CN208520623U - A kind of architectural engineering synchronous drawing out soil equipment of the more depth of soil ramming test - Google Patents
A kind of architectural engineering synchronous drawing out soil equipment of the more depth of soil ramming test Download PDFInfo
- Publication number
- CN208520623U CN208520623U CN201820825004.7U CN201820825004U CN208520623U CN 208520623 U CN208520623 U CN 208520623U CN 201820825004 U CN201820825004 U CN 201820825004U CN 208520623 U CN208520623 U CN 208520623U
- Authority
- CN
- China
- Prior art keywords
- drawing out
- fixedly connected
- out soil
- link block
- soil equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of architectural engineering soil rammings to test the synchronous drawing out soil equipment of more depth, belong to building engineering field, a kind of architectural engineering synchronous drawing out soil equipment of the more depth of soil ramming test, including drawing out soil equipment ontology, drawing out soil equipment ontology upper end offers connection ring, first rectangular opening, first rectangular opening is located on the right side of through-hole, and link block is communicated with through-hole, drawing out soil equipment ontology upper end is fixedly connected there are two connecting rod, two connecting rods are located at the two sides of through-hole, two connecting rod upper ends are fixedly connected with second handle, bottom end offers sliding slot in drawing out soil equipment ontology, sliding slot bottom end offers left groove, left groove right side wall offers the first card slot, left groove inner end is inserted with link block, link block outer end is fixedly connected with buckle, buckle matches with the first card slot, link block upper end offers upper groove, it may be implemented The soil of different depth is sampled simultaneously, reduces testing crew workload.
Description
Technical field
The utility model relates to building engineering fields, are tested more specifically to a kind of architectural engineering with soil ramming
The synchronous drawing out soil equipment of more depth.
Background technique
Compaction test refers to a kind of method that soil compaction characteristic is understood with hammer compacted soil samples.This method is with difference
Compactive effort (hammer weigh × fall away from × hammer number) hammering different moisture content respectively soil sample, and measure corresponding dry density, from
And maximum dry unit weight (generally referring to aggregate accumulation or compactness densities), optimum moisture content are acquired, it is design, the construction of fill construction
Foundation is provided.Compaction, which is tested, should at least prepare the soil samples of 5 different water cuts, after the completion of compaction test, draw moisture content
With dry density relation curve, peak of curve is found out, maximum dry density, the optimum moisture content of soil is determined, provides ginseng for roadbed filling
Number.
But the soil water experiment data of different depth also can not be identical for same place, so that experimental data exists
Certain error, thus need to be sampled the soil of different depth in same place.
Utility model content
1. technical problems to be solved
Aiming at the problems existing in the prior art, the purpose of this utility model is to provide a kind of architectural engineerings is hit with soil
Real to test the synchronous drawing out soil equipment of more depth, the soil for sampling different depth simultaneously may be implemented in it, reduces testing crew workload.
2. technical solution
To solve the above problems, the utility model adopts the following technical scheme.
A kind of architectural engineering synchronous drawing out soil equipment of the more depth of soil ramming test, including drawing out soil equipment ontology, it is described to take
Native device noumenon upper end offers connection ring, the first rectangular opening, and first rectangular opening is located on the right side of through-hole, and link block and logical
Hole communicates, and drawing out soil equipment ontology upper end is fixedly connected there are two connecting rod, and two connecting rods are located at the two sides of through-hole,
Two connecting rod upper ends are fixedly connected with second handle, and bottom end offers sliding slot, the cunning in the drawing out soil equipment ontology
Slot bottom end offers left groove, and the left groove right side wall offers the first card slot, and the left groove inner end is inserted with link block,
The link block outer end is fixedly connected with buckle, and the buckle matches with the first card slot, and the link block upper end offers
Groove, the L shape bar outer end are arranged with multiple connection rings, and the connection ring outer end is connected with lock-screw, and the connection ring is right
End is fixedly connected with sampling box, and the drawing out soil equipment ontology right end offers multiple second rectangular openings, second rectangular opening with
Sampling box matches, and the L shape bar passes through through-hole and link block grafting, and the L shape bar left upper end is fixedly connected with the first in command,
The link block outer end is fixedly connected with extension spring, and the extension spring is located at buckle top, and the extension spring is far from even
The one end for connecing block is fixedly connected with sliding slot inner wall, and the soil for sampling different depth simultaneously may be implemented in it, reduces testing crew work
It measures.
Preferably, bottom end offers right groove in the sliding slot, and the right groove is located on the right side of left groove, the right groove
Side wall offers the second card slot, and second card slot matches with buckle, when the end motion to the right of L shape bar is out of drawing out soil equipment ontology
When going out to be on the waiting list sample, the link block of L shape bar lower end grafting can be injected and right groove and be sticked into buckle in the second card slot, it can be with
Fixed L shape bar, facilitates sampling.
Preferably, the fovea superior groove sidewall is fixedly connected with the second arc convex, and the L shape bar outer end is fixedly connected with
One arc convex, first arc convex are mutually clamped with the second arc convex, facilitate the installation between L shape bar and link block
With disassembly.
Preferably, graduation mark is carved in the L shape bar outer end, can be convenient testing crew and accurately adjusts between sampling box
Distance facilitates the soil sample of sampling different depth.
3. beneficial effect
Compared with the prior art, utility model has the advantages that
(1) soil for sampling different depth simultaneously may be implemented in this programme, reduces testing crew workload.
(2) bottom end offers right groove in sliding slot, and right groove is located on the right side of left groove, and right groove side wall offers the second card
Slot, the second card slot match with buckle, can be by L when the end motion to the right of L shape bar goes out to be on the waiting list sample out of drawing out soil equipment ontology
The link block of shape bar lower end grafting injects right groove and sticks into buckle in the second card slot, can fix L shape bar, facilitate sampling.
(3) fovea superior groove sidewall is fixedly connected with the second arc convex, and L shape bar outer end is fixedly connected with the first arc convex,
First arc convex is mutually clamped with the second arc convex, facilitates the installation and removal between L shape bar and link block.
(4) graduation mark is carved in L shape bar outer end, can be convenient testing crew and accurately adjusts the distance between sampling box, side
Just the soil sample of different depth is sampled.
Detailed description of the invention
Fig. 1 is the positive structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram in Fig. 1 at A;
Fig. 3 is the three-dimensional figure structure schematic representation of the utility model;
Fig. 4 is the structural schematic diagram of the sampling box part of the utility model;
Structural schematic diagram when Fig. 5 is the sampling of the utility model;
Fig. 6 is the structural schematic diagram in Fig. 5 at B.
Figure label explanation:
It is 1 drawing out soil equipment ontology, 2 first in command, 3L shape bar, 4 sampling boxes, 5 connection rings, 6 through-holes, 7 connecting rods, 8 second
Hand, 9 second rectangular openings, 10 right grooves, 11 second card slots, 12 extension springs, 13 left grooves, 14 sliding slots, 15 first rectangular openings, 16
Link block, 17 buckles, 18 first card slots, 19 upper grooves, 20 first arc convex, 21 second arc convex.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model;The technical scheme in the embodiment of the utility model is carried out
Clearly and completely describe;Obviously;The described embodiments are only a part of the embodiments of the utility model;Rather than whole
Embodiment, based on the embodiments of the present invention;Those of ordinary skill in the art are without making creative work
Every other embodiment obtained;It fall within the protection scope of the utility model.
In the description of the present invention, it should be noted that term " on ", "lower", "inner", "outside" " top/bottom end " etc.
The orientation or positional relationship of instruction is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description the utility model
It is described with simplifying, rather than the device or element of indication or suggestion meaning must have a particular orientation, with specific orientation structure
It makes and operates, therefore should not be understood as limiting the present invention.In addition, term " first ", " second " are only used for description mesh
, it is not understood to indicate or imply relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified
Dress ", " being provided with ", " be arranged/connect ", " connection " etc., shall be understood in a broad sense, such as " connection ", may be a fixed connection, can also be with
It is to be detachably connected, or be integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be with
Indirectly connected through an intermediary, it can be the connection inside two elements.For the ordinary skill in the art, may be used
The concrete meaning of above-mentioned term in the present invention is understood with concrete condition.
Embodiment 1:
Please refer to Fig. 1-6, a kind of architectural engineering synchronous drawing out soil equipment of the more depth of soil ramming test, including drawing out soil equipment
Ontology 1,1 upper end of drawing out soil equipment ontology offer connection ring 5, the first rectangular opening 15, and the first rectangular opening 15 is located at 6 right side of through-hole,
And link block 16 is communicated with through-hole 6,1 upper end of drawing out soil equipment ontology is fixedly connected there are two connecting rod 7, and two connecting rods 7 are located at
The two sides of through-hole 6, two 7 upper ends of connecting rod are fixedly connected with second handle 8, and bottom end offers sliding slot in drawing out soil equipment ontology 1
14,14 bottom end of sliding slot offers left groove 13, and 13 right side wall of left groove offers the first card slot 18, and 13 inner end of left groove is inserted with
Link block 16,16 outer end of link block are fixedly connected with buckle 17, and buckle 17 matches with the first card slot 18, and 16 upper end of link block is opened
Equipped with upper groove 19,3 outer end of L shape bar is arranged with multiple connection rings 5, and 5 outer end of connection ring is connected with lock-screw, and lock-screw is used
In the position for being fixedly connected with ring 5,5 right end of connection ring is fixedly connected with sampling box 4, and sampling box 4 is spiral helicine, and sampling box 4
Box mouth at do sharp processing, facilitate sampling soil, 1 right end of drawing out soil equipment ontology offers multiple second rectangular openings 9, the second square
Shape hole 9 matches with sampling box 4, and L shape bar 3 passes through through-hole 6 and 16 grafting of link block, and 3 left upper end of L shape bar is fixedly connected with first
Handle 2,16 outer end of link block are fixedly connected with extension spring 12, and extension spring 12 is located at 17 top of buckle, when link block 16
When in left groove 13, extension spring 12 is in tensional state, in the one end of extension spring 12 far from link block 16 and sliding slot 14
Wall is fixedly connected, and the soil for sampling different depth simultaneously may be implemented in it, reduces testing crew workload, and bottom end is opened in sliding slot 14
Equipped with right groove 10, right groove 10 is located at 13 right side of left groove, and 10 side wall of right groove offers the second card slot 11, the second card slot 11
Match with buckle 17, it, can will be under L shape bar 3 when 3 end motion to the right of L shape bar goes out to be on the waiting list sample out of drawing out soil equipment ontology 1
The link block 16 of end grafting injects right groove 10 and sticks into buckle 17 in second card slot 11, can fix L shape bar 3, conveniently take
Sample, 1 bottom end of drawing out soil equipment ontology are fixedly connected with jagged slot, make drawing out soil equipment ontology 1 be more easier to inject in soil,
19 side wall of upper groove is fixedly connected with the second arc convex 21, and 3 outer end of L shape bar is fixedly connected with the first arc convex 20, and first
Arc convex 20 and the second mutually clamping of arc convex 21, facilitate the installation and removal between L shape bar 3 and link block 16, L shape bar
Graduation mark is carved in 3 outer ends, can be convenient testing crew and accurately adjusts the distance between sampling box 4, facilitates sampling different depth
Soil sample.
In use, testing crew passes through lock-screw first, adjusts according to the scale on L shape bar 3 and fix every two and take
Then L shape bar 3 is inserted into drawing out soil equipment ontology 1, by L shape bar 3 along the first rectangle by the distance between sample box 4 by through-hole 6
Hole 15 moves right, and L shape bar 3 is sticked into link block 16, and at this moment technical staff can make to take soil downwards by second handle 8
Device noumenon 1 injects in soil, when drawing out soil equipment ontology 1 enters the suitable depth of soil, can hold the first in command 2 first
Come out buckle 17 out of first card slot 18, then being lifted up L shape bar 3 comes out link block 16 out of left groove 13, this
When extension spring 12 rebound to the right, along the elastic force of extension spring 12, the direction along the first rectangular opening 15 passes through testing crew
The first in command 2 pushes away to the right L shape bar 3, and sampling box 4 is made to go out to enter soil out of the second rectangular opening 9 on drawing out soil equipment ontology 1,
Until link block 16 enters right groove 10, buckle 17 is sticked into the second card slot 11, at this moment experimenter can be by second
One circle of the rotation of drawing out soil equipment ontology 1 enters soil in sampling box 4 by hand 8, after sampling, by the first in command 2 by L shape
Bar is moved to the left, and returns to link block 16 in left groove 13, and buckle 17 is blocked back in the first card slot 18, and testing crew will take soil
After device noumenon 1 is taken out out of soil, L shape bar 3 is extracted out of link block 16 upwards by the first in command 2, and upwardly through
Through-hole 6 takes out L shape bar 3, and then the soil sample in collecting and sampling box 4, may be implemented the soil for sampling different depth simultaneously
Earth reduces testing crew workload.
It is described above;The only preferable specific embodiment of the utility model;But the protection scope of the utility model is not
It is confined to this;Anyone skilled in the art is within the technical scope disclosed by the utility model;It is practical according to this
Novel technical solution and its improvement design is subject to equivalent substitution or change;It should all cover in the protection scope of the utility model
It is interior.
Claims (4)
1. a kind of architectural engineering tests the synchronous drawing out soil equipment of more depth, including drawing out soil equipment ontology (1), feature with soil ramming
Be: drawing out soil equipment ontology (1) upper end offers connection ring (5), the first rectangular opening (15), first rectangular opening (15)
On the right side of through-hole (6), and link block (16) is communicated with through-hole (6), and drawing out soil equipment ontology (1) upper end is fixedly connected with two
A connecting rod (7), two connecting rods (7) are located at the two sides of through-hole (6), and two connecting rod (7) upper ends are fixedly connected
Have second handle (8), the interior bottom end of the drawing out soil equipment ontology (1) offers sliding slot (14), and sliding slot (14) bottom end offers
Left groove (13), left groove (13) right side wall offer the first card slot (18), and left groove (13) inner end is inserted with company
It connects block (16), link block (16) outer end is fixedly connected with buckle (17), the buckle (17) and the first card slot (18) phase
To match, link block (16) upper end offers upper groove (19), and drawing out soil equipment ontology (1) inner end is inserted with L shape bar (3),
L shape bar (3) outer end is arranged with multiple connection rings (5), and connection ring (5) outer end is connected with lock-screw, the connection
Ring (5) right end is fixedly connected with sampling box (4), and drawing out soil equipment ontology (1) right end offers multiple second rectangular openings (9),
Second rectangular opening (9) matches with sampling box (4), and the L shape bar (3) passes through through-hole (6) and link block (16) grafting, institute
It states L shape bar (3) left upper end to be fixedly connected with the first in command (2), link block (16) outer end is fixedly connected with extension spring
(12), the extension spring (12) be located at buckle (17) above, the extension spring (12) far from link block (16) one end with
Sliding slot (14) inner wall is fixedly connected.
2. a kind of architectural engineering according to claim 1 tests the synchronous drawing out soil equipment of more depth, feature with soil ramming
Be: the interior bottom end of the sliding slot (14) offers right groove (10), and the right groove (10) is located on the right side of left groove (13), described
Right groove (10) side wall offers the second card slot (11), and second card slot (11) matches with buckle (17).
3. a kind of architectural engineering according to claim 1 tests the synchronous drawing out soil equipment of more depth, feature with soil ramming
Be: upper groove (19) side wall is fixedly connected with the second arc convex (21), and L shape bar (3) outer end is fixedly connected with
First arc convex (20), first arc convex (20) and the second arc convex (21) are mutually clamped.
4. a kind of architectural engineering according to claim 1 tests the synchronous drawing out soil equipment of more depth, feature with soil ramming
It is: is carved with graduation mark in L shape bar (3) outer end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820825004.7U CN208520623U (en) | 2018-05-30 | 2018-05-30 | A kind of architectural engineering synchronous drawing out soil equipment of the more depth of soil ramming test |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820825004.7U CN208520623U (en) | 2018-05-30 | 2018-05-30 | A kind of architectural engineering synchronous drawing out soil equipment of the more depth of soil ramming test |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208520623U true CN208520623U (en) | 2019-02-19 |
Family
ID=65340744
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820825004.7U Expired - Fee Related CN208520623U (en) | 2018-05-30 | 2018-05-30 | A kind of architectural engineering synchronous drawing out soil equipment of the more depth of soil ramming test |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208520623U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110082148A (en) * | 2019-05-22 | 2019-08-02 | 许昌学院 | Geotechnical investigation soil sample mechanism |
CN110239802A (en) * | 2019-06-20 | 2019-09-17 | 深圳市联新移动医疗科技有限公司 | The panelized packing method and modularization Computerized medical platform of Computerized medical platform |
CN110672160A (en) * | 2019-11-19 | 2020-01-10 | 北京享云智汇科技有限公司 | Soil pollution degree monitoring facilities |
CN110849659A (en) * | 2019-10-30 | 2020-02-28 | 生态环境部南京环境科学研究所 | A remove sampling device for detecting heavy metal pollutant soil |
CN110984115A (en) * | 2019-12-18 | 2020-04-10 | 田中华 | Building pile foundation equipment for improving rigidity of transverse single column |
-
2018
- 2018-05-30 CN CN201820825004.7U patent/CN208520623U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110082148A (en) * | 2019-05-22 | 2019-08-02 | 许昌学院 | Geotechnical investigation soil sample mechanism |
CN110082148B (en) * | 2019-05-22 | 2021-07-09 | 许昌学院 | Soil sampling mechanism for geotechnical engineering exploration |
CN110239802A (en) * | 2019-06-20 | 2019-09-17 | 深圳市联新移动医疗科技有限公司 | The panelized packing method and modularization Computerized medical platform of Computerized medical platform |
CN110239802B (en) * | 2019-06-20 | 2021-05-14 | 深圳市联新移动医疗科技有限公司 | Flat packaging method of medical computer platform and modular medical computer platform |
CN110849659A (en) * | 2019-10-30 | 2020-02-28 | 生态环境部南京环境科学研究所 | A remove sampling device for detecting heavy metal pollutant soil |
CN110849659B (en) * | 2019-10-30 | 2020-09-15 | 生态环境部南京环境科学研究所 | A remove sampling device for detecting heavy metal pollutant soil |
CN110672160A (en) * | 2019-11-19 | 2020-01-10 | 北京享云智汇科技有限公司 | Soil pollution degree monitoring facilities |
CN110984115A (en) * | 2019-12-18 | 2020-04-10 | 田中华 | Building pile foundation equipment for improving rigidity of transverse single column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208520623U (en) | A kind of architectural engineering synchronous drawing out soil equipment of the more depth of soil ramming test | |
CN208125422U (en) | A kind of geologic prospect drawing out soil equipment | |
CN105890925B (en) | A kind of deep trouth pulp sampler | |
CN207937194U (en) | A kind of sampler for ground exploration | |
CN206990212U (en) | A kind of flywheel production line casual inspection device | |
CN213422805U (en) | Consolidation apparatus under coupling effect of dynamic load and static load | |
CN105699038A (en) | Battery impact resistance and needling resistance dual detection box | |
CN208399233U (en) | Be used to prepare disturbance soil sample hits sample device | |
CN207470176U (en) | A kind of geology detects the automatic soil sampling equipment of shallow-layer | |
CN111562195A (en) | Method and device for rapidly measuring dry density of fine soil in situ | |
CN216566834U (en) | Soil collection device for soil detection | |
CN208350407U (en) | A kind of Bridge Foundation soil survey sampler | |
CN207423728U (en) | A kind of slump test equipment | |
CN216654605U (en) | Land sample collecting and storing device for land management | |
CN208476575U (en) | A kind of portable undisturbed soil sampling device | |
CN107588934A (en) | A kind of flywheel sampling observation frock for being adapted to production line | |
CN214793886U (en) | Geological survey device of fetching earth | |
CN209459936U (en) | Soil sampling apptss convenient to use | |
CN203490215U (en) | Concrete slump determining device | |
CN104266568B (en) | Tool for detecting distance between tubular filter element large end face and mounting hole end face | |
CN209296391U (en) | Project supervision is packed in bag cement sampler | |
CN207063976U (en) | A kind of drawing out soil equipment | |
CN209372461U (en) | A kind of loess undisturbed soil sampling device | |
CN209624286U (en) | Snow deposit density measurement system | |
CN218725541U (en) | Soil volume weight sample collection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190219 Termination date: 20190530 |
|
CF01 | Termination of patent right due to non-payment of annual fee |