CN208517973U - A kind of asphalt overlaying promotes the prefabricated well cap rock device of well lid - Google Patents

A kind of asphalt overlaying promotes the prefabricated well cap rock device of well lid Download PDF

Info

Publication number
CN208517973U
CN208517973U CN201820988470.7U CN201820988470U CN208517973U CN 208517973 U CN208517973 U CN 208517973U CN 201820988470 U CN201820988470 U CN 201820988470U CN 208517973 U CN208517973 U CN 208517973U
Authority
CN
China
Prior art keywords
cap rock
prefabricated
cage
well lid
spacer bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820988470.7U
Other languages
Chinese (zh)
Inventor
黄锦宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Honesty Construction Engineering Design Co Ltd
Original Assignee
Guangdong Honesty Construction Engineering Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Honesty Construction Engineering Design Co Ltd filed Critical Guangdong Honesty Construction Engineering Design Co Ltd
Priority to CN201820988470.7U priority Critical patent/CN208517973U/en
Application granted granted Critical
Publication of CN208517973U publication Critical patent/CN208517973U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of prefabricated well cap rock device of asphalt overlaying promotion well lid, including the pit shaft set gradually from bottom to up, cage and well lid, the periphery setting cement concrete layer of pit shaft and the asphalt overlay for being laid on cement concrete layer upper surface, cage is equipped with first annular bulge loop, the upper surface of first annular bulge loop is concordant with the upper surface of the upper surface of well lid and asphalt overlay respectively, prefabricated well cap rock is provided between pit shaft and cage, prefabricated well cap rock includes the hoisting depth layer with prefabricated height value and the second annular convex ring for extending upwardly to cage periphery, hoisting depth layer is radially symmetrical to be provided through several spacer bars, spacer bar one end is fixedly connected with pit shaft, the other end is fixedly connected with cage.By using the pre-formed well lid layer with prefabricated height value of macromolecule composite resin material high-volume of environmental protection, accelerating the completion time of project in advance, being easy to constructing operation, accurately control manhole cover lifting height and position control.

Description

A kind of asphalt overlaying promotes the prefabricated well cap rock device of well lid
Technical field
The utility model belongs to municipal works technical field, in particular to a kind of asphalt overlaying promotes the prefabricated well lid of well lid Layer device.
Background technique
Currently, carrying out pitch in original cement concrete pavement in " morning-night " the improvement project construction of urban road It overlays, overlays 8~16cm of pitch thickness, the original inspection shaft of road need to carry out promotion corresponding height.
And in practice of construction, since the bitumen layer of overlay is relatively thin, the promotion of the well lid in construction for inspection shaft is general Way is to add cement mortar.But in work progress, paver, which is compacted be easy to happen when road surface, pushes well lid, well lid displacement, road Face such as is uneven at the situations, the high process control inaccuracy of well lid, it cannot be guaranteed that the integral smoothness on road surface, comfort to driving and Traffic safety impacts.Normal practice is difficult to control manhole cover lifting height and fixed cage, maintaining cement mortar time are long.
Utility model content
Therefore, quasi- the purpose of this utility model is to provide the prefabricated well cap rock device that a kind of asphalt overlaying promotes well lid Really control manhole cover lifting height and fixed cage.
In order to achieve the above objectives, the utility model provides a kind of prefabricated well cap rock device of asphalt overlaying promotion well lid, packet The pit shaft, cage and well lid set gradually from bottom to up is included, the periphery of the pit shaft is arranged cement concrete layer and is laid on institute The asphalt overlay of cement concrete layer upper surface is stated, the cage is equipped with first annular bulge loop, the first annular bulge loop Upper surface is concordant with the upper surface of the upper surface of the well lid and the asphalt overlay respectively, the pit shaft and the cage it Between be provided with prefabricated well cap rock, the prefabricated well cap rock includes having the hoisting depth layer of prefabricated height value and extending upwardly to institute The second annular convex ring of cage periphery is stated, the hoisting depth layer is radially symmetrical to be provided through several positioning steel Muscle, described spacer bar one end are fixedly connected with the pit shaft, and the spacer bar other end is fixedly connected with the cage.
Preferably, the spacer bar is in linear type, is integrally formed with the prefabricated well cap rock.Integral prefabricated molding, can Carry out high-volume Prefabrication, Accelerating The Construction duration.
Preferably, the spacer bar is L-shaped, molding seperated with the prefabricated well cap rock.Separate prefabricated molding, structure letter It is single, it is easy to construction and installation and maintenance.
Preferably, the cage is provided with the through-hole passed through for the spacer bar, and described spacer bar one end is using brill Hole bar planting mode is fixed on the upper surface of the pit shaft, and bending is connected to institute after the spacer bar other end passes through the through-hole State the upper surface of cage.
Preferably, the hoisting depth layer is provided with the location hole passed through for the spacer bar, and the cage is provided with For the through-hole that the spacer bar passes through, one end of the spacer bar uses after sequentially passing through the through-hole and the location hole Steel planting mode is fixed on the upper surface of the pit shaft, and the other end of the spacer bar is connected to the upper table of the cage Face.Location hole is arranged in well lid layer, using the fixed cage of steel planting mode and road surface, is convenient for Construction control and positioning.
Preferably, the annular for loading filler is provided between the first annular bulge loop and the asphalt overlay Groove.It is loaded in annular groove and connection problem between asphalt overlay and well lid can be solved after flattening compacting filler.
Preferably, the filler is tar sand.Make full use of road construction material.
Preferably, the prefabricated well cap rock is internally provided with framework of steel reinforcement.The setting of framework of steel reinforcement is so that prefabricated well lid Layer keeps the globality and structural strength of structure, is not easy to damage by pressure and deform.
Preferably, the prefabricated well cap rock is made of the macromolecule composite resin material of environmental protection.Using the macromolecule of environmental protection Composite resin material, material environmental protection recyclable regenerative.
Compared with prior art, the utility model is the beneficial effects are as follows: have prefabricated height value by pre-formed Well lid layer, promote well lid height instead of conventional cement sand bed, and cage is fixed on pit shaft using spacer bar, no It needs to conserve cement mortar, accelerates the completion time of project, be easy to constructing operation, accurately control manhole cover lifting height and position Control ensure that the integral smoothness on road surface, improve road-ability and safety.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of the prefabricated well cap rock of the preferred embodiment in the utility model;
Fig. 2 is the half section structure diagram of the prefabricated well cap rock of the preferred embodiment in the utility model;
Fig. 3 is the prefabricated well cap rock device scheme of installation of the preferred embodiment in the utility model;
Fig. 4 is the fixed prefabricated well cap rock schematic diagram of the preferred embodiment in the utility model;
Fig. 5 is that the preferred embodiment in the utility model loads into annular groove and flattens compacting filler schematic diagram;
Fig. 6 is the structural schematic diagram of the prefabricated well cap rock of another embodiment of the utility model;
Fig. 7 is the half section structure diagram of the prefabricated well cap rock of another embodiment of the utility model;
Fig. 8 is the prefabricated well cap rock device scheme of installation of another embodiment of the utility model.
Wherein, 1, pit shaft;11, fixation hole;2, cage;21, first annular bulge loop;22, through-hole;3, well lid;4, cement is mixed Solidifying soil layer;5, asphalt overlay;6, prefabricated well cap rock;61, hoisting depth layer;611, location hole;62, the second annular convex ring;63, Framework of steel reinforcement;7, spacer bar;8, annular groove.
Specific embodiment
Below by the technical scheme in the utility model embodiment is clearly and completely described, it is clear that described Embodiment is only a part of the embodiment of the utility model, instead of all the embodiments.Based on the implementation in the utility model Example, all other embodiment obtained by those of ordinary skill in the art without making creative efforts belong to The range of the utility model protection.
The prefabricated well cap rock device that the utility model asphalt overlaying promotes well lid is suitable for town road and overlays pitch transformation Promote well lid.
Specific embodiment of the present utility model is described below in conjunction with attached drawing.
With reference to Fig. 1-5, a kind of prefabricated well lid of asphalt overlaying promotion well lid in the preferred embodiment in the utility model is shown Layer device, including the pit shaft 1, cage 2 and well lid 3 set gradually from bottom to up, the periphery setting cement concrete layer 4 of pit shaft 1 With the asphalt overlay 5 for being laid on 4 upper surface of cement concrete layer, cage 2 is equipped with first annular bulge loop 21, first annular bulge loop 21 upper surface is concordant with the upper surface of the upper surface of well lid 3 and asphalt overlay 5 respectively, is provided between pit shaft 1 and cage 2 Prefabricated well cap rock 6, prefabricated well cap rock 6 include having the hoisting depth layer 61 of prefabricated height value and extending upwardly to 2 periphery of cage The second annular convex ring 62, hoisting depth layer 61 is radially symmetrical to be provided through several spacer bars 7, spacer bar 7 one end are fixedly connected with pit shaft 1, and the other end of spacer bar 7 is fixedly connected with cage 2.The prefabricated height value of hoisting depth layer 61 by The type of the well lid 3 and the construction thickness of the asphalt overlay 5 determine.According to the well lid different model type of inspection shaft and The thickness of asphalt overlay produces the prefabricated well cap rock of respective model, the inspection shaft suitable for different road reformations in advance Manhole cover lifting.
Further, spacer bar 7 is in linear type, is integrally formed with prefabricated well cap rock 6.Integral prefabricated molding can carry out High-volume Prefabrication, Accelerating The Construction duration.
Specifically, the quantity of spacer bar 7 is eight, and cage 2 is also radially symmetrical through eight through-holes 22 of setting So that spacer bar 7 passes through, 7 one end of spacer bar is fixed in the fixation hole 11 of 1 upper surface of pit shaft using steel planting mode, The bending after the through-hole 22 of cage 2 of 7 other end of spacer bar is connected to the upper surface of cage 2.Pass through the clamping of spacer bar 7 Fixed function, cage 2 and prefabricated well cap rock 6 are fixed on the upper surface of pit shaft 1, realize the position control in construction.
Further, the annular being provided between first annular bulge loop 21 and asphalt overlay 5 for loading filler is recessed Slot 8.Specifically, it is being reserved between asphalt overlay 5 and cage 2 in construction or later period cutting mode stays the annular groove of 10cm wide 8, using tar sand as filler load annular groove 8 and by small-sized compacting machine leveling compacting, solve asphalt overlay 5 with Road surface connection problem between cage 2.
Further, prefabricated well cap rock 6 is internally provided with framework of steel reinforcement 63.The setting of framework of steel reinforcement 63 is so that prefabricated well Cap rock 6 keeps the globality and structural strength of structure, is not easy to damage by pressure and deform.
Further, prefabricated well cap rock 6 is made of the macromolecule composite resin material of environmental protection.It is multiple using the macromolecule of environmental protection Resin material, material environmental protection recyclable regenerative.
In construction and installation, first in 1 upper surface of pit shaft of inspection shaft radially eight fixation holes 11 of symmetrical brill, will determine One end that position reinforcing bar 7 is located at 6 lower section of prefabricated well cap rock is aligned in implantation fixation hole 11 one by one respectively, until prefabricated well cap rock 6 Lower surface is bonded with the upper surface of pit shaft 1.Then, cage 2 is sleeved on to the upper surface of prefabricated well cap rock 6 from top to bottom, is positioned The other end that reinforcing bar 7 is located at the top of prefabricated well cap rock 6 is pierced by the upper table that bending after the through-hole 22 of cage 2 is connected to cage 2 respectively Face.And then, the annular groove 8 between first annular bulge loop 21 and asphalt overlay 5 is loaded as filler using tar sand, And by small-sized compacting machine leveling compacting tar sand, so that the road surface joining place between asphalt overlay 5 and cage 2 is smooth.Most Afterwards, well lid 3 is placed on cage 2, that is, completes road asphalt and overlays the promotion of well lid 3 of inspection shaft in construction and fix.
With reference to Fig. 6-8, a kind of prefabricated well lid of asphalt overlaying promotion well lid in another embodiment of the utility model is shown Layer device.Unlike preferred embodiment, in the present embodiment, spacer bar 7 is L-shaped, it is seperated with prefabricated well cap rock 6 at Type.Using separate prefabricated molding, structure is simple, is easy to construction and installation and maintenance.
Specifically, hoisting depth layer 61 is radially symmetrical through eight location holes passed through for spacer bar 7 of setting 611, cage 2 is radially symmetrical through eight through-holes 22 passed through for spacer bar 7 of setting, one end of spacer bar 7 according to It is secondary to be fixed in the fixation hole 11 of 1 upper surface of pit shaft after through-hole 22 and location hole 611 using steel planting mode, position steel The other end bending end of muscle 7 is connected to the upper surface of cage 2.By the way that location hole 611 is arranged on prefabricated well cap rock 6, using brill The fixed cage 2 of hole bar planting mode and road surface, are convenient for Construction control and positioning.
It, will be pre- first in 1 upper surface of pit shaft of inspection shaft radially eight fixation holes 11 of symmetrical brill in construction and installation Well lid layer 6 processed, cage 2 successively overlay the upper surface of pit shaft 1, and make through-hole 22 and location hole 611 and fixation hole 11 one by one Alignment.Insertion is fixed on fixation after one end that L-shaped spacer bar 7 stretches then is sequentially passed through through-hole 22 and location hole 611 In hole 11,7 bending end of spacer bar is connected to the upper surface of cage 2.And then, first is loaded as filler using tar sand Annular groove 8 between annular convex ring 21 and asphalt overlay 5, and by small-sized compacting machine leveling compacting tar sand, so that drip Road surface joining place between green overlay 5 and cage 2 is smooth.Finally, well lid 3 is placed on cage 2, that is, complete road drip The well lid 3 that blueness overlays inspection shaft in construction is promoted and is fixed.
Compared with prior art, the utility model has the beneficial effects that by advance using the macromolecule compound resin of environmental protection The pre-formed well lid layer with prefabricated height value of material high-volume promotes well lid height instead of conventional cement sand bed, and Cage is fixed on pit shaft using spacer bar, does not need to conserve cement mortar, accelerates the completion time of project, is easy to apply Work operation, accurately controls manhole cover lifting height and position control, ensure that the integral smoothness on road surface, improve road-ability and Safety.
It, cannot the above content is specific preferred embodiment further detailed description of the utility model is combined Assert that the specific implementation of the utility model is only limited to these instructions.For the ordinary skill of the utility model technical field For personnel, without departing from the concept of the premise utility, a number of simple deductions or replacements can also be made, should all regard To belong to the protection scope of the utility model.

Claims (9)

1. a kind of asphalt overlaying promotes the prefabricated well cap rock device of well lid, including set gradually from bottom to up pit shaft, cage and Well lid, the periphery setting cement concrete layer of the pit shaft and the asphalt overlaying for being laid on the cement concrete layer upper surface Layer, the cage be equipped with first annular bulge loop, the upper surface of the first annular bulge loop respectively with the upper surface of the well lid and The upper surface of the asphalt overlay is concordant, it is characterised in that: prefabricated well cap rock is provided between the pit shaft and the cage, The prefabricated well cap rock includes the hoisting depth layer with prefabricated height value and the second ring for extending upwardly to the cage periphery Shape bulge loop, the hoisting depth layer is radially symmetrical to be provided through several spacer bars, described spacer bar one end It is fixedly connected with the pit shaft, the spacer bar other end is fixedly connected with the cage.
2. the prefabricated well cap rock device that a kind of asphalt overlaying according to claim 1 promotes well lid, it is characterised in that: described Spacer bar is in linear type, is integrally formed with the prefabricated well cap rock.
3. the prefabricated well cap rock device that a kind of asphalt overlaying according to claim 1 promotes well lid, it is characterised in that: described Spacer bar is L-shaped, molding seperated with the prefabricated well cap rock.
4. the prefabricated well cap rock device that a kind of asphalt overlaying according to claim 2 promotes well lid, it is characterised in that: described Cage is provided with the through-hole passed through for the spacer bar, and described spacer bar one end is fixed on described using steel planting mode The upper surface of pit shaft, the spacer bar other end are connected to the upper surface of the cage across bending after the through-hole.
5. the prefabricated well cap rock device that a kind of asphalt overlaying according to claim 3 promotes well lid, it is characterised in that: described Hoisting depth layer is provided with the location hole that the confession spacer bar passes through, and the cage is provided with what the confession spacer bar passed through Through-hole, one end of the spacer bar use steel planting mode to be fixed on institute after sequentially passing through the through-hole and the location hole The upper surface of pit shaft is stated, the other end of the spacer bar is connected to the upper surface of the cage.
6. the prefabricated well cap rock device that a kind of asphalt overlaying according to claim 4 or 5 promotes well lid, it is characterised in that: The annular groove for loading filler is provided between the first annular bulge loop and the asphalt overlay.
7. the prefabricated well cap rock device that a kind of asphalt overlaying according to claim 6 promotes well lid, it is characterised in that: described Filler is tar sand.
8. the prefabricated well cap rock device that a kind of asphalt overlaying according to claim 1 promotes well lid, it is characterised in that: described Prefabricated well cap rock is internally provided with framework of steel reinforcement.
9. the prefabricated well cap rock device that a kind of asphalt overlaying according to claim 1 promotes well lid, it is characterised in that: described Prefabricated well cap rock is made of the macromolecule composite resin material of environmental protection.
CN201820988470.7U 2018-06-26 2018-06-26 A kind of asphalt overlaying promotes the prefabricated well cap rock device of well lid Active CN208517973U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820988470.7U CN208517973U (en) 2018-06-26 2018-06-26 A kind of asphalt overlaying promotes the prefabricated well cap rock device of well lid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820988470.7U CN208517973U (en) 2018-06-26 2018-06-26 A kind of asphalt overlaying promotes the prefabricated well cap rock device of well lid

Publications (1)

Publication Number Publication Date
CN208517973U true CN208517973U (en) 2019-02-19

Family

ID=65337679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820988470.7U Active CN208517973U (en) 2018-06-26 2018-06-26 A kind of asphalt overlaying promotes the prefabricated well cap rock device of well lid

Country Status (1)

Country Link
CN (1) CN208517973U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764437A (en) * 2020-06-28 2020-10-13 中国二十冶集团有限公司 Manhole cover device and installation method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764437A (en) * 2020-06-28 2020-10-13 中国二十冶集团有限公司 Manhole cover device and installation method thereof

Similar Documents

Publication Publication Date Title
CN207672354U (en) Concrete pavement slab assembly connection structure
CN108035376B (en) Anti-deformation rectification foundation applicable to goaf site wind turbine generator and construction method thereof
CN102839601A (en) Fixed connection structure for steel pier column and cushion cap of portal rigid frame overbridge and construction method of fixed connection structure
CN106836262A (en) A kind of construction method of packaged type bridges substructure
CN106245670B (en) Exposed steel column base construction method
CN112227502A (en) Drainage inspection well construction method
LU501207B1 (en) Structure and method for reinforcing manhole cover anchored with existing road surface foundation by means of dowel bars
CN208517973U (en) A kind of asphalt overlaying promotes the prefabricated well cap rock device of well lid
CN108252290A (en) The soft thick soil treatment structures and methods of high-strength water-permeable fiber concrete pipe rubble core stake
KR101370102B1 (en) Cast-in-place type top-pile and construction process of the same
CN112227340B (en) Pile-supported reinforced embankment based on waste tires and working method thereof
CN208328665U (en) A kind of full assembled light abutment
CN107012760A (en) Prevent the construction method of the periphery depression of urban road inspection shaft and local damage
CN116856932B (en) Large-diameter prestress assembly vertical shaft structure containing glass fiber rib part and construction method
CN106480827A (en) A kind of construction technology of segmented casting concrete box beam
CN212001226U (en) Backfill miscellaneous soil composite foundation structure
CN106638329A (en) Assembling type bridge girder lower structure
CN109267578A (en) A kind of inclined-plane plain concrete construction and its construction method
CN206503079U (en) A kind of packaged type bridges substructure
CN206655065U (en) Combined type support post and overhead rail system for overhead rail system
CN206512619U (en) The assembled steel reinforced concrete cover culvert of U-shaped
CN206784437U (en) A kind of urban road inspection shaft
CN214993788U (en) Assembled cement soil composite pile
CN209260730U (en) A kind of inclined-plane plain concrete construction
CN108978699A (en) Land integral prefabricated bearing platform and production and installation method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant