CN208563937U - A kind of building construction scaffold being easily installed - Google Patents

A kind of building construction scaffold being easily installed Download PDF

Info

Publication number
CN208563937U
CN208563937U CN201820476693.5U CN201820476693U CN208563937U CN 208563937 U CN208563937 U CN 208563937U CN 201820476693 U CN201820476693 U CN 201820476693U CN 208563937 U CN208563937 U CN 208563937U
Authority
CN
China
Prior art keywords
fixedly connected
driving box
pedestal
easily installed
building construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820476693.5U
Other languages
Chinese (zh)
Inventor
毕国昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Hui Hui Formwork Scaffold Engineering Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820476693.5U priority Critical patent/CN208563937U/en
Application granted granted Critical
Publication of CN208563937U publication Critical patent/CN208563937U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model provides a kind of building construction scaffold being easily installed, it is related to construction equipment field, including pedestal, the bottom of the pedestal is fixedly connected with mounting rod, the bottom of the mounting rod is provided with pulley, the first driving box is fixedly connected at the top of the pedestal, the second driving box is fixedly connected at the top of first driving box, first driving box is internally provided with first rotating shaft, the first bevel gear is provided in the first rotating shaft, the bottom of first bevel gear is engaged with the second bevel gear.The building construction scaffold being easily installed, pass through the pulley of base bottom, mobile adjusting easily effectively can be carried out to the equipment, a large amount of manpower and material resources can effectively be saved, the service efficiency and working efficiency for improving scaffold can effectively be fixed support column by the fixed case of base top, it effectively facilitates construction personnel to mount and dismount, the efficiency for improving work and using.

Description

A kind of building construction scaffold being easily installed
Technical field
The utility model relates to technical field of construction equipment, specially a kind of building construction scaffold being easily installed.
Background technique
Scaffold refer to construction site be worker operation and solving vertically and horizontally transport and the various brackets set up, architecture field Generic term, refer on construction site be used in exterior wall, interior decoration or the higher place that can not directly construct of layer height, mainly for Construction personnel works up and down or perimeter security net is gone along with sb. to guard him and high-altitude installation component etc., is plainly exactly to build a framework, scaffold production Material usually has bamboo and wood, steel pipe or synthetic material etc., some engineerings are also with scaffold when template uses, furthermore in advertising, city The departments such as political affairs, traffic road bridge, mine are also used extensively, and comprehensive scaffold has no actual pattern, if in building peace construction, Same position there are many project needs that this scaffold project can be used using scaffold, other foot hands cannot occur again Frame installation project, in construction, unit in charge of construction, which can according to need, is built, this project it is costly, external scaffolding is outer The scaffold of wall construction, interior scaffold is that interior wall is working, but general civil buildings, civil construction cannot apply interior foot hand Frame in pipeline construction, and in more than 3 points 6 meters above sections of height, just there is scaffold project.
But scaffold currently on the market, during use, mobile and installation is inconvenient, waste a large amount of manpowers and when Between, to affect the normal use of building construction scaffold, the working efficiency of building construction scaffold is reduced with this, The service efficiency of building construction scaffold is also reduced simultaneously.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of building construction scaffold being easily installed, solution It has determined the above problem.
(2) technical solution
In order to achieve the above object, the utility model is achieved by the following technical programs: a kind of house being easily installed Construction uses scaffold, including pedestal, the bottom of the pedestal to be fixedly connected with mounting rod, and the bottom of the mounting rod is provided with cunning It takes turns, is fixedly connected with the first driving box at the top of the pedestal, is fixedly connected with the second driving at the top of first driving box Case.
First driving box is internally provided with first rotating shaft, and the first bevel gear, institute are provided in the first rotating shaft The bottom for stating the first bevel gear is engaged with the second bevel gear, and the side of second bevel gear is provided with the second shaft, and described One end of two shafts is sequentially connected with screw rod by shaft coupling, and the top of the first rotating shaft extends to the interior of the second driving box Portion, second driving box are internally provided with motor, and the top of the motor is connected with first gear by rotating shaft transmission, institute The outer cover for stating first gear is equipped with belt, and the first gear is sequentially connected with second gear by belt.
Offering sliding slot at the top of the pedestal, the pedestal slidably connects push plate by sliding slot, and the one of the push plate Side is fixedly connected with push rod, and fixed case is fixedly connected at the top of the pedestal, and one end of the push rod is fixed through fixed case It is connected with the first clamping plate, the side of first clamping plate is fixedly connected with the first clamp pad, on the inner wall of the fixed case It is fixedly connected with connecting rod, the side of the connecting rod is fixedly connected with the second clamping plate, and the side of second clamping plate is solid Surely it is connected with the second clamp pad, support column, the bottom of the support column are provided between first clamp pad and the second clamp pad Portion is provided with limited block.
Preferably, the inside of the push plate offers screw hole, and the screw rod is threadedly coupled by screw hole with push plate.
Preferably, it is fixedly connected with sleeve at the top of the support column, is fixedly connected with top plate at the top of the sleeve.
Preferably, it is fixedly connected with mobile jib at the top of the top plate, is fixedly connected with LED light at the top of the mobile jib.
Preferably, it is characterised in that: the side of the mobile jib is fixedly connected with cross bar, and the bottom of the cross bar is fixedly connected There is guard rail.
Preferably, the distance between described guard rail is equal, and is fixedly connected with protective net between the guard rail.
(3) beneficial effect
The utility model provides a kind of building construction scaffold being easily installed.Have it is following the utility model has the advantages that
1, the building construction scaffold being easily installed can be effectively easily to this by the pulley of base bottom Equipment carries out mobile adjusting, can effectively save a large amount of manpower and material resources, improve the service efficiency and working efficiency of scaffold, By the fixed case of base top, effectively support column can be fixed, construction personnel is effectively facilitated and install And disassembly, the efficiency for improving work and using.
2, the building construction scaffold being easily installed, is rotated by motor, is able to drive second gear rotation, thus First rotating shaft is rotated, then by the first bevel gear and the second bevel gear, the second shaft can be made to rotate, then drive screw rod Rotation, so that push plate be made to move left and right, fixes the first clamping plate and the second clamping plate by support column, can be effectively square Just to the installation and removal of scaffold, it will be apparent that improve service efficiency and working efficiency.
3, the building construction scaffold being easily installed, by the LED light at the top of mobile jib, can effectively light not It shines when enough bright, facilitates the local work not sufficient enough in light, improve work efficiency, pass through the anti-of mobile jib side Guard rail rod and protective net can prevent construction personnel from falling down, and the safety of people's operation is effectively guaranteed.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the first driving box of the utility model and the second driving box structural schematic diagram;
Fig. 3 is the utility model fixed case structural schematic diagram.
In figure: 1 pedestal, 2 sliding slots, 3 second shafts, 4 screw holes, 5 screw rods, 6 mounting rods, 7 pulleys, 8 push rods, 9 fixed cases, 10 Push plate, 11 second driving box, 12 support columns, 13 sleeves, 14 guard rails, 15 protective nets, 16 cross bars, 17LED lamp, 18 mobile jibs, 19 top plates, 20 first driving box, 21 second bevel gears, 22 first bevel gears, 23 first rotating shafts, 24 motors, 25 first gears, 26 belts, 27 second gears, 28 second clamping plates, 29 second clamp pads, 30 connecting rods, 31 first clamp pads, 32 first clamp Plate, 33 limited blocks.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model embodiment provides a kind of building construction scaffold being easily installed, as shown in Figure 1-3, include bottom Seat 1, the bottom of the pedestal 1 is fixedly connected with mounting rod 6, and the bottom of mounting rod 6 is provided with pulley 7, the room being easily installed Construction scaffold in room effectively easily can carry out mobile adjusting, Neng Gouyou to the equipment by the pulley 7 of 1 bottom of pedestal The a large amount of manpower and material resources of the saving of effect, improve the service efficiency and working efficiency of scaffold, and the top of pedestal 1 is fixedly connected with One driving box 20, the top of the first driving box 20 are fixedly connected with the second driving box 11.
First driving box 20 is internally provided with first rotating shaft 23, and the first bevel gear 22 is provided in first rotating shaft 23, the The bottom of one bevel gear 22 is engaged with the second bevel gear 21, and the side of the second bevel gear 21 is provided with the second shaft 3, the second shaft 3 one end is sequentially connected with screw rod 5 by shaft coupling, and the top of first rotating shaft 23 extends to the inside of the second driving box 11, leads to The rotation of motor 24 is crossed, the rotation of second gear 27 is able to drive, so that first rotating shaft 23 be made to rotate, then passes through the first bevel gear 22 With the second bevel gear 21, the second shaft 3 can be made to rotate, then screw rod 5 be driven to rotate, to make push plate 10 move left and right, so After keep the first clamping plate 32 and the second clamping plate 28 that support column 12 is fixed, can effectively facilitate the peace installation and dismantling to scaffold It unloads, it will be apparent that improve service efficiency and working efficiency, the second driving box 11 is internally provided with motor 24, the top of motor 24 Portion is connected with first gear 25 by rotating shaft transmission, and the outer cover of first gear 25 is equipped with belt 26, and first gear 25 passes through skin Band 26 is sequentially connected with second gear 27.
The top of pedestal 1 offers sliding slot 2, and pedestal 1 slidably connects push plate 10 by sliding slot 2, and the inside of push plate 10 is opened Equipped with screw hole 4, screw rod 5 is threadedly coupled by screw hole 4 with push plate 10, and the side of push plate 10 is fixedly connected with push rod 8, pedestal 1 Top is fixedly connected with fixed case 9, by the fixed case 9 at 1 top of pedestal, can effectively be fixed, have to support column 12 The construction personnel that facilitates of effect mounts and dismounts, the efficiency for improving work and using, and fixed case is run through in one end of push rod 8 9 are fixedly connected with the first clamping plate 32, and the side of the first clamping plate 32 is fixedly connected with the first clamp pad 31, fixed case 9 it is interior It is fixedly connected with connecting rod 30 on wall, the side of connecting rod 30 is fixedly connected with the second clamping plate 28, and the one of the second clamping plate 28 Side is fixedly connected with the second clamp pad 29, is provided with support column 12, support column between the first clamp pad 31 and the second clamp pad 29 12 top is fixedly connected with sleeve 13, and the top of sleeve 13 is fixedly connected with top plate 19, and the top of top plate 19 is fixedly connected with Mobile jib 18, the top of mobile jib 18 are fixedly connected with LED light 17, and the side of mobile jib 18 is fixedly connected with cross bar 16, the bottom of cross bar 16 Portion is fixedly connected with guard rail 14, by the LED light 17 at 18 top of mobile jib, can effectively send out when light is not bright enough Light facilitates the local work not sufficient enough in light, improves work efficiency, pass through 14 He of guard rail of 18 side of mobile jib Protective net 15 can prevent construction personnel from falling down, and the safety of people's operation is effectively guaranteed, and the side of mobile jib 18 is solid Surely it is connected with cross bar 16, the bottom of cross bar 16 is fixedly connected with guard rail 14.The bottom of support column 12 is provided with limited block 33
In conclusion the building construction scaffold being easily installed can have efficacious prescriptions by the pulley 7 of 1 bottom of pedestal Just mobile adjusting is carried out to the equipment, can effectively save a large amount of manpower and material resources, improve scaffold service efficiency and Working efficiency can effectively be fixed support column 12 by the fixed case 9 at 1 top of pedestal, effectively facilitate construction Personnel mount and dismount, the efficiency for improving work and using.
The building construction scaffold being easily installed, is rotated by motor 24, is able to drive the rotation of second gear 27, To make first rotating shaft 23 rotate, then by the first bevel gear 22 and the second bevel gear 21, the second shaft 3 can be made to rotate, Then it drives screw rod 5 to rotate, so that push plate 10 be made to move left and right, then makes the first clamping plate 32 and the second clamping plate 28 will support Column 12 is fixed, can effectively facilitate the installation and removal to scaffold, it will be apparent that improve service efficiency and working efficiency.
The building construction scaffold being easily installed can be effectively in light by the LED light 17 at 18 top of mobile jib It shines when not bright enough, facilitates the local work not sufficient enough in light, improve work efficiency, pass through 18 side of mobile jib Guard rail 14 and protective net 15, can prevent construction personnel from falling down, the safety of people's operation is effectively guaranteed.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of building construction scaffold being easily installed, including pedestal (1), it is characterised in that: the bottom of the pedestal (1) It is fixedly connected with mounting rod (6), the bottom of the mounting rod (6) is provided with pulley (7), and the top of the pedestal (1) is fixed to be connected It is connected to the first driving box (20), is fixedly connected with the second driving box (11) at the top of first driving box (20);
First driving box (20) is internally provided with first rotating shaft (23), is provided with the first umbrella on the first rotating shaft (23) The bottom of gear (22), first bevel gear (22) is engaged with the second bevel gear (21), and the one of second bevel gear (21) Side is provided with the second shaft (3), and one end of second shaft (3) is sequentially connected with screw rod (5) by shaft coupling, and described first The top of shaft (23) extends to the inside of the second driving box (11), and second driving box (11) is internally provided with motor (24), the top of the motor (24) is connected with first gear (25) by rotating shaft transmission, the outside of the first gear (25) It is arranged with belt (26), the first gear (25) is sequentially connected with second gear (27) by belt (26);
It being offered sliding slot (2) at the top of the pedestal (1), the pedestal (1) slidably connects push plate (10) by sliding slot (2), The side of the push plate (10) is fixedly connected with push rod (8), is fixedly connected with fixed case (9) at the top of the pedestal (1), described One end of push rod (8) is fixedly connected with the first clamping plate (32) through fixed case (9), and the side of first clamping plate (32) is solid Surely it is connected with the first clamp pad (31), is fixedly connected with connecting rod (30), the connecting rod on the inner wall of the fixed case (9) (30) side is fixedly connected with the second clamping plate (28), and the side of second clamping plate (28) is fixedly connected with the second clamping It pads (29), is provided with support column (12) between first clamp pad (31) and the second clamp pad (29), the support column (12) Bottom be provided with limited block (33).
2. a kind of building construction scaffold being easily installed according to claim 1, it is characterised in that: the push plate (10) inside offers screw hole (4), and the screw rod (5) is threadedly coupled by screw hole (4) with push plate (10).
3. a kind of building construction scaffold being easily installed according to claim 1, it is characterised in that: the support column (12) it is fixedly connected at the top of sleeve (13), is fixedly connected with top plate (19) at the top of the sleeve (13).
4. a kind of building construction scaffold being easily installed according to claim 3, it is characterised in that: the top plate (19) it is fixedly connected at the top of mobile jib (18), is fixedly connected with LED light (17) at the top of the mobile jib (18).
5. a kind of building construction scaffold being easily installed according to claim 4, it is characterised in that: the mobile jib (18) side is fixedly connected with cross bar (16), and the bottom of the cross bar (16) is fixedly connected with guard rail (14).
6. a kind of building construction scaffold being easily installed according to claim 5, it is characterised in that: the protective fence The distance between bar (14) is equal, and is fixedly connected with protective net (15) between the guard rail (14).
CN201820476693.5U 2018-04-04 2018-04-04 A kind of building construction scaffold being easily installed Active CN208563937U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820476693.5U CN208563937U (en) 2018-04-04 2018-04-04 A kind of building construction scaffold being easily installed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820476693.5U CN208563937U (en) 2018-04-04 2018-04-04 A kind of building construction scaffold being easily installed

Publications (1)

Publication Number Publication Date
CN208563937U true CN208563937U (en) 2019-03-01

Family

ID=65479910

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820476693.5U Active CN208563937U (en) 2018-04-04 2018-04-04 A kind of building construction scaffold being easily installed

Country Status (1)

Country Link
CN (1) CN208563937U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114439210A (en) * 2022-02-17 2022-05-06 天长市安骄金属制品科技有限公司 Scaffold for building of being convenient for many people work based on it is adjustable to multilayer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114439210A (en) * 2022-02-17 2022-05-06 天长市安骄金属制品科技有限公司 Scaffold for building of being convenient for many people work based on it is adjustable to multilayer

Similar Documents

Publication Publication Date Title
CN207392710U (en) A kind of adjustable scaffold
CN209011517U (en) A kind of height-adjustable building construction scaffold
CN208563937U (en) A kind of building construction scaffold being easily installed
CN113789948A (en) Large-span house roof atrium side wall sliding rail hanging basket and construction method thereof
CN109920354A (en) A kind of advertisement suspended structure of bus platform
CN214615310U (en) Supporting platform with protection function for construction
CN212247882U (en) Protection machine for road and bridge site operation
CN108466989A (en) A kind of lifting platform in construction site
CN209703967U (en) A kind of Multifunctional decoration construction bracket
CN207330285U (en) A kind of removable spider-man's lifting-point device
CN209585572U (en) A kind of construction site anti-skidding scaffold
CN207633867U (en) A kind of municipal administration that stability is good, which is repaired the roads, uses protective fence
CN204024015U (en) Operation platform modular unit and operation platform thereof
CN203080880U (en) Rail-mounted wall whitewashing device
CN205558326U (en) High floor guardrail for building interim
CN209163625U (en) A kind of construction guardrail
CN208308376U (en) A kind of lifting platform in construction site
CN208702121U (en) Scaffold suitable for curved-surface building inner wall construction
CN205894632U (en) Spiral arm over -and -under type mobile scaffold
CN214575555U (en) Protector is used in high-rise building construction
CN216766734U (en) Scaffold top operation platform guardrail
CN217382446U (en) Tunnel construction environment monitoring device
CN220117876U (en) Protective net for municipal works
CN213710293U (en) Construction platform with safety protection function for building construction
CN208056597U (en) A kind of foldable workbench of stereo garage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190603

Address after: 410007 Xingcheng Imagery Home Building 702, 308 Shawan Road, Yuhua District, Changsha City, Hunan Province

Patentee after: Hunan Hui Hui formwork scaffold Engineering Co., Ltd.

Address before: 430070 Wuhan University of Technology, 122 Lushi Road, Wuhan City, Hubei Province

Patentee before: Bi Guochang

TR01 Transfer of patent right