CN208545316U - A kind of steel form concrete structures spray cracking resistance device - Google Patents

A kind of steel form concrete structures spray cracking resistance device Download PDF

Info

Publication number
CN208545316U
CN208545316U CN201821098657.6U CN201821098657U CN208545316U CN 208545316 U CN208545316 U CN 208545316U CN 201821098657 U CN201821098657 U CN 201821098657U CN 208545316 U CN208545316 U CN 208545316U
Authority
CN
China
Prior art keywords
concrete structures
steel form
structures
cracking resistance
resistance device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821098657.6U
Other languages
Chinese (zh)
Inventor
李溪
李春光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN LINHAI CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
TIANJIN LINHAI CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN LINHAI CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical TIANJIN LINHAI CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN201821098657.6U priority Critical patent/CN208545316U/en
Application granted granted Critical
Publication of CN208545316U publication Critical patent/CN208545316U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model belongs to technical field of building construction, it is related to the spray equipment of concrete structures cracking resistance, especially a kind of steel form sprays cracking resistance device with concrete structures, including structures bottom plate, concrete structures are built with above structures bottom plate, end face outside in the concrete structures two sides is separately installed with steel form, in each steel form backwards to the outer surface of concrete structures, from top to bottom uniform intervals are equipped with multiple spray tubes, multiple spray tubes, which are transversely arranged, to be parallel to each other, each spray tube and the ipsilateral surface uniform intervals of steel form are provided with multiple hole for water sprayings;Gutter is set in the position of structures side, which is connected with a collecting-tank, and the spacing of adjacent two spray tube ipsilateral positioned at die plate is 1.5 meters.

Description

A kind of steel form concrete structures spray cracking resistance device
Technical field
The utility model belongs to technical field of building construction, is related to the spray equipment of concrete structures cracking resistance, especially A kind of steel form concrete structures spray cracking resistance device.
Background technique
Large-scale water process reinforced concrete constructional work, in the high temperature environment, such as during hot weather construction, due to environment temperature Degree is very high, and formation of concrete structures are influenced by temperature shrinkage and drying shrinkage, subtle thermal cracking, this direct shadow in crack occur Ring leak test and examination.
The generation in large-scale water treatment building crack is due to slab concrete structures, and the middle part heat of hydration is concentrated, in heat Concrete setting solidifies under conditions of expansion.After the completion of chemical reaction, concrete walls, plate start to receive with the decline of temperature Contracting, generates stronger tensile stress.Concrete crushing strength is very high, and tensile strength is very low.At this point, periphery has cooled down admittedly Change, generated inner tensile stress, no free end can be used to shrink, and therefore, concrete is pulled off, and form perforation wall Thermal cracking.Since crack is less than 0.2mm mostly, it is difficult to repair, and mostly damaging reparation influences service life.
To solve the above problems, needing a kind of spray equipment that the high temperature that will effectively can be generated in casting process is taken away.
Utility model content
The purpose of the utility model is to overcome the deficiencies in the prior art, provide one kind and are evenly distributed, cooling effect is good A kind of steel form with concrete structures spray cracking resistance device.
A kind of steel form concrete structures spray cracking resistance device, including structures bottom plate, in the upper of structures bottom plate Side is built with concrete structures, and the end face outside in the concrete structures two sides is separately installed with steel form, special Sign is: in each steel form backwards to the outer surface of concrete structures, from top to bottom uniform intervals are equipped with multiple sprays Pipe, multiple spray tubes, which are transversely arranged, to be parallel to each other, and each spray tube surface uniform intervals ipsilateral with steel form are set It is equipped with multiple hole for water sprayings;Gutter is set in the position of structures bottom plate side, which is connected with a collecting-tank.
Moreover, the spacing for being located at ipsilateral adjacent two spray tube of die plate is 1.5 meters.
Moreover, 0.5 meter of the gutter and concrete structures interval, extend along line direction equal with concrete structures Setting, the gutter is connected with a collecting-tank.
Moreover, the spacing of two hole for water sprayings adjacent on each spray tube is 0.5 meter, the diameter of each hole for water spraying is 1mm.
The advantages and positive effects of the utility model are as follows:
In the utility model, when carrying out pouring construction using steel form, the spray tube of parallel interval setting, which is evenly arranged on, to be constructed The two sides of object, during gradually pouring from the bottom to top, according to it is different pour height using corresponding position spray tube into Temperature difference is effectively reduced to largely take away the heat generated in casting process to reduce caused by thermal expansion in row spray It acutely shrinks, effectively prevent the generation in crack;The setting of 1.5 meters of tube spacing of spray and the hole for water spraying aperture of spray tube are set as 1mm is a kind of preferred embodiment, can save cooling water used on the basis of effective temperature-reducing;The setting in gutter For the cooling flowed down water to be imported collecting-tank, and cooling is carried out in collecting-tank and is recycled again.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment 1 in the utility model.
Specific embodiment
It elaborates below by embodiment to the utility model, the embodiment is illustrative instead of limiting , protection scope of this utility model cannot be limited by this.
A kind of steel form concrete structures spray cracking resistance device, including structures bottom plate, in the upper of structures bottom plate Side is built with concrete structures 2, and the end face outside in the concrete structures two sides is separately installed with steel form, this reality It is with novel innovation, in each steel form backwards to the outer surface of concrete structures, from top to bottom uniform intervals are installed There are multiple spray tubes 1, multiple spray tubes, which are transversely arranged, to be parallel to each other, each spray tube and the ipsilateral surface of steel form Uniform intervals are provided with multiple hole for water sprayings;In the position of structures bottom plate side, gutter 4, the discharge outlet and a collecting-tank are set It is connected.
In the present embodiment, the spacing of adjacent two spray tube ipsilateral positioned at die plate is 1.5 meters.
In the present embodiment, 0.5 meter of the gutter and concrete structures interval, along side parallel with concrete structures To being extended, the gutter is connected with a collecting-tank.
In the present embodiment, the spacing of two adjacent hole for water sprayings is 0.5 meter on each spray tube, and the diameter of each hole for water spraying is 1mm。
In the present embodiment, the collecting-tank is arranged far from concrete structures, and preferred water requirement should be vertical not less than 4 Square rice.
In the present embodiment, pump machine is installed in gutter.
In the present embodiment, for having top cover building if any the pond etc. of ceiling, to be roused in manhole, manhole installation, air inducing Machine 3 is discharged damp-heat air, improves the effect of spray cooling.
When the utility model is used, 20 minutes unlatching spray tubes before casting concrete carry out template cooling;Pour knot End in 72 hours sprays after beam;Water control is at vertical m/h of every linear meter(lin.m.) water consumption 0.2, hydraulic pressure, with top layer's horizontal shower pipe Spray effect, which can normally be played, to be advisable;It is completed 72 hours pouring, starts to loosen template, and by top layer's spray tube, move on to top Portion closes other horizontal shower pipes using maintenance of pouring water.
In the utility model, when carrying out pouring construction using steel form, the spray tube of parallel interval setting, which is evenly arranged on, to be constructed The two sides of object, during gradually pouring from the bottom to top, according to it is different pour height using corresponding position spray tube into Temperature difference is effectively reduced to largely take away the heat generated in casting process to reduce caused by thermal expansion in row spray It acutely shrinks, effectively prevent the generation in crack;The setting of 1.5 meters of tube spacing of spray and the hole for water spraying aperture of spray tube are set as 1mm is a kind of preferred embodiment, can save cooling water used on the basis of effective temperature-reducing;The setting in gutter For the cooling flowed down water to be imported collecting-tank, and cooling is carried out in collecting-tank and is recycled again.

Claims (4)

1. a kind of steel form sprays cracking resistance device, including structures bottom plate with concrete structures, in the top of structures bottom plate Concrete structures are built with, the end face outside in the concrete structures two sides is separately installed with steel form, feature Be: the outer surface in each steel form backwards to concrete structures, from top to bottom uniform intervals are equipped with multiple spray tubes, Multiple spray tubes, which are transversely arranged, to be parallel to each other, and each spray tube surface uniform intervals ipsilateral with steel form are provided with Multiple hole for water sprayings;Gutter is set in the position of structures side, which is connected with a collecting-tank.
2. a kind of steel form according to claim 1 sprays cracking resistance device with concrete structures, it is characterised in that: be located at The spacing of ipsilateral adjacent two spray tube of die plate is 1.5 meters.
3. a kind of steel form according to claim 1 sprays cracking resistance device with concrete structures, it is characterised in that: described 0.5 meter of gutter and concrete structures interval are extended along line direction equal with concrete structures, the gutter with One collecting-tank is connected.
4. a kind of steel form according to claim 1 or 2 sprays cracking resistance device with concrete structures, it is characterised in that: The spacing of two adjacent hole for water sprayings is 0.5 meter on each spray tube, and the diameter of each hole for water spraying is 1mm.
CN201821098657.6U 2018-07-12 2018-07-12 A kind of steel form concrete structures spray cracking resistance device Active CN208545316U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821098657.6U CN208545316U (en) 2018-07-12 2018-07-12 A kind of steel form concrete structures spray cracking resistance device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821098657.6U CN208545316U (en) 2018-07-12 2018-07-12 A kind of steel form concrete structures spray cracking resistance device

Publications (1)

Publication Number Publication Date
CN208545316U true CN208545316U (en) 2019-02-26

Family

ID=65424395

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821098657.6U Active CN208545316U (en) 2018-07-12 2018-07-12 A kind of steel form concrete structures spray cracking resistance device

Country Status (1)

Country Link
CN (1) CN208545316U (en)

Similar Documents

Publication Publication Date Title
CN101914992A (en) Water cooling temperature control method of mass concrete of blast furnace foundation
CN103470046A (en) Concrete pouring device and method for ultrahigh steel pipe concrete column tremie method
CN101078213A (en) Method for controlling concrete crack
CN104695709B (en) Adopt the control of concrete cracks method of phase-change material
CN106049862A (en) Inflatable adjustable type construction mold for reserved hole in concrete structure plate, and construction method
CN102296570A (en) Construction method for large cast-in-situ reinforced concrete water inlet channel
CN208545316U (en) A kind of steel form concrete structures spray cracking resistance device
CN101260726A (en) Prestressed concrete wide goose plate construction method
CN101343947A (en) Mass concrete construction method
CN105178256B (en) One kind is used for the deep nonmetallic horizontal slip-form system of narrow gutter wall continuous placing
CN203346950U (en) Hidden laying structure for temporary water supply pipes of high-rise building
CN202380746U (en) Concrete watering maintenance device below large molding board
CN113931495A (en) Precast concrete toilet chassis, manufacturing method and installation method
CN201152521Y (en) Boiler periodical pollutant-discharging device
CN208563997U (en) A kind of plank sheathing concrete structures temperature decrease and crack device
CN209214121U (en) A kind of pressure-bearing solar water heater water tank that anticorrosive inner bag is set
CN216809899U (en) Concrete foundation pile curing means
CN103805723B (en) Blast-furnace hot-air pipeline transposition section refractory brick comes off quick prosthetic appliance and method
CN208991712U (en) Device for sand coated iron mould moulding line iron case cooling system
CN209817220U (en) Cast-in-situ hollow floor system of multi-layer industrial factory building
CN211499968U (en) Anti-freezing structure
CN202117390U (en) Segmentally spliced water tank tower
CN219972949U (en) Special-shaped bearing platform large-volume concrete temperature control system
CN220868888U (en) Large-volume concrete hydration heat circulation cooling device
CN110524715A (en) Ventilation type immersed tube pipeline section condenses pipe device and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant