CN208561031U - Building stones produce finished product bin dust pelletizing system - Google Patents

Building stones produce finished product bin dust pelletizing system Download PDF

Info

Publication number
CN208561031U
CN208561031U CN201821099653.XU CN201821099653U CN208561031U CN 208561031 U CN208561031 U CN 208561031U CN 201821099653 U CN201821099653 U CN 201821099653U CN 208561031 U CN208561031 U CN 208561031U
Authority
CN
China
Prior art keywords
entrucking
deduster
dust
discharger
finished product
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821099653.XU
Other languages
Chinese (zh)
Inventor
周瑞锋
李小慧
曹勃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Zhenyuan Technology Co ltd
Original Assignee
Henan Zhenyuan Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Zhenyuan Technology Co ltd filed Critical Henan Zhenyuan Technology Co ltd
Priority to CN201821099653.XU priority Critical patent/CN208561031U/en
Application granted granted Critical
Publication of CN208561031U publication Critical patent/CN208561031U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a kind of building stones to produce finished product bin dust pelletizing system, including the first entrucking deduster, second entrucking deduster, deduster on feed bin, first entrucking dust collection pipe, second entrucking dust collection pipe, dust collection pipe on feed bin, first exhaust chimney, second exhaust chimney, third exhaust chimney, first sensor of dust concentration, second sensor of dust concentration, third sensor of dust concentration, six dischargers, entrucking deduster scrapper conveyor, deduster scrapper conveyor on feed bin, three-way chute, ashes bucket elevator, ashes reprints scrapper conveyor and 0~3mm reprints belt feeder.The fugitive dust that the utility model carries out during entrucking for finished product belt conveyor unloading point, transfer point and gate batcher, the entrucking belt conveyor under finished product bin on finished product bin in building stones production system gathers dust, without building Special plaster filler bin, ashes is sold together with 0~3mm finished product building stones, while improving 0~3mm finished product building stones quality, income from sales is increased.

Description

Building stones produce finished product bin dust pelletizing system
Technical field:
The utility model relates to a kind of dust pelletizing systems, produce finished product bin dust pelletizing system more particularly to a kind of building stones, belong to In building stones production technical field.
Background technique:
In existing building stones production process, generally finished product building stones are transported in finished product bin using belt conveyor and are stored up It deposits, then entrucking transport is carried out by gate batcher under finished product bin and entrucking belt conveyor.
The dedusting of belt conveyor unloading point and transfer point generallys use on existing feed bin is mounted on finished product bin nearby On deduster gather dust, the ashes being collected into typically directly is discharged into be mounted on finished product bin, influences finished product building stones Quality very big inconvenience is brought for the repair and maintenance of deduster simultaneously because deduster is mounted on finished product bin.
Gate batcher and entrucking belt conveyor under existing finished product bin carry out the fugitive dust generated during entrucking, It generallys use the deduster being mounted on or near entrucking belt conveyor to gather dust, the ashes being collected into is directly or by scraping Trigger is discharged into entrucking belt conveyor, seriously affects finished product building stones quality, while can generate reentrainment of dust.
Utility model content:
The technical problem to be solved by the utility model is to provide a kind of building stones to produce finished product bin dust pelletizing system, for Gate feed under finished product belt conveyor unloading point, transfer point and finished product bin in building stones production system on finished product bin The fugitive dust that machine, entrucking belt conveyor carry out during entrucking gathers dust.
The utility model is adopted the technical scheme that in order to solve the technical problem:
In a kind of building stones production finished product bin dust pelletizing system, including the first entrucking deduster, the second entrucking deduster, feed bin Deduster, the first entrucking dust collection pipe, the second entrucking dust collection pipe, dust collection pipe, first exhaust chimney, second exhaust on feed bin Chimney, third exhaust chimney, the first sensor of dust concentration, the second sensor of dust concentration, third sensor of dust concentration, One discharger, the second discharger, third discharger, the 4th discharger, the 5th discharger, the 6th discharger, entrucking deduster are scraped Deduster scrapper conveyor, three-way chute, ashes bucket elevator, ashes reprint scrapper conveyor on trigger, feed bin and 0~3mm reprints skin With machine, one word of deduster is arranged on the first entrucking deduster, the second entrucking deduster and feed bin, the first entrucking dedusting Flue-dust retainer on device, the second entrucking deduster and feed bin below deduster, which passes through flanged joint respectively and is equipped with described first, to be unloaded Glassware, the second discharger, third discharger, the 4th discharger, the 5th discharger and the 6th discharger upper flange, described first The lower flange charging with entrucking deduster scrapper conveyor respectively of discharger, the second discharger, third discharger and the 4th discharger Mouth flange is connected, the lower flange charging with deduster scrapper conveyor on feed bin respectively of the 5th discharger and the 6th discharger Mouth flange is connected;The discharge port of deduster scrapper conveyor and described three on the discharge port and feed bin of the entrucking deduster scrapper conveyor The feed inlet of logical chute is connected by flange respectively;The discharge port of the three-way chute is using flange and ashes bucket elevator Feed opening flange connection, the discharge port of the ashes bucket elevator reprints the feed inlet method of scrapper conveyor using flange and ashes Orchid connection, the deflector chute that the ashes reprints the discharge port of scrapper conveyor and 0~3mm is reprinted on belt feeder pass through flanged joint;Institute State that the first entrucking deduster, the second entrucking deduster, the air inlet of deduster passes through flange respectively on feed bin and the first entrucking is received Dirt pipeline, the second entrucking dust collection pipe, the flange of dust collection pipe is connected on feed bin.
The first entrucking dust collection pipe, the second entrucking dust collection pipe are respectively under the finished product bin in two entrucking channels Gate batcher unloading point, entrucking belt conveyor unloading point, bulk machine unloading point and entrucking area gather dust;On the feed bin Dust collection pipe by pipe branch on feed bin finished product belt conveyor unloading point and transfer point gather dust.
First sensor of dust concentration, the second sensor of dust concentration, third sensor of dust concentration are installed respectively In the upper surface of first exhaust chimney, second exhaust chimney, third exhaust chimney, first sensor of dust concentration, the second powder Dust concentration sensor, third sensor of dust concentration are connected to the control system, and are used for real-time monitoring first exhaust chimney, second The numerical value of exhaust chimney, the dust concentration of third exhaust chimney and PM2.5.
The building stones of the utility model produce finished product bin dust pelletizing system, on finished product bin in building stones production system at Gate batcher, entrucking belt conveyor under product belt conveyor unloading point, transfer point and finished product bin carry out entrucking process In fugitive dust gather dust.Finished product belt conveyor unloading point and transfer point on finished product bin use 1 dedusting as needed Device, gate batcher and entrucking belt conveyor under finished product bin determine the number of entrucking deduster according to entrucking number of channels Amount, each entrucking channel configures 1 entrucking deduster in principle.
Ashes is discharged to corresponding ash by the discharger under deduster on entrucking deduster and feed bin by the utility model respectively In powder scrapper conveyor, scrapper conveyor is reprinted by ashes bucket elevator and ashes, ashes is transported to 0~3mm on finished product bin turns It carries in belt feeder, belt feeder is reprinted by 0~3mm, ashes is transported in 0~3mm building stones finished product bin, ashes is made not have to construction Dedicated ash filler bin, and ashes can be sold with 0~3mm finished product building stones, improve the same of 0~3mm finished product building stones quality When, increase income from sales.
The utility model is controlled by using PLC, unloads ash to different discharger time-division transfers, required defeated grey equipment compared with It is small, while it is smaller to run power, improves running efficiency of system.
Detailed description of the invention:
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the C-C view in Fig. 1;
Fig. 3 is the K direction view in Fig. 1;
Fig. 4 is the A-A view in Fig. 1;
Fig. 5 is the B-B view in Fig. 1.
Specific embodiment:
The utility model is made further explanation with reference to the accompanying drawing:
Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5, in figure, 1 is the first entrucking deduster, 2 be the second entrucking deduster, 3 is Deduster on feed bin, 4 be the first entrucking dust collection pipe, 5 be the second entrucking dust collection pipe, 6 be dust collection pipe on feed bin, 7 be the One exhaust chimney, 8 be second exhaust chimney, 9 be third exhaust chimney, 10 be the first sensor of dust concentration, 11 be the second powder Dust concentration sensor, 12 be third sensor of dust concentration, 13 be the first discharger, 14 be the second discharger, 15 be that third is unloaded Glassware, 16 be the 4th discharger, 17 be the 5th discharger, 18 be the 6th discharger, 19 be entrucking deduster scrapper conveyor, 20 be material Deduster scrapper conveyor on storehouse, 21 be three-way chute, 22 be ashes bucket elevator, 23 be ashes reprint scrapper conveyor, 24 be 0~ 3mm reprints belt feeder.
Embodiment: a kind of building stones production finished product bin dust pelletizing system, including the first entrucking deduster 1, the second entrucking dedusting 3 first entrucking dust collection pipe 4 of deduster on device 2, feed bin, the second entrucking dust collection pipe 5, dust collection pipe 6, first exhaust on feed bin Chimney 7, second exhaust chimney 8, third exhaust chimney 9, the first sensor of dust concentration 10, the second sensor of dust concentration 11, Third sensor of dust concentration 12, the first discharger 13, the second discharger 14, third discharger 15, the 4th discharger the 16, the 5th Discharger 17, the 6th discharger 18, entrucking deduster scrapper conveyor 19, deduster scrapper conveyor 20, three-way chute 21, ashes on feed bin Bucket elevator 22, ashes reprint scrapper conveyor 23 and 0~3mm reprints belt feeder 24, and the first entrucking deduster 1, the second entrucking remove 3 one word of deduster is arranged on dirt device 2 and feed bin, on the first entrucking deduster 1, the second entrucking deduster 2 and feed bin under deduster 3 The flue-dust retainer of side, which passes through flanged joint respectively and is equipped with the first discharger 13, the second discharger 14, third discharger the 15, the 4th, to be unloaded The upper flange of glassware 16, the 5th discharger 17 and the 6th discharger 18, the first discharger 13, the second discharger 14, third discharging The lower flange of device 15 and the 4th discharger 16 is connected with the feed opening flange of entrucking deduster scrapper conveyor 19 respectively, the 5th discharging The lower flange of device 17 and the 6th discharger 18 is connected with the feed opening flange of deduster scrapper conveyor 20 on feed bin respectively;Entrucking removes The feed inlet of the discharge port of deduster scrapper conveyor 20 and the three-way chute 21 point on the discharge port and feed bin of dirt device scrapper conveyor 19 It is not connected by flange;The discharge port of three-way chute 21 is connected using the feed opening flange of flange and ashes bucket elevator 22 It connects, the discharge port of ashes bucket elevator 22 is connect using flange with the feed opening flange that ashes reprints scrapper conveyor 23, and ashes turns The deflector chute that the discharge port and 0~3mm for carrying scrapper conveyor 23 are reprinted on belt feeder 24 passes through flanged joint;First entrucking deduster 1, The air inlet of deduster 3 passes through flange and the first entrucking dust collection pipe 4, the second entrucking respectively on second entrucking deduster 2, feed bin The flange of dust collection pipe 6 is connected on dust collection pipe 5, feed bin.
First entrucking dust collection pipe 4, the second entrucking dust collection pipe 5 are respectively to the lock under the finished product bin in two entrucking channels Door batcher unloading point, entrucking belt conveyor unloading point, bulk machine unloading point and entrucking area gather dust;Dust-collecting pipe on feed bin Road 6 by pipe branch on feed bin finished product belt conveyor unloading point and transfer point gather dust.
Wherein: the first sensor of dust concentration 10, the second sensor of dust concentration 11, third sensor of dust concentration 12 divide It is not mounted on the upper surface of first exhaust chimney 7, second exhaust chimney 8, third exhaust chimney 9, the first sensor of dust concentration 10, Second sensor of dust concentration 11, third sensor of dust concentration 12 are connected to the control system, and are used for real-time monitoring first row Gas chimney 7, second exhaust chimney 8, the dust concentration of third exhaust chimney 9 and PM2.5 numerical value.
Ashes is discharged to accordingly by the utility model respectively by the discharger under deduster on entrucking deduster and feed bin In ashes scrapper conveyor, 0~3mm that ashes is transported on finished product bin by scrapper conveyor is reprinted by ashes bucket elevator and ashes It reprints in belt feeder, belt feeder is reprinted by 0~3mm, ashes is transported in 0~3mm building stones finished product bin, ashes is made not have to build If dedicated ash filler bin, and ashes can be sold with 0~3mm finished product building stones, improve 0~3mm finished product building stones quality Meanwhile increasing income from sales.
The utility model carries out different dischargers to unload grey control at times by using PLC control, and required deduster is scraped Trigger and deduster reprinting scrapper conveyor are smaller, and operation power is smaller, hence it is evident that improves the operational efficiency of equipment.

Claims (3)

1. a kind of building stones produce finished product bin dust pelletizing system, it is characterised in that: the building stones produce finished product bin dust pelletizing system packet Include the first entrucking deduster (1), the second entrucking deduster (2), deduster (3), the first entrucking dust collection pipe (4), on feed bin Dust collection pipe (6), first exhaust chimney (7), second exhaust chimney (8), third exhaust on two entrucking dust collection pipes (5), feed bin Chimney (9), the first sensor of dust concentration (10), the second sensor of dust concentration (11), third sensor of dust concentration (12), First discharger (13), the second discharger (14), third discharger (15), the 4th discharger (16), the 5th discharger (17), Six dischargers (18), entrucking deduster scrapper conveyor (19), deduster scrapper conveyor (20), three-way chute (21), grey powder hopper on feed bin Formula elevator (22), ashes reprint scrapper conveyor (23) and 0~3mm reprints belt feeder (24), the first entrucking deduster (1), (3) one word of deduster is arranged on second entrucking deduster (2) and feed bin, the first entrucking deduster (1), the second entrucking dedusting Flue-dust retainer on device (2) and feed bin below deduster (3) pass through respectively flanged joint be equipped with first discharger (13), Second discharger (14), third discharger (15), the 4th discharger (16), the 5th discharger (17) and the 6th discharger (18) Upper flange, first discharger (13), the second discharger (14), third discharger (15) and the 4th discharger (16) laxative remedy Orchid is connected with the feed opening flange of entrucking deduster scrapper conveyor (19) respectively, the 5th discharger (17) and the 6th discharger (18) lower flange is connected with the feed opening flange of deduster scrapper conveyor (20) on feed bin respectively;The entrucking deduster scraper plate The discharge port of deduster scrapper conveyor (20) and the feed inlet of the three-way chute (21) are distinguished on the discharge port and feed bin of machine (19) It is connected by flange;The discharge port of the three-way chute (21) uses the feed inlet method of flange and ashes bucket elevator (22) Orchid connection, the discharge port of the ashes bucket elevator (22) reprint the feed opening flange of scrapper conveyor (23) using flange and ashes Connection, the deflector chute that the ashes reprints the discharge port of scrapper conveyor (23) and 0~3mm is reprinted on belt feeder (24) are connected by flange It connects;The first entrucking deduster (1), the second entrucking deduster (2), the air inlet of deduster (3) passes through method respectively on feed bin Orchid is connected with the flange of dust collection pipe (6) on the first entrucking dust collection pipe (4), the second entrucking dust collection pipe (5), feed bin.
2. building stones according to claim 1 produce finished product bin dust pelletizing system, it is characterised in that: first entrucking is gathered dust Pipeline (4), the second entrucking dust collection pipe (5) respectively under the finished product bin in two entrucking channels gate batcher unloading point, Entrucking belt conveyor unloading point, bulk machine unloading point and entrucking area gather dust;Dust collection pipe (6) passes through pipe on the feed bin Road branch on feed bin finished product belt conveyor unloading point and transfer point gather dust.
3. building stones according to claim 1 produce finished product bin dust pelletizing system, it is characterised in that: first dust concentration Sensor (10), the second sensor of dust concentration (11), third sensor of dust concentration (12) are separately mounted to first exhaust cigarette The upper surface of chimney (7), second exhaust chimney (8), third exhaust chimney (9), first sensor of dust concentration (10), the second powder Dust concentration sensor (11), third sensor of dust concentration (12) are connected to the control system, and are used for real-time monitoring first exhaust Chimney (7), second exhaust chimney (8), the dust concentration of third exhaust chimney (9) and PM2.5 numerical value.
CN201821099653.XU 2018-07-12 2018-07-12 Building stones produce finished product bin dust pelletizing system Active CN208561031U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821099653.XU CN208561031U (en) 2018-07-12 2018-07-12 Building stones produce finished product bin dust pelletizing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821099653.XU CN208561031U (en) 2018-07-12 2018-07-12 Building stones produce finished product bin dust pelletizing system

Publications (1)

Publication Number Publication Date
CN208561031U true CN208561031U (en) 2019-03-01

Family

ID=65492670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821099653.XU Active CN208561031U (en) 2018-07-12 2018-07-12 Building stones produce finished product bin dust pelletizing system

Country Status (1)

Country Link
CN (1) CN208561031U (en)

Similar Documents

Publication Publication Date Title
CN103862565B (en) The annual production large-scale technology for producing paper-face plaster board of 6000 Wan ㎡ and production line thereof
CN202575414U (en) Dust collecting device for machine head dedusting of sintering machine
CN104150245B (en) Material feeding notch totally-enclosed movable ventilation dust pelletizing system on the groove groove of a kind of ore deposit
CN105773835A (en) Ceramic raw material mixed-grinding concentrated preparation process and device
CN108722639A (en) machine-made sand production system
CN201753195U (en) Combination conveyor for controlling connection and operation of blanking and batching steel wire rope used for hopper and material storage
CN109758841A (en) Exhaust treatment system and processing method containing sticky dust
CN210874454U (en) Mining equipment dust removal collecting equipment
CN203726617U (en) Large-sized gypsum plasterboard production line with 60,000,000m<2> yearly output
CN208561031U (en) Building stones produce finished product bin dust pelletizing system
CN208757783U (en) Building stones produce combined dust-eliminating system
CN108750722A (en) Building stones produce finished product bin dust pelletizing system
CN209061328U (en) Building stones crushing and screening sand dedusting integrated manufacturing system (IMS)
CN206266486U (en) Cleaning shaft adheres to tar-processing system
CN110103343A (en) A kind of water surely expects Automatic Production System
CN105239491A (en) Aggregate dust removing device and method used before bin cooling and for asphalt concrete mixing equipment
CN206730698U (en) Powder tank centralized dust-removing system and there is its concrete mixing plant
CN206176405U (en) Deposition hopper not
CN108855574A (en) Building stones produce combined dust-eliminating system
CN205088541U (en) A stoving gumming system that gathers materials for asphalt mixing plant
CN208757760U (en) Machine-made Sand production system
CN211056080U (en) Dust keeper of funnel is transported to conveyer belt
CN209423553U (en) A kind of column activated coke granulating system
CN209362114U (en) A kind of bituminous mixing plant production high-efficiency pulse formula bag filter
CN208726994U (en) A kind of rubber exhaust gas pre-processing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 453700 southeast corner of junction of Yudong Road and Weiqi Road, Jingkai District, Xinxiang City, Henan Province

Patentee after: HENAN ZHENYUAN TECHNOLOGY CO.,LTD.

Address before: 453700 southeast corner of the junction of Yudong Road and Weiqi Road in Jingkai District, Xinxiang City, Henan Province

Patentee before: HENAN ZHENYUAN TECHNOLOGY CO.,LTD.