CN108580958A CN201810763003.9A CN201810763003A CN108580958A CN 108580958 A CN108580958 A CN 108580958A CN 201810763003 A CN201810763003 A CN 201810763003A CN 108580958 A CN108580958 A CN 108580958A
Authority
CN
China
Prior art keywords
polygonal mirror
drilling tool
riser
supporting cross
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810763003.9A
Other languages
Chinese (zh)
Inventor
吕彦龙
曹子奂
李季
王希彬
任义
王永兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Longcheng Heavy Industry Co Ltd
Original Assignee
Henan Longcheng Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Longcheng Heavy Industry Co Ltd filed Critical Henan Longcheng Heavy Industry Co Ltd
Priority to CN201810763003.9A priority Critical patent/CN108580958A/en
Publication of CN108580958A publication Critical patent/CN108580958A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B39/00General-purpose boring or drilling machines or devices; Sets of boring and/or drilling machines
    • B23B39/16Drilling machines with a plurality of working-spindles; Drilling automatons
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q3/00Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Drilling And Boring (AREA)

Abstract

A kind of batch drilling tool of polygonal mirror supporting cross bearer, is related to machinery processing apparatus field comprising bottom plate and multiple working cells;Multiple working cells are arranged along the length direction interval of bottom plate.Each working cell includes riser and drilling equipment, and riser is used to that the girder and fixed plate of polygonal mirror supporting cross bearer to be supported and be fixed, then completes bore operation by drilling equipment.The batch drilling tool can be used in the batch bore operation of polygonal mirror supporting cross bearer, improve the production efficiency of polygonal mirror supporting cross bearer, reduce time cost of labor.A kind of production equipment of polygonal mirror supporting cross bearer comprising the efficient mass production of polygonal mirror supporting cross bearer may be implemented in above-mentioned batch drilling tool, reduces production cost.

Description

A kind of the batch drilling tool and production equipment of polygonal mirror supporting cross bearer
Technical field
The present invention relates to machinery processing apparatus fields, in particular to a kind of batch of polygonal mirror supporting cross bearer Drilling tool and production equipment.
Background technology
The outburst of worldwide energy crisis have stimulated research and development of the people to heliotechnics.Relative to solar-electricity Pond it is expensive, less efficient, the efficiency of solar energy thermal-power-generating is higher, Technical comparing is ripe.Many industrially developed country, all Using solar energy thermal-power-generating technology as the emphasis of country's research and development.
The principle of solar light-heat power-generation is that the polygonal mirror arranged by large scale array converges to sunlight too Positive energy collection device, utilizes the heat transfer medium (liquid or gas) in solar energy heating collection device, reheats water and forms steam Or directly drive electrical power generators.Multigroup mounting hole is wherein distributed on mirror holder, every group of mounting hole fixes a face speculum, multigroup Sunlight is gathered same focus by the minute surface of speculum, and the minute surface of polygonal mirror is theoretically on same spherical surface, speculum Mounting hole corresponds to the same center of circle respectively, on the spherical surface of different-diameter.
Since mounting hole is more on mirror support crossbearer, and hole position it is inconsistent, if using a hole, a hole successively by A processing, working efficiency is low, and processing charges is high, cannot be satisfied batch production needs.
Invention content
The purpose of the present invention is to provide a kind of batch drilling tools of polygonal mirror supporting cross bearer, and it can be used to more The batch bore operation of face mirror support crossbearer improves the production efficiency of polygonal mirror supporting cross bearer, and it is artificial to reduce the time Cost.
Another object of the present invention is to provide a kind of production equipments of polygonal mirror supporting cross bearer, may be implemented more The efficient mass production of face mirror support crossbearer.
What the embodiment of the present invention was realized in:
A kind of batch drilling tool of polygonal mirror supporting cross bearer comprising bottom plate and multiple working cells;It is multiple Working cell is arranged along the length direction interval of bottom plate;
Each working cell includes riser and drilling equipment;
Each riser include bottom wall, roof, abutted to the fixed plate to polygonal mirror supporting cross bearer the One side wall, and the second sidewall that is oppositely arranged with the first side wall;Bottom wall is connect with bottom plate, and roof is provided with mounting groove, installation Slot runs through the first side wall and second sidewall;The mounting groove of multiple working cells is aligned along the length direction of bottom plate, is provided commonly for pair Support is fixed in the girder of polygonal mirror supporting cross bearer;
Each drilling equipment includes at least one drilling machine, and is fixed for drilling machine to be fixed on the drilling machine on bottom plate Seat.
Further, in the other preferred embodiments of the present invention, the first side wall is convexly equipped with for being positioned to fixed plate Boss, boss is located at the lower section of mounting groove.
Further, in the other preferred embodiments of the present invention, the first side wall and second sidewall are separately provided for pair Riser carries out firm the first gusset and the second gusset;
Further, in the other preferred embodiments of the present invention, the height of the first gusset is less than boss;The height of second gusset Degree is higher than the first gusset.
Further, in the other preferred embodiments of the present invention, in each working cell, drilling machine is respectively positioned on riser first The side of side wall, and drill bit is directed toward the first side wall.
Further, in the other preferred embodiments of the present invention, bottom plate includes be located at both ends on its length direction first End and the second end;Multiple working cells are divided into the first working group close to first end using the center of bottom plate as boundary, and Close to the second working group of the second end;Multiple risers in first working group are with the first side wall towards first end;Second Multiple risers in working group are with the first side wall towards the second end.
Further, in the other preferred embodiments of the present invention, the first working group and the second working group are to cross bottom plate center Section be plane of symmetry mirror image each other.
Further, in the other preferred embodiments of the present invention, first end is provided with positioning riser, positions the bottom of riser Portion is connect with bottom plate, and positioning riser includes the bearing surface abutted for the end with girder.
Further, in the other preferred embodiments of the present invention, each riser is both provided at least one location hole, positioning The first side wall and second sidewall are run through in hole;Drilling machine is corresponded with location hole, and the drill bit of drilling machine and corresponding location hole are coaxial It is arranged, drill jig sleeve is both provided in each location hole.
A kind of production equipment of polygonal mirror supporting cross bearer comprising above-mentioned batch drilling tool.
The advantageous effect of the embodiment of the present invention is:
An embodiment of the present invention provides a kind of batch drilling tools of polygonal mirror supporting cross bearer comprising bottom plate, with And multiple working cells;Multiple working cells are arranged along the length direction interval of bottom plate.Each working cell include riser and Drilling equipment, riser are filled for the girder and fixed plate of polygonal mirror supporting cross bearer to be supported and positioned, then by drilling It sets and completes bore operation.The batch drilling tool can be used in the batch bore operation of polygonal mirror supporting cross bearer, improve more The production efficiency of face mirror support crossbearer reduces time cost of labor.
The embodiment of the present invention additionally provides a kind of production equipment of polygonal mirror supporting cross bearer comprising above-mentioned batch bores The efficient mass production of polygonal mirror supporting cross bearer may be implemented in hole tool, reduces production cost.
Description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
The schematic diagram for the polygonal mirror supporting cross bearer that Fig. 1 is provided by the embodiment of the present invention;
The schematic diagram of the fixed plate for the polygonal mirror supporting cross bearer that Fig. 2 is provided by the embodiment of the present invention;
Schematic diagram of the batch drilling tool that Fig. 3 is provided by the embodiment of the present invention under the first visual angle;
The schematic diagram of the riser for the batch drilling tool that Fig. 4 is provided by the embodiment of the present invention;
Schematic diagram of the batch drilling tool that Fig. 5 is provided by the embodiment of the present invention under the second visual angle;
The signal that the batch drilling tool that Fig. 6 is provided by the embodiment of the present invention is combined with polygonal mirror supporting cross bearer Figure.
Icon:100- polygonal mirror supporting cross bearers;110- girders;120- fixed plates;The first mounting holes of 121-;122- Two mounting holes;123- third mounting holes;200- batch drilling tools;210- bottom plates;211- first ends;212- the second ends; 213- positions riser;213a- bearing surfaces;The working cells 220-;The first working groups of 220a-;The second working groups of 220b-;221- is vertical Plate;2211- bottom walls;2212- roofs;2213- the first side walls;2214- second sidewalls;2215- mounting grooves;2216- boss; 2217- location holes;The first gussets of 2218-;The second gussets of 2219-;222- drilling equipments;2221- drilling machines;2222- drilling machines are fixed Seat.
Specific implementation mode
To keep the purpose, technical scheme and advantage of embodiment of the present invention clearer, implement below in conjunction with the present invention The technical solution in embodiment of the present invention is clearly and completely described in attached drawing in mode, it is clear that described reality The mode of applying is some embodiments of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ability The every other embodiment that domain those of ordinary skill is obtained without creative efforts, belongs to the present invention The range of protection.Therefore, the detailed description of the embodiments of the present invention to providing in the accompanying drawings is not intended to limit and wants below The scope of the present invention of protection is sought, but is merely representative of the selected embodiment of the present invention.Based on the embodiment in the present invention, The every other embodiment that those of ordinary skill in the art are obtained without creative efforts belongs to this Invent the range of protection.
In the description of the present invention, it is to be understood that, term "center", " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside", " up time The orientation or positional relationship of the instructions such as needle ", " counterclockwise " is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of The description present invention and simplified description, do not indicate or imply the indicated equipment or element must have a particular orientation, with spy Fixed azimuth configuration and operation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " are used for description purposes only, it is not understood to indicate or imply relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more this feature.In the description of the present invention, the meaning of " plurality " is two or more, Unless otherwise specifically defined.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc. Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;Can be that machinery connects It connects, can also be electrical connection;It can be directly connected, can also can be indirectly connected through an intermediary in two elements The interaction relationship of the connection in portion or two elements.It for the ordinary skill in the art, can be according to specific feelings Condition understands the concrete meaning of above-mentioned term in the present invention.
In the present invention unless specifically defined or limited otherwise, fisrt feature the "upper" of second feature or "lower" It may include that the first and second features are in direct contact, can also not be to be in direct contact but pass through it including the first and second features Between other characterisation contact.Moreover, fisrt feature second feature " on ", " top " and " above " include first special Sign is right over second feature and oblique upper, or is merely representative of fisrt feature level height and is higher than second feature.Fisrt feature exists Second feature " under ", " lower section " and " following " include fisrt feature immediately below second feature and obliquely downward, or be merely representative of Fisrt feature level height is less than second feature.
Embodiment
A kind of batch drilling tool 200 is present embodiments provided, the batch for polygonal mirror supporting cross bearer 100 drills Operation.As shown in Figure 1, the polygonal mirror supporting cross bearer 100 includes a cylinder steel pipe as girder 110, and along master Multiple fixed plates 120 of 110 length direction of beam setting.Specifically, in the present embodiment, the polygonal mirror supporting cross bearer 100 110 a diameter of 200mm of girder, be provided with 8 fixed plates 120 altogether thereon, the spacing between two neighboring fixed plate 120 is 600mm, and 8 fixed plates 120 are symmetrical as the plane of symmetry using the cross section at 110 center of girder.In each fixed plate 120 It needs to drill out three mounting holes, for speculum to be fixed.By taking the visual angle of Fig. 2 as an example, three mounting holes include being located at admittedly First mounting hole 121 on the right side of fixed board 120 is located at the second mounting hole 122 of upper left, and the third mounting hole positioned at lower-left 123, and the aperture of three mounting holes is 6.5mm.Wherein, it is located in two fixed plates 120 at 110 center of girder Distance L is minimum between first mounting hole 121 and girder 110, and closer to the fixed plate 120 at 110 both ends of girder, the first mounting hole 121 translations outward, the value of L is bigger, and the L value increments of two neighboring fixed plate 120 are 0.5mm, meanwhile, the second mounting hole 122, The displacement of third mounting hole 123 is consistent with the first mounting hole 121, to ensure three mounting hole phases in same fixed plate 120 It is constant to position.
For above-mentioned polygonal mirror supporting cross bearer 100, for fixed plate 120 and mounting hole position accuracy demand compared with Height, and the position of the mounting hole of every piece of fixed plate 120 has differences, and to realize that the drilling production of mass, difficulty are very big 's.
For this purpose, present embodiments provide a kind of batch drilling tool 200, with reference to shown in Fig. 3 comprising bottom plate 210 and Multiple working cells 220, multiple working cells 220 are arranged along the length direction interval of bottom plate 210, and each working cell 220 is equal Including riser 221 and drilling equipment 222, riser 221 is for being fixed the position of girder 110 and fixed plate 120, drilling dress 222 are set for drilling to fixed plate 120.In the present embodiment, corresponding with polygonal mirror supporting cross bearer 100, work The quantity for making unit 220 is 8, and the bore operation of a fixed plate 120 is completed in each working cell 220.
As shown in Figure 3 and Figure 4, each riser 221 includes bottom wall 2211, roof 2212, to polygonal mirror branch The first side wall 2213 that the fixed plate 120 of crossbearer 100 is abutted is supportted, and the second side being oppositely arranged with the first side wall 2213 Wall 2214.Bottom wall 2211 is connect with bottom plate 210, and roof 2212 is provided with mounting groove 2215, and mounting groove 2215 runs through the first side wall 2213 and second sidewall 2214.The mounting groove 2215 of multiple working cells 220 is aligned along the length direction of bottom plate 210, common to use Support is fixed in the girder 110 to polygonal mirror supporting cross bearer 100.When carrying out operation, girder 110 is placed in installation In slot 2215, the fixation to girder 110 is completed, then fixed plate 120 is close to the first side wall 2213 of riser 221, when each solid After fixed board 120 is all close to corresponding riser 221, that is, complete being accurately positioned for fixed plate 120.It is noticeable It is that the position of riser 221 is needed by advance adjustment so that adjacent in the case where fixed plate 120 is close to the first side wall 2213 Spacing between fixed plate 120 can be maintained at 600mm.Further, the first side wall 2213 is convexly equipped with for fixed plate 120 The boss 2216 being supported, boss 2216 are located at the lower section of mounting groove 2215, the distance of boss 2216 to girder 110 and fixation The distance of plate 120 lower edge to girder 110 is consistent, and when fixed plate 120 is close to the first side wall 2213, the lower edge of fixed plate 120 is rigid Good to be abutted with the upper surface of boss 2216, boss 2216 can play the role of fixed plate 120 positioning and limitation overturning.It is fixed After plate 120 positions, you can to being welded and fixed for fixed plate 120 and girder 110.
Preferably, close to two risers 221 at 210 both ends of bottom plate to its main fixed function of the position of girder 110, peace The width of tankage 2215 should be suitable with the diameter of girder 110, to prevent the shaking of girder 110.Meanwhile because steel pipe straightness Different because of processing conditions, it is absolute straight not ensure that, the width of the mounting groove 2215 of remaining riser 221 should be slightly bigger than girder 110 diameter, such as width can be set to 201~205mm, the clamping convenient for girder 110 and dismounting.
As shown in Figure 3 and Figure 4, each drilling equipment 222 includes at least one drilling machine 2221, and is used for drilling machine 2221 are fixed on the drilling machine fixed seat 2222 on bottom plate 210.Each riser 221 is both provided at least one location hole 2217, In the present embodiment, there are three location holes 2217 for setting altogether, and the position of three location holes 2217 needs to drill out in fixed plate 120 Mounting hole position it is corresponding.Location hole 2217 runs through the first side wall 2213 and second sidewall 2214, aperture 16mm, hole It is inside provided with drill jig sleeve (not shown), the outer diameter of drill jig sleeve is identical as the aperture of location hole 2217, and internal diameter is identical as mounting hole, bores Die sleeve has positioning, guiding role to drill bit.Drilling machine 2221 and location hole 2217 correspond, the drill bit of drilling machine 2221 with it is corresponding Location hole 2217 be coaxially disposed.In each working cell 220, drilling machine 2221 is respectively positioned on riser 221 in the first side wall 2213 Side, and drill bit is directed toward the first side wall 2213.
Further, the first side wall 2213 and second sidewall 2214 are separately provided for carrying out riser 221 firm First gusset 2218 and the second gusset 2219.The height of first gusset 2218 is influenced by 2216 position of boss, in order not to hinder The placement of fixed plate 120, height are less than boss 2216.Since the drilling of drilling machine 2221 is opened by the side of the first side wall 2213 Begin, stress is larger during the work time for the second gusset 2219.Therefore, the height of the second gusset 2219 is higher than the first gusset 2218 With boss 2216, to increase the height of support as far as possible.
As shown in Figure 3 and Figure 5, bottom plate 210 includes the first end 211 and the second end for being located at both ends on its length direction 212;Multiple working cells 220 are divided into the first working group 220a close to first end 211 using the center of bottom plate 210 as boundary, with And the second working group 220b close to the second end 212;Multiple risers 221 in first working group 220a are with the first side wall 2213 towards first end 211;Multiple risers 221 in second working group 220b are with the first side wall 2213 towards the second end 212.First working group 220a and the second working group 220b is to cross the section at bottom plate 210 center as plane of symmetry mirror image each other.Into When row bore operation, the first working group 220a is opposite with the drill bit drilling direction in the second working group 220b, and symmetrical structure can So that internal force is cancelled out each other, make entire batch drilling tool 200 more firm.Further, first end 211 is provided with positioning The bottom of riser 213, positioning riser 213 is connect with bottom plate 210, and positioning riser 213 includes bearing surface 213a, and bearing surface 213a is used It is abutted in the end of girder 110, to be accurately positioned the position of girder 110.
The batch boring work of the present embodiment includes the following steps in operation:
S1. the girder 110 of polygonal mirror supporting cross bearer 100 is passed through into multiple fixed plates 120.
S2. girder 110 is placed in the mounting groove 2215 of each riser 221, and by one end of girder 110 and positions riser 213 bearing surface 213a is abutted, to be positioned to girder 110.
S3. each fixed plate 120 is abutted with the first side wall 2213 of corresponding riser 221, and by the lower edge of fixed plate 120 It is abutted against with boss 2216, completes the positioning of fixed plate 120, and by welding, fixed plate 120 and girder 110 are welded, formed State as shown in FIG. 6.
S4. start drilling equipment 222, drill to each fixed plate 120, produce the mounting hole in fixed plate 120.
Further, the present embodiment additionally provides a kind of production equipment of polygonal mirror supporting cross bearer 100 comprising on Batch drilling tool 200 is stated, the efficient mass production of polygonal mirror supporting cross bearer 100 may be implemented, reduction is produced into This.
In conclusion an embodiment of the present invention provides a kind of batch drilling tool of polygonal mirror supporting cross bearer, packet Include bottom plate and multiple working cells;Multiple working cells are arranged along the length direction interval of bottom plate.Each working cell Jun Bao Riser and drilling equipment are included, riser is used to that the girder and fixed plate of polygonal mirror supporting cross bearer to be supported and be fixed, then Bore operation is completed by drilling equipment.The batch drilling that the batch drilling tool can be used in polygonal mirror supporting cross bearer is made Industry improves the production efficiency of polygonal mirror supporting cross bearer, reduces time cost of labor.
The embodiment of the present invention additionally provides a kind of production equipment of polygonal mirror supporting cross bearer comprising above-mentioned batch bores The efficient mass production of polygonal mirror supporting cross bearer may be implemented in hole tool, reduces production cost.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, any made by repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of batch drilling tool of polygonal mirror supporting cross bearer, which is characterized in that including bottom plate and multiple job notes Member;Multiple working cells are arranged along the length direction interval of the bottom plate;
Each working cell includes riser and drilling equipment;
Each riser includes bottom wall, roof, is abutted to the fixed plate to the polygonal mirror supporting cross bearer The first side wall, and the second sidewall that is oppositely arranged with the first side wall;The bottom wall is connect with the bottom plate, the top Wall is provided with mounting groove, and the mounting groove runs through the first side wall and the second sidewall;The institute of multiple working cells The length direction that mounting groove is stated along the bottom plate is aligned, and is provided commonly for consolidating the girder of the polygonal mirror supporting cross bearer Fixed support;
Each drilling equipment includes at least one drilling machine, and the brill for being fixed on the drilling machine on the bottom plate Machine fixed seat.
2. batch drilling tool according to claim 1, which is characterized in that the first side wall is convexly equipped with for described The boss that fixed plate is positioned, the boss are located at the lower section of the mounting groove.
3. batch drilling tool according to claim 2, which is characterized in that the first side wall and the second sidewall point It is not provided with for carrying out firm the first gusset and the second gusset to the riser.
4. batch drilling tool according to claim 3, which is characterized in that the height of first gusset is less than described convex Platform;The height of second gusset is higher than first gusset.
5. batch drilling tool according to claim 4, which is characterized in that in each working cell, the drilling machine The riser is respectively positioned in the side of the first side wall, and the drill bit is directed toward the first side wall.
6. batch drilling tool according to claim 5, which is characterized in that the bottom plate includes being located on its length direction The first end and the second end at both ends;Multiple working cells are divided into using the center of the bottom plate as boundary close to described the First working group of one end, and the second working group close to the second end;Multiple institutes in first working group Riser is stated with the first side wall towards the first end;Multiple risers in second working group are with described The first side wall is towards the second end.
7. batch drilling tool according to claim 6, which is characterized in that first working group and second work Group is using the section at the excessively described bottom plate center as plane of symmetry mirror image each other.
8. batch drilling tool according to claim 6, which is characterized in that the first end is provided with positioning riser, The bottom of the positioning riser is connect with the bottom plate, and the positioning riser includes for being abutted with the end of the girder Bearing surface.
9. batch drilling tool according to claim 1, which is characterized in that each riser is both provided at least one Location hole, the location hole run through the first side wall and the second sidewall;The drilling machine is corresponded with the location hole, The drill bit of the drilling machine is coaxially disposed with the corresponding location hole, and drill jig sleeve is both provided in each location hole.
10. a kind of production equipment of polygonal mirror supporting cross bearer, which is characterized in that including any one of such as claim 1~9 institute The batch drilling tool stated.
CN201810763003.9A 2018-07-11 2018-07-11 A kind of the batch drilling tool and production equipment of polygonal mirror supporting cross bearer Pending CN108580958A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810763003.9A CN108580958A (en) 2018-07-11 2018-07-11 A kind of the batch drilling tool and production equipment of polygonal mirror supporting cross bearer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810763003.9A CN108580958A (en) 2018-07-11 2018-07-11 A kind of the batch drilling tool and production equipment of polygonal mirror supporting cross bearer

Publications (1)

Publication Number Publication Date
CN108580958A true CN108580958A (en) 2018-09-28

Family

ID=63615407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810763003.9A Pending CN108580958A (en) 2018-07-11 2018-07-11 A kind of the batch drilling tool and production equipment of polygonal mirror supporting cross bearer

Country Status (1)

Country Link
CN (1) CN108580958A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200317804Y1 (en) * 2003-04-02 2003-06-25 한정택 Multiple spindle boring machine
CN106180801A (en) * 2016-08-29 2016-12-07 杭州鸿立机械有限公司 Light heat solar girder integrated fully-automatic production system and boring method
CN106624040A (en) * 2017-03-16 2017-05-10 棕橙智造盐城机器人有限公司 Integral primary drilling device for solar mirror bracket
CN106825669A (en) * 2017-01-06 2017-06-13 浙江中控太阳能技术有限公司 A kind of heliostat girder process equipment
CN208528129U (en) * 2018-07-11 2019-02-22 河南龙成重工有限公司 A kind of the batch drilling tool and production equipment of polygonal mirror supporting cross bearer

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200317804Y1 (en) * 2003-04-02 2003-06-25 한정택 Multiple spindle boring machine
CN106180801A (en) * 2016-08-29 2016-12-07 杭州鸿立机械有限公司 Light heat solar girder integrated fully-automatic production system and boring method
CN106825669A (en) * 2017-01-06 2017-06-13 浙江中控太阳能技术有限公司 A kind of heliostat girder process equipment
CN106624040A (en) * 2017-03-16 2017-05-10 棕橙智造盐城机器人有限公司 Integral primary drilling device for solar mirror bracket
CN208528129U (en) * 2018-07-11 2019-02-22 河南龙成重工有限公司 A kind of the batch drilling tool and production equipment of polygonal mirror supporting cross bearer

Similar Documents

Publication Publication Date Title
CN206157897U (en) Assembled steel construction of high -rise structure system
CN100579712C (en) Firstly hole drilling construction method in girder steel hole-drilling
CA1083527A (en) Apparatus for electrochemically forming a plurality of articles
CN106475741B (en) A kind of self-elevating drilling platform cantilever beam pushing-pulling-rack building technology
CN208528129U (en) A kind of the batch drilling tool and production equipment of polygonal mirror supporting cross bearer
CN104722799B (en) A kind of drilling equipment and positioning component
CN109252451A (en) One kind for welding steel truss girder bridge closure mouth accurately matched method entirely
CN108580958A (en) A kind of the batch drilling tool and production equipment of polygonal mirror supporting cross bearer
CN106670662A (en) Laser welding fixture for fuel element frame
CN103264215A (en) Beam structure of plasma drilling and cutting all-in-one machine
CN113664408A (en) Method for manufacturing corner section of large low-temperature wind tunnel
CN110014241B (en) Welding process for power transmission steel pipe tower flange
CN103286338B (en) AP1000 steam generator tube sheet group hole High Efficient Machining Technology method
CN206883233U (en) A kind of fixing device for being exclusively used in milling pin oil groove
CN113458639B (en) 80MW marine generator base and welding process thereof
CN209647646U (en) A kind of drilling equipment of bridge construction
CN105134088B (en) A kind of mast and preparation method thereof, rotary drilling rig
CN209578268U (en) A kind of girder steel drilling template tooling
CN110424629A (en) A kind of special-shaped complicated suspension column structure and production method
CN220377108U (en) Hollow pier embedded bar positioning tool
CN2325140Y (en) Improved structure of securing base of hand electric drill
CN211516198U (en) Novel steel plate milling inclined plane processing equipment
CN215510072U (en) High-precision boring tool
CN201136077Y (en) Gantry type special welder for welding heat-exchanger
CN212807677U (en) Water conservancy and hydropower engineering construction is with surveying equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination