the 3rd resistor R3 and is connected to the 6th switch S6;
Wherein, between the U phase line cable and the V phase line cable and it is connected to the 4th resistance R4, and on the 4th resistance R4 And it is connected to the 7th switch S7;
Wherein, between the V phase line cable and the W phase line cable and it is connected to the 5th resistance R5, and on the 5th resistance R5 And it is connected to the 8th switch S8;
Wherein, between the W phase line cable and the U phase line cable and it is connected to the 6th resistance R6, and on the 6th resistance R6 And it is connected to the 9th switch S9.
2. 10KV high voltage cable fault simulation as described in claim 1 tests circuit, which is characterized in that when the first switch When S1 is disconnected, simulates U phase line cable and open-circuit fault occur;When the second switch S2 is disconnected, simulates V phase line cable and go out Existing open-circuit fault;When the third switch S3 is disconnected, simulates W phase line cable and open-circuit fault occur.
3. 10KV high voltage cable fault simulation as described in claim 1 tests circuit, which is characterized in that when the first switch S1 and the 4th switch S4 is closed and the 7th switch S7, the tenth switch S10 and the 14th switch S14 are disconnected When, U phase line cable low resistive state over the ground is simulated, and impedance value is the resistance value of the tenth resistance R10;When the first switch S1 and the 14th switch S14 is closed and the 7th switch S7, the tenth switch S10 and the 4th switch S4 are disconnected When, it simulates U phase line cable and short trouble occurs;As first switch S1 closure and the 4th switch S4, the 7th open When pass S7, the tenth switch S10 and the 14th switch S14 are disconnected, U phase line cable high-impedance state, and impedance value over the ground is simulated For the sum of the resistance value of the first resistor R1 and the tenth resistance R10;
When the second switch S2 and the 5th switch S5 be closed and the 8th switch S8, the 11st switch S11 and When 15th switch S15 is disconnected, V phase line cable low resistive state over the ground is simulated, and impedance value is the eleventh resistor R11 Resistance value;As the second switch S2 and the 15th switch S15 is closed and the 8th switch S8, the 11st opens When pass S11 and the 5th switch S5 is disconnected, simulates V phase line cable and short trouble occur;When the second switch S2 be closed, with And the 5th switch S5, the 8th switch S8, the 11st switch S11 and the 15th switch S15 simulate V phase line when disconnecting Cable high-impedance state over the ground, and impedance value is the sum of the resistance value of the second resistance R2 and the eleventh resistor R11;
When the third switch S3 and the 6th switch S6 be closed and the 9th switch S9, the 12nd switch S12 and When sixteenmo pass S16 is disconnected, W phase line cable low resistive state over the ground is simulated, and impedance value is the twelfth resistor R12 Resistance value;It is closed and the 9th switch S9, the 12nd opens when the third switch S3 and the sixteenmo close S16 When pass S12 and the 6th switch S6 is disconnected, simulates W phase line cable and short trouble occur;When three switches S3 closure, and When the 6th switch S6, the 9th switch S9, the 12nd switch S12 and sixteenmo pass S16 are disconnected, W phase line line is simulated Cable high-impedance state over the ground, and impedance value is the sum of the resistance value of the 3rd resistor R3 and the twelfth resistor R12.
4. 10KV high voltage cable fault simulation as described in claim 1 tests circuit, which is characterized in that when the first switch S1, second switch S2 and the 7th switch S7 are closed and the third switch S3, the 4th switch S4, the 5th switch S5, the 8th Switch S8, the 9th switch S9, the tenth switch S10, the 11st switch S11, the 14th switch S14 and the 15th switch S15 are disconnected When opening, simulates between U phase line cable and V phase line cable and the failure of phase fault occur;As the first switch S1 and described Second switch S2 is closed and the third switch S3, the 4th switch S4, the 5th switch S5, the 7th switch S7, the 8th switch When S8, the 9th switch S9, the tenth switch S10, the 11st switch S11, the 14th switch S14 and the 15th switch S15 are disconnected When, the interphase impedance between U phase line cable and V phase line cable is simulated, and impedance value is the resistance value of the 4th resistance R4;
When the second switch S2, third switch S2 and the 8th switch S8 be closed and the first switch S1, the 5th switch S5, the 6th switch S6, the 7th switch S7, the 9th switch S9, the 11st switch S11, the 12nd switch S12, the 15th switch S15 And sixteenmo closes S16 when disconnecting, and simulates between V phase line cable and W phase line cable and the failure of phase fault occurs;Work as institute State second switch S2 and the third switch S3 is closed and the first switch S1, the 5th switch S5, the 6th switch S6, 7th switch S7, the 8th switch S8, the 9th switch S9, the 11st switch S11, the 12nd switch S12, the 15th switch S15 and Sixteenmo closes S16 and disconnects the interphase impedance constantly simulated between V phase line cable and W phase line cable, and impedance value is institute State the resistance value of the 5th resistance R5;
When the first switch S1, third switch S3 and the 9th switch S9 be closed and the second switch S2, the 4th switch S4, the 6th switch S6, the 7th switch S7, the 8th switch S8, the tenth switch S10, the 12nd switch S12, the 14th switch S14 and When sixteenmo pass S16 is disconnected, simulates between W phase line cable and U phase line cable and the failure of phase fault occur;When described The first switch S1 and third switch S3 is closed and the second switch S2, the 4th switch S4, the 6th switch S6, Seven switch S7, the 8th switch S8, the 9th switch S9, the tenth switch S10, the 12nd switch S12, the 14th switch S14 and the tenth Six switch S16 disconnect the interphase impedance constantly simulated between W phase line cable and U phase line cable, and impedance value is described the The resistance value of six resistance R6.
5. 10KV high voltage cable fault simulation as described in claim 1 tests circuit, which is characterized in that when the first switch When S1 and the tenth switch S10 is closed and the 7th switch S7 and the 9th switch S9 is disconnected, U phase line is simulated The ground capacitance of cable, and capacitance is the sum of the capacitance of the first capacitor device C1 and the 4th capacitor C4;When When the first switch S1 closure and the 7th switch S7, the 9th switch S9 and the tenth switch S10 are disconnected, U is simulated The ground capacitance of phase line cable, and capacitance is the capacitance of the first capacitor device C1;
As the second switch S2 and the 11st switch S11 is closed and the 7th switch S7 and the 8th switch S8 When disconnecting, the ground capacitance of V phase line cable is simulated, and capacitance is the second capacitor C2 and the 5th capacitor The sum of the capacitance of device C5;When second switch S2 closure and the 7th switch S7, the 8th switch S8 and the 11st are opened When pass S11 is disconnected, the ground capacitance of V phase line cable is simulated, and capacitance is the capacitance of the second capacitor C2;
As the third switch S3 and the 12nd switch S12 is closed and the 8th switch S8 and the 9th switch S9 When disconnecting, the ground capacitance of W phase line cable is simulated, and capacitance is the third capacitor C3 and the 6th capacitor The sum of the capacitance of device C6;When third switch S3 closure and the 8th switch S8, the 9th switch S9 and the 12nd are opened When pass S12 is disconnected, the ground capacitance of W phase line cable is simulated, and capacitance is the capacitance of the third capacitor C3.
6. 10KV high voltage cable fault simulation as described in claim 1 tests circuit, which is characterized in that further include the 7th resistance R7, the 8th resistance R8, the 9th resistance R9 and the 13rd switch S13;Wherein,
One end of the 7th resistance R7 is connected on the U phase line cable, one end of the other end and the 8th resistance R8, institute One end of one end and the 13rd switch S13 for stating the 9th resistance R9 is connected;
The other end of the 8th resistance R8 is connected with the V phase line cable;
The other end of the 9th resistance R9 is connected with the W phase line cable;
The other end of the 13rd switch S13 is grounded.
7. 10KV high voltage cable fault simulation as claimed in claim 6 tests circuit, which is characterized in that open when the described 13rd When closing S13, realize to the U phase line cable, V phase line cable and W phase line cable discharge treatment.
8. a kind of 10KV high voltage cable fault simulation test device, which is characterized in that including such as any one of claim 1-7 institute The 10KV high voltage cable fault simulation test circuit stated.
CN201821179303.4U 2018-07-25 2018-07-25 A kind of 10KV high voltage cable fault simulation test circuit and device Active CN208568962U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821179303.4U CN208568962U (en) 2018-07-25 2018-07-25 A kind of 10KV high voltage cable fault simulation test circuit and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821179303.4U CN208568962U (en) 2018-07-25 2018-07-25 A kind of 10KV high voltage cable fault simulation test circuit and device

Publications (1)

Publication Number Publication Date
CN208568962U true CN208568962U (en) 2019-03-01

Family

ID=65447692

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821179303.4U Active CN208568962U (en) 2018-07-25 2018-07-25 A kind of 10KV high voltage cable fault simulation test circuit and device

Country Status (1)

Country Link
CN (1) CN208568962U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110244179A (en) * 2019-05-27 2019-09-17 广州供电局有限公司 Cable fault simulation circuit and device
CN112611995A (en) * 2020-11-23 2021-04-06 深圳供电局有限公司 Testing device for AC/DC trial delivery instrument
CN112684378A (en) * 2020-12-14 2021-04-20 深圳供电局有限公司 Three-core system cable fault simulation device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110244179A (en) * 2019-05-27 2019-09-17 广州供电局有限公司 Cable fault simulation circuit and device
CN112611995A (en) * 2020-11-23 2021-04-06 深圳供电局有限公司 Testing device for AC/DC trial delivery instrument
CN112684378A (en) * 2020-12-14 2021-04-20 深圳供电局有限公司 Three-core system cable fault simulation device

Similar Documents

Publication Publication Date Title
CN208568962U (en) A kind of 10KV high voltage cable fault simulation test circuit and device
CN104391241A (en) High-voltage relay state detection circuit of power battery and method thereof
CN201402539Y (en) Simulating device for electrical cable fault test
CN201174186Y (en) Secondary circuit fault simulation apparatus for relay protection training
CN209560755U (en) A kind of cable fault simulation box
CN104977482B (en) A kind of fault simulation circuit and method for DC experiment system
CN109307842A (en) A kind of analog power that circuit is realized
CN107766675A (en) A kind of artificial circuit and method of three branch models dc circuit breaker
CN206002634U (en) A kind of cable fault simulation device
CN107393383B (en) A kind of power network dynamic model and its construction method
CN105510714A (en) Intelligent substation pressure transmitter secondary automatic phase tester
CN115219807A (en) Lightning protection test and insulation test compatible circuit and electronic equipment
CN104218457A (en) Power distribution device and electric master system thereof
CN208969215U (en) A kind of analog power that circuit is realized
CN209216329U (en) A kind of current-voltage transformer secondary circuit failure simulator
CN107293198A (en) A kind of low-voltage power supply system fault diagnosis actual training device
CN108986581A (en) A kind of simulation operation apparatus
CN207215874U (en) A kind of load box
CN106370962A (en) Cased bomb initiating explosive device's conduction test and its test method
CN209560844U (en) A kind of termination box of General Motors fault setting and detection
CN104020326B (en) A kind of switching device tested used by switch machine characteristic
CN110244179A (en) Cable fault simulation circuit and device
CN207318664U (en) A kind of direct current test product switchs on/off switch detection device
CN202994950U (en) Leak current test instrument for three-phase equipment
CN208156507U (en) The Performance Test System of switch controller is automated on column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant