CN208536622U - Metal Melting circulating water equipment - Google Patents

Metal Melting circulating water equipment Download PDF

Info

Publication number
CN208536622U
CN208536622U CN201820983307.1U CN201820983307U CN208536622U CN 208536622 U CN208536622 U CN 208536622U CN 201820983307 U CN201820983307 U CN 201820983307U CN 208536622 U CN208536622 U CN 208536622U
Authority
CN
China
Prior art keywords
cooling
water
sink
cabinet
receiving tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820983307.1U
Other languages
Chinese (zh)
Inventor
武高升
张吉川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Gaosheng Industry And Trade Co Ltd
Original Assignee
Tianjin Gaosheng Industry And Trade Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Gaosheng Industry And Trade Co Ltd filed Critical Tianjin Gaosheng Industry And Trade Co Ltd
Priority to CN201820983307.1U priority Critical patent/CN208536622U/en
Application granted granted Critical
Publication of CN208536622U publication Critical patent/CN208536622U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses Metal Melting circulating water equipment, belong to apparatus for melting metal technical field, the temperature for solving the cooling water in cooling water storage bin gradually rises, the technical issues of cooling effect weakens, its key points of the technical solution are that including cabinet and setting in the intracorporal cooling tube of case, water inlet pipe and outlet pipe are provided with outside cabinet, cooling tube one end is connected to water inlet pipe, the other end is connected to outlet pipe, the first cooling component and the second cooling component that cooling tube successively passes through are provided in the cabinet, first cooling component includes the immersion sink being fixedly connected with cabinet, the both ends for impregnating sink, which offer, impregnates hole, second cooling component includes being fixed at several spray tubes impregnated below sink, water receiving tank is provided with below spray tube, cooling chamber is formed between sparge pipe and water receiving tank, water receiving tank and impregnate sink it Between be connected with the first water pump, the second water pump is connected between water receiving tank and spray tube, achieve the effect that improve cooling effect.

Description

Metal Melting circulating water equipment
Technical field
The utility model relates to a kind of apparatus for melting metal fields, in particular to Metal Melting circulating water equipment.
Background technique
Metal smelting-furnace is essential equipment in metal casting operation, can be generated during to Metal Melting big The smoke exhaust of amount.
Existing to can refer to the Chinese patent that notification number is CN207159085U, it discloses one kind to have the cooling function of exhaust gas The smelting furnace of energy, including melting furnace body, cooling water storage bin, air dedusting cleaner, cooler bin, support leg and idler wheel, melt Exhaust pipe is provided on furnace ontology, smelting furnace bodies top is equipped with cooling water storage bin, is arranged with heat conducting pipe outside exhaust pipe, The cooling tube being bonded with heat conducting pipe is provided in cooler bin.The heat of exhaust pipe is passed out by the heat conducting pipe being bonded with it, Cooling tube is cooled down to heat conducting pipe, reduces the heat of exhaust gas, is conducive to the hot exhaust gasses that melting is taken and is cooled down, keeps away Exempt from the strainer in air dedusting cleaner to contact hot exhaust gasses for a long time and cause to melt, that improves strainer uses the time, simultaneously Reduce production cost.
It returns to wait in cooling water storage bin after cooling water use and be recycled, but after a period of use, it is cold But the temperature of the cooling water in water storage bin gradually rises, and cooling effect weakens.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of Metal Melting circulating waters Equipment achievees the effect that improve cooling effect.
The above-mentioned technical purpose of the utility model has the technical scheme that
A kind of Metal Melting circulating water equipment, including cabinet and setting are outside the intracorporal cooling tube of case, cabinet It is provided with water inlet pipe and outlet pipe, cooling tube one end is connected to water inlet pipe, and the other end is connected to outlet pipe, setting in the cabinet There are the first cooling component that cooling tube successively passes through and the second cooling component below the first cooling component, the first cooling group Part includes the immersion sink being fixedly connected with cabinet, and the both ends for impregnating sink offer the immersion hole protruded into for cooling tube, and second Cooling component includes being fixed at several spray tubes impregnated below sink, is provided with water receiving tank, sparge pipe below spray tube Cooling chamber is formed between water receiving tank, the first water pump is connected between water receiving tank and immersion sink, between water receiving tank and spray tube It is connected with the second water pump.
Through the above technical solutions, water to be cooled enters cooling tube from water inlet pipe, it is cold to flow to first along cooling tube But at component, at first time cooling component, cooling tube be immersed in impregnate sink in, impregnate sink in water by cooling tube with Water coke slurry heat to be cooled in cooling tube, generates cooling effect to it.Then cooling water is as cooling tube is by the second cooling Component, spray tube is sprayed water downwards at the second cooling component, is sprayed on cooling tube, is carried out heat again with the water in cooling tube Exchange, cooling water are left after being cooled in cabinet by outlet pipe.First water pump is lasting to supply water to immersion sink, extra Water is overflowed from sink top edge is impregnated, and is dropped down onto water receiving tank, and the second water pump is lasting to supply water to spray tube, under spray tube spray The water come drops down onto water receiving tank, and water receiving tank accepts the water fallen above all in lower section.Water increases road during falling Diameter is exchanged with atmospheric heat in the sky, and the coolant-temperature gage fallen into water receiving tank has decreased, continuation and air in water receiving tank Heat exchanges, and the coolant-temperature gage in water receiving tank reduces, for cooling device recycling.To sum up, reach the effect for improving cooling effect Fruit.
Preferably, it is described impregnate hole inner wall be adapted with the outer wall of cooling tube, impregnate sink both ends offer it is overboard Through slot, overboard through slot, which is located at, to be impregnated at the top of hole and is connected to hole is impregnated.
It is overflowed from overboard through slot through the above technical solutions, the water in immersion sink has part, the water of spilling can drip The top for dropping down onto cooling tube, with cooling tube again exchange heat, improve cooling effect.
Preferably, the cooling tube is located at the serpentine-like plate-like in part impregnated in sink.
Through the above technical solutions, the cooling tube area of snakelike plate-like is larger, and when cooling tube is immersed in water, cooling effect It is good, so increasing the cooling length of tube and area being immersed in water, it can further improve cooling effect.
Preferably, be provided with pre-cooling component in the cabinet, pre-cooling component include be arranged in impregnate it is several above sink Pre- cold water pipe offers several pre-cooling holes on pre- cold water pipe, pre- water supply pump, pre- cold water is connected between pre- cold water pipe and water receiving tank Pre-cooling chamber is formed between pipe and immersion sink.
Through the above technical solutions, pre-cooling component cools down cooling water before the first cooling component, pre- water supply pump It supplies water to pre- cold water pipe, water drenches out from cold hole, and when cooling tube is by pre-cooling chamber, preparatory to the cooling water in cooling tube is cold But, cooling effect is improved.
Preferably, the cabinet offers ventilation window on the side wall of cooling chamber.
Through the above technical solutions, ventilation window improves the air permeability of cooling chamber, so that the coolant-temperature gage drop under spray tube spray It is low, but also the coolant-temperature gage in water receiving tank decreases, further improve cooling effect.
Preferably, being provided with waffle slab at the ventilation window.
Through the above technical solutions, the grid supplied gas on waffle slab flows, ventilation effect is kept, and for extraneous ash Trifle in the world object has barriering effect, can be improved the cleannes of the water in water receiving tank, prevents the blocking of equipment, and that improves equipment uses the longevity Life.
Preferably, the waffle slab includes the first waffle slab and the second waffle slab, cunning is provided between waffle slab and cabinet Component is moved, sliding assembly opens or closes ventilation window for waffle slab.
Through the above technical solutions, worker is mobile by waffle slab by sliding assembly, ventilation window is opened and is convenient for worker The intracorporal working condition of case is observed, daily maintenance is also convenient for.
Preferably, the sliding assembly includes the sliding block for being installed in waffle slab edge, offer on cabinet for sliding block The sliding slot of sliding.
Through the above technical solutions, sliding block sliding motion in sliding slot, drive the waffle slab that is fixedly connected with a slide block along The length direction sliding motion of sliding slot, the cooperation of sliding slot and sliding block avoid waffle slab so that the movement of waffle slab is more smooth Sliding trajectory shifts, and guarantees the mobile stabilization of waffle slab.
Preferably, the wall box is provided with sound insulation cavity.
Through the above technical solutions, water flow sound is larger in cabinet, setting sound insulation cavity can have certain soundproof effect, drop The noise that low cooling equipment generates when working, improves the environmental quality in workshop, workpeople is made to be in a cheerful frame of mind, to improve work effect Rate.
Preferably, being provided with filter screen between the cooling tube and outlet pipe.
Through the above technical solutions, filter screen can generate filtering and make when the cooling water in cooling tube enters outlet pipe With, the degree of purity of the cooling water entered in outlet pipe is improved, the probability of equipment blocking is reduced, improves the service life of equipment, drop Low-maintenance cost.
In conclusion the utility model has the following beneficial effects:
1, the cooling water in cooling tube is cooled down by pre-cooling component, the first cooling component, the second cooling component, is mentioned High cooling effect;
2, the blocking for preventing equipment improves the service life of equipment, reduces maintenance cost;
3, noise is reduced.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of Metal Melting circulating water equipment;
Fig. 2 is the partial enlargement diagram in Fig. 1 at A;
Fig. 3 is the partial sectional view for embodying sound insulation cavity;
Fig. 4 is the schematic diagram after removing cabinet in order to embody box inner structure;
Fig. 5 be after cabinet is removed in order to embody box inner structure another visual angle schematic diagram;
Fig. 6 is the partial enlargement diagram in Fig. 5 at B;
Fig. 7 is the structural schematic diagram of cooling tube.
In figure, 1, cabinet;11, water inlet pipe;12, outlet pipe;121, filter screen;13, sound insulation cavity;2, cooling tube;3, One cooling component;31, sink is impregnated;32, hole is impregnated;321, overboard through slot;4, the second cooling component;41, spray tube;42, it sprays Drench mouth;5, water receiving tank;51, the first water pump;52, the second water pump;53, pre- water supply pump;6, component is pre-chilled;61, pre- cold water pipe;62, Hole is pre-chilled;7, ventilation window;71, waffle slab;711, the first waffle slab;712, the second waffle slab;72, sliding assembly;721, sliding Block;722, sliding slot.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.The wherein identical attached drawing of identical components Label indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "up" and "down" refer to It is the direction in attached drawing, word " bottom surface " and " top surface ", "inner" and "outside" are referred respectively to towards or away from particular elements geometry The direction at center.
A kind of Metal Melting circulating water equipment is provided in cabinet 1 as shown in Figure 1, including the cabinet 1 of cuboid The side wall of 2 cabinet 1 of cooling tube is provided with sound insulation cavity 13(with reference to Fig. 3).The top side wall of length direction one end of cabinet 1 connects There is water inlet pipe 11, the sidewall bottom of the other end is connected with outlet pipe 12, and one end of cooling tube 2 is connected to water inlet pipe 11, the other end It is connected to outlet pipe 12, cooling tube 2 and 12 connectivity part of outlet pipe are provided with filter screen 121(with reference to Fig. 7).
As shown in figure 4, being from top to bottom disposed with the cooling group of pre-cooling component 6, the first cooling component 3, second in cabinet 1 Part 4 and water receiving tank 5.It is pre-chilled between component 6 and the first cooling component 3 and forms pre-cooling chamber, the second cooling component 4 and water receiving tank 5 Between form cooling chamber, cooling tube 2 first passes through pre-cooling chamber, then pass through the first cooling component 3, eventually pass through cooling chamber.
As shown in figure 4, pre-cooling component 6 includes several pre- cold water pipes 61 that 1 roof of cabinet is arranged in, the axis of pre- cold water pipe 61 To parallel with the length direction of cabinet 1.Several pre-cooling holes 62 are offered on pre- cold water pipe 61.Pre- cold water pipe 61 and water receiving tank 5 Between be provided with pre- water supply pump 53.Water in water receiving tank 5 is supplied pre- cold water pipe 61 by pre- water supply pump 53, the water in pre- cold water pipe 61 It is flowed out from pre-cooling hole 62, forms cascade in pre-cooling chamber.
Shown in conjunction with Fig. 5 and Fig. 6, the first cooling component 3 includes the immersion sink 31 positioned at pre- 61 lower section of cold water pipe.Leaching Soaked slot 31 is in the rectangular-shape of top uncovered, and the length direction for impregnating sink 31 is parallel with the length direction of water tank.Pre- cold water The water flowed out in pipe 61, which is fallen to, to be impregnated in sink 31.It impregnates and is provided with the first water pump 51 between sink 31 and water receiving tank 5, first The lasting supply of water in water receiving tank 5 is impregnated sink 31 by water pump 51.The length direction both ends for impregnating sink 31 offer immersion Hole 32 offers overboard through slot 321 on impregnating sink 31, overboard through slot 321 be located at the top for impregnating hole 32 and with impregnate hole 32 connections.Cooling tube 2 is entered by the immersion hole 32 of wherein one end to be impregnated in sink 31, and is soaked impregnating in sink 31 Bubble, cooling tube 2 are located at the serpentine-like plate-like in part (referring to Fig. 7) impregnated in sink 31, and cooling tube 2 is finally from the immersion of the other end Hole 32, which is left, impregnates sink 31.
Fig. 5 is reviewed, the second cooling component 4 includes being installed in several sprays with spray nozzle 42 for impregnating 31 bottom of sink Pipe 41 is connected with the second water pump 52 between spray tube 41 and water receiving tank 5, the lasting water supply of the second water pump 52 is to spray tube 41, spray The downward shower water of shower pipe 41 forms cascade in cooling chamber.
Fig. 1 is reviewed, cabinet 1 offers ventilation window 7 on the side wall of cooling chamber, and being provided at ventilation window 7 will divulge information Window 7 covers the waffle slab 71 closed, is provided with several grids on waffle slab 71.The size dimension of grid enters in cabinet 1 for air stream Portion prevents most of foreign matter from passing through.
As shown in Fig. 2, waffle slab 71 includes the first waffle slab 711 and the second waffle slab 712, the first waffle slab 711 and the Two waffle slabs 712 are provided with sliding assembly 72 between cabinet 1 respectively.Sliding assembly 72 include be provided on cabinet 1, vent window The sliding slot 722 at mouthful 7 edges, sliding is connected with sliding block 721 in sliding slot 722, sliding block 721 respectively with the first waffle slab 711 and second Waffle slab 712 is fixedly connected.The first waffle slab 711 or the second waffle slab 712 are slid by sliding assembly 72, it can be by vent window Mouth 7 is opened.
Wherein, pre- water supply pump 53 is by the pre- cold water pipe 61 of cooling water supply in water receiving tank 5, and the first water pump 51 is by water receiving tank 5 Interior cooling water supply impregnates sink 31, and the second water pump 52 is by the cooling water supply spray tube 41 in water receiving tank 5.Pre- cold water pipe 61 The cooling water of outflow, which drops to connect, impregnates sink 31, and the cooling water a part impregnated in sink 31 is overflow from the top for impregnating sink 31 It is flowed in water receiving tank 5 out, some is flowed out from overboard through slot 321, is finally also flow in water receiving tank 5.In spray tube 41 Cooling water outflow after drop down onto water receiving tank 5.To sum up, the circulation of cooling water is formed.
Water to be cooled enters cooling tube 2 from water inlet pipe 11, is pre-chilled in the part that cooling tube 2 is located at pre-cooling chamber, then into Enter to impregnate in sink 31, be cooled down, the water flowed out in overboard through slot 321 also cools down cooling tube 2.Then to be cooled Water, eventually by filter screen 121, is flowed out via outlet pipe 12, is cooled down after cooling chamber, cold in outlet pipe 12 But water can be supplied to cooling water storage bin and use, and to sum up, achieve the effect that improve cooling effect.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (10)

1. a kind of Metal Melting circulating water equipment, including cabinet (1) and the cooling tube (2) being arranged in cabinet (1), case Water inlet pipe (11) and outlet pipe (12) are provided with outside body (1), cooling tube (2) one end is connected to water inlet pipe (11), the other end and Outlet pipe (12) connection, it is characterised in that: be provided with the first cooling component that cooling tube (2) successively passes through in the cabinet (1) (3) and the second cooling component (4) below the first cooling component (3), the first cooling component (3) include solid with cabinet (1) Surely the immersion sink (31) connected, the both ends for impregnating sink (31) offer the immersion hole (32) protruded into for cooling tube (2), and second Cooling component (4) includes being fixed at several spray tubes (41) impregnated below sink (31), setting below spray tube (41) Have water receiving tank (5), forms cooling chamber between sparge pipe and water receiving tank (5), be connected between water receiving tank (5) and immersion sink (31) First water pump (51) is connected with the second water pump (52) between water receiving tank (5) and spray tube (41).
2. Metal Melting circulating water equipment according to claim 1, it is characterised in that: described to impregnate the interior of hole (32) Wall is adapted with the outer wall of cooling tube (2), and the both ends for impregnating sink (31) offer overboard through slot (321), overboard through slot (321) It is connected at the top of immersion hole (32) and with hole (32) are impregnated.
3. Metal Melting circulating water equipment according to claim 1, it is characterised in that: the cooling tube (2) is located at Impregnate the serpentine-like plate-like in part in sink (31).
4. Metal Melting circulating water equipment according to claim 1, it is characterised in that: setting in the cabinet (1) Have pre-cooling component (6), pre-cooling component (6) includes that several pre- cold water pipes (61) above sink (31), pre- cold water are being impregnated in setting Several pre-cooling holes (62) are offered on pipe (61), are connected with pre- water supply pump (53) between pre- cold water pipe (61) and water receiving tank (5), in advance Pre-cooling chamber is formed between cold water pipe (61) and immersion sink (31).
5. Metal Melting circulating water equipment according to claim 1, it is characterised in that: the cabinet (1) is in cooling Ventilation window (7) are offered on the side wall of chamber.
6. Metal Melting circulating water equipment according to claim 5, it is characterised in that: at the ventilation window (7) It is provided with waffle slab (71).
7. Metal Melting circulating water equipment according to claim 6, it is characterised in that: the waffle slab (71) includes First waffle slab (711) and the second waffle slab (712), are provided with sliding assembly (72) between waffle slab (71) and cabinet (1), sliding Component (72) are moved to open or close ventilation window (7) for waffle slab (71).
8. Metal Melting circulating water equipment according to claim 7, it is characterised in that: sliding assembly (72) packet The sliding block (721) for being installed in waffle slab (71) edge is included, the sliding slot for sliding block (721) sliding is offered on cabinet (1) (722)。
9. Metal Melting circulating water equipment according to claim 1, it is characterised in that: cabinet (1) side wall is set It is equipped with sound insulation cavity (13).
10. Metal Melting circulating water equipment according to claim 1, it is characterised in that: the cooling tube (2) with go out Filter screen (121) are provided between water pipe (12).
CN201820983307.1U 2018-06-25 2018-06-25 Metal Melting circulating water equipment Expired - Fee Related CN208536622U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820983307.1U CN208536622U (en) 2018-06-25 2018-06-25 Metal Melting circulating water equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820983307.1U CN208536622U (en) 2018-06-25 2018-06-25 Metal Melting circulating water equipment

Publications (1)

Publication Number Publication Date
CN208536622U true CN208536622U (en) 2019-02-22

Family

ID=65392624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820983307.1U Expired - Fee Related CN208536622U (en) 2018-06-25 2018-06-25 Metal Melting circulating water equipment

Country Status (1)

Country Link
CN (1) CN208536622U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110552866A (en) * 2019-09-11 2019-12-10 台州新界机电有限公司 Air compressor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110552866A (en) * 2019-09-11 2019-12-10 台州新界机电有限公司 Air compressor
CN110552866B (en) * 2019-09-11 2021-11-23 浙江凯途科技有限公司 Air compressor

Similar Documents

Publication Publication Date Title
CN208536622U (en) Metal Melting circulating water equipment
CN218478680U (en) Air cooling device for processing toughened glass
CN209819632U (en) Domestic kitchen cleaning oil smoke discharging fume exhauster
CN207042127U (en) A kind of Tower for purifying waste gas
CN205867924U (en) Circulation drip washing exhaust -gas treatment tower among pyrometallurgical copper smelting
CN210146922U (en) Molding sand cooling device
CN212857074U (en) Hot galvanizing flue gas recovery device with arc-shaped guide plate
CN207910317U (en) A kind of inside is not easy the box-type substation of dust stratification
CN221269242U (en) Double-station ladle hot repair is with removing dust cap
CN209541471U (en) A kind of multi-cycle energy-saving type cooling tower
CN208245797U (en) Automobile cooling device
CN208952723U (en) A kind of counterflow cooling tower can effectively reduce cooling water outflow
CN207468704U (en) A kind of photovoltaic welding belt quickly cooling device
CN205867925U (en) A drip washing formula glass steel waste gas absorption tower for pyrometallurgical copper smelting
CN221715672U (en) Perforating device is used in chromium alloy processing
CN208776574U (en) A kind of float glass temperature-reducing tower
CN209424508U (en) Continuous casting roller group with cooling water circulating device
CN207849503U (en) A kind of oil removing cleaner
CN218168235U (en) Cooling device for aluminum profile
CN218811370U (en) Cooling device for toughened glass production
CN217052323U (en) Cooling device for crankshaft quenching
CN209157051U (en) A kind of upright radiator
CN209945045U (en) Submerged arc furnace flue gas and cooling flue gas processing system
CN220818594U (en) Smelting furnace smoke and exhaust gas treatment equipment for aluminum alloy round bar production
CN108411229A (en) A kind of method for rapid cooling of Extrusion Process of Aluminum Alloy Profile press quenching technique

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190222