CN208518074U - Pretensioned prestressing integral precast structure - Google Patents

Pretensioned prestressing integral precast structure Download PDF

Info

Publication number
CN208518074U
CN208518074U CN201820892115.XU CN201820892115U CN208518074U CN 208518074 U CN208518074 U CN 208518074U CN 201820892115 U CN201820892115 U CN 201820892115U CN 208518074 U CN208518074 U CN 208518074U
Authority
CN
China
Prior art keywords
prestressing
prestressing force
reinforced concrete
girder
precast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820892115.XU
Other languages
Chinese (zh)
Inventor
杨峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820892115.XU priority Critical patent/CN208518074U/en
Application granted granted Critical
Publication of CN208518074U publication Critical patent/CN208518074U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

A kind of pretensioned prestressing integral precast structure, including band bolumn cap reinforced concrete pile, Two bors d's oeuveres prestressing force overlapping girder, prestressing force overlapping secondary frame beam, prestressing force overlap secondary beam, steel floor support plate composite floor.The utility model uses the prefabricated assembly structural without temporary support, eliminates the high-supported formwork technique of conventional construction method, and cost is greatly reduced, and site safety civilization is clean and tidy.

Description

Pretensioned prestressing integral precast structure
Technical field
The utility model relates to building structure fields more particularly to a kind of structural system of prefabricated assembly structural to form.
Background technique
The building such as warehouse, workshop, Gongjian's class very high for layer height, load is big, span is big, generallys use post stretching and answers in advance Power cast-in-situ reinforced concrete structure, this mode of construction high-formwork construction risk is big, at high cost, and structural steel amount is big, and the construction period is long; And use the mode of construction of steel construction then cost is high, fire protecting performance is poor, how will be the advantages of steel construction mode of construction and prestressing force The advantages of mode of construction of reinforced concrete structure, combines, while being able to satisfy manufacturing process and construction technology again and regional industrial is mating wants It asks, makes low this kind of construction cost, short time limit, civilized safety, using the structure type of pretensioned prestressing integral precast, in conjunction with steel The construction method of structure composite floor is optimization scheme.A kind of integral precast structure of no temporary support has not been reported.
Utility model content
The technical problem to be solved by the utility model is to overcome the deficiency of the prior art, a kind of no temporary support is provided Integral precast structure.
According to a kind of pretensioned prestressing integral precast structure provided by the utility model, including band bolumn cap reinforced concrete pile, Two bors d's oeuveres prestressing force overlaps girder, prestressing force overlapping secondary frame beam, prestressing force and overlaps secondary beam, steel floor support plate composite floor, the band Bolumn cap section of the reinforced concrete pile of bolumn cap at bean column node is greater than column section, and bolumn cap top extends to plate face, and bolumn cap lower part is prolonged Extend to the following certain length in girder lower surface;The Two bors d's oeuveres prestressing force overlapping girder includes by two pretensioned prestressings arranged side by side Reinforced concrete part is poured after precast beam and top, the side of pretensioned prestressing precast beam, which is equipped with, shelves notch;The prestressing force is folded Closing secondary frame beam includes single pre-tensioning system precast beam and with pouring reinforced concrete part after plate thickness, and Two bors d's oeuveres prestressing force overlaps girder and pre- The pretensioned prestressing precast beam of stress overlapping secondary frame beam partially protrudes into certain length in bolumn cap;The prestressing force overlaps secondary beam Including single pretensioned prestressing precast beam and with reinforced concrete part is poured after plate thickness, pretensioned prestressing precast beam both ends are equipped with It shelves and takes the lead, shelve to take the lead and protrude into the shelving in notch of girder precast beam;The steel board composite floor includes silent floor support plate Or steel bar truss floor support plate and top cast-in-situ reinforced concrete part, silent floor support plate or steel bar truss floor support plate both ends are held on time frame Set a roof beam in place or the top surface of the pretensioned prestressing precast beam of secondary beam on certain length.
Also have following attached technology special according to a kind of pretensioned prestressing integral precast structure provided by the utility model Sign:
The section of the reinforced concrete pile with bolumn cap is the class square-section that wherein two opposite side are in broken line.
Have compared with prior art according to a kind of pretensioned prestressing integral precast knot provided by the utility model as follows Advantage:
1, using the prefabricated assembly structural of no temporary support, the high-supported formwork technique of conventional construction method is eliminated, cost is big Width reduces, and site safety civilization is clean and tidy.
2, using pretensioned prestressing technology, beam steel using amount is greatly decreased and deck-molding is small.
3, using Two bors d's oeuveres girder, the manufacturing process limitation of crossbeam is breached, the hoisting difficulty of crossbeam is reduced.
4, using the composite floor of permanent steel board and concrete, the high-supported formwork process of plate is eliminated, while increasing plate Overload capacity.
Detailed description of the invention
Fig. 1 is the structure composition figure of the utility model
Fig. 2 is the Two bors d's oeuveres girder sectional view of the utility model
Fig. 3 is the secondary frame beam sectional view of the utility model
Fig. 4 is that the secondary beam of the utility model is coupled node with girder
Fig. 5 is the silent floor support plate perspective view of the utility model
Fig. 6 is the steel bar truss floor support plate perspective view of the utility model
Fig. 7 is the contignation sectional view of the utility model
Fig. 8 is the column section figure of the utility model
Specific embodiment
Referring to Fig. 1 to Fig. 7, a kind of pretensioned prestressing integral precast structure that the utility model provides, including band bolumn cap Reinforced concrete pile 1, Two bors d's oeuveres prestressing force overlapping girder 2, prestressing force overlapping secondary frame beam 3, prestressing force overlap secondary beam 4, steel floor support plate group Floor 5 is closed, it is characterized in that bolumn cap 11 section of the reinforced concrete pile 1 with bolumn cap at bean column node is greater than column section, bolumn cap Top extends to plate face, and bolumn cap lower part extends to the following certain length in girder lower surface;The Two bors d's oeuveres prestressing force overlapping girder 2 wraps It includes by pouring reinforced concrete part 22 behind two pretensioned prestressing precast beams 21 arranged side by side and top, pretensioned prestressing precast beam Side is equipped with and shelves notch 23;After the prestressing force overlapping secondary frame beam 3 is including single pre-tensioning system precast beam 31 and with plate thickness Reinforced concrete part 32 is poured, Two bors d's oeuveres prestressing force overlaps the prefabricated beam portion of pretensioned prestressing of girder 2 and prestressing force overlapping secondary frame beam 3 Divide and protrudes into certain length in bolumn cap 11;The prestressing force overlapping secondary beam 4 includes single pretensioned prestressing precast beam 41 and same plate Pour reinforced concrete part 42 after thick, 41 both ends of pretensioned prestressing precast beam, which are equipped with to shelve, takes the lead 411, shelves to take the lead and 411 protrude into Girder precast beam is shelved in notch 23;The steel floor support plate composite floor 5 includes that silent floor support plate 51 or steel bar girder building are held Plate 52 and top cast-in-situ reinforced concrete part 53.Steel bar truss floor support plate 52 is held on the pretensioned prestressing of secondary frame beam or secondary beam Certain length on the top surface of precast beam 31,41.Using the reinforced concrete pile with bolumn cap, bolumn cap is prefabricated for shelving in the construction stage Beam in the anti-seismic performance of service stage reinforced frame bean column node, while keeping bean column node more attractive.Using Two bors d's oeuveres girder, dash forward The manufacturing process limitation for having broken crossbeam, reduces the hoisting difficulty of crossbeam.Using pretensioned prestressing technology, the steel using amount of beam can It is greatly decreased and deck-molding is small.Using the composite floor of permanent steel floor support plate and concrete, the high-supported formwork process of plate is eliminated, is increased simultaneously The overload capacity of plate is added.Column uses big punching block construction technology, beam using it is first prefabricated and lift it is in place after overlapping it is whole pour first open Method prestressing force composite beam, floor use the composite floor of permanent steel floor support plate and concrete, and entire work progress is not necessarily to temporary support, The high-supported formwork of conventional construction method is eliminated, cost is greatly reduced, and site safety civilization is clean and tidy.
Referring to Fig. 1, in above-described embodiment that the utility model provides, the section of the reinforced concrete pile 1 with bolumn cap is it In two opposite side be in broken line class square-section.It is in the class square-section of broken line using wherein two opposite side, is conducive to the peace of big punching block It tears open, while aesthetic in appearance.

Claims (2)

1. a kind of pretensioned prestressing integral precast structure, including band bolumn cap reinforced concrete pile, Two bors d's oeuveres prestressing force overlap girder, answer in advance Power overlaps secondary frame beam, prestressing force overlaps secondary beam, steel floor support plate composite floor, it is characterized in that: the reinforced concrete pile with bolumn cap Bolumn cap section at bean column node is greater than column section, and bolumn cap top extends to plate face, and bolumn cap lower part extends to girder lower surface Following certain length;The Two bors d's oeuveres prestressing force overlapping girder includes by behind two pretensioned prestressing precast beams arranged side by side and top Reinforced concrete part is poured, the side of pretensioned prestressing precast beam, which is equipped with, shelves notch;The prestressing force overlaps secondary frame beam Single pre-tensioning system precast beam and with reinforced concrete part is poured after plate thickness, Two bors d's oeuveres prestressing force overlaps girder and prestressing force overlaps time frame The pretensioned prestressing precast beam of beam partially protrudes into certain length in bolumn cap;The prestressing force overlapping secondary beam includes single pre-tensioning system Prestressing force precast beam and with reinforced concrete part is poured after plate thickness, pretensioned prestressing precast beam both ends are equipped with to shelve and take the lead, and shelve It takes the lead and protrudes into the shelving in notch of girder precast beam;The steel floor support plate composite floor includes silent floor support plate or steel bar girder building Board and top cast-in-situ reinforced concrete part, silent floor support plate or steel bar truss floor support plate both ends are held on secondary frame beam or secondary beam Certain length on the top surface of pretensioned prestressing precast beam.
2. pretensioned prestressing integral precast structure as described in claim 1, it is characterized in that the reinforced concrete pile with bolumn cap Section is the class square-section that wherein two opposite side are in broken line.
CN201820892115.XU 2018-06-08 2018-06-08 Pretensioned prestressing integral precast structure Active CN208518074U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820892115.XU CN208518074U (en) 2018-06-08 2018-06-08 Pretensioned prestressing integral precast structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820892115.XU CN208518074U (en) 2018-06-08 2018-06-08 Pretensioned prestressing integral precast structure

Publications (1)

Publication Number Publication Date
CN208518074U true CN208518074U (en) 2019-02-19

Family

ID=65325188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820892115.XU Active CN208518074U (en) 2018-06-08 2018-06-08 Pretensioned prestressing integral precast structure

Country Status (1)

Country Link
CN (1) CN208518074U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512800A (en) * 2019-09-03 2019-11-29 宁波优造建筑科技有限公司 A kind of steel and concrete combined structure system and construction method
CN110629918A (en) * 2019-07-19 2019-12-31 宁波优造建筑科技有限公司 Interval type prestressing force dysmorphism grooved plate combination floor
CN113863495A (en) * 2021-10-16 2021-12-31 江苏华源建筑设计研究院股份有限公司 Pretensioned prestressing frame beam column connection node
CN113931365A (en) * 2021-10-19 2022-01-14 北京中建建筑设计院有限公司 Post-cast strip-free floor system structure and construction method
CN115419176A (en) * 2022-09-20 2022-12-02 中铁成都规划设计院有限责任公司 Assembled beam slab node

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110629918A (en) * 2019-07-19 2019-12-31 宁波优造建筑科技有限公司 Interval type prestressing force dysmorphism grooved plate combination floor
CN110512800A (en) * 2019-09-03 2019-11-29 宁波优造建筑科技有限公司 A kind of steel and concrete combined structure system and construction method
CN113863495A (en) * 2021-10-16 2021-12-31 江苏华源建筑设计研究院股份有限公司 Pretensioned prestressing frame beam column connection node
CN113863495B (en) * 2021-10-16 2022-10-04 江苏华源建筑设计研究院股份有限公司 Pretensioned prestressing frame beam column connection node
CN113931365A (en) * 2021-10-19 2022-01-14 北京中建建筑设计院有限公司 Post-cast strip-free floor system structure and construction method
CN115419176A (en) * 2022-09-20 2022-12-02 中铁成都规划设计院有限责任公司 Assembled beam slab node

Similar Documents

Publication Publication Date Title
CN208518074U (en) Pretensioned prestressing integral precast structure
CN101936054B (en) Steel truss web combined PC beam and construction method thereof
CN101126254B (en) Sticking-free stiffening rib steel plate shearing force wall
CN105908881B (en) A kind of two-way beam of falling T composite floor
US9856614B1 (en) Aseismic combined pier
CN106049732B (en) A kind of two-way laminated floor slab of honeycomb hole profiled sheet
CN101672077A (en) Bending restraining type shear wall with slideable stiffening shaped steel and internally embedded steel plate
CN201539031U (en) Buckling inhibited shear wall with slideable stiffened steel sections and embedded steel plates
CN215054569U (en) Partially-coated cold-formed thin-wall steel-concrete combined column
JP4762406B2 (en) High-rise building
CN105220792B (en) A kind of prefabricated concealed bracings energy-consuming shear wall and its assemble method
CN100365218C (en) Combined hollow floor slab comprising steel, concrete and hung fireproof ardealite plate and its production process
CN210596977U (en) Steel pipe-steel plate combined web steel-concrete combined box girder
CN103397721B (en) Steel plate precast concrete double-plate shear wall
CN109403465B (en) Steel-concrete combined node and manufacturing method thereof
CN205822542U (en) A kind of novel two-way beam of falling T composite floor
CN114855594A (en) Steel-concrete composite beam bridge shear connector and construction method thereof
CN106088437B (en) A kind of superimposed sheet enhancing two-way transmission force property
CN205954971U (en) Two -way coincide floor of honeycomb holes profiled sheet
CN201778436U (en) Hybrid polycarbonate (PC) girder with steel truss webs
CN215888782U (en) Steel bar truss floor support plate
KR20060085145A (en) Hybrid beam
CN2661809Y (en) nternal force adjustable prestressed steel-concrete combination beam
CN106939706A (en) A kind of anti-fall reinforcing beam-column node structure that collapses
CN210712505U (en) Shallow slot type connection structure of steel plate combination beam and steel plate combination beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant