CN208551331U - Material cleaning container and cooking apparatus - Google Patents

Material cleaning container and cooking apparatus Download PDF

Info

Publication number
CN208551331U
CN208551331U CN201721304037.9U CN201721304037U CN208551331U CN 208551331 U CN208551331 U CN 208551331U CN 201721304037 U CN201721304037 U CN 201721304037U CN 208551331 U CN208551331 U CN 208551331U
Authority
CN
China
Prior art keywords
blast pipe
cavity
side wall
dislocation
material cleaning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201721304037.9U
Other languages
Chinese (zh)
Inventor
杨保民
刘丰收
潘典国
周忠宝
周亚
刘小力
何柏锋
瞿月红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Shunde Midea Electrical Heating Appliances Manufacturing Co Ltd
Original Assignee
Foshan Shunde Midea Electrical Heating Appliances Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Shunde Midea Electrical Heating Appliances Manufacturing Co Ltd filed Critical Foshan Shunde Midea Electrical Heating Appliances Manufacturing Co Ltd
Priority to CN201721304037.9U priority Critical patent/CN208551331U/en
Application granted granted Critical
Publication of CN208551331U publication Critical patent/CN208551331U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Food-Manufacturing Devices (AREA)

Abstract

The utility model proposes a kind of material cleaning container and cooking apparatus, wherein, material cleaning container includes: to blow a meter chamber, including the first cavity, the semicircle or semiellipse that the horizontal cross-section of first cavity is misplaced by two are formed with respect to splicing structure, so that the two sides of the first cavity are respectively formed the first dislocation side wall and the second dislocation side wall;Multiple blast pipes are connected to setting with the first cavity, and multiple blast pipes include the first blast pipe and the second blast pipe, and the first blast pipe is connected to the first dislocation side wall, and the second blast pipe is connected to the second dislocation side wall;Air outlet is set to the bottom for blowing meter chamber.Pass through the technical solution of the utility model, on the one hand, when carrying out material cleaning, by air stream drives, keep material stirring cleaning more abundant, on the other hand, when carrying out material conveying, by air stream drives, improve the transfer efficiency of material.

Description

Material cleaning container and cooking apparatus
Technical field
The utility model relates to household appliance technical fields, in particular to a kind of material cleaning container and a kind of cooking pot Tool.
Background technique
As the intelligent level of household electrical appliance is higher and higher, full-automatic intelligence is produced on the basis of traditional electric cooker Energy rice cooker, wherein realize that automation blows rice and cooks using material cleaning container, on the one hand, need to cooperate other components of rice cooker Assembly, so that the overall structure of rice cooker is more compact, on the other hand, material cleaning device needs faster air-flow and blows speed Degree, enables material quickly to cook, existing material cleaning container, there are still following defects:
(1) when cleaning simultaneously for material in material cleaning container, material is easy to be sticky in appearance after the completion of material cleaning On device inner wall, it cannot achieve and quickly cook;
(2) when the structure setting of blast pipe is unreasonable, it is ineffective to blow rice.
Utility model content
At least one in order to solve the above-mentioned technical problem, one of the utility model is designed to provide a kind of material cleaning Container.
Another of the utility model is designed to provide a kind of cooking apparatus.
To achieve the goals above, the embodiment of the utility model first aspect proposes a kind of material cleaning container, packet It includes: blowing a meter chamber, including the first cavity, the semicircle or semiellipse that the horizontal cross-section of the first cavity is misplaced by two are with respect to splicing structure It is formed, so that the two sides of the first cavity are respectively formed the first dislocation side wall and the second dislocation side wall;Multiple blast pipes, with the first chamber Body connection setting, multiple blast pipes include the first blast pipe and the second blast pipe, and the first blast pipe is connected to the first dislocation side wall, Second blast pipe is connected to the second dislocation side wall;Air outlet is set to the bottom for blowing meter chamber.
In the technical scheme, blowing meter chamber includes the first cavity, the semicircle that the horizontal cross-section of the first cavity is misplaced by two Or semiellipse is formed with respect to splicing structure, to form the first dislocation and the second dislocation in the two sides of the first cavity, first is wrong Position portion includes the connection curved surface of the first dislocation side wall and two sides, and the second dislocation includes the connection song of the second dislocation side wall and two sides Face, the first blast pipe is by connect with the first dislocation side wall and blowing a meter chamber and be connected to, and the second blast pipe with second by misplacing side wall It connects and blows a meter chamber and be connected to, to pass through the first blast pipe and the second blast pipe respectively to the intracavitary air inlet of rice is blown, pass through the first chamber The improvement of body structure and the improvement of corresponding first blast pipe, the second blast pipe set-up mode, on the one hand, carrying out, material is clear When washing, by air stream drives, keeps material stirring cleaning more abundant, on the other hand, when carrying out material conveying, driven by air-flow It is dynamic, improve the transfer efficiency of material.
Wherein, by taking positive round as an example, the angle of two semicircles can be 180 °, might be less that 180 °, can also be greater than 180 °, it is preferable that the structure of two semicircles is identical, and when the opposite splicing of the semicircle of two dislocation is arranged, two semicircles can be direct Fitting splicing can also be spliced by the way that relative gap is arranged.
When executing material cleaning operation, air outlet is closed, and when executing blanking operation, air outlet is opened.
In addition, blowing meter chamber can also be formed by three or three or more dislocation curved surface head and the tail connecting structure.
Specifically, it is configured to by blowing a meter chamber by two or more semicircle or ellipses or irregular camber line group At horizontal cross-section, input air-flow by two or more blast pipes when blanking, and washing intracavitary the is formationed convolution runner of rice, realization Material driving.
In addition, the material cleaning container in above-described embodiment provided by the utility model can also have following supplementary technology Feature:
In the above-mentioned technical solutions, it is preferable that the air inlet direction of the first blast pipe is vertically arranged with the first dislocation side wall;The The air inlet direction of two blast pipes is vertically arranged with the second dislocation side wall.
In the technical scheme, by by the air inlet direction of the first blast pipe and first dislocation side wall be vertically arranged, and The blast pipe of second blast pipe is vertically arranged with the second dislocation side wall, since dislocation side wall is in the same plane or parallel Setting, therefore the air inlet direction of the first blast pipe and the blast pipe direction of the second blast pipe can be oppositely arranged, and then pass through pair The two sides conveying back draught for blowing meter chamber, is blowing the intracavitary formation mediation air-flow of rice, on the one hand, in material cleaning, pass through liquid Vortex is formed, cleaning effect is promoted, in blanking, is formed and is vortexed by gas, is reducing material while inner wall adhesion, is mentioning Rise blanking efficiency.
In any of the above-described technical solution, it is preferable that the outer point of the first dislocation side wall is outer with the second dislocation side wall Line central point between the point of side is symmetrical centre, the horizontal cross-section phase of the horizontal cross-section of the first blast pipe and the second blast pipe Symmetrical centre is symmetrical arranged.
In the technical scheme, by setting the horizontal cross-section of the first blast pipe and the horizontal cross-section of the second blast pipe to It is symmetrical arranged relative to symmetrical centre, i.e., the first blast pipe is identical as the structure of the second blast pipe, and set-up mode is identical, and position is arranged It sets symmetrical, on the one hand, symmetrical structure preparation process complexity reduces, and on the other hand, on the basis of back draught, can guarantee Current rate is identical, and then keeps the swirl stabilization generated higher.
In any of the above-described technical solution, it is preferable that the upper contour line of the first blast pipe and the second blast pipe is along air inlet side It is arranged to horizontal extension, the lower contour of the first blast pipe and the second blast pipe is extended obliquely along air inlet direction, upper wheel Guiding angle is formed between profile and lower contour, wherein guiding angle is greater than or equal to 15 °, and is less than or equal to 45 °.
In the technical scheme, by the way that by lower contour, diagonally downward, to form guiding angle with upper contour line, air-flow is passed through Rotational flow field flow rotation is formed by into after blowing meter chamber by blast pipe and swirling eddy is gradually downward, is held convenient for material cleaning Material in device is under the action of swirling eddy, gradually convergence downwards, and then air outlet is discharged, specifically, guiding angle is big In or be equal to 15 ° and be less than or equal to 45 °, guiding angle change within this range, so that air-flow or the runner of liquid stream is more met stream Field structure reduces the reflux of blast pipe and raising up for flow field, increases flow field sectional area, is conducive to the rotation in flow field, to make Material declines after coming into full contact with air or water.
Preferably, guiding angle is 25 °, can also adjust the angle size according to different product demands.
In addition, upper contour line can also be arranged obliquely along air inlet direction.
In any of the above-described technical solution, it is preferable that the entrance of blast pipe be configured to round, semicircle, ellipse or Any one in person's quadrangle;The exit width of blast pipe is less than or equal to the width of dislocation side wall, and the outlet of blast pipe is high Degree is less than or equal to the height of the first cavity.
In the technical scheme, the entrance of blast pipe is round, ellipse or polygon, and entrance shape rule is convenient for adding Work manufacture, the entrance shape of blast pipe can be selected according to the feeder connected, provide the entrance of various shapes, Simple with the connection structure of blower, adaptable, the outlet port owned by the government of blast pipe is less than or equal to the width of dislocation side wall, blast pipe Outlet height be less than or equal to the height of the first cavity, and then blast pipe and the first cavity corresponding matching is enable to be arranged, The outlet height of blast pipe is equal to the height of the first cavity can when the exit width of blast pipe is equal to the width of dislocation side wall So that the outlet of blast pipe is maximized setting, has just enter into the area coverage for blowing the intracavitary air-flow of rice to increase, further promote gas The driving effect of stream.
In any of the above-described technical solution, it is preferable that opposite in the semicircle that the horizontal cross-section of the first cavity is misplaced by two When splicing structure formation, the ratio between the outlet height of blast pipe and half diameter of a circle is greater than or equal toAnd it is less than or waits InWhen the semiellipse that the horizontal cross-section of the first cavity is misplaced by two is formed with respect to splicing structure, the outlet of blast pipe is high Ratio between degree and the long axis of semiellipse is greater than or equal toAnd it is less than or equal to
In the technical scheme, by limiting between the outlet height of blast pipe and the diameter (or long axis) of cavity cross-section Relationship can further limit the relationship between the air-flow conveying area of blast pipe conveying and cavity volume, on the one hand, Neng Goutong It overregulates air-flow to meet the needs of blowing rice intracavitary generation vortex, on the other hand, can satisfy and be provided with the material cleaning container Cooking apparatus densification demand.
In any of the above-described technical solution, it is preferable that the first cavity further includes being separately positioned on the first dislocation side wall and First surface side wall and the second curved surface sidewall between two dislocation side walls;Multiple blast pipes further include third blast pipe and the 4th into Air hose, third blast pipe and the 4th blast pipe relative symmetry center symmetric setting, third blast pipe and first surface side wall are tangent Connection, the 4th blast pipe with the second curved surface sidewall is tangent is connected to.
In the technical scheme, tangent with side wall by increasing on the basis of the first blast pipe and the second blast pipe Third blast pipe and the 4th blast pipe are able to ascend and blow the intracavitary current rate of rice, the vortex formed by above-mentioned twice air-flow The vortex formed by four air-flows is increased to, and then keeps the driving force of vortex stronger.
Further, the multiple that the quantity of blast pipe is 2.
In any of the above-described technical solution, it is preferable that further include: cylindric separation net can be dismantled to be set to and blow a meter chamber Interior, the center of circle of the horizontal cross-section of cylindric separation net is overlapped setting with symmetrical centre, and the radius of cylindric separation net is less than or waits In the distance between symmetrical centre and dislocation inside sidewalls endpoint, wherein the mesh diameter of cylindric separation net is less than specified object The mean outside diameter of material.
In the technical scheme, by the way that cylindric separation net is arranged, cylindric separation net, which can be dismantled to be set to, blows a meter chamber After interior, make to form the isolated area that cross section is gradually reduced between the outlet of blast pipe and material accommodating area, material can be accommodated Area is isolated with the outlet of blast pipe, and then reduces the contact area of material and side wall, thus after material cleaning, energy It is enough to reduce the inventory sticked on side wall, and then when stopping air-flow conveying, the material of accommodating area can smoothly enter To interior pot, while reducing material adhesion, if improving material rate.
In any of the above-described technical solution, it is preferable that the first cavity is cross-section cavity;Blow a meter chamber further include: adapter cavity Body, transitional cavity top profile are connected to the profile of the first cavity, the profile of transitional cavity be configured to it is round or Ellipse, the second cavity, the top profile of the second cavity are connected to the profile of transitional cavity, and the second cavity is extending downwardly While to contract, to form back taper cavity, wherein air outlet is enclosed by the profile of the second cavity.
In the technical scheme, in the technical scheme, by the way that adapter cavity is arranged between the first cavity and the second cavity Body, on the one hand, material can be reduced in the trapping phenomena of junction, transitional cavity top profile is connected to the lower part of the first cavity Profile, material can be imported on transitional cavity through the first cavity, on the other hand, by constructing the profile of transitional cavity At circle, make the second cavity constructions at the cone set, the profile of transitional cavity is constructed into ovalisation, makes the second chamber Body is configured to the elliptical cone set, so that the inner wall of the second cavity be made to form smooth inner wall face, and then is conducive to material to out The export in air port.
The embodiment of the utility model second aspect proposes a kind of cooking apparatus, comprising: the utility model first aspect In material cleaning container in any technical solution.
Wherein, cooking apparatus is electric cooker, electric pressure cooking saucepan, electric cooking pot, electric steamer or soy bean milk making machine.
In the technical scheme, due to the material cleaning container that cooking apparatus includes in any of the above-described technical solution, Whole beneficial effects of material cleaning container with any of the above-described technical solution.
The additional aspect and advantage of the utility model will become obviously in following description section, or practical new by this The practice of type is recognized.
Detailed description of the invention
The above-mentioned and/or additional aspect and advantage of the utility model from the description of the embodiment in conjunction with the following figures will Become obvious and be readily appreciated that, in which:
Fig. 1 shows the structural schematic diagram of the material cleaning container of one embodiment according to the present utility model;
Fig. 2 shows the schematic top plan views of material cleaning container shown in FIG. 1;
Fig. 3 shows the structural schematic diagram of the material cleaning container of another embodiment according to the present utility model;
Fig. 4 shows the schematic top plan view of material cleaning container shown in Fig. 3;
Fig. 5 shows the schematic side view of material cleaning container shown in Fig. 3;
Fig. 6 shows the A-A diagrammatic cross-section of the material cleaning container in Fig. 5;
Fig. 7 shows the overlooking structure diagram of the material cleaning container of another embodiment according to the present utility model.
Wherein, corresponding relationship of the Fig. 1 into Fig. 7 between appended drawing reference and component names are as follows:
102 blow a meter chamber, 1,022 first cavitys, 1,024 first dislocation side walls, 1,026 second dislocation side walls, 104 first air inlets Pipe, 106 second blast pipes, 108 air outlets, the entrance of 1042 blast pipes, the outlet of 1044 blast pipes, 110 cylindric separation nets, 1028 transitional cavities, 1,030 second cavitys.
Specific embodiment
In order to be more clearly understood that the above objects, features, and advantages of the utility model, with reference to the accompanying drawing and have The utility model is further described in detail in body embodiment.It should be noted that in the absence of conflict, this Shen The feature in embodiment and embodiment please can be combined with each other.
Many details are explained in the following description in order to fully understand the utility model, still, this is practical Novel to be implemented using other than the one described here other modes, therefore, the protection scope of the utility model is simultaneously It is not limited by the specific embodiments disclosed below.
Referring to Fig. 1 to Fig. 7 description according to the material cleaning container of some embodiments of the utility model.
Embodiment one:
As shown in Figures 1 to 4, the material cleaning container of embodiment according to the present utility model, comprising: blow meter chamber 102, wrap The first cavity 1022 is included, the semicircle or semiellipse that the horizontal cross-section of the first cavity 1022 is misplaced by two are with respect to splicing structure shape At so that the two sides of the first cavity 1022 are respectively formed the first dislocation side wall 1024 and the second dislocation side wall 1026;Multiple air inlets Pipe, setting is connected to the first cavity 1022, and multiple blast pipes include the first blast pipe 104 and the second blast pipe 106, the first air inlet Pipe 104 is connected to the first dislocation side wall 1024, and the second blast pipe 106 is connected to the second dislocation side wall 1026;Air outlet 108, if It is placed in the bottom for blowing meter chamber 102.
In the technical scheme, blowing meter chamber 102 includes the first cavity 1022, and the horizontal cross-section of the first cavity 1022 is by two The semicircle or semiellipse of dislocation are formed with respect to splicing structure, to form the first dislocation and second in the two sides of the first cavity 1022 Dislocation, the first dislocation include the connection curved surface of the first dislocation side wall 1024 and two sides, and the second dislocation includes the second dislocation The connection curved surface of side wall 1026 and two sides, the first blast pipe 104 are connected by connecting with the first dislocation side wall 1024 and blowing meter chamber 102 Logical, the second blast pipe 106 is connected to by connecting with the second dislocation side wall 1026 and blowing meter chamber 102, to pass through the first air inlet respectively Pipe 104 and the second blast pipe 106 are entered the wind to blowing in meter chamber 102, by the improvement of 1022 structure of the first cavity and corresponding The improvement of first blast pipe 104,106 set-up mode of the second blast pipe, on the one hand, when carrying out material cleaning, driven by air-flow It is dynamic, keep material stirring cleaning more abundant, on the other hand, when carrying out material conveying, by air stream drives, improves material Transfer efficiency.
Wherein, by taking positive round as an example, the angle of two semicircles can be 180 °, might be less that 180 °, can also be greater than 180 °, it is preferable that the structure of two semicircles is identical, and when the opposite splicing of the semicircle of two dislocation is arranged, two semicircles can be direct Fitting splicing can also be spliced by the way that relative gap is arranged.
When executing material cleaning operation, air outlet 108 is closed, and when executing blanking operation, air outlet 108 is opened.
In addition, blowing meter chamber 102 can also be formed by three or three or more dislocation curved surface head and the tail connecting structure.
Specifically, it is configured to by blowing meter chamber 102 by two or more semicircle or ellipses or irregular arc The horizontal cross-section of line composition inputs air-flow by two or more blast pipes when blanking, and circles round runner washing intracavitary is formationed of rice, Realize material driving.
In addition, the material cleaning container in above-described embodiment provided by the utility model can also have following supplementary technology Feature:
Embodiment two:
On the basis of embodiment one, in the above-mentioned technical solutions, it is preferable that the air inlet direction of the first blast pipe 104 and the One dislocation side wall 1024 is vertically arranged;The air inlet direction of second blast pipe 106 is vertically arranged with the second dislocation side wall 1026.
In the technical scheme, by the way that the air inlet direction of the first blast pipe 104 misplaces with first, side wall 1024 is vertical to be set It sets and the blast pipe of the second blast pipe 106 is vertically arranged with the second dislocation side wall 1026, since dislocation side wall is in same flat It on face, or is arranged in parallel, therefore the air inlet direction of the first blast pipe 104 and the blast pipe direction of the second blast pipe 106 can It is oppositely arranged, and then by conveying back draught to the two sides for blowing meter chamber 102, mediation air-flow, a side are formed in meter chamber 102 blowing Face is formed by liquid and is vortexed in material cleaning, and cleaning effect is promoted, and in blanking, is formed and is vortexed by gas, subtracted Small material promotes blanking efficiency while inner wall adhesion.
Embodiment three:
In the technology of embodiment two, further, in any of the above-described technical solution, it is preferable that the first dislocation side wall Line central point between 1024 outer point and the outer point of the second dislocation side wall 1026 is symmetrical centre, the first air inlet The horizontal cross-section of pipe 104 and the horizontal cross-section of the second blast pipe 106 are symmetrical arranged relative to symmetrical centre.
In the technical scheme, by by the horizontal cross-section of the horizontal cross-section of the first blast pipe 104 and the second blast pipe 106 It is arranged with respect to symmetrical centre to be symmetrical arranged, i.e., the first blast pipe 104 is identical as the structure of the second blast pipe 106, setting side Formula is identical, and positional symmetry is arranged, on the one hand, symmetrical structure preparation process complexity reduces, on the other hand, in the base of back draught It on plinth, can guarantee that current rate is identical, and then keep the swirl stabilization generated higher.
Example IV:
As shown in figure 5, in any of the above-described technical solution, it is preferable that the first blast pipe 104 and the second blast pipe 106 Upper contour line is along air inlet direction horizontal extension setting, the lower contour edge air inlet side of the first blast pipe 104 and the second blast pipe 106 To being extended obliquely, guiding angle α is formed between upper contour line and lower contour, wherein guiding angle α is greater than or equal to 15 °, and it is less than or equal to 45 °.
In the technical scheme, by the way that by lower contour, diagonally downward, to form guiding angle with upper contour line, air-flow is passed through Rotational flow field flow rotation is formed by into after blowing meter chamber 102 by blast pipe and swirling eddy is gradually downward, it is clear convenient for material The material in container is washed under the action of swirling eddy, gradually convergence downwards, and then air outlet 108 is discharged, specifically, guiding Angle α is greater than or equal to 15 ° and less than or equal to 45 °, and guiding angle α changes within this range, makes the runner of air-flow or liquid stream More meet flow field structure, reduce the reflux of blast pipe and raising up for flow field, increases flow field sectional area, be conducive to the rotation in flow field Turn, to decline after coming into full contact with material with air or water.
Preferably, guiding angle α is 25 °, can also adjust the angle size according to different product demands.
In addition, upper contour line can also be arranged obliquely along air inlet direction.
In any of the above-described technical solution, it is preferable that the entrance 1042 of blast pipe is configured to round, semicircle, oval Any one in shape or quadrangle;1044 width of outlet of blast pipe is less than or equal to the width of dislocation side wall, blast pipe 1044 height of outlet be less than or equal to the first cavity 1022 height.
In the technical scheme, the entrance 1042 of blast pipe is round, ellipse or polygon, and entrance shape rule is just It can be selected according to the feeder connected in 1042 shape of entrance of processing and manufacturing, blast pipe, provide a variety of shapes The entrance of shape, simple with the connection structure of blower, adaptable, 1044 port owned by the government of outlet of blast pipe is less than or equal to dislocation side wall Width, 1044 height of outlet of blast pipe is less than or equal to the height of the first cavity 1022, and then enables blast pipe and the The setting of one cavity, 1022 corresponding matching, in the outlet of blast pipe, 1044 height is equal to the height of the first cavity 1022, blast pipe When exporting width of 1044 width equal to dislocation side wall, the outlet 1044 of blast pipe can be made to maximize setting, to increase just Into the area coverage for blowing the air-flow in meter chamber 102, the driving effect of air-flow is further promoted.
Embodiment five:
As shown in figs. 4 and 5, in any of the above-described technical solution, it is preferable that the horizontal cross-section of the first cavity 1022 by When the semicircle of two dislocation is with respect to splicing structure formation, the ratio between 1044 height of outlet of blast pipe and half diameter of a circle is big In or be equal toAnd it is less than or equal toIn the opposite splicing of semiellipse that the horizontal cross-section of the first cavity 1022 is misplaced by two When construction is formed, the ratio between 1044 height of outlet and the long axis of semiellipse of blast pipe is greater than or equal toAnd be less than or It is equal to
In the technical scheme, by limit blast pipe 1044 height of outlet and cavity cross-section diameter (or long axis) it Between relationship, can further limit blast pipe conveying air-flow conveying area and cavity volume between relationship, on the one hand, energy It is enough meets by adjusting air-flow blowing the needs of generating vortex in meter chamber 102, another aspect can satisfy that be provided with the material clear Wash the demand of the cooking apparatus densification of container.
As shown in figs. 4 and 5, specifically, the 108 height H of air outlet of blast pipe is less than half diameter of a circle L of cavity, recommends The two lenth ratio is between 1/4~2/3, and length of recommended ratio is 1/3, and air outlet 108 is connected with interior pot.
Embodiment six:
In any of the above-described technical solution, it is preferable that the first cavity 1022 further includes being separately positioned on the first dislocation side wall 1024 and second dislocation side wall 1026 between first surface side wall and the second curved surface sidewall;Multiple blast pipes further include third into Air hose and the 4th blast pipe, third blast pipe and the 4th blast pipe relative symmetry center symmetric setting, third blast pipe and first The tangent connection of curved surface sidewall, the 4th blast pipe with the second curved surface sidewall is tangent is connected to.
In the technical scheme, by the basis of the first blast pipe 104 and the second blast pipe 106, increase and side wall Tangent third blast pipe and the 4th blast pipe, is able to ascend the current rate blown in meter chamber 102, by above-mentioned twice air-flow shape At vortex increase to the vortex formed by four air-flows, and then make vortex driving force it is stronger.
Further, the multiple that the quantity of blast pipe is 2.
Embodiment seven:
As shown in fig. 7, in any of the above-described technical solution, it is preferable that further include: cylindric separation net 110 can be dismantled Be set to and blow in meter chamber 102, the center of circle of the horizontal cross-section of cylindric separation net 110 is overlapped setting with symmetrical centre, it is cylindric every The radius of off-network 110 is less than or equal to the distance between symmetrical centre and dislocation inside sidewalls endpoint, wherein cylindric separation net 110 mesh diameter is less than the mean outside diameter of specified material.
In the technical scheme, by the way that cylindric separation net 110 is arranged, cylindric separation net 110, which can be dismantled, to be set to After blowing in meter chamber 102, make to form the isolated area that cross section is gradually reduced between the outlet 1044 of blast pipe and material accommodating area, energy It is enough that material accommodating area is isolated with the outlet 1044 of blast pipe, and then reduce the contact area of material and side wall, thus After material cleans, the inventory sticked on side wall can be reduced, and then when stopping air-flow conveying, the material of accommodating area Interior pot can be smoothly entered, while reducing material adhesion, if improving material rate.
As shown in fig. 6, in any of the above-described technical solution, it is preferable that the first cavity 1022 is cross-section cavity;Blow a meter chamber 102 further include: transitional cavity 1028,1028 top profile of transitional cavity are connected to the profile of the first cavity 1022, transition The profile of cavity 1028 is configured to round or ellipse, and the top profile of the second cavity 1030, the second cavity 1030 connects Be connected to the profile of transitional cavity 1028, the second cavity 1030 while extending downwardly to contract, to form back taper Cavity, wherein air outlet 108 is enclosed by the profile of the second cavity 1030.
In the technical scheme, in the technical scheme, by being set between the first cavity 1022 and the second cavity 1030 Set transitional cavity 1028, on the one hand, material can be reduced in the trapping phenomena of junction, the connection of 1028 top profile of transitional cavity To the profile of the first cavity 1022, material can be imported on transitional cavity 1028 through the first cavity 1022, on the other hand, By the way that the profile of transitional cavity 1028 is configured to circle, so that the second cavity 1030 is configured to the cone set, incited somebody to action The profile construction ovalisation for crossing cavity 1028, makes the second cavity 1030 be configured to the elliptical cone set, to make the The inner wall of two cavitys 1030 forms smooth inner wall face, and then is conducive to export of the material to air outlet 108.
Embodiment according to the present utility model provides a kind of cooking apparatus, comprising: appoints in the utility model first aspect Material cleaning container in one embodiment.Wherein, cooking apparatus is electric cooker, electric pressure cooking saucepan, electric cooking pot, electric steamer or soya-bean milk Machine.
In this embodiment, due to the material cleaning container that cooking apparatus includes in any of the above-described embodiment, have Whole beneficial effects of the material cleaning container of any of the above-described embodiment.
In the present invention, term " first ", " second ", " third " are only used for the purpose of description, and should not be understood as Indication or suggestion relative importance;Term " multiple " then refers to two or more, unless otherwise restricted clearly.Term " peace Dress ", " connected ", " connection ", the terms such as " fixation " shall be understood in a broad sense, can also be with for example, " connection " may be a fixed connection It is to be detachably connected, or be integrally connected;" connected " can be directly connected, can also be indirectly connected through an intermediary.It is right For those skilled in the art, can understand as the case may be above-mentioned term in the present invention specifically contain Justice.
In the description of the utility model, it is to be understood that term " on ", "lower", "left", "right", "front", "rear" etc. refer to The orientation or positional relationship shown be based on the orientation or positional relationship shown in the drawings, be merely for convenience of description the utility model and Simplify description, rather than the device or unit of indication or suggestion meaning there must be specific direction, with specific orientation construction And operation, it is thus impossible to be construed as a limitation of the present invention.
In the description of this specification, the description of term " one embodiment ", " some embodiments ", " specific embodiment " etc. Mean that particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least the one of the utility model In a embodiment or example.In the present specification, schematic expression of the above terms are not necessarily referring to identical embodiment Or example.Moreover, the particular features, structures, materials, or characteristics of description can be in any one or more embodiment or examples In can be combined in any suitable manner.
The above is only the preferred embodiments of the utility model, are not intended to limit the utility model, for this field Technical staff for, various modifications and changes may be made to the present invention.Within the spirit and principle of the utility model, Any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (10)

1. a kind of material cleaning container characterized by comprising
A meter chamber, including the first cavity are blown, the semicircle or semiellipse that the horizontal cross-section of first cavity is misplaced by two are opposite to spell It connects construction to be formed, so that the two sides of first cavity are respectively formed the first dislocation side wall and the second dislocation side wall;
Multiple blast pipes, setting is connected to first cavity, and the multiple blast pipe includes the first blast pipe and the second air inlet Pipe, first blast pipe are connected to first dislocation side wall (1024), and it is wrong that second blast pipe is connected to described second Position side wall;
Air outlet is set to the bottom for blowing meter chamber.
2. material cleaning container according to claim 1, which is characterized in that
The air inlet direction of first blast pipe is vertically arranged with the first dislocation side wall;
The air inlet direction of second blast pipe is vertically arranged with the second dislocation side wall.
3. material cleaning container according to claim 2, which is characterized in that
It is described first dislocation side wall outer point and it is described second dislocation side wall outer point between line central point be Symmetrical centre, first blast pipe and second blast pipe are symmetrical arranged relative to the symmetrical centre.
4. material cleaning container according to claim 3, which is characterized in that
The upper contour line of first blast pipe and second blast pipe along air inlet direction horizontal extension setting, described first into The lower contour of air hose and second blast pipe is extended obliquely along air inlet direction, the upper contour line and the lower whorl Guiding angle is formed between profile,
Wherein, the guiding angle is greater than or equal to 15 °, and is less than or equal to 45 °.
5. material cleaning container according to claim 4, which is characterized in that
The entrance of the blast pipe is configured to any one in round, semicircle, ellipse or quadrangle;
The exit width of the blast pipe is less than or equal to the width of the dislocation side wall, and the outlet height of the blast pipe is less than Or the height equal to first cavity.
6. material cleaning container according to claim 5, which is characterized in that
When the semicircle that the horizontal cross-section of first cavity is misplaced by two is formed with respect to splicing structure, the blast pipe goes out Ratio between open height and half diameter of a circle is greater than or equal toAnd it is less than or equal to
When the semiellipse that the horizontal cross-section of first cavity is misplaced by two is formed with respect to splicing structure, the blast pipe Ratio between outlet height and the long axis of the semiellipse is greater than or equal toAnd it is less than or equal to
7. material cleaning container according to claim 3, which is characterized in that
First cavity further includes first be separately positioned between the first dislocation side wall and the second dislocation side wall Curved surface sidewall and the second curved surface sidewall;
The multiple blast pipe further includes third blast pipe and the 4th blast pipe, the third blast pipe and the 4th blast pipe The relatively described symmetrical centre is symmetrical arranged, the third blast pipe with the first surface side wall is tangent is connected to, the described 4th into Air hose with second curved surface sidewall is tangent is connected to.
8. material cleaning container according to claim 3, which is characterized in that further include:
Cylindric separation net, can dismantle be set to it is described blow that rice is intracavitary, the center of circle of the horizontal cross-section of the cylindrical shape separation net Setting is overlapped with the symmetrical centre, the radius of the cylindrical shape separation net is less than or equal to the symmetrical centre and the dislocation The distance between inside sidewalls endpoint,
Wherein, the mesh diameter of the cylindric separation net is less than the mean outside diameter of specified material.
9. material cleaning container according to any one of claim 1 to 8, which is characterized in that
First cavity is cross-section cavity;
It is described to blow a meter chamber further include:
Transitional cavity, the transitional cavity top profile are connected to the profile of first cavity, the transitional cavity Profile is configured to round or ellipse,
Second cavity, the top profile of second cavity are connected to the profile of the transitional cavity, second cavity To contract while extending downwardly, to form back taper cavity,
Wherein, the air outlet is enclosed by the profile of second cavity.
10. a kind of cooking apparatus, which is characterized in that including material cleaning container as claimed in any one of claims 1-9 wherein,
Wherein, the cooking apparatus is electric cooker, electric pressure cooking saucepan, electric cooking pot, electric steamer or soy bean milk making machine.
CN201721304037.9U 2017-10-11 2017-10-11 Material cleaning container and cooking apparatus Withdrawn - After Issue CN208551331U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721304037.9U CN208551331U (en) 2017-10-11 2017-10-11 Material cleaning container and cooking apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721304037.9U CN208551331U (en) 2017-10-11 2017-10-11 Material cleaning container and cooking apparatus

Publications (1)

Publication Number Publication Date
CN208551331U true CN208551331U (en) 2019-03-01

Family

ID=65445040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721304037.9U Withdrawn - After Issue CN208551331U (en) 2017-10-11 2017-10-11 Material cleaning container and cooking apparatus

Country Status (1)

Country Link
CN (1) CN208551331U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109645834A (en) * 2017-10-11 2019-04-19 佛山市顺德区美的电热电器制造有限公司 Material cleaning container and cooking apparatus
CN109907671A (en) * 2019-03-22 2019-06-21 广东水利电力职业技术学院(广东省水利电力技工学校) A kind of rice washer
CN112823596A (en) * 2019-11-21 2021-05-21 竹山县绿谷食用菌有限公司 Energy-saving environment-friendly edible mushroom sterilizing furnace

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109645834A (en) * 2017-10-11 2019-04-19 佛山市顺德区美的电热电器制造有限公司 Material cleaning container and cooking apparatus
CN109645834B (en) * 2017-10-11 2023-12-19 佛山市顺德区美的电热电器制造有限公司 Material cleaning container and cooking utensil
CN109907671A (en) * 2019-03-22 2019-06-21 广东水利电力职业技术学院(广东省水利电力技工学校) A kind of rice washer
CN112823596A (en) * 2019-11-21 2021-05-21 竹山县绿谷食用菌有限公司 Energy-saving environment-friendly edible mushroom sterilizing furnace

Similar Documents

Publication Publication Date Title
CN208551331U (en) Material cleaning container and cooking apparatus
CN208625312U (en) Material cleaning device and cooking apparatus
CN206252420U (en) Cleaning chamber, material cleaning device and cooking apparatus
CN206026110U (en) Oven inner container structure
CN109645834A (en) Material cleaning container and cooking apparatus
CN208551550U (en) Material transferring container and cooking apparatus
CN208658879U (en) Material transferring container and cooking apparatus
CN208551333U (en) Material transferring container and cooking apparatus
CN107960902B (en) Cleaning cavity, material cleaning device and cooking utensil
CN208598179U (en) Material transferring container and cooking apparatus
CN208659063U (en) Material cleaning container and cooking apparatus
CN208658757U (en) Material transferring container and cooking apparatus
CN205433533U (en) Hand dryer
CN2506957Y (en) High speed centrifugal spraying dryer with circular air blowing
CN109645832A (en) Material transferring container and cooking apparatus
CN208551093U (en) Material cleaning container and cooking apparatus
CN208551389U (en) Cooking equipment and its pedestal
CN209106973U (en) Bulb-breaking device, lid and cooking apparatus
CN207940678U (en) Steam valve module and the electric cooker for including the steam valve module
CN207940730U (en) Steam valve module and the electric cooker for including the steam valve module
CN109645833B (en) Material conveying container and cooking utensil
CN107296504B (en) Transfer cavity, feeding system and cooking utensil
CN109645830B (en) Material conveying container and cooking utensil
CN208876032U (en) Send meter structure and cooking equipment
CN206189103U (en) Rotary drum washing machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20190301

Effective date of abandoning: 20231219

AV01 Patent right actively abandoned

Granted publication date: 20190301

Effective date of abandoning: 20231219

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned