CN208477349U - Construction site power control cabinet intelligent monitor system based on Internet of Things - Google Patents
Construction site power control cabinet intelligent monitor system based on Internet of Things Download PDFInfo
- Publication number
- CN208477349U CN208477349U CN201821432049.4U CN201821432049U CN208477349U CN 208477349 U CN208477349 U CN 208477349U CN 201821432049 U CN201821432049 U CN 201821432049U CN 208477349 U CN208477349 U CN 208477349U
- Authority
- CN
- China
- Prior art keywords
- power control
- control cabinet
- internet
- things
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The utility model discloses the construction site power control cabinet intelligent monitor systems based on Internet of Things, including environment monitoring module, Data collecting conversion module, operation executing module, middle control MCU, Internet of Things and backstage center.Environment monitoring module and data acquisition conversion module acquire power control cabinet surrounding enviroment information and required power control cabinet data information respectively, and transmit this information to middle control MCU, backstage center is uploaded to by Internet of Things after the analysis processing of middle control MCU, background work personnel data are analyzed after according to different situations send command adapted thereto to middle control MCU, it transfers to operation executing module to execute corresponding actions to control power control cabinet, realizes the purpose to construction site power control cabinet intelligent monitoring.The power control cabinet intelligent monitor system data acquisition of power control cabinet monitoring system compared with the prior art, the utility model is more abundant comprehensive, and information feedback is accurate much sooner, and intelligent control effect is more preferable.
Description
Technical field
The utility model relates to electric power power consumption management technical fields, specially the construction site power control cabinet intelligence based on Internet of Things
It can monitoring system.
Background technique
The dispersion of Construction of Engineering Projects scene power distribution cabinet distribution at this stage, it has not been convenient to be managed collectively, power control cabinet operating condition is complete
It is complete to rely on manual inspection mode, when there is bad weather or power control cabinet operation occurs abnormal, it is unable to get timely and effective processing,
All kinds of parameters of ammeter can not be stored effectively in power control cabinet, and electricity consumption situation can not also carry out real-time and precise monitoring in Item Sets, can not
Judge to go into operation situation and carry out necessary specific yield electrical energy consumption analysis to propose a kind of intelligent remote monitoring so being directed to power control cabinet
System monitors each parameter of power control cabinet by backstage center remote to realize, while can realize intelligent remote control.
Internet of Things refers to through information sensing devices such as radio frequency identification (RFID), infrared inductor, GPS, laser scanners,
By the agreement of agreement, realize that any time, any place, any object carry out information exchange and communication, to realize intelligent knowledge
Not, it positions, track, a kind of network of monitoring and management.Internet of Things is with complete perception, reliable transmission, Intelligent treatment feature
Connection physical world network.
This programme is quasi- to utilize the power control cabinet intelligent monitor system based on Internet of Things, carries out for power control cabinet parameters long-range
Monitoring, acquisition, analysis and storage, to realize the intelligent monitoring to power control cabinet.
Utility model content
The purpose of this utility model is to provide the construction site power control cabinet intelligent monitor systems based on Internet of Things, for electricity
Control cabinet parameters are remotely monitored, are acquired, analyzed and are stored, to realize the intelligent monitoring to power control cabinet, wherein borrow
The information popularity for helping Internet of Things and diversity realization avoid sharp in the prior art the remotely intelligently monitoring scheme of power control cabinet
With the limitation of the power control cabinet intelligent monitor system of traditional network.
To achieve the above object, the utility model provides the following technical solutions:
Construction site power control cabinet intelligent monitor system based on Internet of Things comprising:
Environment monitoring module, for being monitored to power control cabinet periphery natural environment and emergency situations comprising natural
Environmental monitoring unit and emergency situations monitoring unit;Data collecting conversion module, for reading required power control cabinet real time data
And the data are converted comprising data acquisition unit and Date Conversion Unit;Operation executing module, after executing
The operation to power control cabinet that platform center sends over comprising power operation execution unit and other operation execution units;Middle control
MCU for being analyzed and processed to collected various data, and executes the instruction of backstage center transmission;Internet of Things, for real
The data interaction of control MCU and backstage center in existing;And backstage center, the data for centering control MCU transmission carry out analysis system
Meter and storage, and instruction control power control cabinet is issued according to corresponding situation and is operated;
Wherein, natural environment monitoring unit, emergency situations monitoring unit, Date Conversion Unit, power operation execution unit
And other operation execution units be electrically connected in control MCU, data acquisition unit is electrically connected Date Conversion Unit, middle control
MCU passes through Internet of Things communication connection backstage center.
Preferably, natural environment monitoring unit includes temperature humidity monitor, to monitor the temperature and humidity of power control cabinet.
Preferably, emergency situations monitoring unit is human body sensor, whether has work beside power control cabinet to monitor
Personnel avoid safety accident.
Preferably, data acquisition unit is data collector
Preferably, Date Conversion Unit is ADC analog-digital converter.
Preferably, the operation executing module connects power control cabinet, and the specially described power operation execution unit connection is automatically controlled
Breaker control power control cabinet power-off in cabinet, other operation execution units connect other electric elements controls in power control cabinets and hold
The other functions of row.
Preferably, Internet of Things Nb-Iot.
Preferably, the backstage center is background server
Compared with prior art, the utility model has the beneficial effects that the utility model is using Internet of Things to construction site
Power control cabinet carry out intelligent monitoring, firstly, compared to traditional network, the multiple types sensor disposed on Internet of Things can be more complete
Face, the mass data for acquiring power control cabinet different-format different content in real time;In addition Internet of Things can between traditional network structure
Build various heterogeneous networks and agreement, can ensure the collected data about power control cabinet transmission when correctness and in time
Property;Also, Internet of Things combines sensor and Intelligent treatment, can be with using the various intellectual technologies such as cloud computing, pattern-recognition
Valuable data are analyzed, process and handled out from the massive information that sensor obtains, then cooperate the work people at backstage center
Member, can be realized to power control cabinet intelligent control.The power control cabinet intelligent monitor system of the utility model is compared with prior art on the whole
Power control cabinet monitoring system, data acquisition more it is abundant comprehensively, information feedback is accurate much sooner, and intelligent control effect is more preferable.
Detailed description of the invention
Fig. 1 is the construction site power control cabinet intelligent monitor system structure chart based on Internet of Things in the utility model.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figure 1, the construction site power control cabinet intelligent monitor system based on Internet of Things comprising:
Environment monitoring module, for being monitored to power control cabinet periphery natural environment and emergency situations comprising natural
Environmental monitoring unit and emergency situations monitoring unit;Data collecting conversion module, for reading required power control cabinet real time data
And the data are converted comprising data acquisition unit and Date Conversion Unit;Operation executing module, after executing
The operation to power control cabinet that platform center sends over comprising power operation execution unit and other operation execution units;Middle control
MCU for being analyzed and processed to collected various data, and executes the instruction of backstage center transmission;Internet of Things, for real
The data interaction of control MCU and backstage center in existing;And backstage center, the data for centering control MCU transmission carry out analysis system
Meter and storage, and instruction control power control cabinet is issued according to corresponding situation and is operated;
Wherein, natural environment monitoring unit, emergency situations monitoring unit, Date Conversion Unit, power operation execution unit
And other operation execution units be electrically connected in control MCU, data acquisition unit is electrically connected Date Conversion Unit, middle control
MCU passes through Internet of Things communication connection backstage center.
Environment monitoring module, for being monitored to power control cabinet periphery natural environment and emergency situations comprising natural
Environmental monitoring unit and emergency situations monitoring unit.Natural environment monitoring unit is specially temperature humidity monitor, to monitor
The temperature and humidity of power control cabinet and power control cabinet surrounding enviroment, when power control cabinet is in high temperature since fire occurs, or due under
When heavy rain humidity is excessive, environment temperature or humidity are abnormal, will affect the normal work of power control cabinet, or even also will cause power control cabinet
Damage, abnormal temperature humidity data can be acquired and be fed back to middle control MCU and backstage center by temperature humidity monitor at this time,
Facilitate staff to grasp power control cabinet situation in time and takes timely measure.Emergency situations monitoring unit is people's body-sensing inductive sensing
Whether device has staff beside power control cabinet to monitor, avoids safety accident.Due to the up and-down work people in construction site
Member and other social personnel are relatively more, and the human body sensor of emergency situations monitoring unit can be to a certain range around power control cabinet
Interior personnel activity's information is acquired, when the personnel of sensing, which cross safety zone, to be entered in the risk range of power control cabinet,
Report this information in time, middle control MCU or background work personnel, which can take timely measure, to be alerted, when necessary to power control cabinet into
Row power down process.
Data collecting conversion module, for reading required power control cabinet real time data and converting the data,
Including data acquisition unit and Date Conversion Unit.Specifically, data acquisition unit is various data collectors, to required electricity
The control various operating state datas of cabinet are acquired, including electricity consumption, instantaneous power, phase voltage and phase current;Date Conversion Unit
For ADC analog-digital converter, the discrete letter indicated with binary numeral that collected data conversion can be identified at middle control MCU
Number convenient for middle control MCU further analysis processing.
Operation executing module, the operational order to power control cabinet for executing backstage center or middle control MCU is sended over,
Including power operation execution unit and other operation execution units.Operation executing module connects power control cabinet, and wherein power operation is held
Row unit connects the breaker control power control cabinet power-off in power control cabinet, when an emergency situation is encountered, such as has personnel accidentally to enter
When the danger zone of power control cabinet or abnormal conditions lead to power control cabinet short circuit, electric leakage, timely operating breaker is needed to control power control cabinet
Power-off;Other electric elements controls execute other functions in other operation execution unit connection power control cabinets, such as connect alarm pair
Emergency case is alarmed, and connection loudspeaker commands power control cabinet surrounding people, and connection blower, air-conditioning device are respectively to electricity
Control cabinet carries out dehumidifying and cooling processing.
Middle control MCU for being analyzed and processed to collected various data, and executes the instruction of backstage center transmission.
Middle control MCU is whole system Data Analysis Services center, and executes the execution that backstage care workers send operational order
Center, data collecting module collected to data after conversion to middle control MCU, using analysis processing can independently selection be by
Data storage is still uploaded to backstage center, or directly transmits instruction and execute corresponding actions to executing agency.
Internet of Things, for realizing the data interaction of middle control MCU and backstage center, Internet of Things uses Nb- in practical application
Iot narrow band communication technology, it is whole to complete power control cabinet and construction site using its narrow bandwidth, the network structure of low-power consumption
The data interaction of middle the control MCU and backstage center of power control cabinet intelligent monitor system are realized in the construction of a Internet of Things net system.
Backstage center, the data for centering control MCU transmission are analyzed and counted and are stored, and are issued according to corresponding situation
Instruction control power control cabinet is operated.Backstage center is background server, and staff can be according to the data monitoring of upload
The working condition of power control cabinet gives middle control MCU to send instruction control power control cabinet work in time for different situations.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (8)
1. the construction site power control cabinet intelligent monitor system based on Internet of Things characterized by comprising
Environment monitoring module, for being monitored to power control cabinet periphery natural environment and emergency situations comprising natural environment
Monitoring unit and emergency situations monitoring unit;
Data collecting conversion module, for reading required power control cabinet real time data and converting the data comprising
Data acquisition unit and Date Conversion Unit;
Operation executing module, the operation to power control cabinet sended over for executing backstage center comprising power operation executes
Unit and other operation execution units;
Middle control MCU for being analyzed and processed to collected various data, and executes the instruction of backstage center transmission;
Internet of Things, for realizing the data interaction of middle control MCU and backstage center;And
Backstage center, the data for centering control MCU transmission are analyzed and counted and are stored, and are issued and instructed according to corresponding situation
Control power control cabinet is operated;
Wherein, the natural environment monitoring unit, emergency situations monitoring unit, Date Conversion Unit, power operation execution unit
And other operation execution units be electrically connected in control MCU, the data acquisition unit is electrically connected Date Conversion Unit, institute
It states middle control MCU and passes through Internet of Things communication connection backstage center.
2. the construction site power control cabinet intelligent monitor system according to claim 1 based on Internet of Things, which is characterized in that institute
Stating natural environment monitoring unit includes temperature humidity monitor, to monitor power control cabinet and surrounding temperature and humidity.
3. the construction site power control cabinet intelligent monitor system according to claim 1 based on Internet of Things, which is characterized in that institute
Stating emergency situations monitoring unit is human body sensor, whether has staff beside power control cabinet to monitor, avoids safety
Accident.
4. the construction site power control cabinet intelligent monitor system according to claim 1 based on Internet of Things, which is characterized in that institute
Stating data acquisition unit is data collector.
5. the construction site power control cabinet intelligent monitor system according to claim 1 based on Internet of Things, which is characterized in that institute
Stating Date Conversion Unit is ADC analog-digital converter.
6. the construction site power control cabinet intelligent monitor system according to claim 1 based on Internet of Things, which is characterized in that institute
State operation executing module connection power control cabinet, the breaker control electricity in the specially described power operation execution unit connection power control cabinet
Cabinet power-off is controlled, other electric elements controls execute other functions in other operation execution unit connection power control cabinets.
7. the construction site power control cabinet intelligent monitor system according to claim 1 based on Internet of Things, which is characterized in that institute
Stating Internet of Things is Nb-Iot.
8. the construction site power control cabinet intelligent monitor system according to claim 1 based on Internet of Things, which is characterized in that institute
Stating backstage center is background server.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821432049.4U CN208477349U (en) | 2018-09-03 | 2018-09-03 | Construction site power control cabinet intelligent monitor system based on Internet of Things |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821432049.4U CN208477349U (en) | 2018-09-03 | 2018-09-03 | Construction site power control cabinet intelligent monitor system based on Internet of Things |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208477349U true CN208477349U (en) | 2019-02-05 |
Family
ID=65208658
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821432049.4U Active CN208477349U (en) | 2018-09-03 | 2018-09-03 | Construction site power control cabinet intelligent monitor system based on Internet of Things |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208477349U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110992662A (en) * | 2019-11-23 | 2020-04-10 | 中国建筑第八工程局有限公司 | Wide-area narrow-band data wireless acquisition system for intelligent construction and operation and maintenance |
CN112212458A (en) * | 2020-08-17 | 2021-01-12 | 珠海格力电器股份有限公司 | Electric cabinet safety control device and method and electrical equipment |
-
2018
- 2018-09-03 CN CN201821432049.4U patent/CN208477349U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110992662A (en) * | 2019-11-23 | 2020-04-10 | 中国建筑第八工程局有限公司 | Wide-area narrow-band data wireless acquisition system for intelligent construction and operation and maintenance |
CN112212458A (en) * | 2020-08-17 | 2021-01-12 | 珠海格力电器股份有限公司 | Electric cabinet safety control device and method and electrical equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106532935B (en) | For carrying out the method and its system of secondary system of intelligent substation fault diagnosis | |
CN102904343B (en) | State monitoring system and method based on distributed multi-agent system | |
CN202676300U (en) | An intelligent wireless electric contact temperature monitoring device of an electric power distribution cabinet | |
CN208477349U (en) | Construction site power control cabinet intelligent monitor system based on Internet of Things | |
CN103729990A (en) | On-line cable line monitoring system based on all-in-one sensor | |
CN111077817A (en) | Security monitoring management system for power company based on Internet of things | |
CN105807158A (en) | Electric power parameter online monitoring system and monitoring control method for power grid connection points and switches | |
CN102355063A (en) | Power equipment monitoring system | |
CN204425045U (en) | Transformer station's wireless monitoring device | |
CN107546856A (en) | A kind of ring-main unit comprehensive monitoring system | |
CN205389193U (en) | Photovoltaic power plant is with intelligent subassembly and photovoltaic power plant wireless monitoring system | |
CN204758756U (en) | Smart line trouble monitored control system | |
CN202309223U (en) | Electrical equipment monitoring system | |
CN202033052U (en) | Intelligent online monitoring and early warning device for cable running conditions | |
CN206059137U (en) | A kind of intelligent transformer of below 800kVA | |
CN205210974U (en) | Can real -time supervision substation equipment maintain and debugging process patrol and examine robot | |
CN210927564U (en) | Data acquisition system for photovoltaic power station | |
CN105186696A (en) | Intelligent multifunctional monitoring system | |
CN210806849U (en) | Photovoltaic microgrid control system | |
CN203502120U (en) | Remote wireless temperature measurement system of high-voltage electrical equipment | |
CN207856142U (en) | A kind of novel building fire protection and maintained equipment | |
CN207968075U (en) | integrated monitoring system based on data fusion technique | |
CN113625639A (en) | Agricultural intelligent monitoring system and monitoring method thereof | |
CN206743191U (en) | Photovoltaic plant inverter apparatus for evaluating | |
CN218216805U (en) | Intelligent monitoring system for electrical operation state of equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |