CN208528129U - A kind of the batch drilling tool and production equipment of polygonal mirror supporting cross bearer - Google Patents

A kind of the batch drilling tool and production equipment of polygonal mirror supporting cross bearer Download PDF

Info

Publication number
CN208528129U
CN208528129U CN201821102363.6U CN201821102363U CN208528129U CN 208528129 U CN208528129 U CN 208528129U CN 201821102363 U CN201821102363 U CN 201821102363U CN 208528129 U CN208528129 U CN 208528129U
Authority
CN
China
Prior art keywords
drilling tool
polygonal mirror
supporting cross
side wall
cross bearer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821102363.6U
Other languages
Chinese (zh)
Inventor
吕彦龙
曹子奂
李季
王希彬
任义
王永兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Henglu Steel Structure Co ltd
Original Assignee
Henan Longcheng Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Longcheng Heavy Industry Co Ltd filed Critical Henan Longcheng Heavy Industry Co Ltd
Priority to CN201821102363.6U priority Critical patent/CN208528129U/en
Application granted granted Critical
Publication of CN208528129U publication Critical patent/CN208528129U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drilling And Boring (AREA)

Abstract

A kind of batch drilling tool of polygonal mirror supporting cross bearer, is related to machinery processing apparatus field comprising bottom plate and multiple working cells;Multiple working cells are arranged along the length direction interval of bottom plate.Each working cell includes vertical plate and drilling equipment, and vertical plate is used to that the girder and fixed plate of polygonal mirror supporting cross bearer to be supported and be fixed, then completes bore operation by drilling equipment.The batch drilling tool can be used in the batch bore operation of polygonal mirror supporting cross bearer, improve the production efficiency of polygonal mirror supporting cross bearer, reduce time cost of labor.A kind of production equipment of polygonal mirror supporting cross bearer comprising the efficient mass production of polygonal mirror supporting cross bearer may be implemented in above-mentioned batch drilling tool, reduces production cost.

Description

A kind of the batch drilling tool and production equipment of polygonal mirror supporting cross bearer
Technical field
The utility model relates to machinery processing apparatus fields, in particular to a kind of polygonal mirror supporting cross bearer Batch drilling tool and production equipment.
Background technique
The outburst of worldwide energy crisis have stimulated research and development of the people to heliotechnics.Relative to solar-electricity The expensive of pond, efficiency are lower, and the efficiency of solar energy thermal-power-generating is higher, Technical comparing is mature.Many industrially developed country, all Using solar energy thermal-power-generating technology as the emphasis of country's research and development.
The principle of solar light-heat power-generation is to be converged to sunlight too by the polygonal mirror that large scale array is arranged Positive energy collection device, utilizes the heat transfer medium (liquid or gas) in solar energy heating collection device, reheats water and forms steam Or directly drive electrical power generators.Multiple groups fixation hole is wherein distributed on mirror holder, every group of fixation hole fixes a face reflecting mirror, multiple groups Sunlight is gathered same focus by the mirror surface of reflecting mirror, and the mirror surface of polygonal mirror is theoretically on same spherical surface, reflecting mirror Fixation hole respectively corresponds the same center of circle, on the spherical surface of different-diameter.
Since fixation hole is more on mirror support crossbearer, and hole location is inconsistent, if using a hole, a hole successively by A processing, working efficiency is low, and processing charges is high, is unable to satisfy batch production needs.
Utility model content
The purpose of this utility model is to provide a kind of batch drilling tools of polygonal mirror supporting cross bearer, can use In the batch bore operation of polygonal mirror supporting cross bearer, the production efficiency of polygonal mirror supporting cross bearer is improved, reduces the time Cost of labor.
The another object of the utility model is to provide a kind of production equipment of polygonal mirror supporting cross bearer, can be real The efficient mass production of existing polygonal mirror supporting cross bearer.
The embodiments of the present invention are achieved in that
A kind of batch drilling tool of polygonal mirror supporting cross bearer comprising bottom plate and multiple working cells;It is multiple Working cell is arranged along the length direction interval of bottom plate;
Each working cell includes vertical plate and drilling equipment;
Each vertical plate include bottom wall, roof, abutted to the fixed plate to polygonal mirror supporting cross bearer One side wall, and the second sidewall being oppositely arranged with the first side wall;Bottom wall is connect with bottom plate, and roof is provided with mounting groove, installation Slot runs through the first side wall and second sidewall;The mounting groove of multiple working cells is aligned along the length direction of bottom plate, is provided commonly for pair Support is fixed in the girder of polygonal mirror supporting cross bearer;
Each drilling equipment includes at least one drilling machine, and is fixed for drilling machine to be fixed on the drilling machine on bottom plate Seat.
Further, in the other preferred embodiments of the utility model, the first side wall is convexly equipped with for carrying out to fixed plate The boss of positioning, boss are located at the lower section of mounting groove.
Further, in the other preferred embodiments of the utility model, the first side wall and second sidewall are respectively set useful In carrying out firm the first gusset and the second gusset to vertical plate;
Further, in the other preferred embodiments of the utility model, the height of the first gusset is lower than boss;Second gusset Height be higher than the first gusset.
Further, in the other preferred embodiments of the utility model, in each working cell, drilling machine is respectively positioned on vertical plate and exists The side of the first side wall, and drill bit is directed toward the first side wall.
Further, in the other preferred embodiments of the utility model, bottom plate includes being located at both ends on its length direction First end and the second end;Multiple working cells are divided into the first working group close to first end using the center of bottom plate as boundary, And the second working group close to the second end;Multiple vertical plates in first working group are with the first side wall towards first end; Multiple vertical plates in second working group are with the first side wall towards the second end.
Further, in the other preferred embodiments of the utility model, the first working group and the second working group are to cross bottom plate The section at center is plane of symmetry mirror image each other.
Further, in the other preferred embodiments of the utility model, first end is provided with positioning vertical plate, positions vertical plate Bottom connect with bottom plate, positioning vertical plate include the bearing surface abutted for the end with girder.
Further, in the other preferred embodiments of the utility model, each vertical plate is provided at least one location hole, Location hole runs through the first side wall and second sidewall;Drilling machine and location hole correspond, the drill bit of drilling machine and corresponding location hole Coaxial arrangement, each positioning hole are provided with drill jig sleeve.
A kind of production equipment of polygonal mirror supporting cross bearer comprising above-mentioned batch drilling tool.
The beneficial effect of the utility model embodiment is:
The utility model embodiment provides a kind of batch drilling tool of polygonal mirror supporting cross bearer comprising bottom Plate and multiple working cells;Multiple working cells are arranged along the length direction interval of bottom plate.Each working cell includes standing Plate and drilling equipment, vertical plate are used to that the girder and fixed plate of polygonal mirror supporting cross bearer to be supported and be positioned, then by boring Aperture apparatus completes bore operation.The batch drilling tool can be used in the batch bore operation of polygonal mirror supporting cross bearer, mention The production efficiency of high polygonal mirror supporting cross bearer reduces time cost of labor.
The utility model embodiment additionally provides a kind of production equipment of polygonal mirror supporting cross bearer comprising above-mentioned batch Drilling tool is measured, the efficient mass production of polygonal mirror supporting cross bearer may be implemented, reduces production cost.
Detailed description of the invention
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment Attached drawing be briefly described, it should be understood that the following drawings illustrates only some embodiments of the utility model, therefore should not be by Regard the restriction to range as, for those of ordinary skill in the art, without creative efforts, may be used also To obtain other relevant attached drawings according to these attached drawings.
Fig. 1 is the schematic diagram of polygonal mirror supporting cross bearer provided by the utility model embodiment;
Fig. 2 is the schematic diagram of the fixed plate of polygonal mirror supporting cross bearer provided by the utility model embodiment;
Fig. 3 is schematic diagram of the batch drilling tool under the first visual angle provided by the utility model embodiment;
Fig. 4 is the schematic diagram of the vertical plate of batch drilling tool provided by the utility model embodiment;
Fig. 5 is schematic diagram of the batch drilling tool under the second visual angle provided by the utility model embodiment;
Fig. 6 is that batch drilling tool provided by the utility model embodiment shows with what polygonal mirror supporting cross bearer combined It is intended to.
Icon: 100- polygonal mirror supporting cross bearer;110- girder;120- fixed plate;The first fixation hole of 121-;122- Two fixation holes;123- third fixation hole;200- batch drilling tool;210- bottom plate;211- first end;212- the second end; 213- positions vertical plate;213a- bearing surface;The working cell 220-;The first working group of 220a-;The second working group of 220b-;221- is vertical Plate;2211- bottom wall;2212- roof;2213- the first side wall;2214- second sidewall;2215- mounting groove;2216- boss; 2217- location hole;The first gusset of 2218-;The second gusset of 2219-;222- drilling equipment;2221- drilling machine;2222- drilling machine is fixed Seat.
Specific embodiment
It is practical below in conjunction with this to keep the purposes, technical schemes and advantages of the utility model embodiment clearer The technical solution in the utility model embodiment is clearly and completely described in attached drawing in novel embodiment, shows So, described embodiment is a part of embodiment of the utility model, rather than whole embodiments.It is practical based on this Embodiment in novel, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment is fallen within the protection scope of the utility model.Therefore, the implementation to the utility model provided in the accompanying drawings below The detailed description of mode is not intended to limit the range of claimed invention, but is merely representative of the utility model Selected embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not making creative labor Every other embodiment obtained under the premise of dynamic, fall within the protection scope of the utility model.
In the description of the present invention, it should be understood that term " center ", " longitudinal direction ", " transverse direction ", " length ", " width Degree ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside", The orientation or positional relationship of the instructions such as " clockwise ", " counterclockwise " be based on the orientation or positional relationship shown in the drawings, be only for Convenient for description the utility model and simplify description, rather than the equipment of indication or suggestion meaning or element must have specifically Orientation is constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more of the features.The meaning of " plurality " is two or two in the description of the present invention, More than, unless otherwise specifically defined.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " Gu It is fixed " etc. terms shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be Mechanical connection, is also possible to be electrically connected;It can be directly connected, two can also be can be indirectly connected through an intermediary The interaction relationship of connection or two elements inside element.It for the ordinary skill in the art, can basis Concrete condition understands the concrete meaning of above-mentioned term in the present invention.
In the present invention unless specifically defined or limited otherwise, fisrt feature the "upper" of second feature or it "lower" may include that the first and second features directly contact, and also may include that the first and second features are not direct contacts but lead to Cross the other characterisation contact between them.Moreover, fisrt feature includes above the second feature " above ", " above " and " above " One feature is right above second feature and oblique upper, or is merely representative of first feature horizontal height higher than second feature.First is special Sign is directly below and diagonally below the second feature including fisrt feature under the second feature " below ", " below " and " below ", or only Indicate that first feature horizontal height is less than second feature.
Embodiment
A kind of batch drilling tool 200 is present embodiments provided, the batch for polygonal mirror supporting cross bearer 100 drills Operation.As shown in Figure 1, the polygonal mirror supporting cross bearer 100 includes a cylinder steel pipe as girder 110, and along master Multiple fixed plates 120 of 110 length direction of beam setting.Specifically, in the present embodiment, the polygonal mirror supporting cross bearer 100 110 diameter of girder be 200mm, be provided with 8 fixed plates 120 altogether thereon, the spacing between two neighboring fixed plate 120 is 600mm, and 8 fixed plates 120 are symmetrical as the plane of symmetry using the cross section at 110 center of girder.In each fixed plate 120 Need to drill out three fixation holes, for reflecting mirror to be fixed.By taking the visual angle of Fig. 2 as an example, three fixation holes include being located at admittedly First fixation hole 121 on the right side of fixed board 120, the second fixation hole 122 positioned at upper left, and the third fixation hole positioned at lower-left 123, and the aperture of three fixation holes is 6.5mm.Wherein, positioned in two fixed plates 120 at 110 center of girder Distance L is minimum between first fixation hole 121 and girder 110, and the fixed plate 120 closer to 110 both ends of girder, the first fixation hole 121 translations outward, the value of L is bigger, and the L value increment of two neighboring fixed plate 120 is 0.5mm, meanwhile, the second fixation hole 122, The displacement of third fixation hole 123 is consistent with the first fixation hole 121, to guarantee three fixation hole phases in same fixed plate 120 It is constant to position.
For above-mentioned polygonal mirror supporting cross bearer 100, for fixed plate 120 and fixation hole position accuracy demand compared with Height, and the position of the fixation hole of every piece of fixed plate 120 has differences, and to realize the drilling production of mass, difficulty is very big 's.
For this purpose, present embodiments provide a kind of batch drilling tool 200, referring to shown in Fig. 3 comprising bottom plate 210 and Multiple working cells 220, multiple working cells 220 are arranged along the length direction interval of bottom plate 210, and each working cell 220 is Including vertical plate 221 and drilling equipment 222, vertical plate 221 is for being fixed the position of girder 110 and fixed plate 120, drilling dress 222 are set for drilling to fixed plate 120.In the present embodiment, corresponding with polygonal mirror supporting cross bearer 100, work The quantity for making unit 220 is 8, and the bore operation of a fixed plate 120 is completed in each working cell 220.
As shown in Figure 3 and Figure 4, each vertical plate 221 includes bottom wall 2211, roof 2212, to polygonal mirror branch The first side wall 2213 that the fixed plate 120 of support crossbearer 100 is abutted, and the second side being oppositely arranged with the first side wall 2213 Wall 2214.Bottom wall 2211 is connect with bottom plate 210, and roof 2212 is provided with mounting groove 2215, and mounting groove 2215 runs through the first side wall 2213 and second sidewall 2214.The mounting groove 2215 of multiple working cells 220 is aligned along the length direction of bottom plate 210, common to use Support is fixed in the girder 110 to polygonal mirror supporting cross bearer 100.When carrying out operation, girder 110 is placed in installation In slot 2215, the fixation to girder 110 is completed, then fixed plate 120 is close to the first side wall 2213 of vertical plate 221, when each solid After fixed board 120 is all close to corresponding vertical plate 221, that is, complete the accurate positioning of fixed plate 120.It is noticeable It is that the position of vertical plate 221 is needed by preparatory adjustment, so that in the case where fixed plate 120 is close to the first side wall 2213, it is adjacent Spacing between fixed plate 120 is able to maintain in 600mm.Further, the first side wall 2213 is convexly equipped with for fixed plate 120 The boss 2216 being supported, boss 2216 are located at the lower section of mounting groove 2215, and boss 2216 arrives the distance and fixation of girder 110 The distance of plate 120 lower edge to girder 110 is consistent, and when fixed plate 120 is close to the first side wall 2213, the lower edge of fixed plate 120 is rigid Good to abut with the upper surface of boss 2216, boss 2216 can play the role of positioning and limitation overturning to fixed plate 120.It is fixed It, being welded and fixed to fixed plate 120 and girder 110 after plate 120 positions.
Preferably, two vertical plates 221 close to 210 both ends of bottom plate are to its main fixed function of the position of girder 110, peace The width of tankage 2215 should be suitable with the diameter of girder 110, to prevent the shaking of girder 110.Meanwhile because steel pipe straightness Different because of processing conditions, it is absolute straight not ensure that, the width of the mounting groove 2215 of remaining vertical plate 221 should be slightly bigger than girder 110 diameter, such as 201~205mm can be set by width, clamping and disassembly convenient for girder 110.
As shown in Figure 3 and Figure 4, each drilling equipment 222 includes at least one drilling machine 2221, and is used for drilling machine 2221 are fixed on the drilling machine fixing seat 2222 on bottom plate 210.Each vertical plate 221 is provided at least one location hole 2217, In the present embodiment, setting is there are three location hole 2217 altogether, the position of three location holes 2217 with need to drill out in fixed plate 120 Fixation hole position it is corresponding.Location hole 2217 runs through the first side wall 2213 and second sidewall 2214, aperture 16mm, hole It is inside provided with drill jig sleeve (not shown), the outer diameter of drill jig sleeve is identical as the aperture of location hole 2217, and internal diameter is identical as fixation hole, bores Die sleeve has positioning, guiding role to drill bit.Drilling machine 2221 and location hole 2217 correspond, the drill bit of drilling machine 2221 with it is corresponding Location hole 2217 be coaxially disposed.In each working cell 220, drilling machine 2221 is respectively positioned on vertical plate 221 in the first side wall 2213 Side, and drill bit is directed toward the first side wall 2213.
Further, the first side wall 2213 and second sidewall 2214 are separately provided for carrying out vertical plate 221 firm First gusset 2218 and the second gusset 2219.The height of first gusset 2218 is influenced by 2216 position of boss, in order not to hinder The placement of fixed plate 120, height are lower than boss 2216.Since the drilling of drilling machine 2221 is opened by the side of the first side wall 2213 Begin, stress is larger during the work time for the second gusset 2219.Therefore, the height of the second gusset 2219 is higher than the first gusset 2218 With boss 2216, to increase the height of support as far as possible.
As shown in Figure 3 and Figure 5, bottom plate 210 includes the first end 211 and the second end positioned at both ends on its length direction 212;Multiple working cells 220 are divided into the first working group 220a close to first end 211 using the center of bottom plate 210 as boundary, with And the second working group 220b close to the second end 212;Multiple vertical plates 221 in first working group 220a are with the first side wall 2213 towards first end 211;Multiple vertical plates 221 in second working group 220b are with the first side wall 2213 towards the second end 212.First working group 220a and the second working group 220b is to cross the section at 210 center of bottom plate as plane of symmetry mirror image each other.Into When row bore operation, the first working group 220a is opposite with the drill bit drilling direction in the second working group 220b, and symmetrical structure can So that internal force is cancelled out each other, make entire batch drilling tool 200 more firm.Further, first end 211 is provided with positioning The bottom of vertical plate 213, positioning vertical plate 213 is connect with bottom plate 210, and positioning vertical plate 213 includes bearing surface 213a, and bearing surface 213a is used It is abutted in the end of girder 110, to be accurately positioned the position of girder 110.
The batch boring work of the present embodiment includes the following steps: in operation
S1. the girder 110 of polygonal mirror supporting cross bearer 100 is passed through into multiple fixed plates 120.
S2. girder 110 is placed in the mounting groove 2215 of each vertical plate 221, and by one end of girder 110 and positions vertical plate 213 bearing surface 213a is abutted, to position to girder 110.
S3. each fixed plate 120 is abutted with the first side wall 2213 of corresponding vertical plate 221, and by the lower edge of fixed plate 120 It is abutted against with boss 2216, completes the positioning of fixed plate 120, and by welding, fixed plate 120 and girder 110 are welded, formed State as shown in FIG. 6.
S4. start drilling equipment 222, drill to each fixed plate 120, produce the fixation hole in fixed plate 120.
Further, the present embodiment additionally provides a kind of production equipment of polygonal mirror supporting cross bearer 100 comprising on Batch drilling tool 200 is stated, the efficient mass production of polygonal mirror supporting cross bearer 100 may be implemented, reduction is produced into This.
In conclusion the utility model embodiment provides a kind of batch drilling tool of polygonal mirror supporting cross bearer, It includes bottom plate and multiple working cells;Multiple working cells are arranged along the length direction interval of bottom plate.Each working cell It include vertical plate and drilling equipment, vertical plate is for being supported and consolidating to the girder and fixed plate of polygonal mirror supporting cross bearer It is fixed, then bore operation is completed by drilling equipment.The batch that the batch drilling tool can be used in polygonal mirror supporting cross bearer bores Hole operation improves the production efficiency of polygonal mirror supporting cross bearer, reduces time cost of labor.
The utility model embodiment additionally provides a kind of production equipment of polygonal mirror supporting cross bearer comprising above-mentioned batch Drilling tool is measured, the efficient mass production of polygonal mirror supporting cross bearer may be implemented, reduces production cost.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (10)

1. a kind of batch drilling tool of polygonal mirror supporting cross bearer, which is characterized in that including bottom plate and multiple job notes Member;Multiple working cells are arranged along the length direction interval of the bottom plate;
Each working cell includes vertical plate and drilling equipment;
Each vertical plate includes bottom wall, roof, abuts to the fixed plate to the polygonal mirror supporting cross bearer The first side wall, and the second sidewall being oppositely arranged with the first side wall;The bottom wall is connect with the bottom plate, the top Wall is provided with mounting groove, and the mounting groove runs through the first side wall and the second sidewall;The institute of multiple working cells The length direction that mounting groove is stated along the bottom plate is aligned, and is provided commonly for consolidating the girder of the polygonal mirror supporting cross bearer Fixed support;
Each drilling equipment includes at least one drilling machine, and the brill for being fixed on the drilling machine on the bottom plate Machine fixing seat.
2. batch drilling tool according to claim 1, which is characterized in that the first side wall is convexly equipped with for described The boss that fixed plate is positioned, the boss are located at the lower section of the mounting groove.
3. batch drilling tool according to claim 2, which is characterized in that the first side wall and the second sidewall point It is not provided with for carrying out firm the first gusset and the second gusset to the vertical plate.
4. batch drilling tool according to claim 3, which is characterized in that the height of first gusset is lower than described convex Platform;The height of second gusset is higher than first gusset.
5. batch drilling tool according to claim 4, which is characterized in that in each working cell, the drilling machine The vertical plate is respectively positioned in the side of the first side wall, and the drill bit of the drilling machine is directed toward the first side wall.
6. batch drilling tool according to claim 5, which is characterized in that the bottom plate includes being located on its length direction The first end and the second end at both ends;Multiple working cells are divided into using the center of the bottom plate as boundary close to described the First working group of one end, and the second working group close to the second end;Multiple institutes in first working group Vertical plate is stated with the first side wall towards the first end;Multiple vertical plates in second working group are with described The first side wall is towards the second end.
7. batch drilling tool according to claim 6, which is characterized in that first working group and second work Group is using the section at the excessively described bottom plate center as plane of symmetry mirror image each other.
8. batch drilling tool according to claim 6, which is characterized in that the first end is provided with positioning vertical plate, The bottom of the positioning vertical plate is connect with the bottom plate, and the positioning vertical plate includes for being abutted with the end of the girder Bearing surface.
9. batch drilling tool according to claim 1, which is characterized in that each vertical plate is provided at least one Location hole, the location hole run through the first side wall and the second sidewall;The drilling machine and the location hole correspond, The drill bit of the drilling machine is coaxially disposed with the corresponding location hole, and each positioning hole is provided with drill jig sleeve.
10. a kind of production equipment of polygonal mirror supporting cross bearer, which is characterized in that including any one of such as claim 1~9 institute The batch drilling tool stated.
CN201821102363.6U 2018-07-11 2018-07-11 A kind of the batch drilling tool and production equipment of polygonal mirror supporting cross bearer Active CN208528129U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821102363.6U CN208528129U (en) 2018-07-11 2018-07-11 A kind of the batch drilling tool and production equipment of polygonal mirror supporting cross bearer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821102363.6U CN208528129U (en) 2018-07-11 2018-07-11 A kind of the batch drilling tool and production equipment of polygonal mirror supporting cross bearer

Publications (1)

Publication Number Publication Date
CN208528129U true CN208528129U (en) 2019-02-22

Family

ID=65387519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821102363.6U Active CN208528129U (en) 2018-07-11 2018-07-11 A kind of the batch drilling tool and production equipment of polygonal mirror supporting cross bearer

Country Status (1)

Country Link
CN (1) CN208528129U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108580958A (en) * 2018-07-11 2018-09-28 河南龙成重工有限公司 A kind of the batch drilling tool and production equipment of polygonal mirror supporting cross bearer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108580958A (en) * 2018-07-11 2018-09-28 河南龙成重工有限公司 A kind of the batch drilling tool and production equipment of polygonal mirror supporting cross bearer

Similar Documents

Publication Publication Date Title
CN208528129U (en) A kind of the batch drilling tool and production equipment of polygonal mirror supporting cross bearer
CN108580958A (en) A kind of the batch drilling tool and production equipment of polygonal mirror supporting cross bearer
CN113458639B (en) 80MW marine generator base and welding process thereof
CN107695961B (en) Integrated trimming and detecting platform for side wall framework
CN206399428U (en) A kind of Multifunctional mapping instrument
CN207662548U (en) Simulating test device for surface milling cutter
CN211120056U (en) Pile foundation positioning device for trough type solar heat collector
CN109235484A (en) Boiler steel frame mounting process
CN106052658B (en) Photo-thermal power generation heat collector pylon positioning measuring device and pylon localization method
CN214996172U (en) Lattice column accurate positioning and elevation control device
CN212896347U (en) Positioning and centering device for static pile press
CN209647646U (en) A kind of drilling equipment of bridge construction
CN211276957U (en) Ultrasonic welding jig for IGBT module power terminal
CN209021618U (en) A kind of steel tube drilling machine integral type workbench of multiple functional accurate positioning
CN216524289U (en) Weighing tool
CN212807677U (en) Water conservancy and hydropower engineering construction is with surveying equipment
CN205909823U (en) Solar -thermal power generation heat collector pylon location survey device
CN206677863U (en) The quick assembly tool of photo-thermal sulculus
CN212271364U (en) Herringbone beam steel roof truss
CN217637059U (en) Water and electricity engineering surveying and mapping device
CN211740046U (en) Special measuring tool for mounting upright post of groove type solar heat collector
CN210636436U (en) Auxiliary device for static pressure construction of concrete prefabricated solid square pile
CN206435865U (en) The welder of cantilever beam in the pylon of solar energy thermo-power station
CN213397023U (en) Large-scale slewing bearing raceway contour measurement frock
CN207629667U (en) Positioning tool for processing engine rooms of wind power generators

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231007

Address after: 474571 No. 12, Huayuan Village Industrial Park, Huiche Town, Xixia County, Nanyang City, Henan Province

Patentee after: Henan Henglu Steel Structure Co.,Ltd.

Address before: 474500 Industrial Park, Huiche Town, Xixia County, Nanyang City, Henan Province

Patentee before: HENAN LONGCHENG HEAVY INDUSTRY Co.,Ltd.