CN208553647U - A kind of acheson furnace waste gas collection device - Google Patents
A kind of acheson furnace waste gas collection device Download PDFInfo
- Publication number
- CN208553647U CN208553647U CN201821094625.9U CN201821094625U CN208553647U CN 208553647 U CN208553647 U CN 208553647U CN 201821094625 U CN201821094625 U CN 201821094625U CN 208553647 U CN208553647 U CN 208553647U
- Authority
- CN
- China
- Prior art keywords
- cabinet
- conduit
- exhaust gas
- fixedly connected
- strainer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Treating Waste Gases (AREA)
Abstract
The utility model discloses a kind of acheson furnace waste gas collection devices, including bottom plate, the upper surface of the bottom plate is fixedly connected with the lower surface of cabinet, the left side of the cabinet is connected with one end of the second conduit, the left side of second conduit is provided with valve, the top of second conduit is connected with the air outlet of draw-out device, and the right side of the draw-out device is fixedly connected with the left side of cabinet.The acheson furnace waste gas collection device, pass through setting cabinet, blower, the first conduit, the second conduit, valve, strainer and first through hole, so that exhaust gas passes through the intracorporal water of case first, water is allowed to filter out some impurity for being dissolved in water in exhaust gas, when exhaust gas is circulated upwards by water, so that exhaust gas passes sequentially through first through hole and strainer and is discharged outside cabinet, strainer is allowed to filter out some impurity not soluble in water in exhaust gas, so that the exhaust gas outside discharge cabinet obtained certain processing, pollution of the exhaust gas to environment is reduced.
Description
Technical field
The utility model relates to acheson furnace technical field, specially a kind of acheson furnace waste gas collection device.
Background technique
Acheson furnace is a kind of heat-treatment furnace of carbonaceous material (carbide) graphite crystallization prosperity after making charing, Chinese mugwort
Odd inferior graphitizing furnace production graphitized coke carburant be with containing fugitive constituent petroleum coke and calcined coke do raw material, by 2800 DEG C with
On high-temperature process obtain high-quality carburant.
During Acheson's work, a large amount of exhaust gas can be generated, traditional furnace body exhaust gas discharge is by longer
Pipeline is connected with the gas outlet of furnace body, and after having collected exhaust gas, exhaust gas passes through pipeline direct emission in air, and exhaust gas does not have
It performs corresponding processing, it is larger to the pollution of environment.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of acheson furnace waste gas collection device, solves biography
The furnace body exhaust gas discharge of system is to be connected by longer pipeline with the gas outlet of furnace body, and after having collected exhaust gas, exhaust gas passes through pipe
In air, and exhaust gas does not perform corresponding processing road direct emission, the larger problem of the pollution to environment.
(2) technical solution
To achieve the above object, the utility model provides the following technical solutions: a kind of acheson furnace waste gas collection device, packet
Bottom plate is included, the upper surface of the bottom plate is fixedly connected with the lower surface of cabinet, the left side of the cabinet and the one of the second conduit
End is connected, and the left side of second conduit is provided with valve, the top of second conduit and the air outlet of draw-out device
It is connected, the right side of the draw-out device is fixedly connected with the left side of cabinet, front and the drainage arrangement of the cabinet
One end is connected.
The air inlet of the draw-out device is connected with one end of the first conduit, and the upper surface of the cabinet is provided with case
Plug, the upper surface of the cabinet are fixedly connected with the bottom end of radical occlusion device, and the radical occlusion device is located at the top of connecting plate, described
The lower surface of connecting plate is fixedly connected with sealing ring, and the lower surface of the sealing ring and the upper surface of cabinet overlap, the sealing
Circle is located between two threaded posts.
The threaded post is threaded in the second thread cap, and second thread cap is connected to the upper surface of connecting plate,
The threaded post is threaded in the first thread cap, and first thread cap is connected to the upper surface of cabinet, the connecting plate
Upper surface offer the second through-hole, strainer is provided in second through-hole, the strainer is located at the top of first through hole, institute
State the upper surface that first through hole is provided with cabinet.
Preferably, the radical occlusion device includes fixed link, and the quantity of the fixed link is four, and the bottom of four fixed links
End is fixedly connected with the upper surface of cabinet, and the top of four fixed links is fixedly connected with the lower surface of top plate.
Preferably, the draw-out device includes blower, the fixed company in the right side of the Blower Body and the left side of cabinet
It connects, the air inlet of the blower is connected with one end of the first conduit, one end phase of the air outlet of the blower and the second conduit
Connection.
Preferably, the drainage arrangement includes drainpipe, and one end of the drainpipe is connected with the front of cabinet, described
The upper surface of drainpipe is provided with drain valve.
Preferably, the upper surface of the bottom plate is fixedly connected with the lower surface of power supply, the upper surface of the power supply and switch
Lower surface be fixedly connected.
Preferably, the output end of the power supply is electrically connected by conducting wire with the input terminal of switch, the output end of the switch
It is electrically connected by conducting wire with the input terminal of blower.
(3) beneficial effect
The utility model provides a kind of acheson furnace waste gas collection device, have it is following the utility model has the advantages that
1, acheson furnace waste gas collection device, by the way that cabinet, blower, the first conduit, the second conduit, valve, filter is arranged
Net and first through hole, when needing to be collected processing to exhaust gas, staff first connects the first conduit with Waste gas outlet
It is logical, by control blower work, allow the first conduit to extract exhaust gas, so that exhaust gas passes sequentially through the first conduit and second and leads
It manages and enters in cabinet, so that exhaust gas passes through the intracorporal water of case first, water is filtered out some molten in exhaust gas
In the impurity of water, when exhaust gas is circulated upwards by water, so that exhaust gas passes sequentially through first through hole and strainer and cabinet is discharged
Outside, strainer is allowed to filter out some impurity not soluble in water in exhaust gas, so that the exhaust gas outside discharge cabinet obtained centainly
Processing, reduces pollution of the exhaust gas to environment.
2, acheson furnace waste gas collection device, by the way that threaded post, the first thread cap, the second thread cap, connecting plate is arranged
And strainer, when needing to clean strainer, staff unscrews column manually so that road threaded post with spiral shell in the second thread cap
It is moved up under the action of line connection, so that threaded post is detached from the first thread cap, when two threaded posts are detached from two first respectively
When thread cap, staff can remove connecting plate and clean to strainer, so that when staff removes strainer more
It is convenient.
3, acheson furnace waste gas collection device, by setting top plate, fixed link, cabinet and strainer, when blower long-time
Work when so that exhaust gas is constantly discharged out of cabinet, so that the dust and impurities above strainer are not fallen out on strainer, make
Better effect when obtaining strainer filtering exhaust gas, and the utility model which has a compact structure and a reasonable design, it is practical.
Detailed description of the invention
Fig. 1 is the schematic diagram of the section structure that the utility model is faced;
Fig. 2 is the structural schematic diagram that the utility model cabinet is faced;
Fig. 3 is the structural schematic diagram amplified at the utility model A.
In figure: 1 power supply, 2 switches, 3 bottom plates, 4 cabinets, 5 first through hole, 6 second through-holes, 7 strainers, 8 radical occlusion devices, 81 are consolidated
Fixed pole, 82 top plates, 9 casees plugs, 10 draw-out devices, 101 first conduits, 102 blowers, 11 second conduits, 12 valves, 13 draining dresses
It sets, 131 drainpipes, 132 drain valves, 14 threaded posts, 15 connecting plates, 16 sealing rings, 17 first thread caps, 18 second thread caps.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figure 1-3, the utility model provides a kind of technical solution: a kind of acheson furnace waste gas collection device, including
The upper surface of bottom plate 3, bottom plate 3 is fixedly connected with the lower surface of cabinet 4, the fixed company in the upper surface of bottom plate 3 and the lower surface of power supply 1
It connects, the upper surface of power supply 1 is fixedly connected with the lower surface of switch 2, by the way that power supply 1 is arranged, so that power supply 1 can be with fan 102
Power supply, so that blower 102 can work normally, by the way that switch 2 is arranged, so that the control blower 102 that staff is more convenient
The output end of work, power supply 1 is electrically connected by conducting wire with the input terminal of switch 2, and the output end of switch 2 passes through conducting wire and blower
102 input terminal electrical connection, the left side of cabinet 4 are connected with one end of the second conduit 11, and the left side of the second conduit 11 is set
It is equipped with valve 12, by the way that valve 12 is arranged, when exhaust gas is handled, staff can open valve 12, so that useless
Gas is more convenient when can be entered in cabinet 4 by the second conduit 11, the top of the second conduit 11 and the outlet air of draw-out device 10
Mouth is connected, and draw-out device 10 includes blower 102, and the right side of 102 fuselage of blower is fixedly connected with the left side of cabinet 4, wind
The air inlet of machine 102 is connected with one end of the first conduit 101, and the air outlet of blower 102 is connected with one end of the second conduit 11
It is logical, by the way that blower 102 is arranged, allow the first conduit 101 to extract exhaust gas, so that exhaust gas passes sequentially through 101 He of the first conduit
It second conduit 11 and enters in cabinet 4, so that exhaust gas passes through the water in cabinet 4 first, water is allowed to filter out exhaust gas
In some impurity for being dissolved in water, the right side of draw-out device 10 is fixedly connected with the left side of cabinet 4, the front of cabinet 4 with
One end of drainage arrangement 13 is connected, and drainage arrangement 13 includes drainpipe 131, one end of drainpipe 131 and the positive phase of cabinet 4
Connection, the upper surface of drainpipe 131 is provided with drain valve 132.
The air inlet of draw-out device 10 is connected with one end of the first conduit 101, by the way that drainpipe 131 is arranged, works as needs
When replacing the water in cabinet 4, staff opens drain valve 132, and the water in cabinet 4 is discharged by drainpipe 131
Outside cabinet 4, staff is poured into clean water in cabinet 4 so that staff replace cabinet 4 in water when more
Add conveniently, the upper surface of cabinet 4 is provided with case plug 9, and the upper surface of cabinet 4 is fixedly connected with the bottom end of radical occlusion device 8, blocks dress
Setting 8 includes fixed link 81, and the quantity of fixed link 81 is four, and the bottom end of four fixed links 81 is solid with the upper surface of cabinet 4
Fixed connection, and the top of four fixed links 81 is fixedly connected with the lower surface of top plate 82, by the way that top plate 82 is arranged, works as blower
When 102 prolonged work, so that exhaust gas is constantly discharged out of cabinet 4, so that the dust and impurities of 7 top of strainer are not fallen out
On strainer 7, so that better effect when strainer 7 filters exhaust gas, radical occlusion device 8 are located at the top of connecting plate 15, connecting plate 15
Lower surface is fixedly connected with sealing ring 16, and the lower surface of sealing ring 16 and the upper surface of cabinet 4 overlap, and sealing ring 16 is located at two
Between threaded post 14, by the way that sealing ring 16 is arranged, when exhaust gas is outer by the discharge cabinet 4 of strainer 7, so that exhaust gas will not be from cabinet
Gap between 4 and connecting plate 15 leaks out.
Threaded post 14 is threaded in the second thread cap 18, and the second thread cap 18 is connected to the upper surface of connecting plate 15,
Threaded post 14 is threaded in the first thread cap 17, by the way that threaded post 14, when needing to clean strainer 7, staff is arranged
The column 14 that unscrews manually makes so that road threaded post 14 moves up under the action of connecting with 18 internal screw thread of the second thread cap
It obtains threaded post 14 and is detached from the first thread cap 17, when two threaded posts 14 are detached from two the first thread caps 17 respectively, staff
Connecting plate 15 can be removed and strainer 7 is cleaned, so that staff removes more convenient when strainer 7, the first screw thread
Cap 17 is connected to the upper surface of cabinet 4, and the upper surface of connecting plate 15 offers the second through-hole 6, is provided with strainer in the second through-hole 6
7, by the way that strainer 7 is arranged, when exhaust gas is circulated upwards by water, so that exhaust gas passes sequentially through first through hole 5 and strainer 7 and arranges
Out outside cabinet 4, strainer 7 is allowed to filter out some impurity not soluble in water in exhaust gas, strainer 7 is located at the upper of first through hole 5
Side, first through hole 5 are provided with the upper surface of cabinet 4.
In use, staff first discharges the first conduit 101 with exhaust gas when needing to be collected processing to exhaust gas
Mouth is connected, and is worked by control blower 102, is allowed the first conduit 101 to extract exhaust gas, lead so that exhaust gas passes sequentially through first
It pipe 101 and the second conduit 11 and enters in cabinet 4, so that exhaust gas passes through the water in cabinet 4 first, water is filtered
Fall some impurity for being dissolved in water in exhaust gas, when exhaust gas is circulated upwards by water, so that exhaust gas passes sequentially through 5 He of first through hole
It strainer 7 and is discharged outside cabinet 4, when needing to clean strainer 7, staff unscrews column 14 manually, so that road threaded post
14 move up under the action of connecting with 18 internal screw thread of the second thread cap, so that threaded post 14 is detached from the first thread cap 17, when
When two threaded posts 14 are detached from two the first thread caps 17 respectively, staff can remove connecting plate 15 and to strainer 7 into
Row cleaning.
Can to sum up obtain, 1, the acheson furnace waste gas collection device, by setting cabinet 4, blower 102, the first conduit 101,
Second conduit 11, valve 12, strainer 7 and first through hole 5, when needing to be collected processing to exhaust gas, staff first will
First conduit 101 is connected with Waste gas outlet, is worked by control blower 102, the first conduit 101 is allowed to extract exhaust gas,
So that exhaust gas passes sequentially through the first conduit 101 and the second conduit 11 and enters in cabinet 4, so that exhaust gas passes through cabinet first
Water in 4 allows water to filter out some impurity for being dissolved in water in exhaust gas, when exhaust gas is circulated upwards by water, so that
Exhaust gas passes sequentially through first through hole 5 and strainer 7 and is discharged outside cabinet 4, strainer 7 is filtered out some insoluble in exhaust gas
Pollution of the exhaust gas to environment was reduced so that the exhaust gas outside discharge cabinet 4 obtains certain processing in the impurity of water.
2, the acheson furnace waste gas collection device, by setting threaded post 14, the first thread cap 17, the second thread cap 18,
Connecting plate 15 and strainer 7, when needing to clean strainer 7, staff unscrews column 14 manually so that road threaded post 14 with
It is moved up under the action of the connection of second thread cap, 18 internal screw thread, so that threaded post 14 is detached from the first thread cap 17, when two spiral shells
When line column 14 is detached from two the first thread caps 17 respectively, staff can remove connecting plate 15 and clean to strainer 7,
So that staff remove it is more convenient when strainer 7.
3, the acheson furnace waste gas collection device works as blower by setting top plate 82, fixed link 81, cabinet 4 and strainer 7
When 102 prolonged work, so that exhaust gas is constantly discharged out of cabinet 4, so that the dust and impurities of 7 top of strainer are not fallen out
On strainer 7, so that better effect when strainer 7 filters exhaust gas, and the utility model which has a compact structure and a reasonable design, it is practical.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of acheson furnace waste gas collection device, including bottom plate (3), it is characterised in that: the upper surface of the bottom plate (3) and case
The lower surface of body (4) is fixedly connected, and the left side of the cabinet (4) is connected with one end of the second conduit (11), and described second
The left side of conduit (11) is provided with valve (12), the top of second conduit (11) and the air outlet phase of draw-out device (10)
Connection, the right side of the draw-out device (10) are fixedly connected with the left side of cabinet (4), front and the row of the cabinet (4)
One end of water installations (13) is connected;
The air inlet of the draw-out device (10) is connected with one end of the first conduit (101), and the upper surface of the cabinet (4) is set
It is equipped with case plug (9), the upper surface of the cabinet (4) is fixedly connected with the bottom end of radical occlusion device (8), radical occlusion device (8) position
It is fixedly connected with sealing ring (16) in the lower surface of the top of connecting plate (15), the connecting plate (15), the sealing ring (16)
Lower surface and the upper surface of cabinet (4) overlap, the sealing ring (16) is located between two threaded posts (14);
The threaded post (14) is threaded in the second thread cap (18), and second thread cap (18) is connected to connecting plate
(15) upper surface, the threaded post (14) are threaded in the first thread cap (17), the first thread cap (17) clamping
It offers the second through-hole (6) in the upper surface of the upper surface of cabinet (4), the connecting plate (15), is set in second through-hole (6)
It is equipped with strainer (7), the strainer (7) is located at the top of first through hole (5), and the first through hole (5) is provided with the upper of cabinet (4)
Surface.
2. a kind of acheson furnace waste gas collection device according to claim 1, it is characterised in that: the radical occlusion device (8)
Including fixed link (81), the quantity of the fixed link (81) is four, and the bottom end of four fixed links (81) with cabinet (4)
Upper surface is fixedly connected, and the top of four fixed links (81) is fixedly connected with the lower surface of top plate (82).
3. a kind of acheson furnace waste gas collection device according to claim 1, it is characterised in that: the draw-out device (10)
Including blower (102), the right side of blower (102) fuselage is fixedly connected with the left side of cabinet (4), the blower
(102) air inlet is connected with the one end of the first conduit (101), the air outlet and the second conduit (11) of the blower (102)
One end be connected.
4. a kind of acheson furnace waste gas collection device according to claim 1, it is characterised in that: the drainage arrangement (13)
Including drainpipe (131), one end of the drainpipe (131) is connected with the front of cabinet (4), the drainpipe (131)
Upper surface is provided with drain valve (132).
5. a kind of acheson furnace waste gas collection device according to claim 3, it is characterised in that: the bottom plate (3) it is upper
Surface is fixedly connected with the lower surface of power supply (1), and the upper surface of the power supply (1) is fixedly connected with the lower surface of switch (2).
6. a kind of acheson furnace waste gas collection device according to claim 5, it is characterised in that: the power supply (1) it is defeated
Outlet is electrically connected by conducting wire with the input terminal for switching (2), and the output end of the switch (2) passes through conducting wire and blower (102)
Input terminal electrical connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821094625.9U CN208553647U (en) | 2018-07-11 | 2018-07-11 | A kind of acheson furnace waste gas collection device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821094625.9U CN208553647U (en) | 2018-07-11 | 2018-07-11 | A kind of acheson furnace waste gas collection device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208553647U true CN208553647U (en) | 2019-03-01 |
Family
ID=65492700
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821094625.9U Active CN208553647U (en) | 2018-07-11 | 2018-07-11 | A kind of acheson furnace waste gas collection device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208553647U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111948350A (en) * | 2020-08-19 | 2020-11-17 | 邢台职业技术学院 | Environment-friendly online detection and transmission device for various waste gases |
-
2018
- 2018-07-11 CN CN201821094625.9U patent/CN208553647U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111948350A (en) * | 2020-08-19 | 2020-11-17 | 邢台职业技术学院 | Environment-friendly online detection and transmission device for various waste gases |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208553647U (en) | A kind of acheson furnace waste gas collection device | |
CN208869334U (en) | Grid maker is used in a kind of processing of Novel sewage | |
CN107520049B (en) | A kind of multistage combined mesh electrode coal dust dust-precipitator | |
CN209459413U (en) | A kind of Metal Melting device convenient for dedusting | |
CN204767713U (en) | Multi -functional water treatment filter | |
CN208599342U (en) | A kind of oil mist separator | |
CN211339032U (en) | Waste water cyclic utilization device | |
CN211141972U (en) | Full-automatic filter | |
CN210613165U (en) | Impurity removing device for manufacturing brass tube material for cable | |
CN208260318U (en) | A kind of water feed apparatus of underground sewage disposal system system | |
CN209020047U (en) | A kind of Environmental Monitoring Laboratory water sample processing unit | |
CN202962174U (en) | Dust-removing device of vacuum pump | |
CN205373467U (en) | Take filter screen waste heat recovery heat exchanger | |
CN204367225U (en) | A kind of Resin Washing Equipment | |
CN209917414U (en) | Efficient energy-saving oil purification device for hydrogen compressor | |
CN205035211U (en) | Industry water purification system | |
CN212188234U (en) | Dust removal framework for filtering high-temperature smoke | |
CN220479077U (en) | Grinding fluid iron fillings filtration splitter | |
CN201216906Y (en) | Flue gas filter of smelting-furnace | |
CN217247193U (en) | Traditional chinese medicine extract filters storage device | |
CN210814105U (en) | Circulating water slag remover with automatic slag removing function | |
CN209368196U (en) | A kind of device extracting coal tar | |
CN209679783U (en) | A kind of iron alloy electric furnace tail gas methanol fountain dust-extraction unit | |
CN212236243U (en) | Natural animal and plant extract filtering device | |
CN220696111U (en) | Environment-friendly device for filtering and purifying oil |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 051137 No. 8, kuntian Avenue, Suyang Township, Yuanshi County, Shijiazhuang City, Hebei Province Patentee after: Hebei kuntian new energy Co.,Ltd. Address before: 051137 south of Su Yang Xiang Nan Bai Lou Cun, Yuanshi County, Shijiazhuang City, Hebei Province Patentee before: HEBEI KUNTIAN NEW ENERGY TECHNOLOGY Co.,Ltd. |