CN208545979U - Brick device is removed in a kind of construction site for building - Google Patents

Brick device is removed in a kind of construction site for building Download PDF

Info

Publication number
CN208545979U
CN208545979U CN201820864601.0U CN201820864601U CN208545979U CN 208545979 U CN208545979 U CN 208545979U CN 201820864601 U CN201820864601 U CN 201820864601U CN 208545979 U CN208545979 U CN 208545979U
Authority
CN
China
Prior art keywords
rack
locating
brick
construction site
brick device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820864601.0U
Other languages
Chinese (zh)
Inventor
明景泰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tu Jingyu
Original Assignee
Tu Jingyu
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tu Jingyu filed Critical Tu Jingyu
Priority to CN201820864601.0U priority Critical patent/CN208545979U/en
Application granted granted Critical
Publication of CN208545979U publication Critical patent/CN208545979U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to construction material haulage equipment technical fields, and it discloses a kind of construction site for building and removes brick device, including lifting platform, side at the top of the lifting platform is fixedly connected with support rod, the inside of the support rod offers locating slot, the internal activity of the locating slot is socketed with locating piece, and the side of the locating piece is fixedly connected by locating rod with the side of rack, and the front of the rack offers loose slot.Remove brick device in the construction site for building, pass through the cooperation of steel wire cable, pulley, winding plate, rotary shaft and dual-axle motor, automatic transporting can be carried out to brick, the artificial trouble for throwing fortune is avoided, not only reduces the working strength of worker, and also improve the efficiency of carrying, pass through the cooperation of locating slot, locating piece and locating rod, it can play the role of positioning to rack when carrying, the direction of motion for avoiding rack shifts, to ensure that stability when rack movement.

Description

Brick device is removed in a kind of construction site for building
Technical field
The utility model relates to construction material haulage equipment technical field, brick dress is removed in specially a kind of construction site for building It sets.
Background technique
Brick refers to artificial small-sized bulk for building, is divided into fired brick (referring mainly to clay brick) and no-firing brick (Dinas brickes With flyash brick etc.), it is commonly called as brick;Clay brick with clay (including the powders such as shale and gangue) be primary raw material, through pug Processing, molding, dry and roast, clay brick is gathered materials on the spot, and cheap, durable, there are also fire prevention, heat-insulated, sound insulation And the advantages that moisture absorption, using extensively in civil construction project, useless queen closer can also make gathering materials for concrete.
However, existing construction site will often find that worker by way of throwing brick, by brick from lower toward high Place is carried, so the not only working strength of increased worker, but also but also handling efficiency is low, while there is also huge peaces Full hidden danger.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of construction site for building and removes brick device, has energy It is enough that automatic transporting is carried out to brick, to reduce the working strength of worker, the efficiency of brick carrying is improved, while being capable of root Fixation is adjusted to brick according to the quantity of brick, avoids brick from falling off during carrying, ensure that handling process In safety the advantages that, solve existing construction site by way of throwing brick, brick removed from lower toward eminence Fortune, the so not only working strength of increased worker, but also but also handling efficiency is low, while there is also huge security risks The problem of.
(2) technical solution
For realization is above-mentioned brick can be improved to reduce the working strength of worker to brick progress automatic transporting The efficiency of carrying, while fixation can be adjusted to brick according to the quantity of brick, avoid brick from sending out during carrying Life falls off, and ensure that the purpose of safety in handling process, the utility model provides the following technical solutions: a kind of construction for building Brick device, including lifting platform are removed in scene, and the side at the top of the lifting platform is fixedly connected with support rod, the inside of the support rod Locating slot is offered, the internal activity of the locating slot is socketed with locating piece, and the side of the locating piece passes through locating rod and puts The side for setting frame is fixedly connected, and the front of the rack offers loose slot, and the internal activity of the loose slot is socketed with work The bottom of lever, the motion bar is sequentially connected by the inner wall of movable spring and rack, and the fixed company in one end of motion bar It is connected to clamping plate, the side at the top of the clamping plate is fixedly installed with movable button, and the side of the movable button by fixing bolt and is placed The flank threads of frame inner cavity connect, and the side of the rack inner cavity offers fixing groove, and the top of rack is fixedly mounted There is link block, steel wire cable is fixedly connected at the top of the link block, the steel wire cable is actively socketed on the outside of pulley, The pulley is fixedly mounted on the bottom of cross bar, is fixedly connected at the top of one end and support rod side of the cross bar, the steel The one ends wound of wire rope is connected to rotary shaft in the outside of winding plate, the side fixing sleeve of the winding plate, the rotary shaft External activity is socketed with support plate, and one end of rotary shaft is fixedly connected by shaft joint with the output shaft of dual-axle motor, described Dual-axle motor is fixedly mounted on the top of lifting platform.
Preferably, side of the both ends of the locating rod respectively with the side of locating piece and rack is mutually perpendicular to, and fixed One end of position bar is run through and extends to the side of support rod.
Preferably, the movable spring is located at the inside of loose slot, and the both ends of movable spring are respectively and in rack The bottom of wall and motion bar is mutually perpendicular to.
Preferably, the side of the clamping plate and one end of motion bar are mutually perpendicular to, and the bottom of clamping plate and rack is mutual In parallel, the shape of the clamping plate is rectangle.
Preferably, the quantity of the fixing groove is 14, and 14 fixing grooves is equal in magnitude, and 14 described solid Determining slot seven is one group, and two groups of fixing grooves are adapted with fixing bolt.
Preferably, it is mutually perpendicular at the top of the bottom of the support plate and lifting platform, and phase between support plate and winding plate It is mutually parallel.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of construction site for building and removes brick device, and having following has Beneficial effect:
1, brick device is removed in the construction site for building, passes through motion bar, movable spring, movable button, fixing bolt and fixing groove Cooperation, the position of clamping plate can be adjusted, to be clamped to brick, kept away according to the quantity of brick on rack Exempt from brick to fall off during carrying because of shaking, improves stability when brick is carried, while also ensuring carrying Safety in the process.
2, brick device is removed in the construction site for building, passes through steel wire cable, pulley, winding plate, rotary shaft and dual-axle motor Cooperation, automatic transporting can be carried out to brick, avoid the artificial trouble for throwing fortune, not only reduce the working strength of worker, And the efficiency of carrying is also improved, by the cooperation of locating slot, locating piece and locating rod, placement can be erected when carrying The effect of positioning is arrived, the direction of motion for avoiding rack shifts, to ensure that stability when rack movement.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is partial enlargement diagram at the A of the utility model structure chart 1;
Fig. 3 is partial enlargement diagram at the B of the utility model structure chart 1.
In figure: 1 lifting platform, 2 support rods, 3 locating slots, 4 locating pieces, 5 locating rods, 6 racks, 7 loose slots, 8 motion bars, 9 movable springs, 10 clamping plates, 11 movable buttons, 12 fixing bolts, 13 fixing grooves, 14 link blocks, 15 steel wire cables, 16 pulleys, 17 cross Bar, 18 winding plates, 19 rotary shafts, 20 support plates, 21 shaft joints, 22 dual-axle motors.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1-3, brick device, including lifting platform 1, the side at 1 top of lifting platform are removed in a kind of construction site for building It is fixedly connected with support rod 2, the inside of support rod 2 offers locating slot 3, and the internal activity of locating slot 3 is socketed with locating piece 4, The side of locating piece 4 is fixedly connected by locating rod 5 with the side of rack 6, the both ends of locating rod 5 respectively with locating piece 4 Side and the side of rack 6 are mutually perpendicular to, and the side of support rod 2 is run through and extended in one end of locating rod 5, can removed Play the role of positioning to rack 6 when fortune, the direction of motion for avoiding rack 6 shifts, to ensure that placement Stability when frame 6 moves, the front of rack 6 offer loose slot 7, and the internal activity of loose slot 7 is socketed with motion bar 8, The bottom of motion bar 8 is sequentially connected by the inner wall of movable spring 9 and rack 6, and movable spring 9 is located at the inside of loose slot 7, And bottom of the both ends of movable spring 9 respectively with the inner wall of rack 6 and motion bar 8 is mutually perpendicular to, and motion bar 8 can be made in work It moves the lower movement of elastic force effect of spring 9, to drive clamping plate 10 to move in the vertical direction, so that the process adjusted is simple It is convenient and time saving and energy saving, and one end of motion bar 8 is fixedly connected with clamping plate 10, the side of clamping plate 10 and one end phase of motion bar 8 It is mutually vertical, and clamping plate 10 and the bottom of rack 6 are parallel to each other, the shape of clamping plate 10 is rectangle, and clamping plate 10 is located at rack 6 Inside, and clamping plate 10 can play the role of being fixedly clamped to brick, avoid shaking between brick, ensure that between brick Stability, the side at the top of clamping plate 10 is fixedly installed with movable button 11, and the side of movable button 11 by fixing bolt 12 and is placed The flank threads of 6 inner cavity of frame connect, and the side of 6 inner cavity of rack offers fixing groove 13, and the quantity of fixing groove 13 is 14, And 14 fixing grooves 13 is equal in magnitude, 14 fixing groove 13 7 are one group, and two groups of fixing grooves 13 are and fixing bolt 12 are adapted, and the position of clamping plate 10 can be adjusted, according to the quantity of brick on rack 6 to press from both sides to brick Tightly, it avoids brick to fall off during carrying because of shaking, improves stability when brick is carried, also ensure simultaneously Safety in handling process, and the top of rack 6 is fixedly installed with link block 14, the top of link block 14 is fixedly connected with Steel wire cable 15, steel wire cable 15 are actively socketed on the outside of pulley 16, and pulley 16 is fixedly mounted on the bottom of cross bar 17, cross bar It is fixedly connected at the top of 17 one end and 2 side of support rod, the one ends wound of steel wire cable 15 is in the outside of winding plate 18, winding The side fixing sleeve of plate 18 is connected to rotary shaft 19, and the external activity of rotary shaft 19 is socketed with support plate 20, the bottom of support plate 20 It is mutually perpendicular to the top of lifting platform 1, and is parallel to each other between support plate 20 and winding plate 18, winding plate 18 can be played The effect of support, while positioning can also be played the role of to winding plate 18, so that winding plate 18 can be operated flexibly, And one end of rotary shaft 19 is fixedly connected by shaft joint 21 with the output shaft of dual-axle motor 22, dual-axle motor 22 is fixedly mounted on The top of lifting platform 1.
When work, fixing bolt 12 is rotated first and opens movable button 11, while motion bar 8 is made in the elastic force of movable spring 9 With lower movement, so that clamping plate 10 be driven to be moved, then rotates fixing bolt 12 and be allowed to be threadedly coupled with fixing groove 13, and then is right The position of clamping plate 10 is adjusted, and then opens dual-axle motor 22, rotates rotary shaft 19, so that winding plate 18 is driven to rotate, And steel wire cable 15 is wound, and then rack 6 is pulled to move in the vertical direction.
In conclusion brick device is removed in the construction site for building, by motion bar 8, movable spring 9, movable button 11, fix The cooperation of bolt 12 and fixing groove 13 can be adjusted the position of clamping plate 10 according to the quantity of brick on rack 6, thus Brick is clamped, brick is avoided and falls off during carrying because of shaking, improves stability when brick is carried, The safety in handling process is also ensured simultaneously;Pass through steel wire cable 15, pulley 16, winding plate 18, rotary shaft 19 and twin shaft The cooperation of motor 22 can carry out automatic transporting to brick, avoid the artificial trouble for throwing fortune, not only reduce the work of worker Intensity, and also improve the efficiency of carrying can be when carrying pair by the cooperation of locating slot 3, locating piece 4 and locating rod 5 Rack 6 plays the role of positioning, and the direction of motion for avoiding rack 6 shifts, to ensure that rack 6 moves When stability, solve existing construction site by way of throwing brick, by brick from lower toward eminence carry, in this way The not only working strength of increased worker, but also but also the problem of handling efficiency is low, while there is also huge security risks.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. brick device, including lifting platform (1) are removed in a kind of construction site for building, it is characterised in that: at the top of the lifting platform (1) Side is fixedly connected with support rod (2), and the inside of the support rod (2) offers locating slot (3), the locating slot (3) it is interior Portion's movable sleeve is connected to locating piece (4), the fixed company in side that the side of the locating piece (4) passes through locating rod (5) and rack (6) It connecing, the front of the rack (6) offers loose slot (7), and the internal activity of the loose slot (7) is socketed with motion bar (8), The bottom of the motion bar (8) is sequentially connected by the inner wall of movable spring (9) and rack (6), and one end of motion bar (8) It is fixedly connected with clamping plate (10), the side at the top of the clamping plate (10) is fixedly installed with movable button (11), the movable button (11) Side connect with the flank threads of rack (6) inner cavity by fixing bolt (12), the side of rack (6) inner cavity opens up Have fixing groove (13), and be fixedly installed with link block (14) at the top of rack (6), the top of the link block (14) is fixed to be connected It is connected to steel wire cable (15), the steel wire cable (15) is actively socketed on the outside of pulley (16), the fixed peace of the pulley (16) Mounted in the bottom of cross bar (17), it is fixedly connected at the top of one end and support rod (2) side of the cross bar (17), the wirerope The one ends wound of rope (15) is connected to rotary shaft (19) in the outside of winding plate (18), the side fixing sleeve of the winding plate (18), The external activity of the rotary shaft (19) is socketed with support plate (20), and one end of rotary shaft (19) pass through it is shaft joint (21) and double The output shaft of spindle motor (22) is fixedly connected, and the dual-axle motor (22) is fixedly mounted on the top of lifting platform (1).
2. brick device is removed in a kind of construction site for building according to claim 1, it is characterised in that: the locating rod (5) Side of the both ends respectively with the side of locating piece (4) and rack (6) be mutually perpendicular to, and one end of locating rod (5) is through simultaneously Extend to the side of support rod (2).
3. brick device is removed in a kind of construction site for building according to claim 1, it is characterised in that: the movable spring (9) be located at the inside of loose slot (7), and the both ends of movable spring (9) respectively with the inner wall of rack (6) and motion bar (8) Bottom is mutually perpendicular to.
4. brick device is removed in a kind of construction site for building according to claim 1, it is characterised in that: the clamping plate (10) One end of side and motion bar (8) is mutually perpendicular to, and clamping plate (10) and the bottom of rack (6) are parallel to each other, the clamping plate (10) shape is rectangle.
5. brick device is removed in a kind of construction site for building according to claim 1, it is characterised in that: the fixing groove (13) Quantity be 14, and 14 fixing grooves (13) is equal in magnitude, and 14 the fixing groove (13) seven are one group, and Two groups of fixing grooves (13) are adapted with fixing bolt (12).
6. brick device is removed in a kind of construction site for building according to claim 1, it is characterised in that: the support plate (20) Bottom and lifting platform (1) at the top of be mutually perpendicular to, and be parallel to each other between support plate (20) and winding plate (18).
CN201820864601.0U 2018-06-06 2018-06-06 Brick device is removed in a kind of construction site for building Expired - Fee Related CN208545979U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820864601.0U CN208545979U (en) 2018-06-06 2018-06-06 Brick device is removed in a kind of construction site for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820864601.0U CN208545979U (en) 2018-06-06 2018-06-06 Brick device is removed in a kind of construction site for building

Publications (1)

Publication Number Publication Date
CN208545979U true CN208545979U (en) 2019-02-26

Family

ID=65420938

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820864601.0U Expired - Fee Related CN208545979U (en) 2018-06-06 2018-06-06 Brick device is removed in a kind of construction site for building

Country Status (1)

Country Link
CN (1) CN208545979U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763846A (en) * 2019-03-26 2019-05-17 中交第二公路工程局有限公司 A kind of arch installation trolley

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763846A (en) * 2019-03-26 2019-05-17 中交第二公路工程局有限公司 A kind of arch installation trolley

Similar Documents

Publication Publication Date Title
CN110094074B (en) Wall body masonry robot system
CN208545979U (en) Brick device is removed in a kind of construction site for building
CN114476968A (en) Multi-functional assembled hoisting device for building prefabricated component
CN108583401A (en) A kind of assembly transport device for building
CN205662081U (en) Concrete block hacking machine
CN211617795U (en) Building material conveyer
CN216659960U (en) A conveyer for air entrainment piece
CN209567711U (en) A kind of hollow brick special hoisting bar in quadrangle
CN207749840U (en) A kind of wallboard mounting machine
CN209634514U (en) A kind of simple transportation equipment of small-sized prefabricated member
CN209416016U (en) A kind of dry kiln car automatic loader and unloader structure
CN205914387U (en) Building construction prevents stifled device
CN108166757A (en) A kind of bindiny mechanism of building template
CN207088146U (en) A kind of automatic brick cutting machine
CN209668226U (en) A kind of catching robot of die station
CN107350548A (en) A kind of construction material sheet cutting machine
CN208345089U (en) A kind of coal separation bucket elevator of Anti-fall formula
CN208747142U (en) Adobe mobile mechanism
CN208244927U (en) It is a kind of can auto feed sand making machine
CN210192633U (en) Brick plate conveying mechanism for cement brick production machine
CN202828981U (en) Stack moving device used for baking-free brick whole stack
CN217838079U (en) Steel construction section bar hoist device
CN209702102U (en) A kind of hollow concrete block special hoisting bar
CN212892774U (en) Hacking machine of aerated concrete block
CN220702326U (en) Truss-based material conveying device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190226

Termination date: 20190606