CN208522369U - The underground pipe gallery cable and wire of urban engineering project is laid with traction device - Google Patents
The underground pipe gallery cable and wire of urban engineering project is laid with traction device Download PDFInfo
- Publication number
- CN208522369U CN208522369U CN201820887226.1U CN201820887226U CN208522369U CN 208522369 U CN208522369 U CN 208522369U CN 201820887226 U CN201820887226 U CN 201820887226U CN 208522369 U CN208522369 U CN 208522369U
- Authority
- CN
- China
- Prior art keywords
- friction
- transfer tape
- tape assemble
- cable
- wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The underground pipe gallery cable and wire that the utility model provides urban engineering project is laid with traction device, it includes bottom plate, cabinet is fixedly installed on the bottom plate, the inside of the cabinet is paralleled to the layout and installation by the first vertical bar and the second vertical bar mutually matched bottom friction transfer tape assemble and friction-top transfer tape assemble, the bottom friction transfer tape assemble and friction-top transfer tape assemble are all connected with the power device for driving it to be driven, entrance hole and outlet hole are respectively arranged in the two sides of cabinet, guiding mechanism for being oriented to cable is installed on the bottom plate of entrance hole and outlet hole position.This traction device can be used in the towage of cable and wire, and then substitute traditional manual work mode, greatly improves its working efficiency, reduces the labor intensity of operating personnel.
Description
Technical field
The utility model relates to Architectural Equipment fields, spread more particularly to the underground pipe gallery cable and wire of urban engineering project
If traction device.
Background technique
During municipal construction, need to carry out the laying project of buried cable and electric wire, these usual cable or wires
It is all arranged on underground pipe gallery, in process of deployment, needed from one using being manually laid in traditional process of deployment
Duan Jinhang traction, currently, in common distraction procedure mainly by way of artificial traction, using artificial traction, operation intensity
Height, and working efficiency is low, and therefore, it is necessary to design a kind of underground pipe gallery cable and wire of urban engineering project to be laid with traction dress
It sets.
Utility model content
In order to solve the above technical problems, the underground pipe gallery cable and wire laying that the utility model provides urban engineering project is led
Leading-in device, this traction device can be used in the towage of cable and wire, and then substitute traditional manual work mode, greatly
Its working efficiency is improved, the labor intensity of operating personnel is reduced.
In order to realize above-mentioned technical characteristic, purpose of the utility model is realized as follows: the ground of urban engineering project
Lower piping lane cable and wire is laid with traction device, it includes bottom plate, and cabinet, the inside of the cabinet are fixedly installed on the bottom plate
Mutually matched bottom friction transfer tape assemble is paralleled to the layout and installation by the first vertical bar and the second vertical bar and top is rubbed
Transfer tape assemble is wiped, the bottom friction transfer tape assemble and friction-top transfer tape assemble are all and for driving the dynamic of its transmission
Power device is connected, and is respectively arranged with entrance hole and outlet hole in the two sides of cabinet, in entrance hole and outlet hole position
Guiding mechanism for being oriented to cable is installed on bottom plate.
The power device includes motor, and the motor is fixedly mounted on bottom plate by motor base, the motor
Output shaft is equipped with active synchronization belt wheel, the active synchronization belt wheel by synchronous belt simultaneously with the first driven synchronous pulley and the
Two driven synchronous pulley engaged transmissions.
The bottom friction transfer tape assemble includes the first bottom side plate, and first bottom side plate is slided by slip base
Be fitted in the first vertical bar and the second vertical bar, the both ends of the first bottom side plate pass through respectively the first bottom main shaft and
Second bottom main shaft is equipped with the second bottom side plate, is fitted with friction band on the first bottom main shaft and the second bottom main shaft
It takes turns, bottom friction conveyer belt, the driven synchronous belt of the second of the power device is combined with by V belt translation on the friction belt wheel
Wheel is mounted on the first bottom main shaft, and drives its rotation.
The friction-top transfer tape assemble includes the first top side plate, and first top side plate is slided by slip base
Be fitted in the first vertical bar and the second vertical bar, the both ends of the first top side plate pass through respectively the first top main shaft and
Second top main shaft is equipped with the second top side plate, is fitted with friction band on the first top main shaft and the second top main shaft
It takes turns, friction-top conveyer belt, the driven synchronous belt of the first of the power device is combined with by V belt translation on the friction belt wheel
Wheel is mounted on the first top main shaft, and drives its rotation.
Hand-operated lifting regulating mechanism, the hand-operated lifting regulating mechanism packet are installed on the friction-top transfer tape assemble
Top fixing plate is included, the top fixing plate is fixedly mounted in the first vertical bar and the second vertical bar, on top fixing plate
It is fitted with lifting screw by screw-driven, runner is installed at the top of the lifting screw, in the bottom of lifting screw
End is equipped with link block, and the link block is fixedly linked with the first top side plate.
The guiding mechanism includes that first be fixedly mounted on horizontal concrete chute is vertically directed bar and second and is vertically directed bar,
The horizontal concrete chute is arranged on bottom plate;It is vertically-mounted on bottom plate to have vertical plate, it is machined with vertical chute on the vertical plate,
Horizontally-guided bar is fixedly installed on the vertical chute.
The utility model has the advantages that:
1, it is laid with traction device by using above-mentioned cable and wire, be used in urban construction work progress, cable and wire
Laying, pass through in use, it is only necessary to which cable is penetrated into the bottom friction conveyer belt group of box house from entrance hole
Between part and friction-top transfer tape assemble, start the motor of power device, is driven by motor driven synchronous belt, then by synchronous belt
Dynamic first driven synchronous pulley and the second driven synchronous pulley, and then friction-top conveyer belt and bottom friction conveyer belt are driven,
The cable between friction belt for power transmission is finally output to outlet hole by frictional power, and is pierced by from outlet hole, electricity is completed
The towage of cable substitutes traditional artificial traction mode, greatly improves working efficiency, reduces the labour of operating personnel
Intensity.
2, by active synchronization belt wheel being driven by motor, by active synchronization in the power device course of work
Belt wheel by synchronous belt simultaneously with the first driven synchronous pulley and the second driven synchronous pulley engaged transmission, rub by final drive bottom
Transfer tape assemble and friction-top transfer tape assemble are wiped, entire cable is driven to transmit by way of frictional drive in two frictions
Traction conveying is carried out between component.
3, by friction-top transfer tape assemble and bottom friction transfer tape assemble can by friction-top conveyer belt and
Bottom friction conveyer belt generates friction to cable, and then generates tractive force and draw to it.
4, by the hand-operated lifting regulating mechanism can adjust friction-top conveyer belt and bottom friction conveyer belt it
Between gap, and then adapt to various sizes of cable.
5, good guiding role can be played to cable by the guiding mechanism.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is the first visual angle of the utility model overall structure three-dimensional figure.
Fig. 2 is the second visual angle of the utility model overall structure three-dimensional figure.
Fig. 3 is that the utility model removes the first visual angle three-dimensional figure after cabinet.
Fig. 4 is that the utility model removes the second visual angle three-dimensional figure after cabinet.
Specific embodiment
The embodiments of the present invention is described further with reference to the accompanying drawing.
Referring to Fig. 1-4, the underground pipe gallery cable and wire of urban engineering project is laid with traction device, it includes bottom plate 1, described
Cabinet 2 is fixedly installed on bottom plate 1, the inside of the cabinet 2 is arranged in parallel by the first vertical bar 28 and the second vertical bar 30
Mutually matched bottom friction transfer tape assemble and friction-top transfer tape assemble, the bottom friction transfer tape assemble are installed
All it is connected with the power device for driving it to be driven with friction-top transfer tape assemble, is respectively set in the two sides of cabinet 2
There are entrance hole 10 and outlet hole 8, is equipped on the bottom plate 1 of 8 position of entrance hole 10 and outlet hole for being oriented to cable
Guiding mechanism.By using above-mentioned traction device, can be used in urban engineering project the traction of buried cable electric wire and
It is laid with work, in the course of work, passes through power device and drives bottom friction transfer tape assemble and friction-top conveyer belt group simultaneously
Part will carry out traction drive by frictional force positioned at cable between the two, complete the laying operation of cable.
Further, the power device includes motor 4, and the motor 4 is fixedly mounted on bottom plate 1 by motor base 3
On, the output shaft of the motor 4 is equipped with active synchronization belt wheel, and the active synchronization belt wheel is by synchronous belt 7 simultaneously with first
Driven synchronous pulley 6 and the second driven 5 engaged transmission of synchronous pulley.By using above-mentioned power device, in the course of work, lead to
Cross motor 4 drive active synchronization belt wheel, then by active synchronization belt wheel drive synchronous belt 7, pass through synchronous belt 7 simultaneously drive first from
Dynamic synchronous pulley 6 and the second driven synchronous pulley 5, and then realize the traction of cable.
Further, the bottom friction transfer tape assemble includes the first bottom side plate 25, first bottom side plate 25
It is slidably installed in the first vertical bar 28 and the second vertical bar 30 by slip base, at the both ends of the first bottom side plate 25 point
Not Tong Guo the first bottom main shaft 17 and the second bottom main shaft 21 second bottom side plate 19 is installed, in the first bottom main shaft 17 and
It is fitted with friction belt wheel on two bottom main shafts 21, bottom friction conveyer belt is combined with by V belt translation on the friction belt wheel
22, the driven synchronous pulley 5 of the second of the power device is mounted on the first bottom main shaft 17, and drives its rotation.By adopting
With above-mentioned bottom friction transfer tape assemble, in the course of work, friction belt wheel is driven by the first bottom main shaft 17, passes through friction
Belt wheel further drives the bottom friction conveyer belt 22 being mounted on two friction belt wheels, and then passes through bottom friction conveyer belt
Frictional force between 22 and cable realizes its traction.
Further, the friction-top transfer tape assemble includes the first top side plate 26, first top side plate 26
It is slidably installed in the first vertical bar 28 and the second vertical bar 30 by slip base, at the both ends of the first top side plate 26 point
Not Tong Guo the first top main shaft 18 and the second top main shaft 23 second top side plate 20 is installed, in the first top main shaft 18 and
It is fitted with friction belt wheel on two top main shafts 23, friction-top conveyer belt is combined with by V belt translation on the friction belt wheel
24, the driven synchronous pulley 6 of the first of the power device is mounted on the first top main shaft 18, and drives its rotation.By adopting
With above-mentioned friction-top transfer tape assemble, in the course of work, friction belt wheel is driven by the first top main shaft 18, then by rubbing
Band wheel drive friction-top conveyer belt 24 is wiped, and then passes through matching between friction-top conveyer belt 24 and bottom friction conveyer belt 22
Closing will draw positioned at cable between the two.
Further, hand-operated lifting regulating mechanism, the hand-operated lifting are installed on the friction-top transfer tape assemble
Regulating mechanism includes top fixing plate 27, and the top fixing plate 27 is fixedly mounted on the first vertical bar 28 and the second vertical bar 30
On, lifting screw 29, the top installation of the lifting screw 29 are fitted with by screw-driven on top fixing plate 27
There is runner 9, link block 31 is installed in the bottom end of lifting screw 29, the link block 31 and the first top side plate 26 are fixed
It is connected.In adjustment process, lifting screw 29 is driven by rotating wheel 9, and then block 31 is drivingly connected by lifting screw 29,
It is adjusted by height of the link block 31 to the first top side plate 26, and then realizes that friction-top transfer tape assemble and bottom rub
Wipe the adjusting of the spacing between transfer tape assemble.
Further, the guiding mechanism includes that first be fixedly mounted on horizontal concrete chute 15 is vertically directed bar 14 and
Two are vertically directed bar 16, and the horizontal concrete chute 15 is arranged on bottom plate 1;It is vertically-mounted on bottom plate 1 to have a vertical plate 13, it is described perpendicular
It is machined with vertical chute 12 in straight panel 13, is fixedly installed with horizontally-guided bar 11 on the vertical chute 12.It is led by above-mentioned
Cable can be limited to mechanism, make its be always positioned at friction-top transfer tape assemble and bottom friction transfer tape assemble it
Between, and then frictional traction is generated to cable, draw it smoothly.
The utility model use process is as follows:
Firstly, cable to be penetrated into bottom friction transfer tape assemble and the friction-top transmission of box house from entrance hole 10
Between band component;
Then, the motor 4 for starting power device drives synchronous belt 7 by motor 4, then driven by the driving first of synchronous belt 7
Synchronous pulley 6 and the second driven synchronous pulley 5, and then drive friction-top conveyer belt 24 and bottom friction conveyer belt 22;
Finally, the cable between friction belt for power transmission is output to outlet hole 8 by frictional power, and from outlet hole 8
It is pierced by, completes the towage of cable.
The above embodiments are only the optimal technical scheme of the utility model, and are not construed as the limit for the utility model
System, the technical solution that the protection scope of the utility model should be recorded with claim, the technical solution recorded including claim
The equivalents of middle technical characteristic are protection scope.Equivalent replacement i.e. within this range is improved, also in the utility model
Protection scope within.
Claims (6)
1. the underground pipe gallery cable and wire of urban engineering project is laid with traction device, it is characterised in that: it includes bottom plate (1), institute
It states and is fixedly installed on bottom plate (1) cabinet (2), the inside of the cabinet (2) passes through the first vertical bar (28) and the second vertical bar
(30) paralleling to the layout and installation has mutually matched bottom friction transfer tape assemble and friction-top transfer tape assemble, and the bottom is rubbed
It wipes transfer tape assemble and friction-top transfer tape assemble to be all connected with the power device for driving it to be driven, in cabinet (2)
Two sides are respectively arranged with entrance hole (10) and outlet hole (8), in the bottom plate of entrance hole (10) and outlet hole (8) position
(1) guiding mechanism for being oriented to cable is installed on.
2. the underground pipe gallery cable and wire of urban engineering project is laid with traction device according to claim 1, it is characterised in that:
The power device includes motor (4), and the motor (4) is fixedly mounted on bottom plate (1) by motor base (3), the electricity
The output shaft of machine (4) is equipped with active synchronization belt wheel, and the active synchronization belt wheel is driven same with first simultaneously by synchronous belt (7)
Walk belt wheel (6) and the second driven synchronous pulley (5) engaged transmission.
3. the underground pipe gallery cable and wire of urban engineering project is laid with traction device according to claim 1, it is characterised in that:
The bottom friction transfer tape assemble includes the first bottom side plate (25), and first bottom side plate (25) is slided by slip base
It is fitted in the first vertical bar (28) and the second vertical bar (30), passes through respectively at the both ends of the first bottom side plate (25)
One bottom main shaft (17) and the second bottom main shaft (21) are equipped with the second bottom side plate (19), in the first bottom main shaft (17) and
It is fitted with friction belt wheel on two bottom main shafts (21), bottom friction conveyer belt is combined with by V belt translation on the friction belt wheel
(22), the second of the power device the driven synchronous pulley (5) is mounted on the first bottom main shaft (17), and drives its rotation.
4. the underground pipe gallery cable and wire of urban engineering project is laid with traction device according to claim 1, it is characterised in that:
The friction-top transfer tape assemble includes the first top side plate (26), and first top side plate (26) is slided by slip base
It is fitted in the first vertical bar (28) and the second vertical bar (30), passes through respectively at the both ends of the first top side plate (26)
One top main shaft (18) and the second top main shaft (23) are equipped with the second top side plate (20), in the first top main shaft (18) and
It is fitted with friction belt wheel on two top main shafts (23), friction-top conveyer belt is combined with by V belt translation on the friction belt wheel
(24), the first of the power device the driven synchronous pulley (6) is mounted on the first top main shaft (18), and drives its rotation.
5. the underground pipe gallery cable and wire of urban engineering project is laid with traction device according to claim 4, it is characterised in that:
Hand-operated lifting regulating mechanism is installed, the hand-operated lifting regulating mechanism is solid including top on the friction-top transfer tape assemble
Fixed board (27), the top fixing plate (27) is fixedly mounted in the first vertical bar (28) and the second vertical bar (30), at top
It is fitted with lifting screw (29) in fixed plate (27) by screw-driven, is equipped with and turns at the top of the lifting screw (29)
It takes turns (9), is equipped with link block (31) in the bottom end of lifting screw (29), the link block (31) and the first top side plate
(26) it is fixedly linked.
6. the underground pipe gallery cable and wire of urban engineering project is laid with traction device according to claim 1, it is characterised in that:
The guiding mechanism includes that first be fixedly mounted on horizontal concrete chute (15) is vertically directed bar (14) and second and is vertically directed bar
(16), the horizontal concrete chute (15) is arranged on bottom plate (1);It is vertically-mounted on bottom plate (1) to have vertical plate (13), it is described vertical
It is machined on plate (13) vertical chute (12), is fixedly installed with horizontally-guided bar (11) on the vertical chute (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820887226.1U CN208522369U (en) | 2018-06-08 | 2018-06-08 | The underground pipe gallery cable and wire of urban engineering project is laid with traction device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820887226.1U CN208522369U (en) | 2018-06-08 | 2018-06-08 | The underground pipe gallery cable and wire of urban engineering project is laid with traction device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208522369U true CN208522369U (en) | 2019-02-19 |
Family
ID=65325166
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820887226.1U Expired - Fee Related CN208522369U (en) | 2018-06-08 | 2018-06-08 | The underground pipe gallery cable and wire of urban engineering project is laid with traction device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208522369U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110212458A (en) * | 2019-05-24 | 2019-09-06 | 南京市第六建筑安装工程有限公司 | A kind of cable tunnel that can be laid with cable automatically |
CN111017638A (en) * | 2019-12-12 | 2020-04-17 | 吴树辉 | Cable traction stretching device for communication engineering |
CN111799708A (en) * | 2020-07-03 | 2020-10-20 | 广州浰江软件开发有限责任公司 | Underground pipe gallery cable wire laying traction equipment for municipal construction engineering |
CN111864641A (en) * | 2020-08-26 | 2020-10-30 | 国家电网有限公司 | Cable laying device for electric power and convenient for laying cable into pipeline |
CN112600118A (en) * | 2020-12-06 | 2021-04-02 | 武汉露能科技有限公司 | Transmission line work robot |
CN112928701A (en) * | 2021-02-01 | 2021-06-08 | 万修顺 | Underground pipe gallery cable laying traction device for municipal construction engineering |
CN114039307A (en) * | 2021-11-17 | 2022-02-11 | 安徽电缆股份有限公司 | Fixed end device for nuclear-grade cable laying traction |
CN115021152A (en) * | 2022-08-05 | 2022-09-06 | 山东达驰电气有限公司 | Submarine cable erection equipment |
-
2018
- 2018-06-08 CN CN201820887226.1U patent/CN208522369U/en not_active Expired - Fee Related
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110212458A (en) * | 2019-05-24 | 2019-09-06 | 南京市第六建筑安装工程有限公司 | A kind of cable tunnel that can be laid with cable automatically |
CN111017638A (en) * | 2019-12-12 | 2020-04-17 | 吴树辉 | Cable traction stretching device for communication engineering |
CN111799708A (en) * | 2020-07-03 | 2020-10-20 | 广州浰江软件开发有限责任公司 | Underground pipe gallery cable wire laying traction equipment for municipal construction engineering |
CN111864641A (en) * | 2020-08-26 | 2020-10-30 | 国家电网有限公司 | Cable laying device for electric power and convenient for laying cable into pipeline |
CN112600118A (en) * | 2020-12-06 | 2021-04-02 | 武汉露能科技有限公司 | Transmission line work robot |
CN112600118B (en) * | 2020-12-06 | 2022-05-10 | 武汉露能科技有限公司 | Transmission line work robot |
CN112928701A (en) * | 2021-02-01 | 2021-06-08 | 万修顺 | Underground pipe gallery cable laying traction device for municipal construction engineering |
CN114039307A (en) * | 2021-11-17 | 2022-02-11 | 安徽电缆股份有限公司 | Fixed end device for nuclear-grade cable laying traction |
CN114039307B (en) * | 2021-11-17 | 2023-09-19 | 安徽电缆股份有限公司 | End fixing device for nuclear-grade cable laying traction |
CN115021152A (en) * | 2022-08-05 | 2022-09-06 | 山东达驰电气有限公司 | Submarine cable erection equipment |
CN115021152B (en) * | 2022-08-05 | 2022-10-25 | 山东达驰电气有限公司 | Submarine cable erection equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208522369U (en) | The underground pipe gallery cable and wire of urban engineering project is laid with traction device | |
CN106451242A (en) | Pipe cable conveying device and method | |
CN105197697B (en) | Automatic takeup formula mobile electrical power box | |
CN202016083U (en) | Minisize automatic smoothing mill | |
CN205415253U (en) | A device for steel strand wires rust cleaning | |
CN205752957U (en) | A kind of cable peeling device | |
CN106868723A (en) | Cloth automatic conveying device and cloth automatic conveyor line | |
CN104377603B (en) | Device for laying cables in horizontal cable trays and application method of device | |
CN204205436U (en) | Horizontal crane span structure inner cable laying apparatu | |
CN101890705A (en) | Two-dimensional turnover device maintenance platform | |
CN105226576A (en) | Power cable threader | |
CN201402944Y (en) | Cable layer for comprehensively mechanized face | |
CN201671537U (en) | Reciprocating rail trolley | |
CN208305037U (en) | Track robot | |
CN210862286U (en) | Automatic wind-shielding anti-freezing device for air cooling island | |
CN202222209U (en) | Greenhouse curtain spreader | |
CN106044412A (en) | Convenient-to-use cable holder | |
CN109519601A (en) | A kind of natural gas line laying apparatus | |
CN202448239U (en) | Material lifting device and concrete stirring station | |
CN205387647U (en) | Flexible axle high frequency tamping tool | |
CN2367767Y (en) | Electric-tracted coal-cutting machine | |
CN216162301U (en) | Electric power construction is with multi-functional hank mill structure | |
CN206017613U (en) | Socks shaping modular system drive pole device | |
CN205029252U (en) | Cable laying device | |
CN205076424U (en) | Self -adaptation belt adjusting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190219 Termination date: 20200608 |