CN208545892U - Metal pan tile and metal pan tile earth system - Google Patents

Metal pan tile and metal pan tile earth system Download PDF

Info

Publication number
CN208545892U
CN208545892U CN201820779732.9U CN201820779732U CN208545892U CN 208545892 U CN208545892 U CN 208545892U CN 201820779732 U CN201820779732 U CN 201820779732U CN 208545892 U CN208545892 U CN 208545892U
Authority
CN
China
Prior art keywords
tile
metal pan
pan tile
metal
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820779732.9U
Other languages
Chinese (zh)
Inventor
胡宝义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongjun New Energy Co ltd
Original Assignee
Beijing Hanergy Solar Power Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Hanergy Solar Power Investment Co Ltd filed Critical Beijing Hanergy Solar Power Investment Co Ltd
Priority to CN201820779732.9U priority Critical patent/CN208545892U/en
Application granted granted Critical
Publication of CN208545892U publication Critical patent/CN208545892U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The utility model discloses a kind of metal pan tiles, are related to a kind of construction material.The metal pan tile includes pan tile main body (1), pan tile main body (1) two sides set gradually faying surface (12) and the mounting surface (13) for fixed metal plate watt, longitudinal one end of pan tile main body (1) is provided with the overlapping regions (15) for overlapping other longitudinally adjacent metal pan tiles, is provided with installing mechanism (131) on mounting surface (13).The utility model is by the installing mechanism fixed metal plate watt on mounting surface, because the overlap joint of metal pan tile can be realized without electric welding.In addition, being provided with water blocking slope between the faying surface and mounting surface for being located at pan tile main body the same side to stop rainwater to flow backwards, waterproofness is improved.Therefore, solve that metal pan tile influences the service life of metal pan tile because of ponding and metal pan tile is not easy the problem of installing.The utility model is built for roofing pan tile.

Description

Metal pan tile and metal pan tile earth system
Technical field
The utility model relates to a kind of construction material, in particular to a kind of metal pan tile and metal pan tile earth system.
Background technique
With the development and progress of society, the type of construction material is also more and more.Metal pan tile is one of.
A kind of metal pan tile is provided in the related technology, comprising: pan tile main body.The metal pan tile, should in roof shingles With electric welding connection between metal pan tile and metal pan tile.
But metal pan tile is by electric welding connection in the related technology, welds the crator left and is easy ponding, and then is easy life Rust, reduces the service life of metal pan tile.Also, during the installation process, it is also necessary to which for welder in roof operation, work difficulty is big, takes When it is laborious.
Utility model content
The utility model provides a kind of metal pan tile and metal pan tile earth system, can solve metal pan tile because of product Water and influence the service life of metal pan tile and metal pan tile is not easy the problem of installing.The technical solution is as follows:
A kind of metal pan tile is provided, the metal pan tile includes: pan tile main body (1), and pan tile main body (1) two sides are equal Set gradually faying surface (12) and the mounting surface (13) for fixing the metal pan tile;It is same positioned at the pan tile main body (1) Water blocking slope (14) are provided between the faying surface (12) and the mounting surface (13) of side;The longitudinal direction of the pan tile main body (1) One end is provided with the overlapping regions (15) for overlapping longitudinally adjacent metal pan tile;Wherein, it is arranged on the mounting surface (13) There are installing mechanism (131).
Optionally, longitudinal other end of the pan tile main body (1) is provided with the dash side (16) for water conservancy diversion.
Optionally, dash side (16) extends preset length along the vertical direction of longitudinal other end of the pan tile main body (1).
Optionally, the overlapping regions (15) is umbilicate type, the thickness of the size of recess and metal pan tile of wanting that overlapped Unanimously.
Optionally, the angle between the water blocking slope (14) and the faying surface (12) is greater than 90 degree.
Optionally, metal pan tile surface is provided with weather resistant coatings.
Optionally, the installing mechanism (131) is mounting hole or installation buckle.
A kind of metal pan tile earth system is additionally provided, the metal pan tile earth system includes that at least one is as above any The metal pan tile (1) and at least one semicircular tile (2);The semicircular tile (2) is overlapped on corresponding metal pan tile (1).
Optionally, the metal pan tile earth system further include: tile batten (3) and installation pedestal (4), the tile batten (3) it is horizontally set on roofing, the installation pedestal (4) is detachably connected with the tile batten (3);The metal pan tile (1) It is removably mounted on the installation pedestal (4).
Optionally, the metal pan tile earth system further includes the semicircular tile for the fixed semicircular tile (2) for being located at longitudinally outboard Installed cassette (5);One end of the semicircular tile installed cassette (5) is fixed on corresponding with semicircular tile (2) positioned at longitudinally outboard On the installation pedestal (4), the other end is fixed on the upper surface of the semicircular tile (2) positioned at the longitudinally outboard.
Optionally, the metal pan tile (1) is removably mounted on the installation pedestal (4) by screw.
Optionally, semicircular tile (2) surface is provided with weather resistant coatings.
Technical solution bring beneficial effect provided by the utility model includes at least:
Metal pan tile provided by the embodiment of the utility model is realized by the installing mechanism and faying surface that are arranged on mounting surface Metal pan tile can be fixed and overlapped without electric welding.In addition, in the faying surface and mounting surface that are located at pan tile main body the same side Between be provided with water blocking slope, stop rainwater to flow backwards by water blocking slope, while the channel formed by water blocking slope and faying surface is along gold Belong to pan tile longitudinal direction water conservancy diversion rainwater, improves waterproofness.Thus solving metal pan tile influences making for metal pan tile because of ponding The problem of installing is not easy with service life and metal pan tile.
Detailed description of the invention
It, below will be to required in embodiment description in order to illustrate more clearly of the technical scheme in the embodiment of the utility model Attached drawing to be used is briefly described, it should be apparent that, the accompanying drawings in the following description is only some realities of the utility model Example is applied, it for those of ordinary skill in the art, without creative efforts, can also be according to these attached drawings Obtain other attached drawings.
Fig. 1 is a kind of structural schematic diagram of metal pan tile provided by the embodiment of the utility model;
Fig. 2 is the structural schematic diagram of another metal pan tile provided by the embodiment of the utility model;
Fig. 3 is the schematic side view after two metal pan tiles overlap joint provided by the embodiment of the utility model;
Fig. 4 is the schematic top plan view after two metal pan tiles overlap joint provided by the embodiment of the utility model;
Fig. 5 is a kind of schematic front view of metal pan tile provided by the embodiment of the utility model;
Fig. 6 is a kind of structural schematic diagram of metal pan tile earth system provided by the embodiment of the utility model;
Fig. 7 is a kind of schematic side view of semicircular tile installed cassette provided by the embodiment of the utility model.
Wherein, appended drawing reference respectively indicates:
1- pan tile main body;12- faying surface;13- mounting surface;131- installing mechanism;14- water blocking slope;15- overlapping regions;16- Dash side;
2- semicircular tile;3- tile batten;4- installation pedestal;5- semicircular tile installed cassette.
Specific embodiment
It is practical new to this below in conjunction with attached drawing to keep the purpose of this utility model, technical solution and advantage clearer Type embodiment is described in further detail.
The utility model embodiment provides a kind of metal pan tile, which can be realized installation without electric welding, and And it is provided with water blocking slope, the use that metal pan tile influences metal pan tile because of ponding can be solved at least with water conservancy diversion rainwater Service life and metal pan tile are not easy the problem of installing.
Metal pan tile provided by the embodiment of the utility model is from practical application scene analysis, it is contemplated that causes metal plate Watt lower a big chunk reason of service life, the crator welded when exactly being installed are easy caused by ponding, so Need metal pan tile using a kind of mounting means without electric welding, to avoid generating crator and then generating ponding.Also, Metal plate watt-hour is installed with electric welding, installation operation is more difficult in practical application scene, for this purpose, the utility model is implemented Example provides a kind of metal pan tile being easily installed.
Fig. 1 is a kind of structural schematic diagram of metal pan tile shown according to an exemplary embodiment, referring to Fig. 1, the metal Pan tile includes: pan tile main body 1, and 1 two sides of pan tile main body are disposed with faying surface 12 and the installation for fixed metal plate watt Face 13;Water blocking slope 14 is provided between the faying surface 12 and mounting surface 13 of 1 the same side of pan tile main body;Pan tile main body 1 is indulged One end is provided with the overlapping regions 15 for overlapping longitudinally adjacent metal pan tile;Wherein, installation is provided on mounting surface 13 Mechanism 131.
It wherein, can be using the both ends for being provided with faying surface 12 and mounting surface 13 in pan tile main body 1 and its extending direction as cross To using the other both ends and its extending direction of faying surface 12 not set in pan tile main body 1 and mounting surface 13 as longitudinal.
About the shape and quantity of installing mechanism 131, the utility model embodiment is not specifically limited, can be according to practical feelings Condition is configured.
In one possible embodiment, optionally, installing mechanism 131 can be mounting hole or installation buckle.Work as installation When mechanism 131 is mounting hole, circular hole can be set by installing mechanism 131, be respectively set one or more at 13 both ends of mounting surface A installing mechanism 131.No matter by installing mechanism 131 which kind of shape is set, guarantees that the installing mechanism 131 can be with fixed spiral shell Nail is adapted.
During installation, it can be worn by 131 fixed metal plate watt of installing mechanism that is arranged on mounting surface 13, such as by screw It crosses installing mechanism 131 metal pan tile is fixed on the fixing bodies such as roofing, or is fixed on metal pan tile by installation buckle On the fixing bodies such as roofing.In addition, the overlapping regions 15 by metal pan tile can overlap longitudinally adjacent metal pan tile, certainly, also One end of the longitudinal not set overlapping regions 15 of metal pan tile can be overlapped in the overlapping regions 15 of other metal pan tiles, thus Realize the longitudinal lap joint of multiple metal pan tiles.The either overlap joint of the fixation of single metal pan tile or multiple metal pan tiles, by In the mode without welding, thus the problem of crator gets rusty is avoided, so as to improve the service life of metal pan tile.
Further, since being provided with water blocking slope 14 between faying surface 12 and mounting surface 13, can be stopped by water blocking slope 14 inverse Stream and on rainwater, improve semicircular tile and metal pan tile lap-joint waterproofness, it is thus possible to further increase making for metal pan tile Use the service life.
In conclusion metal pan tile provided by the embodiment of the utility model, by the installing mechanism that is arranged on mounting surface and Faying surface, which is realized, can fix and overlap metal pan tile without electric welding.In addition, in the overlap joint for being located at pan tile main body the same side It is provided with water blocking slope between face and mounting surface, stops rainwater to flow backwards by water blocking slope, while being formed by water blocking slope and faying surface Channel along metal pan tile longitudinal direction water conservancy diversion rainwater, improve waterproofness.Thus solving metal pan tile influences gold because of ponding The service life and metal pan tile for belonging to pan tile are not easy the problem of installing.
Optionally, Fig. 2 is a kind of structural schematic diagram of pan tile main body 1 shown according to an exemplary embodiment, referring to figure 2, on the basis of Fig. 1, longitudinal other end of pan tile main body 1 is also provided with the dash side 16 for water conservancy diversion.It can be seen that Longitudinal one end of pan tile main body 1 is provided with overlapping regions 15, and longitudinal other end is provided with dash side 16.
It should be noted that dash side 16 can be designed according to actual needs, to realize the effect of water conservancy diversion, this is practical New embodiment is not limited thereto.
In the utility model embodiment, dash side 16 improves the leakproofness between metal pan tile and metal pan tile, rain Water is successively flowed down along the dash side 16, while being avoided and being permeated rainwater by the contact surface between metal pan tile and metal pan tile May, realize the waterproof effect of longitudinal direction on metal pan tile.And water blocking slope 14 then can be laterally inverse on barrier metal pan tile Stream and on rainwater, the small-sized drainage for forming rainwater along water blocking slope 14 and faying surface 12 is by rainwater along metal pan tile Longitudinal direction water conservancy diversion.In the utility model embodiment, semicircular tile is improved with water blocking slope 14 and dash side 16 and metal pan tile overlaps The waterproofness at place, it is thus possible to further increase the service life of metal pan tile.
In a kind of optional embodiment, which extends along the vertical direction of longitudinal other end of pan tile main body 1 Preset length.
Wherein, preset length can be arranged according to the size of metal pan tile, for example, the preset length is that metal pan tile is long The certain proportion of degree.For example, the preset length is 1 centimetre if the longitudinal length of metal pan tile is 20 centimetres.Certainly, should Preset length can also have other set-up modes, such as be arranged according to the actual situation, and the present embodiment is to this without limiting.
In conclusion metal pan tile provided by the embodiment of the utility model, by the installing mechanism that is arranged on mounting surface and Faying surface, which is realized, can fix and overlap metal pan tile without electric welding.In the faying surface and peace for being located at pan tile main body the same side Water blocking slope is provided between dress face, the channel for stopping rainwater to flow backwards by water blocking slope, while being formed by water blocking slope and faying surface Along metal pan tile longitudinal direction water conservancy diversion rainwater, waterproofness is improved.In addition, longitudinal one end by pan tile main body is provided with for water conservancy diversion Dash side is stopped rainwater to flow backwards, while being contacted closely between metal pan tile and metal pan tile with water blocking edge lap by dash side, Rainwater is difficult to penetrate into wherein, solves the service life that metal pan tile influences metal pan tile because of ponding.
Optionally, the metal pan tile surface in the utility model embodiment is provided with coating, which is weather resistant coatings, The service life of metal pan tile is further increased by weather resistant coatings.Illustratively, which is fluororine-carbon coating, can satisfy two 15 years or more requirements.
In a kind of optional embodiment, the material of the metal pan tile can select the common metals such as steel, aluminium, copper and its conjunction Golden material.
Optionally, in the utility model embodiment, two or more metal pan tiles can pass through overlapping regions 15 It overlaps.By taking two metal pan tiles overlap as an example, as shown in Fig. 1 or Fig. 2, two metal pan tiles can pass through overlap Domain 15 overlaps.In order to enable the metal pan tile after overlap joint is at same level, in a kind of optional embodiment In, overlapping regions 15 provided by the embodiment of the utility model is umbilicate type.
For example, Fig. 3 is the schematic side view after two metal pan tile overlap joints, Fig. 4 is bowing after two metal pan tiles overlap Depending on schematic diagram.Referring to Fig. 3 and Fig. 4, overlapping regions 15 is umbilicate type, the thickness of the size of recess and metal pan tile of wanting that overlapped Unanimously, the shape of recess and the bond end for metal pan tile of wanting that overlapped match, and can to overlap by overlapping regions 15 Two metal pan tiles afterwards are in same parallel surface.
Referring to Fig. 3, Fig. 4 and Fig. 2 it is found that in a possible embodiment, optionally, in mutual overlap joint, metal plate Watt dash side 16, faying surface 12, water blocking slope 14 and mounting surface 13 are overlapped on the overlapping regions 15 of another metal pan tile On, referring to fig. 2 it is found that the dash side 16 of overlapping regions 15 and the metal pan tile, faying surface 12, water blocking slope 14 and mounting surface 13 Shape is agreed with, and can directly overlap to form Fig. 3 or overlap joint result shown in Fig. 4.Continuing with referring to fig. 2, Fig. 3 and Fig. 4, installation Installing mechanism 131 on face 13 is overlapped with the position of the installing mechanism 131 in overlapping regions 15, ensure that two metal pan tiles Compactness when overlap joint.
Optionally, in order to guarantee the water blocking effect on water blocking slope 14, improve the waterproof performance of metal pan tile, water blocking slope 14 with take Angle between junction 12 can be greater than 90 degree, i.e. water blocking slope 14 reaches certain slope, is convenient for water conservancy diversion rainwater.Referring to Fig. 5, Fig. 5 It is a kind of schematic front view of metal pan tile, the angle between the water blocking slope 14 and the faying surface 12 is α, and α is greater than 90 degree.Such as figure Described, the angle between mounting surface 13 and water blocking slope 14 is β, and β is greater than 90 degree.In the embodiment of the present invention, faying surface 12 and installation It is parallel relation between face 13.In one possible embodiment, optionally, the angle between faying surface 12 and mounting surface 13 may be used also To be less than 180 degree and be greater than 90 degree.
In conclusion metal pan tile provided by the embodiment of the utility model, by the installing mechanism that is arranged on mounting surface and Faying surface, which is realized, can fix and overlap metal pan tile without electric welding.In the faying surface and peace for being located at pan tile main body the same side It is provided with water blocking slope between dress face, rainwater is stopped to flow backwards, while the channel formed by water blocking slope and faying surface is along metal pan tile Longitudinal water conservancy diversion rainwater improves waterproofness.In addition, being provided with the dash side for water conservancy diversion by longitudinal one end of pan tile main body, lead to Crossing dash side prevents rainwater adverse current, while being contacted closely between metal pan tile and metal pan tile with water blocking edge lap, and rainwater is difficult It penetrates into wherein, solves the service life that metal pan tile influences metal pan tile because of ponding.It is set by metal pan tile surface Weather resistant coatings are equipped with, the service life of metal pan tile is further improved.By the way that the overlapping regions of umbilicate type is arranged, so that taking Metal pan tile after connecing is in same level, so that being not easy to stockpile rainwater between metal pan tile.
Fig. 6 is a kind of structural schematic diagram of metal pan tile earth system shown according to an exemplary embodiment, referring to figure 6, which includes at least one metal pan tile 1, at least one semicircular tile 2, which is overlapped on correspondence Metal pan tile 1 on.
Wherein, the structure of metal pan tile 1 can refer to the various embodiments described above, the structure as described in Fig. 1-Fig. 5 is any.
In addition, with continued reference to FIG. 6, the metal pan tile earth system further include: tile batten 3 and installation pedestal 4, the tile hanging Item 3 is fixed on roofing (not marking in figure), and installation pedestal 4 is detachably connected with tile batten 3.
In a kind of optional embodiment, the quantity of tile batten 3 can be determined according to the overlap joint number of rows of metal pan tile 1. For example, if five row's metal pan tiles 1 of installation, each row's metal pan tile 1 are correspondingly arranged a tile batten 3.The quantity of installation pedestal 4 can It is determined according to the quantity of metal pan tile 1, for example, if 13 rear and front end of each mounting surface of metal pan tile 1 is provided with peace Mounting mechanism 131, then settable corresponding with the 131 correspondence position of installing mechanism of each mounting surface 13 of metal pan tile 1 Installation pedestal 4, overlapped longitudinally adjacent two metal pan tiles 1 can share one since installing mechanism 131 is corresponding Installation pedestal 4.
In a kind of optional embodiment, installation pedestal 4 can be connected by screw to tile batten 3, specific connection side Formula may be set according to actual conditions, and the utility model embodiment is not limited thereto.
As shown in fig. 6, metal pan tile 1 is removably mounted in corresponding installation pedestal 4.Optionally, metal pan tile 1 can be with It is removably mounted in installation pedestal 4 by screw.
When installing above-mentioned metal pan tile earth system, first tile batten 3 is fixed on roofing, then by installation pedestal 4 It is detachably connected with tile batten 3, metal pan tile 1 is removably mounted in installation pedestal 4, and semicircular tile 2 is overlapped on corresponding metal plate On watt 1.
Further, each metal pan tile 1 is securable in installation pedestal 4 by installing mechanism 131, in order to further solid Fixed overlapped with metal pan tile 1 semicircular tile 2, in an alternative embodiment, which further includes for consolidating It is positioned at the semicircular tile installed cassette 5 of the semicircular tile 2 of longitudinally outboard, about the specific implementation of semicircular tile installed cassette 5, the present embodiment It is not specifically limited, fixed function can be played.In a kind of optional embodiment, one end of the semicircular tile installed cassette 5 is solid It is scheduled in installation pedestal 4 corresponding with the semicircular tile 2 of longitudinally outboard is located at, the other end is fixed on the semicircular tile 2 positioned at longitudinally outboard Upper surface.
Fig. 7 shows a kind of schematic side view of semicircular tile installed cassette 5, and the height of the semicircular tile installed cassette 5 is d, the height Degree d be when semicircular tile 2 lies in a horizontal plane in ground on the outside of distance of the tiling apart from ground.
It should be noted that the above-mentioned semicircular tile 2 positioned at longitudinally outboard is to be longitudinally mounted to outermost cylinder in all semicircular tiles 2 Watts 2, that is, closest to that one end of eaves, the front does not overlap other semicircular tiles.Wherein, semicircular tile installed cassette 5 and installation The fixed form of pedestal 4 can be screw fixation method, or connect and fix mode, the utility model embodiment to this not It limits.
Optionally, 2 surface of semicircular tile is provided with coating, and coating is weather resistant coatings, to improve the service life of semicircular tile.Show Example ground, the coating are fluororine-carbon coating, can satisfy 25 years or more requirements.The optional steel of the material of the semicircular tile 2, The common metals such as aluminium, copper and its alloy material.
During installation, tile batten 3 is fixed on roofing, and installation pedestal 4 is detachably connected with tile batten 3, and metal pan tile 1 can Disassembly is mounted in installation pedestal 4, and semicircular tile 2 is overlapped on corresponding metal pan tile 1, and semicircular tile installed cassette 5 will be located at outside Semicircular tile 2 is fixed.
In conclusion metal pan tile earth system provided by the embodiment of the utility model, it can be in room without electric welding Realize the overlap joint between metal pan tile and the overlap joint and metal pan tile of semicircular tile in face.Meanwhile metal pan-and roll roofing tile surface is arranged There are weather resistant coatings, improves the service life of metal pan-and roll roofing tile.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all practical at this Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model Within the scope of shield.

Claims (12)

1. a kind of metal pan tile, which is characterized in that the metal pan tile includes: pan tile main body (1), the pan tile main body (1) two Side sets gradually faying surface (12) and the mounting surface (13) for fixing the metal pan tile;
Water blocking slope is provided between the faying surface (12) and the mounting surface (13) of described pan tile main body (1) the same side (14);
Longitudinal one end of the pan tile main body (1) is provided with the overlapping regions (15) for overlapping longitudinally adjacent metal pan tile;
Wherein, the installing mechanism (131) of the fixed metal pan tile is provided on the mounting surface (13).
2. metal pan tile according to claim 1, which is characterized in that longitudinal other end of the pan tile main body (1) is arranged There is the dash side (16) for water conservancy diversion.
3. metal pan tile according to claim 2, which is characterized in that the dash side (16) is along the pan tile main body (1) Longitudinal other end vertical direction extend preset length.
4. metal pan tile according to claim 1 to 3, which is characterized in that the overlapping regions (15) is umbilicate type, The consistency of thickness of the size of recess and metal pan tile of wanting that overlapped.
5. metal pan tile according to claim 1 to 3, which is characterized in that the water blocking slope (14) and the faying surface (12) angle between is greater than 90 degree.
6. metal pan tile according to claim 1 to 3, which is characterized in that metal pan tile surface is provided with weather-proof Property coating.
7. metal pan tile according to claim 1, which is characterized in that the installing mechanism (131) is mounting hole or peace Be loaded button.
8. a kind of metal pan tile earth system, which is characterized in that the metal pan tile earth system includes at least one as described in Metal pan tile (1) as claimed in claim 1 to 7 and at least one semicircular tile (2);
The semicircular tile (2) is overlapped on corresponding metal pan tile (1).
9. metal pan tile earth system according to claim 8, which is characterized in that the metal pan tile earth system is also wrapped Include: tile batten (3) and installation pedestal (4), the tile batten (3) are horizontally set on roofing, the installation pedestal (4) with it is described Tile batten (3) is detachably connected;
The metal pan tile (1) is removably mounted on the installation pedestal (4).
10. metal pan tile earth system according to claim 9, which is characterized in that the metal pan tile earth system is also Including the semicircular tile installed cassette (5) for the fixed semicircular tile (2) for being located at longitudinally outboard;
One end of the semicircular tile installed cassette (5) is fixed on the installation corresponding with semicircular tile (2) positioned at longitudinally outboard On pedestal (4), the other end is fixed on the upper surface of the semicircular tile (2) positioned at the longitudinally outboard.
11. metal pan tile earth system according to claim 9, which is characterized in that the metal pan tile (1) passes through screw It is removably mounted on the installation pedestal (4).
12. according to the metal pan tile earth system any in claim 8-11, which is characterized in that semicircular tile (2) table Face is provided with weather resistant coatings.
CN201820779732.9U 2018-05-23 2018-05-23 Metal pan tile and metal pan tile earth system Active CN208545892U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820779732.9U CN208545892U (en) 2018-05-23 2018-05-23 Metal pan tile and metal pan tile earth system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820779732.9U CN208545892U (en) 2018-05-23 2018-05-23 Metal pan tile and metal pan tile earth system

Publications (1)

Publication Number Publication Date
CN208545892U true CN208545892U (en) 2019-02-26

Family

ID=65421412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820779732.9U Active CN208545892U (en) 2018-05-23 2018-05-23 Metal pan tile and metal pan tile earth system

Country Status (1)

Country Link
CN (1) CN208545892U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267619A (en) * 2020-10-19 2021-01-26 庄河市铭泰艺术铸造厂 Method for realizing laying of cornice type archaized building roof tiles based on metal tile assembly

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267619A (en) * 2020-10-19 2021-01-26 庄河市铭泰艺术铸造厂 Method for realizing laying of cornice type archaized building roof tiles based on metal tile assembly

Similar Documents

Publication Publication Date Title
CN208545892U (en) Metal pan tile and metal pan tile earth system
US2777405A (en) Roof gutter and downspout assembly
CN207794460U (en) Photovoltaic ceiling waterproof system
CN208733938U (en) The fixed device of reinforcement for the installation of alloy roofing
CN205791421U (en) The lighting proof strip device of the anti-sideflash of roofing skeleton layer curtain wall
CN212388615U (en) Anti-floating anchor rod top waterproof construction
CN210031989U (en) Spray branch pipe support and hanger frame mounted on clear water concrete top plate
CN211007362U (en) Metal structure of cornicing with effect modelled after an antique
CN207427037U (en) A kind of photovoltaic generating system stent
CN201292505Y (en) Expansion joint apparatus for slagless bridge
CN210395718U (en) Waterproof edge folding structure at joint of brick wall and color steel wall of steel structure factory building
CN108532855B (en) Photovoltaic building integrated roof
CN208455958U (en) A kind of detachable roof structure of assembled housing
CN207010193U (en) A kind of lighting proof strip attachment means for membrane structure
CN218580712U (en) Post-cast strip structure of multilayer restraint antiseep
CN211286315U (en) Edge waterproof plate for photovoltaic module clamping system
CN218843549U (en) Building eave waterproof construction
CN221524009U (en) Waterproof device for double-slope photovoltaic power station
CN214785413U (en) Roofing drainage system of easily installing
CN211229227U (en) Cornice structure
CN209816647U (en) Bridge expansion joint
CN218323536U (en) Awning cornice structure for energy-adding station
CN207512984U (en) Building roof sun ridge waterproof construction
CN212715579U (en) High-rise building curtain wall lightning protection system
CN218814842U (en) Supporting ridge of photoelectric building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 101400 Beijing city Huairou area yangsongzhen Fengxiang East Street, No. 5

Patentee after: BEIJING HANERGY OPTOVOLTAIC TECHNOLOGY Co.,Ltd.

Address before: 101400 Beijing city Huairou area yangsongzhen Fengxiang East Street, No. 5

Patentee before: BEIJING HANERGY SOLAR POWER INVESTMENT Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20200716

Address after: 510000 room B030, office card, maker space, youth home innovation and entrepreneurship incubation base, unit 1004, No. 182, science Avenue, Huangpu District, Guangzhou City, Guangdong Province

Patentee after: Guangzhou Hanpu Technology Co.,Ltd.

Address before: 101400 Beijing city Huairou area yangsongzhen Fengxiang East Street, No. 5

Patentee before: BEIJING HANERGY OPTOVOLTAIC TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201224

Address after: No.38, Paradise Street, Yanqi Economic Development Zone, Huairou District, Beijing

Patentee after: Lingfan new energy technology (Beijing) Co.,Ltd.

Address before: 510000 innovation and entrepreneurship incubation base of youth home, unit 1004, 182 science Avenue, Huangpu District, Guangzhou City, Guangdong Province

Patentee before: Guangzhou Hanpu Technology Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211110

Address after: 101499 No. 31, Yanqi street, Yanqi Economic Development Zone, Huairou District, Beijing

Patentee after: Dongjun new energy Co.,Ltd.

Address before: 101407 38 Paradise Street, Yanqi Economic Development Zone, Huairou District, Beijing

Patentee before: Lingfan new energy technology (Beijing) Co.,Ltd.

TR01 Transfer of patent right
PP01 Preservation of patent right

Effective date of registration: 20240930

Granted publication date: 20190226