CN202309223U - Electrical equipment monitoring system - Google Patents

Electrical equipment monitoring system Download PDF

Info

Publication number
CN202309223U
CN202309223U CN201120417181XU CN201120417181U CN202309223U CN 202309223 U CN202309223 U CN 202309223U CN 201120417181X U CN201120417181X U CN 201120417181XU CN 201120417181 U CN201120417181 U CN 201120417181U CN 202309223 U CN202309223 U CN 202309223U
Authority
CN
China
Prior art keywords
monitoring
equipment
electric power
connects
main frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120417181XU
Other languages
Chinese (zh)
Inventor
张旭光
施世鸿
谭茂强
贾红舟
樊冬梅
贺智
周翔胜
余荣兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Construction Group Guangdong Electric Power Design Institute Co Ltd
Original Assignee
Guangdong Electric Power Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Electric Power Design Institute filed Critical Guangdong Electric Power Design Institute
Priority to CN201120417181XU priority Critical patent/CN202309223U/en
Application granted granted Critical
Publication of CN202309223U publication Critical patent/CN202309223U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The utility model provides an electrical equipment monitoring system, comprising a field monitoring device, a monitoring host which is connected with the field monitoring device and acquires the monitoring data, a communication device which is connected with the monitoring host and uploads the monitoring data of the monitoring host and a monitoring server which receives the monitoring data which are uploaded by the communication device. By the electrical equipment monitoring system disclosed by the utility model, monitoring personnel can obtain the field monitoring data at a remote end only by remotely accessing the monitoring server, the electrical equipment monitoring system is suitable for monitoring the position of a common earth electrode isolating blade, monitoring personnel do not needed to be on-site, and the electrical equipment monitoring system accords with the accurate, timely and reliable operation requirements of an electrical power system and is convenient.

Description

A kind of electric power equipment inspect system
Technical field
The utility model relates to the power equipment monitoring technology, relates in particular to a kind of electric power equipment inspect system.
Background technology
Along with the increasing of " transferring electricity from the west to the east " construction scale, DC transmission engineering puts into operation more and more.For reducing investment outlay and reducing engineering construction expropriation of land difficulty, adopt a plurality of DC converter station shared grounding utmost point patterns usually in the DC engineering construction.The correct monitoring of shared grounding utmost point isolation knife position is related to the safe and stable operation of a plurality of DC converter stations.Because the common unattended operation in place of the shared grounding utmost point, earth electrode equipment is simple, all need the person of sending someone go to on-the-spot affirmation to the affirmation of earth electrode isolation knife position at every turn.Thisly rely on not only time and effort consuming of artificial monitoring to earth electrode, and have the unreliability of human factor, can not satisfy electric power networks in time, accurately, service requirement reliably.
The utility model content
The technical problem that the utility model solves is to provide a kind of artificial electric power equipment inspect system of participating in that need not; Be applicable to the monitoring of shared grounding utmost point isolation knife position; Need not artificial participation, meet accurate, timely, the reliable service requirement of electric power system, more convenient.
A kind of electric power equipment inspect system; Comprise field monitoring equipment, monitoring main frame, communication equipment and monitor server; Said field monitoring equipment connects said monitoring main frame, and said monitoring main frame connects said communication equipment, and said communication equipment connects said monitor server via communication network.
Compared with prior art; The electric power equipment inspect system of the utility model is through the Monitoring Data of monitoring main frame active collection site monitoring equipment; And said Monitoring Data is uploaded to said monitor server through said communication equipment, therefore, the monitoring personnel only need be through the said monitor server of remote access; Can obtain on-the-spot Monitoring Data at far-end; Monitoring for shared grounding utmost point isolation knife position need not the monitoring personnel to on-the-spot, and is more convenient, meets accurate, timely, the reliable service requirement of electric power system.
Preferably, said electric power equipment inspect system also comprises at least one the station end work station that connects said monitor server through network.Through special station end work station is provided, make the staff of electric power system obtain Monitoring Data more easily through the said monitor server of access to netwoks.
Preferably, said field monitoring equipment comprises: infrared intelligent camera and switching value probe, said infrared intelligent camera is connected said monitoring main frame respectively with the switching value probe.Through the infrared intelligent camera is set, can obtain to monitor on-the-spot monitoring image, through said switching value probe, then can obtain the on-the-spot on off state of monitoring.Therefore, be particularly suitable for the monitoring of shared grounding utmost point isolation knife position.
Preferably, said monitoring main frame connects said field monitoring equipment through optical fiber.Said monitoring main frame is connected through optical fiber with said field monitoring equipment, can gather Monitoring Data fast, improves the on-the-spot data transmission quality of monitoring.
Preferably, said communication equipment is a mobile communication equipment, connects said monitor server through cordless communication network.Through cordless communication network transmission of monitoring data, need not special data line is set, convenient.
Preferably; Said electric power equipment inspect system further comprises power-supply system; Said power-supply system comprises: generating equipment, charging-discharging controller and storage battery, and said generating equipment connects said storage battery through said charging-discharging controller, and said charging-discharging controller connects said monitoring main frame.Through said power-supply system, realize monitoring system monitoring on-the-spot independent current source, the cable that need not to depend on electric power networks provides power supply, makes the operation of said electric power equipment inspect system safer, and is reliable.Control said charging and discharging of accumulator through said charging-discharging controller, can improve the utilization ratio of electric energy, make the said electric power equipment inspect system can be when generating equipment can't be generated electricity, for a long time independent operating.
Further, said generating equipment comprises: wind-driven generator and solar panel, said wind-driven generator and said solar panel are connected to said charging-discharging controller respectively.Multiple generation mode is provided, can be applicable to various site environment.
Description of drawings
Fig. 1 is the structural representation of the utility model electric power equipment inspect system;
The structural representation of the power-supply system of a kind of preferred implementation of Fig. 2 the utility model electric power equipment inspect system.
Embodiment
Below in conjunction with accompanying drawing the utility model is done description more specifically.
See also Fig. 1, Fig. 1 is the structural representation of the utility model electric power equipment inspect system.
Said electric power equipment inspect system comprises: field monitoring equipment 11, monitoring main frame 12, communication equipment 13 and monitor server 14.Said field monitoring equipment 11 connects said monitoring main frame 12, and said monitoring main frame 12 connects said communication equipment 13, and said communication equipment connects said monitor server 14 via communication network.
The power equipment at 11 pairs of scenes of said field monitoring equipment is monitored, and obtains Monitoring Data.In this execution mode, said field monitoring equipment 11 comprises infrared intelligent camera 111 and switching value probe 112, and said infrared intelligent camera 111 is connected said monitoring main frame 12 respectively with switching value probe 112.Through said infrared intelligent camera 111 is set, can obtain to monitor on-the-spot monitoring image, through said switching value probe 112, then can obtain the on off state of the on-the-spot power equipment of monitoring.Therefore, be particularly suitable for the monitoring of shared grounding utmost point isolation knife position.As a kind of preferred implementation; Said infrared intelligent camera 111 all is connected said monitoring main frame 12 through fiber optic network with switching value probe 112; Gather the video and the position contact point signal of isolation knife, video and position contact point signal are transmitted through the fiber to said monitoring main frame 12.Connect through optical fiber, can gather Monitoring Data fast, improve the on-the-spot data transmission quality of monitoring.
Said monitoring main frame 12 connects said field monitoring equipment 11 and said communication equipment 13, and the Monitoring Data of gathering said field monitoring equipment 11 carries out transferring to said communication equipment 13 after compressed encoding is handled to said Monitoring Data then.In this execution mode, said monitoring main frame 12 connects said communication equipment 13 through the 10/100M Shielded Twisted Pair, transmits said Monitoring Data.
Said communication equipment 13 is used to upload Monitoring Data to the said monitor server 14 of said monitoring main frame 12.In this execution mode, said communication equipment 13 is selected mobile radio communication device for use, is connected said monitor server 14, transmission of monitoring data with Internet through cordless communication network.Through cordless communication network transmission of monitoring data, need not special data line is set, convenient.
Said monitor server 14 receives the Monitoring Data that said communication equipment 13 is uploaded, and said Monitoring Data is carried out unified management, and access interface is provided, so that the user can visit monitor server 14, obtains real-time Monitoring Data.
Preferably, in this execution mode, said electric power equipment inspect system also comprises at least one station end workstation1 5 of the said monitor server 14 of visit, and each said station end workstation1 5 connects said monitor server 14 through network.Through special station end workstation1 5 is provided, make the staff of electric power system obtain Monitoring Data more easily through the said monitor server 14 of access to netwoks, for example obtain the video and the position contact point signal of the monitoring of shared grounding utmost point isolation knife position.And can access rights etc. be set through said station end workstation1 5, convenient management to Monitoring Data.
Compared with prior art; The electric power equipment inspect system of the utility model is through the Monitoring Data of monitoring main frame active collection site monitoring equipment; And said Monitoring Data is uploaded to said monitor server through said communication equipment, therefore, the monitoring personnel only need be through the said monitor server of remote access; Can obtain on-the-spot Monitoring Data at far-end; Monitoring for shared grounding utmost point isolation knife position need not the monitoring personnel to on-the-spot, and is more convenient, meets accurate, timely, the reliable service requirement of electric power system.
See also Fig. 2, the structural representation of the power-supply system of a kind of preferred implementation of Fig. 2 the utility model electric power equipment inspect system.
In this execution mode, said electric power equipment inspect system is provided with independently-powered power-supply system, need not to depend on the power supply of electric power networks.Said power-supply system comprises: generating equipment 16, charging-discharging controller 17 and storage battery 18; Said generating equipment 16 connects said storage battery 18 through said charging-discharging controller 17; Said charging-discharging controller 17 connects load, and said load promptly is that said electric power equipment inspect system is arranged on the on-the-spot field monitoring equipment 11 of monitoring, monitoring main frame 12, communication equipment 13 etc.Said charging-discharging controller 17 can be supplied power through 12 pairs of said field monitoring equipment 11 of said monitoring main frame and said communication equipment 13 through connecting said monitoring main frame 12, also can be independently-powered to above-mentioned three kinds of equipment respectively simultaneously.
Through said power-supply system, realize electric power equipment inspect system at the on-the-spot independent current source of monitoring, the cable that need not to depend on electric power networks provides power supply, makes the operation of said electric power equipment inspect system safer, and is reliable.Carry out electric energy management through the said storage battery of 17 pairs of said charging-discharging controllers 18, said generating equipment 16 and load equipment; Can improve the utilization ratio of electric energy; Make the said electric power equipment inspect system can be when generating equipment can't be generated electricity, for a long time independent operating.
In this execution mode, said generating equipment 16 comprises wind-driven generator 161 and solar panel 162, and said wind-driven generator 161 is connected to said charging-discharging controller 17 respectively with said solar panel 162.Multiple generation mode is provided, can be applicable to various site environment.
As a kind of execution mode for example, the load equipment total power consumption of said power-supply system configuration is about 20W, and solar cell 162 plates of configuration are chosen 300W; Wind-driven generator 161 is chosen 400W, and storage battery 18 is chosen 600Ah, through analog computation; The full electricity of storage battery and under calm no solar energy extreme weather situation; Can be normal 15 days, 24 hours every days are operation continuously incessantly, satisfies the power industry service requirement.
What the complete design of the utility model electric power equipment inspect system can satisfy power industry operation in time, accurately, reliably monitors requirement, and saves great deal of investment.At first solved the problem of earth electrode station equipment power supply source, adopted wind, light complementary system can effectively solve the long-time powerup issue of equipment, need not obtain external power supply through newly tiing up the power cable of establishing.Secondly, need not tie up and establish new communication media, save cost of equipment greatly.Station end work station configurable number is numerous once more, and can satisfy operation simultaneously, and convenient a plurality of administrative departments are checked simultaneously.
The utility model electric power equipment inspect system can realize the complete set technology of the supervision of video and position contact to shared grounding utmost point isolation knife; Can transmit through wireless signal, need not tie up and establish communication media; The scheme of gathering isolation knife video and position contact point signal can satisfy the judgement requirement of power industry to the disconnecting link running status.
Above-described the utility model execution mode does not constitute the qualification to the utility model protection range.The modification of being done within any spirit and principle at the utility model, be equal to replacement and improvement etc., all should be included within the claim protection range of the utility model.

Claims (7)

1. electric power equipment inspect system; It is characterized in that; Comprise field monitoring equipment, monitoring main frame, communication equipment and monitor server; Said field monitoring equipment connects said monitoring main frame, and said monitoring main frame connects said communication equipment, and said communication equipment connects said monitor server via communication network.
2. electric power equipment inspect system as claimed in claim 1 is characterized in that, also comprises at least one station end work station, and each said station end work station connects said monitor server through network.
3. electric power equipment inspect system as claimed in claim 1 is characterized in that, said field monitoring equipment comprises: infrared intelligent camera and switching value probe, said infrared intelligent camera is connected said monitoring main frame respectively with the switching value probe.
4. electric power equipment inspect system as claimed in claim 1 is characterized in that, said monitoring main frame connects said field monitoring equipment through optical fiber.
5. electric power equipment inspect system as claimed in claim 1 is characterized in that, said communication equipment is a mobile communication equipment, connects said monitor server through cordless communication network.
6. like each described electric power equipment inspect system of claim 1 to 5; It is characterized in that; Further comprise power-supply system; Said power-supply system comprises generating equipment, charging-discharging controller and storage battery, and said generating equipment connects said storage battery through said charging-discharging controller, and said charging-discharging controller connects said monitoring main frame.
7. electric power equipment inspect system as claimed in claim 6 is characterized in that said generating equipment comprises wind-driven generator and solar panel, and said wind-driven generator is connected said charging-discharging controller respectively with said solar panel.
CN201120417181XU 2011-10-27 2011-10-27 Electrical equipment monitoring system Expired - Fee Related CN202309223U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120417181XU CN202309223U (en) 2011-10-27 2011-10-27 Electrical equipment monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120417181XU CN202309223U (en) 2011-10-27 2011-10-27 Electrical equipment monitoring system

Publications (1)

Publication Number Publication Date
CN202309223U true CN202309223U (en) 2012-07-04

Family

ID=46378036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120417181XU Expired - Fee Related CN202309223U (en) 2011-10-27 2011-10-27 Electrical equipment monitoring system

Country Status (1)

Country Link
CN (1) CN202309223U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102355063A (en) * 2011-10-27 2012-02-15 广东省电力设计研究院 Power equipment monitoring system
CN107040041A (en) * 2017-05-24 2017-08-11 上海电力设计院有限公司 Cable termination platform online monitoring system
CN107666591A (en) * 2017-07-12 2018-02-06 重庆雅智兰能源管理有限公司 Power equipment gathered data processing method and equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102355063A (en) * 2011-10-27 2012-02-15 广东省电力设计研究院 Power equipment monitoring system
CN107040041A (en) * 2017-05-24 2017-08-11 上海电力设计院有限公司 Cable termination platform online monitoring system
CN107666591A (en) * 2017-07-12 2018-02-06 重庆雅智兰能源管理有限公司 Power equipment gathered data processing method and equipment

Similar Documents

Publication Publication Date Title
CN201608541U (en) Solar-energy photovoltaic intelligent power station based on Ethernet
CN102355063A (en) Power equipment monitoring system
CN203743860U (en) Self-generating water supply network monitoring system based on Internet of Things technology
CN101819712A (en) Collecting and monitoring method and system of wireless comprehensive data of transmission line
CN103595136A (en) Energy management system of micro-grid
CN203455714U (en) ZigBee wireless monitoring system of power line towers
CN103166311A (en) Intelligent distribution box
CN109324165A (en) Water quality on-line monitoring device and system
CN202309223U (en) Electrical equipment monitoring system
CN104166061A (en) Intelligent power distribution and utilization state detection device based on 4D technology
CN204408024U (en) A kind of 10kV circuit operation information acquisition system
CN207067754U (en) A kind of generating set remote monitoring system
CN206743249U (en) A kind of power concentrator and the system for transmitting electric power data
CN201893617U (en) Remote monitoring system of solar power supply device
CN103378604A (en) Smart micro-grid
CN202093665U (en) Breeze vibration monitoring base station of power transmission line
CN103439938A (en) Small hydropower station control system
CN204557562U (en) Distribution network information management system
CN201409017Y (en) Distribution transformer comprehensive monitoring and reactive power compensating system
CN203027026U (en) Remote operation and video monitoring system for integrated intelligent isolating switch
CN203366105U (en) A concentration optimization monitor system applicable to distributed-type access wind power generation
CN202696288U (en) Rapid on site self-healing apparatus and system for power distribution network fault
CN203812997U (en) Accumulator remote maintenance system
CN205050324U (en) Wireless network deployment concentrator
CN106027961A (en) Wireless video monitoring system of electric power network

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC

Free format text: FORMER NAME: GUANGDONG ELECTRIC POWER DESIGN INSTITUTE

CP01 Change in the name or title of a patent holder

Address after: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee after: Company limited of China Energy Engineering Group Guangdong Electric Power Design Institute

Address before: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee before: Guangdong Electric Power Design Institute

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20181027