CN208533539U - A kind of foundation pit overflow slope protection well fixing piece - Google Patents

A kind of foundation pit overflow slope protection well fixing piece Download PDF

Info

Publication number
CN208533539U
CN208533539U CN201820731616.XU CN201820731616U CN208533539U CN 208533539 U CN208533539 U CN 208533539U CN 201820731616 U CN201820731616 U CN 201820731616U CN 208533539 U CN208533539 U CN 208533539U
Authority
CN
China
Prior art keywords
overflow
slope protection
wellblock
pipe
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820731616.XU
Other languages
Chinese (zh)
Inventor
丰有发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Advocating Creation Shanghai Consulting Management Firm
Original Assignee
丰有发
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 丰有发 filed Critical 丰有发
Priority to CN201820731616.XU priority Critical patent/CN208533539U/en
Application granted granted Critical
Publication of CN208533539U publication Critical patent/CN208533539U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of foundation pit overflow slope protection well fixing pieces, including slope protection pile, slope protection well is formed inside the slope protection pile, the overflow pipe being connected to the slope protection well is provided in the slope protection pile, each overflow pipe includes overflow supervisor and overflow branched pipe, the overflow supervisor tilts down setting, the overflow branched pipe distribution is set to the end of the overflow supervisor and is connected to overflow supervisor, the overflow pipe is connected to the slope protection well, the overflow supervisor offers exhaust pipe, and the exhaust pipe extends upwardly to floor surface.When needing to pour, so that it may which liquid can flow into overflow pipe, form multiple support constructions after solidification, guarantee the effect poured, improve the intensity of entire slope protection pile.

Description

A kind of foundation pit overflow slope protection well fixing piece
Technical field
The present invention relates to civic building foundation pit equipment, more specifically to a kind of foundation pit overflow slope protection well fixing piece.
Background technique
Pattern foundation pit supporting structure is the safety to guarantee Underground Construction and foundation pit surrounding environment, to foundation pit side-wall and peripheral ring Supporting and retaining system, reinforcing and the safeguard measure that border uses.(1) foundation pit supporting project is a temporary project, and the safety stock of design is opposite can With smaller, but it is related with provincialism.Its feature of different zones geological conditions is not also identical.Foundation pit supporting project is ground work again The subject that journey, Structural Engineering and construction technology cross one another is the system engineering of Various Complex factor reciprocal effect, is theoretical On wait development complex art subject.Since foundation pit supporting project cost is high, the quantity that goes into operation is more, is that each unit in charge of construction fights for Emphasis, and due to technology complexity, coverage is wide, and changing factor is more, and accident is frequent, is most challenging in architectural engineering Technical difficult point, while being also to reduce project cost, it is ensured that the emphasis of construction quality.The positive big depth of foundation pit supporting project, Large area direction is developed, and some length and widths are more than over one hundred rice, and depth is more than more than 20 rice.Project scale increasingly increases.Rock Soil nature matter is ever-changing, complexity, the inhomogeneities of geology mode of occurence and hydrogeologic condition, and it is resulting to often result in prospecting Data discrete is very big, it is difficult to represent the overall situation of soil layer, and accuracy is lower, design to foundation pit supporting project and apply Work increases difficulty.Excavation pit under the conditions of weak soil, phreatic high and other complex sites, it is easy to it is sliding to generate the soil body Shifting, instability of foundation pit, pile body displacement, bottom heave, the serious leak of retaining structure, stream soil are so that the diseases such as breakage, to neighboring buildings The safety of object, underground structure and pipeline causes very big threat.Engineering practice proves, to carry out foundation pit supporting project, it is necessary to wrap The overall process of entire excavation supporting is included, it includes the entire series such as prospecting, design, construction and monitoring, thus emphasizes to want essence The heart carries out the work of each link.With the propulsion of reconstruction of the old city town, the main high-rise, super high-rise building in each city is mostly concentrated on In big, densely populated, the congested in traffic narrow and small place of site coverage, the condition of foundation pit supporting project construction is very poor.It is neighbouring normal There are the permanent construction and public utility that must be protected, is unable to slope excavation, stable to foundation pit and Bit andits control requirement It is very tight.Foundation pit supporting project includes many links being closely connected such as earth-retaining, supporting, waterproof, precipitation, shoveling, therein a certain Link failure will will lead to the failure of entire engineering.The foundation pit construction in adjacent place, such as piling, precipitation, the every construction of shoveling Link can all generate and influence each other and restrict, and increase accident risk factor.It should include that support system selects in support engineering design Type, the bearing capacity of building enclosure, deformation calculate, inside and outside place soil body stability, precipitation require, cut the earth requirement, monitoring content etc., It should be noted that avoiding " operating condition " and calculating " the leakage item " being likely to occur between content, so as to cause foundation pit fault.In the construction process, When especially constructing in soft clay area, it should the method that reasonable arrangement is cut the earth well, and the cooperation of support and shoveling are conscientiously studied, The generation of foundation pit deformation and pattern foundation pit supporting structure accident will be reduced significantly.Foundation pit supporting project cost is higher, but is provisional Engineering is generally reluctant to put into more fund.But once there is accident, handle it is very difficult, caused by economic loss and society It influences often extremely serious.Foundation pit supporting project long construction period, whole concealed works of below ground from excavating to completing, often Many unfavorable conditions such as multiple rainfall, periphery preloading, vibration, construction wrong need to be undergone, the randomness of degree of safety is larger, accident Generation often have it is sudden.
And it is typically provided with the structure that pattern foundation pit supporting structure is realized by slope protection pile, and first of slope protection pile needs in foundation pit Bottom week is along several trench structures of excavation, and the excavation of trench structure needs the artificial progress of machine cooperation, after forming slope protection well, It needs to condense the borehole wall by condensing matter, guarantees construction, and finally after steel reinforcement cage is installed, it needs to pour by cement, and show Some supporting foundation pits, which are easy to appear, pours that effect is poor to cause entire supporting pile structure bearing strength still lower, so needing one The kind higher support pile of intensity.
Summary of the invention
In view of this, it is an object of the present invention to provide a kind of foundation pit overflow slope protection well fixing pieces.
In order to solve the above-mentioned technical problem, the technical scheme is that a kind of foundation pit overflow slope protection well fixing piece, including Slope protection pile, the slope protection pile inside form slope protection well, are provided with the overflow pipe being connected to the slope protection well in the slope protection pile, often One overflow pipe includes overflow supervisor and overflow branched pipe, and the overflow supervisor tilts down setting, the overflow branched pipe Distribution is set to the end of the overflow supervisor and is connected to overflow supervisor, and the overflow pipe is connected to the slope protection well, institute It states overflow supervisor and offers exhaust pipe, the exhaust pipe extends upwardly to floor surface.
Further: the slope protection bottom is provided with several positioning steady flow pipes extended downwardly.
Further: the slope protection well from top to bottom includes the first wellblock, the second wellblock, third wellblock, and described first Wellblock and the second wellblock pass through the second annular table by first annular transition between second wellblock and the third wellblock Transition.
Further: the overflow pipe includes the first overflow pipe and the second overflow pipe, and first overflow pipe is set to institute First annular is stated, second overflow pipe is set to second annular table.
Further: the hole diameter of first wellblock gradually decreasees from top to bottom, the hole diameter of second wellblock by up to Under it is equal, the hole diameter of the third wellblock gradually decreasees from top to bottom.
Further: being provided with first annular slot on the borehole wall of first wellblock, set on the borehole wall of the third wellblock It is equipped with third annular groove.
The technology of the present invention effect major embodiment is in the following areas: being arranged in this way, when needing to pour, so that it may liquid Overflow pipe can be flowed into, forms multiple support constructions after solidification, guarantees the effect poured, improves the intensity of entire slope protection pile.
Detailed description of the invention
A kind of Fig. 1: structural schematic diagram of foundation pit overflow slope protection well fixing piece of the present invention.
Appended drawing reference: 100, slope protection pile;110, the first wellblock;111, first annular;120, the second wellblock;121, second Annular table;130, third wellblock;210, the first overflow pipe;220, the second overflow pipe;211, overflow is responsible for;212, spill pipe; 201, exhaust pipe;310, steady flow pipe is positioned.
Specific embodiment
Below in conjunction with attached drawing, a specific embodiment of the invention is described in further detail, so that technical solution of the present invention is more It should be readily appreciated that and grasp.
Shown in referring to Fig.1, a kind of foundation pit overflow slope protection well fixing piece, including slope protection pile 100, inside the slope protection pile 100 Slope protection well is formed, the overflow pipe being connected to the slope protection well is provided in the slope protection pile 100, each overflow pipe includes overflowing Stream supervisor 211 and overflow branched pipe, the overflow supervisor 211 tilt down setting, and the overflow branched pipe distribution is set to institute It states the end of overflow supervisor 211 and is connected to overflow supervisor 211, the overflow pipe is connected to the slope protection well, the overflow Supervisor 211 offers exhaust pipe 201, and the exhaust pipe 201 extends upwardly to floor surface.First when pouring, more water Mudflow enters overflow pipe, then flows to spill pipe 212 by overflow supervisor 211, then flows to soil by spill pipe 212 again In, a preferable support construction is formed, and exhaust pipe 201 gas in overflow pipe can be discharged, in case gas pressure is made The phenomenon that being loosened at soil.
The slope protection bottom is provided with several positioning steady flow pipes 310 extended downwardly.The setting of steady flow pipe 310 is positioned, It can be further improved steady flow result, guarantee fixed reliability.
The slope protection well from top to bottom includes the first wellblock 110, the second wellblock 120, third wellblock 130, and described first Wellblock 110 and the second wellblock 120 by first annular 111 transition, second wellblock 120 and the third wellblock 130 it Between pass through 121 transition of the second annular table.The overflow pipe includes the first overflow pipe 210 and the second overflow pipe 220, and described first overflows Flow tube 210 is set to described first annular 111, and second overflow pipe 220 is set to second annular table 121.It is described The hole diameter of first wellblock 110 gradually decreasees from top to bottom, and the hole diameter of second wellblock 120 is equal from top to bottom, the third The hole diameter of wellblock 130 gradually decreasees from top to bottom.It is provided with first annular slot on the borehole wall of first wellblock 110, described Third annular groove is provided on the borehole wall of three wellblocks 130.Be arranged in this way, can play the role of gathering, at the same provide compared with For reliable operating space, while the first overflow pipe 210 and the second overflow pipe 220 being separately positioned in annular table, Ke Yiqi The effect of fixed effect is improved to one.
Certainly, above is representative instance of the invention, and in addition to this, the present invention can also have other a variety of specific implementations Mode, all technical solutions formed using equivalent substitution or equivalent transformation, is all fallen within the scope of protection of present invention.

Claims (6)

1. a kind of foundation pit overflow slope protection well fixing piece, including slope protection pile, it is characterised in that: form slope protection inside the slope protection pile Well, the overflow pipe being connected to the slope protection well is provided in the slope protection pile, and each overflow pipe includes overflow supervisor and overflows Flow point branch pipe, the overflow supervisor tilt down setting, and the overflow branched pipe distribution is set to the end of the overflow supervisor And be connected to overflow supervisor, the overflow pipe is connected to the slope protection well, and the overflow supervisor offers exhaust pipe, the row Tracheae extends upwardly to floor surface.
2. a kind of foundation pit overflow slope protection well fixing piece as described in claim 1, it is characterised in that: the slope protection bottom setting There are several positioning steady flow pipes extended downwardly.
3. a kind of foundation pit overflow slope protection well fixing piece as described in claim 1, it is characterised in that: the slope protection well is from top to bottom It include the first wellblock, the second wellblock, third wellblock, first wellblock and the second wellblock pass through first annular transition, institute It states between the second wellblock and the third wellblock through the second annular table transition.
4. a kind of foundation pit overflow slope protection well fixing piece as claimed in claim 2, it is characterised in that: the overflow pipe includes first Overflow pipe and the second overflow pipe, first overflow pipe are set to described first annular, and second overflow pipe is set to institute State the second annular table.
5. a kind of foundation pit overflow slope protection well fixing piece as claimed in claim 2, it is characterised in that: the hole diameter of first wellblock Gradually decrease from top to bottom, the hole diameter of second wellblock is equal from top to bottom, the hole diameter of the third wellblock from top to bottom by It is decrescence small.
6. a kind of foundation pit overflow slope protection well fixing piece as claimed in claim 5, it is characterised in that: the borehole wall of first wellblock On be provided with first annular slot, be provided with third annular groove on the borehole wall of the third wellblock.
CN201820731616.XU 2018-05-15 2018-05-15 A kind of foundation pit overflow slope protection well fixing piece Active CN208533539U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820731616.XU CN208533539U (en) 2018-05-15 2018-05-15 A kind of foundation pit overflow slope protection well fixing piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820731616.XU CN208533539U (en) 2018-05-15 2018-05-15 A kind of foundation pit overflow slope protection well fixing piece

Publications (1)

Publication Number Publication Date
CN208533539U true CN208533539U (en) 2019-02-22

Family

ID=65394629

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820731616.XU Active CN208533539U (en) 2018-05-15 2018-05-15 A kind of foundation pit overflow slope protection well fixing piece

Country Status (1)

Country Link
CN (1) CN208533539U (en)

Similar Documents

Publication Publication Date Title
CN102505695B (en) Construction method for deep foundation pit of three-dimensional garage
CN108457285B (en) Ultra-deep pit-in-pit open type dewatering construction method
CN100510281C (en) Semi-inverse construction method of super large diameter, ultra-burial depth storage pond
CN108612117A (en) A kind of seabed water-retaining structure across municipal tunnel greatly and construction method
CN107587516A (en) A kind of efficient sealing of Follow-up type hinders sand precipitation hybrid system and its construction method
CN108316354A (en) With waterproof, the underground pipe gallery structure of drain function and its construction method
CN105239578A (en) Water-rich sand layer deep foundation pit underwater construction method
CN208088344U (en) With waterproof, the underground pipe gallery structure of drain function
CN105133581A (en) Three-in-one construction method for uplift pile, lattice column and precipitation well in supporting structure
CN106884431A (en) One kind building pit foundation construction safety supporting construction
CN107165640B (en) Tunnels and underground engineering surely builds method certainly
CN109577277A (en) A kind of wall-mounted drainage anchor rod barrier wall structure and its construction method
CN109594574A (en) Large-scale push pipe open caisson reversed construction method based on the confined space
CN107542152A (en) A kind of pavement comprehensive pipe network and drainage system
CN203977432U (en) Multistage H type soil blocking pile
CN208533539U (en) A kind of foundation pit overflow slope protection well fixing piece
CN110512594A (en) The simple and easy method of churning driven opportunity cavity pore-forming
CN110206062A (en) The dark construction method of underground river shallow embedding is worn under a kind of Urban Underground pipe gallery
Al‐Rashed et al. Hydrogeological aspects of groundwater drainage of the urban areas in Kuwait City
CN106149631B (en) High mountain strid arch dam avalanche type Slope Treatment method
CN104975610A (en) Expanded-end decompression well, deep foundation pit structure and construction method for expanded-end decompression well
CN209760299U (en) light and shade of avoiding house to tear open and move is dug and is combined subway station structure
CN211256877U (en) Hydraulic engineering cut-off wall
CN211257900U (en) Control structure of confined water in existing basement storey-adding construction
CN208563344U (en) A kind of foundation pit rapid hardening slope protection well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190722

Address after: 202172 Room 1260, No. 495 Yuejin South Road, Xinhai Town, Chongming District, Shanghai (Guangming Rice Industry Economic Park)

Patentee after: Advocating Creation (Shanghai) Consulting Management Firm

Address before: 014010 No. 45 Iron and Steel Avenue, Kun District, Baotou City, Inner Mongolia Autonomous Region (Zhongye Oriental Engineering Technology Co., Ltd.)

Patentee before: Feng Youfa

TR01 Transfer of patent right