CN208563117U - A kind of Coping Construction guardrail - Google Patents

A kind of Coping Construction guardrail Download PDF

Info

Publication number
CN208563117U
CN208563117U CN201820728357.5U CN201820728357U CN208563117U CN 208563117 U CN208563117 U CN 208563117U CN 201820728357 U CN201820728357 U CN 201820728357U CN 208563117 U CN208563117 U CN 208563117U
Authority
CN
China
Prior art keywords
basket
long
drop shot
baskets
short
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820728357.5U
Other languages
Chinese (zh)
Inventor
孙广滨
黄永亮
邢海龙
周晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN201820728357.5U priority Critical patent/CN208563117U/en
Application granted granted Critical
Publication of CN208563117U publication Critical patent/CN208563117U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model is a kind of Coping Construction guardrail, two long hanging baskets and two drop shot baskets including being set to surrounding at the top of pier stud, two long hanging baskets are located at two long edge positions at the top of pier stud, two drop shot baskets are located at two short sides at the top of pier stud, the top of the long hanging basket is equipped with long hanger, the top of the drop shot basket is equipped with short hanger, the long hanging basket and drop shot basket include frame and protective net, the frame of the long hanging basket and drop shot basket is all made of channel steel and is welded, the frame roof of the long hanging basket and drop shot basket is equipped with a plurality of round steel, the side of the long hanging basket and drop shot basket is fixed by connector.The utility model passes through surrounding two long hanging baskets of setting and two drop shot baskets at the top of pier stud; utilize the embedded ribs of pier stud; by two long hanging baskets and two short hanging basket suspensions, two long hanging baskets and two drop shot baskets are equipped with firm frame structure and protective net, protect the safety of construction personnel.

Description

A kind of Coping Construction guardrail
Technical field
The utility model relates to Coping Construction fields, more particularly to a kind of Coping Construction guardrail.
Background technique
In bridge construction, needs to construct to bent cap after the completion of pier stud pours, not have in traditional work progress Safeguard procedures cause construction personnel not have safety guarantee.
Utility model content
The purpose of the utility model is to provide a kind of Coping Construction guardrails for protecting construction personnel's safety.
The utility model is achieved through the following technical solutions above-mentioned purpose: a kind of Coping Construction guardrail, including is set to pier stud The two long hanging baskets and two drop shot baskets of top surrounding, two long hanging baskets are located at two long edge positions at the top of pier stud, and two The drop shot basket is located at two short sides at the top of pier stud, and the top of the long hanging basket is equipped with long hanger, the top of the drop shot basket Portion is equipped with short hanger, and the long hanging basket and drop shot basket include frame and protective net, and the frame of the long hanging basket and drop shot basket is equal It is welded using channel steel, the frame roof of the long hanging basket and drop shot basket is equipped with a plurality of round steel, the long hanging basket and drop shot The side of basket is fixed by connector.
Further, the long hanger includes long hanging rod and three long connecting rods disposed in parallel, the long hanging rod and length Connecting rod vertically connects, and the long connecting rod is connect with the top of long hanging basket, and the long hanging rod is located at the inside of embedded ribs, described Long connecting rod is located between two embedded ribs.
Further, the short hanger includes short hanging rod and two short connecting rods disposed in parallel, the short hanging rod with it is short Connecting rod vertically connects, and the short connecting rod is connect with the top of drop shot basket, and the short hanging rod is located at the inside of embedded ribs, described Short connecting rod is located between two embedded ribs.
Further, the side and bottom surface of the long hanging basket and drop shot basket are equipped with protective net.
Further, one of them described long hanging basket is equipped with entrance.
Further, two long hanging baskets and two drop shot baskets have opening in joint, and opening makes two institutes State mutual connection after long Hanging Basket and two short Hanging Baskets installations.
Compared with prior art, the beneficial effect of the utility model Coping Construction guardrail is: passing through the surrounding at the top of pier stud Two long hanging baskets and two drop shot baskets are set, using the embedded ribs of pier stud, by two long hanging baskets and two short hanging basket suspensions, two Long hanging basket and two drop shot baskets are equipped with firm frame structure and protective net, protect the safety of construction personnel.
Detailed description of the invention
Fig. 1 is the schematic front view of the utility model.
Fig. 2 is the left view schematic diagram of the utility model.
Fig. 3 is the schematic top plan view of the utility model.
Specific embodiment
It please refers to Fig.1 to Fig.3, the top of pier stud 1 is rectangle, on the top surface of pier stud 1, is equipped with along rectangle four edges pre-buried Muscle 2, a kind of Coping Construction guardrail, two long hanging basket 3 and two drop shot baskets 4 including being set to surrounding at the top of pier stud are two long to hang Basket 3 is located at two long edge positions at the top of pier stud, and two drop shot baskets 4 are located at two short sides at the top of pier stud.
The top of long hanging basket 3 is equipped with long hanger 5, and long hanger 5 includes long hanging rod 52 and three long connecting rods disposed in parallel 51, long hanging rod 52 is vertical with long connecting rod 51 to be connect, and long connecting rod 51 is connect with the top of long hanging basket 3, and long hanging rod 52 is located at pre- The inside of muscle 2 is buried, long connecting rod 51 is located between two embedded ribs 2, is limited by 2 pairs of embedded ribs long hanging rods 52, thus Long hanging basket 3 is hung on embedded ribs 2.
The top of drop shot basket 4 is equipped with short hanger 6, and short hanger 6 includes short hanging rod 62 and two short connecting rods disposed in parallel 61, short hanging rod 62 is vertical with short connecting rod 61 to be connect, and short connecting rod 61 is connect with the top of drop shot basket 4, and short hanging rod 62 is located at pre- The inside of muscle 2 is buried, short connecting rod 61 is located between two embedded ribs 2, is limited by embedded ribs 2 to short hanging rod 62, thus Drop shot basket 4 is hung on embedded ribs 2.
Long hanging basket 3 and drop shot basket 4 include frame (figure is not marked) and protective net 10, and the frame of long hanging basket 3 and drop shot basket 4 is equal It is welded using channel steel, the frame roof of long hanging basket 3 and drop shot basket 4 is equipped with a plurality of round steel 7, can enhance the strong of frame Degree, the side and bottom surface of long hanging basket 3 and drop shot basket 4 are equipped with protective net 10, play the effect of protection construction personnel's safety.Long hanging basket 3 and drop shot basket 4 side it is fixed by connector 8, two long hanging basket 3 and two drop shot baskets 4 have opening in joint, are open Mutual connection after installing two long Hanging Baskets and two short Hanging Basket walks back and forth operation for construction personnel.One of length is hung Basket 3 is equipped with entrance 9, passes in and out convenient for construction personnel.Long hanging basket 3 and drop shot basket 4 can be freely combined according to pier stud side length, be convenient for Turnover repeatedly utilizes.
The utility model utilizes the pre-buried of pier stud by surrounding two long hanging baskets of setting and two drop shot baskets at the top of pier stud Muscle, by two long hanging baskets and two short hanging basket suspensions, two long hanging baskets and two drop shot baskets be equipped with firm frame structure and Protective net protects the safety of construction personnel.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above, for For those skilled in the art, it is clear that the present invention is not limited to the details of the above exemplary embodiments, and without departing substantially from this In the case where the spirit or essential attributes of utility model, the utility model can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the utility model is by institute Attached claim rather than above description limit, it is intended that will fall within the meaning and scope of the equivalent elements of the claims All changes are embraced therein.It should not treat any reference in the claims as limiting related right It is required that.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (6)

1. a kind of Coping Construction guardrail, it is characterised in that: including being set to two long hanging baskets of surrounding and two drop shots at the top of pier stud Basket, two long hanging baskets are located at two long edge positions at the top of pier stud, and two drop shot baskets are located at the top of pier stud two short At side, the top of the long hanging basket is equipped with long hanger, and the top of the drop shot basket is equipped with short hanger, the long hanging basket and drop shot basket It include frame and protective net, the frame of the long hanging basket and drop shot basket is all made of channel steel and is welded, the long hanging basket and short The frame roof of hanging basket is equipped with a plurality of round steel, and the side of the long hanging basket and drop shot basket is fixed by connector.
2. Coping Construction guardrail according to claim 1, it is characterised in that: the long hanger includes that long hanging rod and three are flat The long connecting rod of row setting, the long hanging rod is vertical with long connecting rod to be connect, and the long connecting rod is connect with the top of long hanging basket, The long hanging rod is located at the inside of embedded ribs, and the long connecting rod is located between two embedded ribs.
3. Coping Construction guardrail according to claim 1, it is characterised in that: the short hanger includes that short hanging rod and two are flat The short connecting rod of row setting, the short hanging rod is vertical with short connecting rod to be connect, and the short connecting rod is connect with the top of drop shot basket, The short hanging rod is located at the inside of embedded ribs, and the short connecting rod is located between two embedded ribs.
4. Coping Construction guardrail according to claim 1, it is characterised in that: the side and bottom of the long hanging basket and drop shot basket Face is equipped with protective net.
5. Coping Construction guardrail according to claim 1, it is characterised in that: one of them described long hanging basket be equipped with into Mouthful.
6. Coping Construction guardrail according to claim 1, it is characterised in that: two long hanging baskets and two drop shots Basket has opening in joint, and opening makes mutual connection after two long hanging baskets and two drop shot basket installations.
CN201820728357.5U 2018-05-16 2018-05-16 A kind of Coping Construction guardrail Expired - Fee Related CN208563117U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820728357.5U CN208563117U (en) 2018-05-16 2018-05-16 A kind of Coping Construction guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820728357.5U CN208563117U (en) 2018-05-16 2018-05-16 A kind of Coping Construction guardrail

Publications (1)

Publication Number Publication Date
CN208563117U true CN208563117U (en) 2019-03-01

Family

ID=65483220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820728357.5U Expired - Fee Related CN208563117U (en) 2018-05-16 2018-05-16 A kind of Coping Construction guardrail

Country Status (1)

Country Link
CN (1) CN208563117U (en)

Similar Documents

Publication Publication Date Title
CN208201668U (en) A kind of protective platform of revealing all the details for cross-line bridge cradle construction
CN208563117U (en) A kind of Coping Construction guardrail
CN204000898U (en) Novel shock-resistant passive protection system
CN208430425U (en) A kind of high-speed railway pier top protective device of installation easy to disassemble
CN207537892U (en) Bridge construction fall arrest device
CN206785093U (en) A kind of orchard anti-theft fence
CN205355670U (en) Coaster for insulator spindle in transmission line construction
CN208159678U (en) A kind of herding protective fence
CN214661747U (en) Large-scale spherical storage tank inspection maintenance auxiliary device
CN208870497U (en) A kind of construction safety column facilitating disengaging
CN205557392U (en) Novel railway guardrail
CN208733829U (en) A kind of Cantilever Beams construction joint position H profile steel embedded system
CN207277875U (en) Detachable floor level hole protective net frame
CN206267163U (en) Slope reinforcement structure
CN205399858U (en) Balcony guardrail
CN218607871U (en) Rope net climbing training equipment
CN205100655U (en) Gardens guardrail
CN212897720U (en) A rail guard net for facing limit is protected
CN108612329A (en) A kind of safeguard structure and its construction method of skyscraper internal core tube construction
CN109868739A (en) A kind of fall arrest Bridge guardrail
CN205320759U (en) Vinegrowing frame
CN205857036U (en) A kind of portable construction hanging basket
CN220914927U (en) Cable support
CN107762168A (en) A kind of spliced steel plate safety net guard system and its construction method
CN216722690U (en) Horizontal bee bucket is consolidated to block formula of raising apis cerana

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Room 101, Building 1, Famous Business Plaza, Suzhou High-tech Zone, Jiangsu Province

Co-patentee after: CHINA FIRST HIGHWAY ENGINEERING Co.,Ltd.

Patentee after: NO.2 ENGINEERING CO., LTD. OF CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.

Address before: Room 101, Building 1, Famous Business Plaza, Suzhou High-tech Zone, Jiangsu Province

Co-patentee before: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.

Patentee before: NO.2 ENGINEERING CO., LTD. OF CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190301

Termination date: 20210516