CN208563353U - Rock massif restoration of the ecosystem structure - Google Patents
Rock massif restoration of the ecosystem structure Download PDFInfo
- Publication number
- CN208563353U CN208563353U CN201821125796.3U CN201821125796U CN208563353U CN 208563353 U CN208563353 U CN 208563353U CN 201821125796 U CN201821125796 U CN 201821125796U CN 208563353 U CN208563353 U CN 208563353U
- Authority
- CN
- China
- Prior art keywords
- frame
- rock massif
- restoration
- top margin
- secondary bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000011435 rock Substances 0.000 title claims abstract description 42
- 230000013011 mating Effects 0.000 claims description 11
- 230000003014 reinforcing effect Effects 0.000 claims description 11
- 238000010276 construction Methods 0.000 abstract description 9
- 238000005067 remediation Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 5
- 239000002689 soil Substances 0.000 description 3
- 238000004873 anchoring Methods 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/23—Dune restoration or creation; Cliff stabilisation
Landscapes
- Revetment (AREA)
Abstract
The utility model relates to ecological remediation and treatment technical fields, specially rock massif restoration of the ecosystem structure, its key points of the technical solution are that including several frames being arranged along the slope surface of rock massif, the frame includes the two top margin frames for being located at the side frame at frame both ends and being connected between the frame end of two sides, the top margin frame includes the mobile jib for being located at its both ends and being detachably fixed connection with side frame, it is removably connected with secondary bar between mobile jib on same top margin frame, is detachably connected between the secondary bar on same top margin frame;According to the area of specific rock massif, select the quantity of the secondary bar connected between two mobile jibs, so that the length of the frame formed is suitble to the needs of rock massif, and several frames being arranged along the slope surface of rock massif, to needing the area for carrying out restoration of the ecosystem to cover, the length of frame can be set according to actual needs at the construction field (site), to adapt to the restoration of the ecosystem of different rock massifs.
Description
Technical field
The utility model relates to ecological remediation and treatment technical fields, more specifically, it relates to rock massif restoration of the ecosystem
Structure.
Background technique
Restoration of the ecosystem is the self-recovery ability using the ecosystem, is aided with artificial measures, makes the ecosystem destroyed
System gradually restores or develops the ecosystem to benign cycle direction.
With the fast development of economic society, the capital construction fast speed in China, because implementing traffic, water conservancy, electric power, adopting
The engineering constructions such as stone construction project carry out massif excavation, destroy original vegetation coating, lead to a large amount of exposed mountain occurred
Body, influence it is beautiful even will cause a series of ecological environment problems and geological disaster hidden danger, therefore, it is necessary to rock massif into
Row restoration of the ecosystem.
Often frame of the setting for planting plants, different rock massifs need to repair in massif in the prior art
Region area it is different, need to carry out the production of frame according to the area of massif, working efficiency is low.
Utility model content
The purpose of the utility model is to provide rock massif restoration of the ecosystem structures, are repaired with adapting to the ecology of different rock massifs
It is multiple.
The above-mentioned technical purpose of the utility model has the technical scheme that rock massif restoration of the ecosystem
Structure, including several frames being arranged along the slope surface of rock massif, the frame includes the side frame positioned at frame both ends
And two top margin frames being connected between the frame end of two sides, the top margin frame include positioned at its both ends and detachable with side frame
The mobile jib being fixedly connected, is removably connected with secondary bar between the mobile jib on same top margin frame, between the secondary bar on same top margin frame
It is detachably connected.
The pair connected between two mobile jibs is selected according to the area of specific rock massif by using above-mentioned technical proposal
The quantity of bar, so that the length of the frame formed is suitble to the needs of rock massif, and be arranged along the slope surface of rock massif
Frame can be arranged to needing the area for carrying out restoration of the ecosystem to cover in several frames according to actual needs at the construction field (site)
Length, to adapt to the restoration of the ecosystem of different rock massifs.
Preferably, the frame is fixedly connected by anchor pole with rock massif.
By using above-mentioned technical proposal, frame is made more securely to be fixed on rock massif.
Preferably, mobile jib end corresponding with side frame is mating, and is fixed to each other by pin shaft.
It by using above-mentioned technical proposal, is fixed after mobile jib is mutually inserted with side frame using pin shaft, operation letter
Folk prescription just, is conducive to improve construction efficiency.
Preferably, the secondary bar and adjacent mobile jib are axially mating, and are fixed to each other by screw rod and nut.
By using above-mentioned technical proposal, it is fixed after secondary bar is mutually inserted with mobile jib using pin shaft, it is easy to operate
It is convenient, be conducive to improve construction efficiency.
Preferably, axial mating between adjacent secondary bar, and be fixed to each other by screw rod and nut.
By using above-mentioned technical proposal, when needing to connect adjacent two secondary bars, make adjacent two secondary bar first place grafting,
And its relative position is fixed using bolt and nut, it is simple to operate.
Preferably, it is detachably connected between neighbouring frame.
By using above-mentioned technical proposal, reinforce the bonding strength between neighbouring frame, improves restoration of the ecosystem knot
The globality of structure.
Preferably, be respectively threaded with the connecting rod of coaxial arrangement between the top margin frame of adjacent frame, adjacent connecting rod it
Between pass through clamp connection.
By using above-mentioned technical proposal, when needing to connect neighbouring frame, by two frame phase of connecting rod precession
It at position, and is in two corresponding connecting rods on same axis, two connecting rods is fixed using clip, realize
Fixation to adjacent frame.
Preferably, cushion is provided between the clip and connecting rod.
By using above-mentioned technical proposal, clip and connecting rod are separated, clip is reduced and the direct of connecting rod connects
The case where touching and damaging.
Preferably, reinforcing rod is removably connected between two top margin frames of same frame.
By using above-mentioned technical proposal, reinforce the bonding strength of top margin frame in same frame, improves structural stability.
Preferably, the both ends of the reinforcing rod pass through screw rod respectively and a top margin frame is mating, and are carried out by nut
It is fixed.
It will reinforce by using above-mentioned technical proposal when needing to reinforce the bonding strength of the top margin frame on same frame
The both ends of bar are separately inserted top margin frame, and are tightened using nut, realize the connection of two side frames, simple to operate.
In conclusion the utility model has the following beneficial effects:
It 1, can be according to the length for needing to be arranged frame of specific rock massif, strong applicability;
2, reinforce the bonding strength between neighbouring frame, improve the globality of restoration of the ecosystem structure;
3, frame is easy to assembly simple, is conducive to improve construction efficiency.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the present embodiment;
Fig. 2 is the structural schematic diagram of frame in the present embodiment;
Fig. 3 is the enlarged diagram of part A in Fig. 2;
Fig. 4 is the enlarged diagram of part B in Fig. 2;
Fig. 5 is the enlarged diagram of C portion in Fig. 2.
Appended drawing reference: 1, frame;2, side frame;3, top margin frame;4, mobile jib;5, secondary bar;6, anchor pole;7, pin shaft;8, screw rod;
9, nut;10, connecting rod;11, clip;12, cushion;13, planting soil;14, reinforcing rod;15, the first jack;16, it second inserts
Hole.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Following specific embodiments are only the explanation to the utility model, are not limitations of the present invention, this
Field technical staff can according to need the modification that not creative contribution is made to the present embodiment after reading this specification,
But as long as all by the protection of Patent Law in the scope of the claims of following utility model.
Rock massif restoration of the ecosystem structure, as shown in Figure 1, including several frames being arranged along the slope surface of rock massif
1, frame 1 includes the two top margin frames 3 for being located at the side frame 2 at 1 both ends of frame and being connected between 2 end of two sides frame, top margin
Frame 3 includes the mobile jib 4 for being located at its both ends and being detachably fixed connection with side frame 2, can between the mobile jib 4 on same top margin frame 3
Dismantling connection has secondary bar 5, is detachably connected between the secondary bar 5 on same top margin frame 3, is provided in the space that frame 1 surrounds
Planting soil 13 for planting plants.
In conjunction with Fig. 2 and Fig. 3, the end that mobile jib 4 is connect with side frame 2 offers the end with side frame 2 towards side frame 2
Mating slot, mobile jib 4 is connected to above slot offers the first jack 15, the end of side frame 2 with the first jack
15 corresponding positions offer the second jack 16, are plugged with pin shaft 7 between the first jack 15 and the second jack 16, to realize mobile jib 4
With being detachably connected for side frame 2.
In conjunction with Fig. 2 and Fig. 4, end of the mobile jib 4 far from side frame 2 is axial mating with secondary bar 5, and its plug-in position
Radial direction is plugged with screw rod 8, and the both ends of screw rod 8 are tightened by nut 9, and realization mobile jib 4 is detachably connected with secondary bar 5.
Similar, it is mutually axially mating between adjacent secondary bar 5, and its plug-in position is radially plugged with screw rod 8,
The both ends of screw rod 8 are tightened by nut 9, realize being detachably connected between adjacent secondary bar 5.
In conjunction with Fig. 2 and Fig. 5, it is detachably connected between adjacent frame 1, specifically, the mobile jib 4 between adjacent frame 1
It is detachably connected between mobile jib 4, between secondary bar 5 and secondary bar 5, for the connection between secondary bar 5 and secondary bar 5, two sides are adjacent
Secondary bar 5 is respectively threaded with a connecting rod 10, and two corresponding connecting rods 10 are located on same axis, and its end is pasted
Closely, it is enclosed with cushion 12 made of rubber material between both ends, clip 11 is set outside cushion 12, by two connecting rods
10 are fixedly connected, to realize being detachably connected between the secondary bar 5 of adjacent frame 1, the mobile jib 4 between adjacent frame 1 with
Connection type between mobile jib 4 is consistent with the connection type between secondary bar 5 and secondary bar 5, to realize between adjacent frame 1
It is detachably connected.
Mobile jib 4 and secondary bar 5 are fixedly connected by anchoring into the anchor pole 6 of rock massif with rock massif, and anchor pole 6 uses screw thread
Reinforcing bar.
Reinforcing rod 14 is removably connected between two top margin frames 3 of same frame 1, reinforcing rib is in former mobile jib 4 and secondary bar 5
Junction or secondary bar 5 are attached with mobile jib 4 or secondary bar 5 respectively with 5 junction of secondary bar, are originally intended to the screw rod of fixed plug-in position
8 fix with the end thread of reinforcing rod 14, and corresponding screw rod 8 injects the plug-in position or secondary bar 5 and secondary bar 5 of mobile jib 4 and secondary bar 5
Plug-in position after tightened using nut 9, the relative position of fixed reinforcing rod 14 and mobile jib 4 and secondary bar 5, realize reinforcing rod 14 with
Top margin frame 3 is detachably connected.
The utility model has the advantages that
1, frame 1 is arranged in the slope surface along rock massif, to needing the area for carrying out restoration of the ecosystem to cover, in frame
Planting plants repair the ecology of rock massif in planting soil 13 in frame 1;
2, according to the area of specific rock massif, the quantity of the secondary bar 5 connected between two mobile jibs 4 is selected, so that being formed
Frame 1 length be suitble to rock massif needs, strong applicability;
3, frame 1 is easy to assembly simple, is conducive to improve construction efficiency.
Claims (10)
1. rock massif restoration of the ecosystem structure, it is characterized in that: including several frames being arranged along the slope surface of rock massif
(1), the frame (1) includes two for being located at the side frame (2) at frame (1) both ends and being connected between two sides frame (2) end
A top margin frame (3), the top margin frame (3) include the mobile jib (4) for being located at its both ends and being detachably fixed connection with side frame (2),
It is removably connected with secondary bar (5) between mobile jib (4) on same top margin frame (3), between the secondary bar (5) on same top margin frame (3)
It is detachably connected.
2. rock massif restoration of the ecosystem structure according to claim 1, it is characterized in that: the frame (1) passes through anchor pole (6)
It is fixedly connected with rock massif.
3. rock massif restoration of the ecosystem structure according to claim 1, it is characterized in that: the mobile jib (4) and side frame (2)
Corresponding end is mating, and is fixed to each other by pin shaft (7).
4. rock massif restoration of the ecosystem structure according to claim 1, it is characterized in that: the secondary bar (5) and adjacent master
Bar (4) is axial mating, and is fixed to each other by screw rod (8) and nut (9).
5. rock massif restoration of the ecosystem structure according to claim 1, it is characterized in that: axial between adjacent secondary bar (5)
It is mating, and be fixed to each other by screw rod (8) and nut (9).
6. rock massif restoration of the ecosystem structure according to claim 1, it is characterized in that: between neighbouring frame (1)
It is detachably connected.
7. rock massif restoration of the ecosystem structure according to claim 6, it is characterized in that: the top margin frame (3) of adjacent frame (1)
Between be respectively threaded with the connecting rod (10) of coaxial arrangement, connected between adjacent connecting rod (10) by clip (11).
8. rock massif restoration of the ecosystem structure according to claim 7, it is characterized in that: the clip (11) and connecting rod
(10) cushion (12) are provided between.
9. rock massif restoration of the ecosystem structure according to claim 5, it is characterized in that: two top margins of same frame (1)
Reinforcing rod (14) are removably connected between frame (3).
10. rock massif restoration of the ecosystem structure according to claim 9, it is characterized in that: the both ends of the reinforcing rod (14)
It is mating by screw rod (8) and a top margin frame (3) respectively, and be fixed by nut (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821125796.3U CN208563353U (en) | 2018-07-16 | 2018-07-16 | Rock massif restoration of the ecosystem structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821125796.3U CN208563353U (en) | 2018-07-16 | 2018-07-16 | Rock massif restoration of the ecosystem structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208563353U true CN208563353U (en) | 2019-03-01 |
Family
ID=65493470
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821125796.3U Expired - Fee Related CN208563353U (en) | 2018-07-16 | 2018-07-16 | Rock massif restoration of the ecosystem structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208563353U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112502169A (en) * | 2020-11-30 | 2021-03-16 | 中国建筑材料工业地质勘查中心湖南总队 | Rock massif ecological remediation structure |
-
2018
- 2018-07-16 CN CN201821125796.3U patent/CN208563353U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112502169A (en) * | 2020-11-30 | 2021-03-16 | 中国建筑材料工业地质勘查中心湖南总队 | Rock massif ecological remediation structure |
CN112502169B (en) * | 2020-11-30 | 2022-05-17 | 中国建筑材料工业地质勘查中心湖南总队 | Rock massif ecological remediation structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203654295U (en) | Single-leg inclined strut reinforced foundation pit supporting structure | |
CN208563353U (en) | Rock massif restoration of the ecosystem structure | |
CN208578050U (en) | A kind of flexible ecological stick for high precipitous rock slope restoration of the ecosystem | |
CN105298205B (en) | A kind of power network electric pole reinforces heightening device and its construction method | |
CN108505511A (en) | A kind of repeatable geotextile tube bag utilized of pin-connected panel and its assembly, application method | |
CN204282382U (en) | A kind of equipment by decompression drainage quick blocking precipitation pipe well | |
CN203626363U (en) | Transposition tower of high-voltage alternating-current single-circuit power transmission line | |
CN207110530U (en) | A kind of civil engineering support meanss | |
CN204282371U (en) | A kind of pre-loaded support struts for foundation ditch | |
CN203514325U (en) | Foundation pit stair support system with gravity type cement cob wall in combination with single rank of piles | |
CN210262920U (en) | Multi-functional water conservancy slope protection net | |
CN211116056U (en) | Adjustable temporary support mechanism for tunnel construction | |
CN210396760U (en) | Assembled supporting system for diversion tunnel construction | |
CN203238674U (en) | Fixing device of steel plate waterstop belt | |
CN208346792U (en) | A kind of ruggedized construction of ground | |
CN207706894U (en) | A kind of soil-water protection plant support device | |
CN208869993U (en) | A kind of hydraulic engineering protective net reinforcing rock-steady structure | |
CN210460948U (en) | Wind power generation impeller assembly | |
CN215105214U (en) | Sand stabilization protective net structure | |
CN204898692U (en) | Slope reinforcement structure | |
CN220486488U (en) | Assembled engineering slope protection structure | |
CN205188909U (en) | Lake prevention of seepage spacer body | |
CN211231936U (en) | A interim pipeline for hydraulic engineering | |
CN221142813U (en) | Efficient rock slope surface soil fixing equipment | |
CN216839534U (en) | A rapid hardening column foot structure for electric line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190301 |