CN208518074U - Pretensioned prestressing integral precast structure - Google Patents
Pretensioned prestressing integral precast structure Download PDFInfo
- Publication number
- CN208518074U CN208518074U CN201820892115.XU CN201820892115U CN208518074U CN 208518074 U CN208518074 U CN 208518074U CN 201820892115 U CN201820892115 U CN 201820892115U CN 208518074 U CN208518074 U CN 208518074U
- Authority
- CN
- China
- Prior art keywords
- prestressing
- prestressing force
- reinforced concrete
- girder
- precast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
A kind of pretensioned prestressing integral precast structure, including band bolumn cap reinforced concrete pile, Two bors d's oeuveres prestressing force overlapping girder, prestressing force overlapping secondary frame beam, prestressing force overlap secondary beam, steel floor support plate composite floor.The utility model uses the prefabricated assembly structural without temporary support, eliminates the high-supported formwork technique of conventional construction method, and cost is greatly reduced, and site safety civilization is clean and tidy.
Description
Technical field
The utility model relates to building structure fields more particularly to a kind of structural system of prefabricated assembly structural to form.
Background technique
The building such as warehouse, workshop, Gongjian's class very high for layer height, load is big, span is big, generallys use post stretching and answers in advance
Power cast-in-situ reinforced concrete structure, this mode of construction high-formwork construction risk is big, at high cost, and structural steel amount is big, and the construction period is long;
And use the mode of construction of steel construction then cost is high, fire protecting performance is poor, how will be the advantages of steel construction mode of construction and prestressing force
The advantages of mode of construction of reinforced concrete structure, combines, while being able to satisfy manufacturing process and construction technology again and regional industrial is mating wants
It asks, makes low this kind of construction cost, short time limit, civilized safety, using the structure type of pretensioned prestressing integral precast, in conjunction with steel
The construction method of structure composite floor is optimization scheme.A kind of integral precast structure of no temporary support has not been reported.
Utility model content
The technical problem to be solved by the utility model is to overcome the deficiency of the prior art, a kind of no temporary support is provided
Integral precast structure.
According to a kind of pretensioned prestressing integral precast structure provided by the utility model, including band bolumn cap reinforced concrete pile,
Two bors d's oeuveres prestressing force overlaps girder, prestressing force overlapping secondary frame beam, prestressing force and overlaps secondary beam, steel floor support plate composite floor, the band
Bolumn cap section of the reinforced concrete pile of bolumn cap at bean column node is greater than column section, and bolumn cap top extends to plate face, and bolumn cap lower part is prolonged
Extend to the following certain length in girder lower surface;The Two bors d's oeuveres prestressing force overlapping girder includes by two pretensioned prestressings arranged side by side
Reinforced concrete part is poured after precast beam and top, the side of pretensioned prestressing precast beam, which is equipped with, shelves notch;The prestressing force is folded
Closing secondary frame beam includes single pre-tensioning system precast beam and with pouring reinforced concrete part after plate thickness, and Two bors d's oeuveres prestressing force overlaps girder and pre-
The pretensioned prestressing precast beam of stress overlapping secondary frame beam partially protrudes into certain length in bolumn cap;The prestressing force overlaps secondary beam
Including single pretensioned prestressing precast beam and with reinforced concrete part is poured after plate thickness, pretensioned prestressing precast beam both ends are equipped with
It shelves and takes the lead, shelve to take the lead and protrude into the shelving in notch of girder precast beam;The steel board composite floor includes silent floor support plate
Or steel bar truss floor support plate and top cast-in-situ reinforced concrete part, silent floor support plate or steel bar truss floor support plate both ends are held on time frame
Set a roof beam in place or the top surface of the pretensioned prestressing precast beam of secondary beam on certain length.
Also have following attached technology special according to a kind of pretensioned prestressing integral precast structure provided by the utility model
Sign:
The section of the reinforced concrete pile with bolumn cap is the class square-section that wherein two opposite side are in broken line.
Have compared with prior art according to a kind of pretensioned prestressing integral precast knot provided by the utility model as follows
Advantage:
1, using the prefabricated assembly structural of no temporary support, the high-supported formwork technique of conventional construction method is eliminated, cost is big
Width reduces, and site safety civilization is clean and tidy.
2, using pretensioned prestressing technology, beam steel using amount is greatly decreased and deck-molding is small.
3, using Two bors d's oeuveres girder, the manufacturing process limitation of crossbeam is breached, the hoisting difficulty of crossbeam is reduced.
4, using the composite floor of permanent steel board and concrete, the high-supported formwork process of plate is eliminated, while increasing plate
Overload capacity.
Detailed description of the invention
Fig. 1 is the structure composition figure of the utility model
Fig. 2 is the Two bors d's oeuveres girder sectional view of the utility model
Fig. 3 is the secondary frame beam sectional view of the utility model
Fig. 4 is that the secondary beam of the utility model is coupled node with girder
Fig. 5 is the silent floor support plate perspective view of the utility model
Fig. 6 is the steel bar truss floor support plate perspective view of the utility model
Fig. 7 is the contignation sectional view of the utility model
Fig. 8 is the column section figure of the utility model
Specific embodiment
Referring to Fig. 1 to Fig. 7, a kind of pretensioned prestressing integral precast structure that the utility model provides, including band bolumn cap
Reinforced concrete pile 1, Two bors d's oeuveres prestressing force overlapping girder 2, prestressing force overlapping secondary frame beam 3, prestressing force overlap secondary beam 4, steel floor support plate group
Floor 5 is closed, it is characterized in that bolumn cap 11 section of the reinforced concrete pile 1 with bolumn cap at bean column node is greater than column section, bolumn cap
Top extends to plate face, and bolumn cap lower part extends to the following certain length in girder lower surface;The Two bors d's oeuveres prestressing force overlapping girder 2 wraps
It includes by pouring reinforced concrete part 22 behind two pretensioned prestressing precast beams 21 arranged side by side and top, pretensioned prestressing precast beam
Side is equipped with and shelves notch 23;After the prestressing force overlapping secondary frame beam 3 is including single pre-tensioning system precast beam 31 and with plate thickness
Reinforced concrete part 32 is poured, Two bors d's oeuveres prestressing force overlaps the prefabricated beam portion of pretensioned prestressing of girder 2 and prestressing force overlapping secondary frame beam 3
Divide and protrudes into certain length in bolumn cap 11;The prestressing force overlapping secondary beam 4 includes single pretensioned prestressing precast beam 41 and same plate
Pour reinforced concrete part 42 after thick, 41 both ends of pretensioned prestressing precast beam, which are equipped with to shelve, takes the lead 411, shelves to take the lead and 411 protrude into
Girder precast beam is shelved in notch 23;The steel floor support plate composite floor 5 includes that silent floor support plate 51 or steel bar girder building are held
Plate 52 and top cast-in-situ reinforced concrete part 53.Steel bar truss floor support plate 52 is held on the pretensioned prestressing of secondary frame beam or secondary beam
Certain length on the top surface of precast beam 31,41.Using the reinforced concrete pile with bolumn cap, bolumn cap is prefabricated for shelving in the construction stage
Beam in the anti-seismic performance of service stage reinforced frame bean column node, while keeping bean column node more attractive.Using Two bors d's oeuveres girder, dash forward
The manufacturing process limitation for having broken crossbeam, reduces the hoisting difficulty of crossbeam.Using pretensioned prestressing technology, the steel using amount of beam can
It is greatly decreased and deck-molding is small.Using the composite floor of permanent steel floor support plate and concrete, the high-supported formwork process of plate is eliminated, is increased simultaneously
The overload capacity of plate is added.Column uses big punching block construction technology, beam using it is first prefabricated and lift it is in place after overlapping it is whole pour first open
Method prestressing force composite beam, floor use the composite floor of permanent steel floor support plate and concrete, and entire work progress is not necessarily to temporary support,
The high-supported formwork of conventional construction method is eliminated, cost is greatly reduced, and site safety civilization is clean and tidy.
Referring to Fig. 1, in above-described embodiment that the utility model provides, the section of the reinforced concrete pile 1 with bolumn cap is it
In two opposite side be in broken line class square-section.It is in the class square-section of broken line using wherein two opposite side, is conducive to the peace of big punching block
It tears open, while aesthetic in appearance.
Claims (2)
1. a kind of pretensioned prestressing integral precast structure, including band bolumn cap reinforced concrete pile, Two bors d's oeuveres prestressing force overlap girder, answer in advance
Power overlaps secondary frame beam, prestressing force overlaps secondary beam, steel floor support plate composite floor, it is characterized in that: the reinforced concrete pile with bolumn cap
Bolumn cap section at bean column node is greater than column section, and bolumn cap top extends to plate face, and bolumn cap lower part extends to girder lower surface
Following certain length;The Two bors d's oeuveres prestressing force overlapping girder includes by behind two pretensioned prestressing precast beams arranged side by side and top
Reinforced concrete part is poured, the side of pretensioned prestressing precast beam, which is equipped with, shelves notch;The prestressing force overlaps secondary frame beam
Single pre-tensioning system precast beam and with reinforced concrete part is poured after plate thickness, Two bors d's oeuveres prestressing force overlaps girder and prestressing force overlaps time frame
The pretensioned prestressing precast beam of beam partially protrudes into certain length in bolumn cap;The prestressing force overlapping secondary beam includes single pre-tensioning system
Prestressing force precast beam and with reinforced concrete part is poured after plate thickness, pretensioned prestressing precast beam both ends are equipped with to shelve and take the lead, and shelve
It takes the lead and protrudes into the shelving in notch of girder precast beam;The steel floor support plate composite floor includes silent floor support plate or steel bar girder building
Board and top cast-in-situ reinforced concrete part, silent floor support plate or steel bar truss floor support plate both ends are held on secondary frame beam or secondary beam
Certain length on the top surface of pretensioned prestressing precast beam.
2. pretensioned prestressing integral precast structure as described in claim 1, it is characterized in that the reinforced concrete pile with bolumn cap
Section is the class square-section that wherein two opposite side are in broken line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820892115.XU CN208518074U (en) | 2018-06-08 | 2018-06-08 | Pretensioned prestressing integral precast structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820892115.XU CN208518074U (en) | 2018-06-08 | 2018-06-08 | Pretensioned prestressing integral precast structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208518074U true CN208518074U (en) | 2019-02-19 |
Family
ID=65325188
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820892115.XU Active CN208518074U (en) | 2018-06-08 | 2018-06-08 | Pretensioned prestressing integral precast structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208518074U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110512800A (en) * | 2019-09-03 | 2019-11-29 | 宁波优造建筑科技有限公司 | A kind of steel and concrete combined structure system and construction method |
CN110629918A (en) * | 2019-07-19 | 2019-12-31 | 宁波优造建筑科技有限公司 | Interval type prestressing force dysmorphism grooved plate combination floor |
CN113863495A (en) * | 2021-10-16 | 2021-12-31 | 江苏华源建筑设计研究院股份有限公司 | Pretensioned prestressing frame beam column connection node |
CN113931365A (en) * | 2021-10-19 | 2022-01-14 | 北京中建建筑设计院有限公司 | Post-cast strip-free floor system structure and construction method |
CN115419176A (en) * | 2022-09-20 | 2022-12-02 | 中铁成都规划设计院有限责任公司 | Assembled beam slab node |
-
2018
- 2018-06-08 CN CN201820892115.XU patent/CN208518074U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110629918A (en) * | 2019-07-19 | 2019-12-31 | 宁波优造建筑科技有限公司 | Interval type prestressing force dysmorphism grooved plate combination floor |
CN110512800A (en) * | 2019-09-03 | 2019-11-29 | 宁波优造建筑科技有限公司 | A kind of steel and concrete combined structure system and construction method |
CN113863495A (en) * | 2021-10-16 | 2021-12-31 | 江苏华源建筑设计研究院股份有限公司 | Pretensioned prestressing frame beam column connection node |
CN113863495B (en) * | 2021-10-16 | 2022-10-04 | 江苏华源建筑设计研究院股份有限公司 | Pretensioned prestressing frame beam column connection node |
CN113931365A (en) * | 2021-10-19 | 2022-01-14 | 北京中建建筑设计院有限公司 | Post-cast strip-free floor system structure and construction method |
CN115419176A (en) * | 2022-09-20 | 2022-12-02 | 中铁成都规划设计院有限责任公司 | Assembled beam slab node |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208518074U (en) | Pretensioned prestressing integral precast structure | |
CN101936054B (en) | Steel truss web combined PC beam and construction method thereof | |
CN105908881B (en) | A kind of two-way beam of falling T composite floor | |
US9856614B1 (en) | Aseismic combined pier | |
CN106049732B (en) | A kind of two-way laminated floor slab of honeycomb hole profiled sheet | |
CN101672077A (en) | Bending restraining type shear wall with slideable stiffening shaped steel and internally embedded steel plate | |
CN201539031U (en) | Buckling inhibited shear wall with slideable stiffened steel sections and embedded steel plates | |
CN101126254A (en) | Sticking-free stiffening rib steel plate shearing force wall | |
CN215054569U (en) | Partially-coated cold-formed thin-wall steel-concrete combined column | |
JP4762406B2 (en) | High-rise building | |
CN100365218C (en) | Combined hollow floor slab comprising steel, concrete and hung fireproof ardealite plate and its production process | |
CN210596977U (en) | Steel pipe-steel plate combined web steel-concrete combined box girder | |
CN103397721B (en) | Steel plate precast concrete double-plate shear wall | |
CN109403465B (en) | Steel-concrete combined node and manufacturing method thereof | |
CN205822542U (en) | A kind of novel two-way beam of falling T composite floor | |
CN114855594A (en) | Steel-concrete composite beam bridge shear connector and construction method thereof | |
CN110439142A (en) | A kind of assembly concrete shear wall and construction method with H profile steel diagonal brace | |
CN106088437B (en) | A kind of superimposed sheet enhancing two-way transmission force property | |
CN205954971U (en) | Two -way coincide floor of honeycomb holes profiled sheet | |
CN201778436U (en) | Hybrid polycarbonate (PC) girder with steel truss webs | |
CN217924210U (en) | Prefabricated parapet of grid formula | |
CN215888782U (en) | Steel bar truss floor support plate | |
KR20060085145A (en) | Hybrid beam | |
CN2661809Y (en) | nternal force adjustable prestressed steel-concrete combination beam | |
CN106939706A (en) | A kind of anti-fall reinforcing beam-column node structure that collapses |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |