CN208533551U - A kind of high-intensitive cavity foundation beam for construction - Google Patents

A kind of high-intensitive cavity foundation beam for construction Download PDF

Info

Publication number
CN208533551U
CN208533551U CN201821146100.5U CN201821146100U CN208533551U CN 208533551 U CN208533551 U CN 208533551U CN 201821146100 U CN201821146100 U CN 201821146100U CN 208533551 U CN208533551 U CN 208533551U
Authority
CN
China
Prior art keywords
foundation beam
cavity
column
cavity foundation
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821146100.5U
Other languages
Chinese (zh)
Inventor
朱志坤
陈俊民
康海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shijiazhuang Xuanli Integrated Housing Co Ltd
Original Assignee
Shijiazhuang Xuanli Integrated Housing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shijiazhuang Xuanli Integrated Housing Co Ltd filed Critical Shijiazhuang Xuanli Integrated Housing Co Ltd
Priority to CN201821146100.5U priority Critical patent/CN208533551U/en
Application granted granted Critical
Publication of CN208533551U publication Critical patent/CN208533551U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a kind of high-intensitive cavity foundation beams for construction, including the first cavity foundation beam, the front side of the first cavity foundation beam is equipped with the second cavity foundation beam, the equal array distribution in inside of first cavity foundation beam and the second cavity foundation beam has reinforcing bar, the medial surface of first cavity foundation beam and the second cavity foundation beam is equipped with ladder type steel plate, the bottom inner surface of ladder type steel plate controls the first fixed column being correspondingly arranged there are two setting, first fixed column and ladder type steel plate weld, this is used for the high-intensitive cavity foundation beam of construction, sound construction, stablize durable, convenience is brought to using, cavity is set as inside first cavity foundation beam and the second cavity foundation beam, the making material of foundation beam can be reduced, waste of material can be reduced, and pass through reinforcing rib, the base of foundation beam can be improved in connecting rod and connecting column Plinth intensity increases the load-bearing dynamics to mobile house, increases the safety in utilization of mobile house.

Description

A kind of high-intensitive cavity foundation beam for construction
Technical field
The utility model relates to mobile house manufacturing technology field, specially a kind of high-intensitive cavity for construction Foundation beam.
Background technique
Foundation beam is briefly exactly the beam on foundation soil.In the manufacture of mobile house, foundation beam is mainly as holding Weight structure, the wall in house fall on foundation beam or foundation beam crosspoint on, main function is the basis as top-out, Upper load is transmitted on ground.Existing foundation beam more wasteful material when production, when the system for reducing foundation beam It when making material, is easy to reduce foundation beam underlying strength, mobile house can collapse, and be easy to happen safe accident.
Utility model content
The technical problems to be solved in the utility model is to overcome existing defect, is provided a kind of for the high-strength of construction Cavity foundation beam is spent, sound construction is stablized durable, brings convenience to using, it is possible to reduce the making material of foundation beam, it can Waste of material is reduced, and the underlying strength of foundation beam can be improved, increases the load-bearing dynamics to mobile house, increases moveable house The safety in utilization in room can effectively solve the problems in background technique.
To achieve the above object, the utility model provides the following technical solutions: a kind of high intensity for construction is empty Chamber foundation beam, including the first cavity foundation beam, the front side of the first cavity foundation beam are equipped with the second cavity foundation beam, and first is empty The equal array distribution in inside of chamber foundation beam and the second cavity foundation beam has reinforcing bar, the first cavity foundation beam and the second cavity foundation beam Medial surface be equipped with ladder type steel plate, the bottom inner surface of ladder type steel plate is set there are two the first fixed column that left and right is correspondingly arranged, First fixed column and ladder type steel plate weld, and array distribution has connecting column between two the first fixed columns, and connecting column and first are fixed Column welding, the inside upper surface of ladder type steel plate set that there are two the second fixed column for being correspondingly arranged of left and right, the second fixed column and ladder types Steel plate welds, and array distribution has connecting rod arranged in a crossed manner between two the second fixed columns, and connecting rod and the second fixed column are welded, The upper surface of connecting rod is equipped with pillar, and one end of the separate connecting rod of pillar is fixedly connected with connecting column, the first cavity foundation beam The middle part of internal connecting column is equipped with fixed block, and the front surface of fixed block sets that there are two upper and lower corresponding card slot, the second cavity bases It is socketed with casing in the middle part of connecting column inside plinth beam, the rear surface of casing sets that there are two upper and lower corresponding snap-gauge, snap-gauge and cards Slot is correspondingly arranged, and the upper surface of snap-gauge is set there are two the pin of correspondence setting, the first cavity foundation beam and fixed block it is upper Surface is equipped with pin hole corresponding with pin.
As a kind of optimal technical scheme of the utility model, the rear surface of the second cavity foundation beam is equipped with positioning The front surface of column, the first cavity foundation beam is equipped with location hole corresponding with positioning column.
As a kind of optimal technical scheme of the utility model, array point between second fixed column and the first fixed column It is furnished with reinforcing rib, the both ends of reinforcing rib and the second fixed column and the first fixed column is welded.
As a kind of optimal technical scheme of the utility model, the outside of the reinforcing bar is equipped with ladder type fixed ring, and ladder type is solid Determine ring and reinforcement welding.
As a kind of optimal technical scheme of the utility model, the front surface of described sleeve pipe is equipped with stud, and stud passes through set Pipe is fixedly connected with connecting column.
Compared with prior art, the utility model has the beneficial effects that this high-intensitive cavity basis for construction Beam, sound construction is stablized durable, brings convenience to using, is set as inside the first cavity foundation beam and the second cavity foundation beam Cavity, it is possible to reduce the making material of foundation beam can reduce waste of material, and pass through reinforcing rib, connecting rod and connecting column The underlying strength of foundation beam can be improved, increase the load-bearing dynamics to mobile house, increase the safety in utilization of mobile house.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model side schematic view;
Fig. 3 is the utility model section schematic diagram.
In figure: 1 first cavity foundation beam, 2 pin holes, 3 location holes, 4 fixed blocks, 5 card slots, 6 second cavity foundation beams, 7 One fixed column, 8 connecting rods, 9 second fixed columns, 10 ladder type steel plates, 11 ladder type fixed rings, 12 pins, 13 positioning columns, 14 pillars, 15 connecting columns, 16 reinforcing bars, 17 reinforcing ribs, 18 casings, 19 snap-gauges.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of high-intensitive cavity base for construction The front side of plinth beam, including the first cavity foundation beam 1, the first cavity foundation beam 1 is equipped with the second cavity foundation beam 6, the second cavity base The rear surface of plinth beam 6 is equipped with positioning column 13, and the front surface of the first cavity foundation beam 1 is equipped with positioning corresponding with positioning column 13 Hole 3 is easily installed and dismantles convenient for the installation to the first cavity foundation beam 1 and the second cavity foundation beam 6, the first cavity basis The equal array distribution in inside of beam 1 and the second cavity foundation beam 6 has reinforcing bar 16, and the outside of reinforcing bar 16 is equipped with ladder type fixed ring 11, ladder Type fixed ring 11 and reinforcing bar 16 weld, and increase structural strength, improve load bearing stength, the first cavity foundation beam 1 and the second cavity base The medial surface of plinth beam 6 is equipped with ladder type steel plate 10, and the bottom inner surface of ladder type steel plate 10 sets that there are two that left and right is correspondingly arranged One fixed column 7, the first fixed column 7 are welded with ladder type steel plate 10, and array distribution has connecting column 15 between two the first fixed columns 7, Connecting column 15 and the first fixed column 7 are welded, and the inside upper surface of ladder type steel plate 10 sets second be correspondingly arranged there are two left and right and consolidates Fixed column 9, the second fixed column 9 are welded with ladder type steel plate 10, and array distribution has connection arranged in a crossed manner between two the second fixed columns 9 Bar 8, connecting rod 8 and the second fixed column 9 are welded, and array distribution has reinforcing rib 17 between the second fixed column 9 and the first fixed column 7, The both ends of reinforcing rib 17 and the second fixed column 9 and the first fixed column 7 are welded, and 15 energy of reinforcing rib 17, connecting rod 8 and connecting column is passed through The load bearing stength for enough increasing foundation beam, improves safety in utilization, and the upper surface of connecting rod 8 is equipped with pillar 14, pillar 14 it is separate One end of connecting rod 8 is fixedly connected with connecting column 15, and the middle part of the connecting column 15 inside the first cavity foundation beam 1 is equipped with fixed block 4, the front surface of fixed block 4 is set there are two upper and lower corresponding card slot 5, the middle part of the connecting column 15 inside the second cavity foundation beam 6 It is socketed with casing 18, the front surface of casing 18 is equipped with stud, and stud passes through casing 18 and is fixedly connected with connecting column 15, casing 18 Rear surface is set there are two upper and lower corresponding snap-gauge 19, and snap-gauge 19 is correspondingly arranged with card slot 5, and the upper surface of snap-gauge 19 is set there are two before The upper surface of the pin 12 being correspondingly arranged afterwards, the first cavity foundation beam 1 and fixed block 4 is equipped with pin corresponding with pin 12 Pin 12 is inserted into pin hole 2, is fixed on snap-gauge 19 in card slot 5 by hole 2, can be by the first cavity foundation beam 1 and the second cavity Foundation beam 6 is installed, and is offered convenience to using.
When in use: being set as cavity inside the first cavity foundation beam 1 and the second cavity foundation beam 6, ladder type steel plate 10 can be with It, can be to the first cavity foundation beam 1 and the second cavity base by the first fixed column 7 and the second fixed column 9 to underlying strength is improved The corner of plinth beam 6 is reinforced, and can increase the load bearing stength of foundation beam by reinforcing rib 17, connecting rod 8 and connecting column 15, Safety in utilization is improved, pin 12 is inserted into pin hole 2, is fixed on snap-gauge 19 in card slot 5, it can be by the first cavity foundation beam 1 and second cavity foundation beam 6 installed.
The utility model sound construction, stablizes durable, brings convenience to using, and the first cavity foundation beam 1 and second is empty Cavity is set as inside chamber foundation beam 6, it is possible to reduce the making material of foundation beam can reduce waste of material, and pass through reinforcement The underlying strength of foundation beam can be improved in muscle 17, connecting rod 8 and connecting column 15, increases the load-bearing dynamics to mobile house, increases The safety in utilization of mobile house.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of high-intensitive cavity foundation beam for construction, including the first cavity foundation beam (1), it is characterised in that: institute The front side for stating the first cavity foundation beam (1) is equipped with the second cavity foundation beam (6), the first cavity foundation beam (1) and the second cavity base The equal array distribution in inside of plinth beam (6) has reinforcing bar (16), the inside of the first cavity foundation beam (1) and the second cavity foundation beam (6) Face is equipped with ladder type steel plate (10), and the bottom inner surface of ladder type steel plate (10) sets that there are two the first fixed columns for being correspondingly arranged of left and right (7), the first fixed column (7) and ladder type steel plate (10) are welded, and array distribution has connecting column between two the first fixed columns (7) (15), connecting column (15) and the first fixed column (7) are welded, and the inside upper surface of ladder type steel plate (10) sets that there are two left and right correspondences to set The second fixed column (9) set, the second fixed column (9) and ladder type steel plate (10) are welded, array point between two the second fixed columns (9) It is furnished with connecting rod arranged in a crossed manner (8), connecting rod (8) and the second fixed column (9) are welded, and the upper surface of connecting rod (8) is equipped with branch One end of column (14), the separate connecting rod (8) of pillar (14) is fixedly connected with connecting column (15), in the first cavity foundation beam (1) The middle part of the connecting column (15) in portion is equipped with fixed block (4), and the front surface of fixed block (4) is set there are two upper and lower corresponding card slot (5), It is socketed with casing (18) in the middle part of the internal connecting column (15) of second cavity foundation beam (6), the rear surface of casing (18) is equipped with two A corresponding snap-gauge (19) up and down, snap-gauge (19) is correspondingly arranged with card slot (5), the upper surface of snap-gauge (19) set there are two front and back it is right The upper surface of the pin (12) that should be arranged, the first cavity foundation beam (1) and fixed block (4) is equipped with corresponding with pin (12) Pin hole (2).
2. a kind of high-intensitive cavity foundation beam for construction according to claim 1, it is characterised in that: described The rear surface of two cavity foundation beams (6) is equipped with positioning column (13), and the front surface of the first cavity foundation beam (1) is equipped with and positioning column (13) corresponding location hole (3).
3. a kind of high-intensitive cavity foundation beam for construction according to claim 1, it is characterised in that: described There is reinforcing rib (17) array distribution between two fixed columns (9) and the first fixed column (7), the both ends of reinforcing rib (17) are fixed with second Column (9) and the first fixed column (7) are welded.
4. a kind of high-intensitive cavity foundation beam for construction according to claim 1, it is characterised in that: the steel The outside of muscle (16) is equipped with ladder type fixed ring (11), and ladder type fixed ring (11) and reinforcing bar (16) are welded.
5. a kind of high-intensitive cavity foundation beam for construction according to claim 1, it is characterised in that: the set The front surface for managing (18) is equipped with stud, and stud passes through casing (18) and is fixedly connected with connecting column (15).
CN201821146100.5U 2018-07-19 2018-07-19 A kind of high-intensitive cavity foundation beam for construction Expired - Fee Related CN208533551U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821146100.5U CN208533551U (en) 2018-07-19 2018-07-19 A kind of high-intensitive cavity foundation beam for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821146100.5U CN208533551U (en) 2018-07-19 2018-07-19 A kind of high-intensitive cavity foundation beam for construction

Publications (1)

Publication Number Publication Date
CN208533551U true CN208533551U (en) 2019-02-22

Family

ID=65385169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821146100.5U Expired - Fee Related CN208533551U (en) 2018-07-19 2018-07-19 A kind of high-intensitive cavity foundation beam for construction

Country Status (1)

Country Link
CN (1) CN208533551U (en)

Similar Documents

Publication Publication Date Title
CN202731104U (en) Novel reinforcing mesh sheet support structure
CN208533551U (en) A kind of high-intensitive cavity foundation beam for construction
CN206693403U (en) A kind of steel core concrete column and connected mode
CN201432272Y (en) Steel structure module platform for steel truss girder rod piece
CN103306378B (en) Construction method of multidirectional through concrete filled steel tubular column beam joint provided with steel corbels and ring beam
CN203559432U (en) Underground powerhouse vault
CN203160428U (en) Connecting structure of beam steel and steel rib at node position of framework beam column
CN202658804U (en) Stirrup positioning structure
CN212129558U (en) Novel connecting structure between beam wall and column
CN204662961U (en) A kind of column-form
CN211369024U (en) Energy-saving prefabricated beam column structure
CN210263383U (en) Double-concrete-beam and concrete frame column connecting structure for building design
CN211229205U (en) High-precision positioning column rib positioning hoop
CN203373754U (en) Angle brace bracket of inner support system of high-rigidity integrated prestress assembled type foundation pit support
CN208533552U (en) A kind of quick assembling prefabricated foundation beam for construction
CN208252133U (en) A kind of dismountable interim median septum
CN208815672U (en) The connecting joint structure of circular steel tube concrete column and reinforced beam
CN208633313U (en) Assembling truss type light steel frame-steel mesh-Combined concrete wall
CN203066043U (en) Diversion tunnel top arch concrete lining steel formwork support
CN205036162U (en) Basis is kept off to prefabricated enclosing of repeatedly usable
CN205348384U (en) Antidetonation local -style dwelling houses steel framework
CN205776900U (en) A kind of encased steel plate wall column quick-assembling structure
CN212743591U (en) Building engineering protection network
CN214696137U (en) Conical joint with self-locking positioning function
CN215926295U (en) Civil engineering assembled building structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190222

Termination date: 20190719