CN208475369U - Coal-burning boiler pulverized coal preparation system - Google Patents

Coal-burning boiler pulverized coal preparation system Download PDF

Info

Publication number
CN208475369U
CN208475369U CN201820826347.5U CN201820826347U CN208475369U CN 208475369 U CN208475369 U CN 208475369U CN 201820826347 U CN201820826347 U CN 201820826347U CN 208475369 U CN208475369 U CN 208475369U
Authority
CN
China
Prior art keywords
coal
outlet
pulverized
pulverizer
preparation system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820826347.5U
Other languages
Chinese (zh)
Inventor
雷建平
廖运波
张涛
陈新建
曹民侠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China (wuhan) Energy Technology Co Ltd
Guang'an Sichuan Power Generation Co Ltd
Original Assignee
China (wuhan) Energy Technology Co Ltd
Guang'an Sichuan Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China (wuhan) Energy Technology Co Ltd, Guang'an Sichuan Power Generation Co Ltd filed Critical China (wuhan) Energy Technology Co Ltd
Priority to CN201820826347.5U priority Critical patent/CN208475369U/en
Application granted granted Critical
Publication of CN208475369U publication Critical patent/CN208475369U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model embodiment discloses a kind of coal-burning boiler pulverized coal preparation system, comprising: run coal bin;Coal pulverizer, the drain hole of inlet communication run coal bin;Pressure fan, the entrance of outlet coal pulverizer;Boiler induced-draft fan, inlet communication coal-burning boiler, the pipeline between outlet coal pulverizer and pressure fan;Coal dust classifier comprising tailing separator and pulverized-coal collector, the outlet end of pulverized-coal collector include that a discharge and a lack of gas export, the outlet of tailing separator inlet communication coal pulverizer, outlet pulverized-coal collector import;Coal dust intermediate bin, inlet communication discharge, the outlet of outlet lack of gas.The utility model is dried the raw coal of coal pulverizer using the hot fume in boiler and conveys the coal dust after coal pulverizer is ground, and it is sent back to the lack of gas of coal pulverizer as a part of primary gas in boiler, reduce the oxygen content in First air, reduce the production quantity of NOx, reduce simultaneously and Secondary Air is tied up, reduces slagging.

Description

Coal-burning boiler pulverized coal preparation system
Technical field
The utility model relates to generating plant pulverized coal boiler pulverized coal preparation system field more particularly to a kind of coal-burning boiler pulverized coal preparation systems.
Background technique
In present production technology, the lack of gas of low speed coal mill warehouse formula pulverized coal carried by hot air pulverized coal preparation system are straight as tertiary air It taps into burning in furnace, coal dust is sent into burning in furnace by heat primary air.When boiler uses low NOx combustion mode, due to pot Outlet of still NOx discharge need to be controlled in certain numerical value, therefore biggish tertiary air quantity and primary air flow is caused to be sent into burner hearth, and Biggish tertiary air quantity and primary air flow are sent into the share for having tied up secondary air flow, reduce secondary air ratio.Cause Secondary Air rigid Property be deteriorated, fluid field in furnace deteriorate, easy coking.
Utility model content
The purpose of the utility model is to overcome above-mentioned technical deficiencies, propose a kind of coal-burning boiler pulverized coal preparation system, solve existing The technical issues of having First air in technology and wind flow is larger three times, tying up the share of Secondary Air, be easy coking in furnace.
In order to reach above-mentioned technical purpose, the utility model embodiment provides a kind of coal-burning boiler pulverized coal preparation system, the combustion Coal burning boiler pulverized coal preparation system includes:
Run coal bin;
Coal pulverizer, the drain hole of inlet communication run coal bin;
Pressure fan, the entrance of outlet coal pulverizer, for raw coal to be blown into coal pulverizer;
Boiler induced-draft fan, inlet communication coal-burning boiler, the pipeline between outlet coal pulverizer and pressure fan;
Coal dust classifier comprising tailing separator and pulverized-coal collector, the outlet end of pulverized-coal collector include a coal Powder outlet and lack of gas outlet, the outlet of tailing separator inlet communication coal pulverizer, outlet pulverized-coal collector import;
Coal dust intermediate bin, inlet communication discharge, the outlet of outlet lack of gas.
Compared with prior art, the utility model has the following beneficial effects: the coal-burning boiler powder system of the utility model System dries the raw coal of coal pulverizer using the hot fume in boiler and conveys the coal dust after coal pulverizer is ground, and by the weary of coal pulverizer Gas is sent back in boiler as a part of primary gas, reduces the oxygen content in First air, reduces the production quantity of NOx, simultaneously Reduce and Secondary Air is tied up, reduces slagging.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of coal-burning boiler pulverized coal preparation system provided by the utility model.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe.
Referring to Figure 1, Fig. 1 is the structural schematic diagram of coal-burning boiler pulverized coal preparation system provided by the utility model.
Coal-burning boiler pulverized coal preparation system include: run coal bin 1, raw coal batcher 2, coal pulverizer 3, pressure fan 4, boiler induced-draft fan 5, Desulfurizer 6, regulating valve 7, oxygen amount meter 8, tailing separator 9, pulverized-coal collector 10, coal dust intermediate bin 11 and mill exhauster 12.
Run coal bin 1 is connected to coal pulverizer 3 by raw coal batcher 2, and pressure fan 4 is connected to the entrance of coal pulverizer 3, is used for coal-grinding Coal dust is worn into raw coal drying in machine 3, and the coal dust conveyed after drying enters tailing separator 9.The inlet end of boiler induced-draft fan 5 It is connected to coal-burning boiler, the branch of outlet side one is connected to regulating valve 7, and the pipeline being connected between pressure fan 4 and coal pulverizer 3, another Branch connection desulfurizer 6 simultaneously accesses gas emission device (not shown).Boiler induced-draft fan 4 is by the hot fume in coal-burning boiler It after regulating valve 7, is mixed into the gas that pressure fan 4 blasts, oxygen amount meter 8 is set on pipeline, for measuring containing for the gas Oxygen amount.
The pulverized coal preparation system of pulverized-coal fired boiler is often according to different design coals, to design pulverized coal preparation system, in general A kind of coal corresponds to a kind of pulverized coal preparation system, and the coal adaptability of pulverized coal preparation system is difficult to adapt to power plant under current situation and carrys out answering for coal Polygamy and diversity.In the utility model embodiment, oxygen amount meter 8 is for detecting the oxygen content after flue gas mixes with air, needle To different coals, the intake of flue gas is adjusted by regulating valve 7, changes the oxygen content for entering gas in coal pulverizer 3, With different coals, applicability is improved.
The outlet of coal pulverizer 3 is sequentially communicated tailing separator 9 and pulverized-coal collector 10, and tailing separator 9 is to coal pulverizer 3 The coal dust ground is filtered for the first time, is left biggish particle and is continued to grind back to coal pulverizer 3, fine breeze is sent to fine powder In separator 10.The outlet end of pulverized-coal collector 10 includes that a discharge and a lack of gas export, and discharge is connected to coal dust Intermediate bin 11, coal dust intermediate bin 11 is for storing fine breeze.The import of lack of gas outlet mill exhauster 12, mill exhauster 12 is by lack of gas It is divided into two parts, a part is connected to the drain hole of coal dust intermediate bin 11 as burning in pneumatic transmission back boiler three times, another part, Fine breeze is blown into primary gas, burning in coal-burning boiler is sent into.
During 3 powder processed of coal pulverizer, due to being mixed into for hot fume, the drying capacity of pulverized coal preparation system is not only increased, And the risk of pulverized coal preparation system spontaneous combustion explosion can be greatly reduced.Primary gas and three times oxygen concentration in gas are reduced simultaneously, no The risk that burner nozzle is burned can be only reduced, and the generation of NOx can be reduced.
Implement the utility model embodiment, has the following beneficial effects: that the coal-burning boiler pulverized coal preparation system of the utility model is adopted The raw coal of coal pulverizer is dried with the hot fume in boiler and conveys the coal dust after coal pulverizer is ground, and the lack of gas of coal pulverizer are made A part for primary gas is sent back in boiler, and the oxygen content in First air is reduced, and is reduced the production quantity of NOx, is reduced simultaneously Secondary Air is tied up, reduces slagging.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (4)

1. a kind of coal-burning boiler pulverized coal preparation system, which is characterized in that the coal-burning boiler pulverized coal preparation system includes:
Run coal bin;
Coal pulverizer, the drain hole of run coal bin described in inlet communication;
Pressure fan, the entrance of coal pulverizer described in outlet;
Boiler induced-draft fan, inlet communication coal-burning boiler, the pipeline described in outlet between coal pulverizer and the pressure fan;
Coal dust classifier comprising tailing separator and pulverized-coal collector, the outlet end of the pulverized-coal collector include a coal Powder outlet and a lack of gas export, the outlet of coal pulverizer described in the tailing separator inlet communication, fine powder described in outlet Separator import;
Coal dust intermediate bin, discharge described in inlet communication, lack of gas outlet described in outlet.
2. coal-burning boiler pulverized coal preparation system according to claim 1, which is characterized in that the coal-burning boiler pulverized coal preparation system also wraps A raw coal batcher is included, is arranged between the run coal bin and the coal pulverizer.
3. coal-burning boiler pulverized coal preparation system according to claim 1, which is characterized in that the coal-burning boiler pulverized coal preparation system also wraps A regulating valve and an oxygen amount meter are included, along the direction of gas transport, the regulating valve and the oxygen amount meter are sequentially arranged in institute It states on the pipeline between boiler induced-draft fan and the coal pulverizer.
4. coal-burning boiler pulverized coal preparation system according to claim 1, which is characterized in that the coal-burning boiler pulverized coal preparation system also wraps A mill exhauster is included, lack of gas described in inlet communication export, the outlet of coal dust intermediate bin described in outlet.
CN201820826347.5U 2018-05-30 2018-05-30 Coal-burning boiler pulverized coal preparation system Active CN208475369U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820826347.5U CN208475369U (en) 2018-05-30 2018-05-30 Coal-burning boiler pulverized coal preparation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820826347.5U CN208475369U (en) 2018-05-30 2018-05-30 Coal-burning boiler pulverized coal preparation system

Publications (1)

Publication Number Publication Date
CN208475369U true CN208475369U (en) 2019-02-05

Family

ID=65219628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820826347.5U Active CN208475369U (en) 2018-05-30 2018-05-30 Coal-burning boiler pulverized coal preparation system

Country Status (1)

Country Link
CN (1) CN208475369U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111750373A (en) * 2020-08-07 2020-10-09 西安热工研究院有限公司 Flue gas recirculation system for preventing accumulated powder of coal powder pipeline of medium-speed coal mill from spontaneous combustion
CN112844650A (en) * 2021-01-05 2021-05-28 北京仁长德恒能源科技研究院有限公司 Coal-fired power plant combined coal pulverizing system and coal pulverizing method thereof
CN113154368A (en) * 2021-06-04 2021-07-23 西安热工研究院有限公司 Pulverized coal boiler fan arrangement system for reducing noises of air feeder and primary fan
CN113776075A (en) * 2021-08-30 2021-12-10 西安交通大学 Walnut shell raw coal blending combustion pulverizing system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111750373A (en) * 2020-08-07 2020-10-09 西安热工研究院有限公司 Flue gas recirculation system for preventing accumulated powder of coal powder pipeline of medium-speed coal mill from spontaneous combustion
CN112844650A (en) * 2021-01-05 2021-05-28 北京仁长德恒能源科技研究院有限公司 Coal-fired power plant combined coal pulverizing system and coal pulverizing method thereof
CN113154368A (en) * 2021-06-04 2021-07-23 西安热工研究院有限公司 Pulverized coal boiler fan arrangement system for reducing noises of air feeder and primary fan
CN113776075A (en) * 2021-08-30 2021-12-10 西安交通大学 Walnut shell raw coal blending combustion pulverizing system

Similar Documents

Publication Publication Date Title
CN208475369U (en) Coal-burning boiler pulverized coal preparation system
CN103216840B (en) Formula of storing up in coal-burning boiler coal pulverizer reduces nitric oxide system
CN203223912U (en) Intermediate storage type super nitrogen reduction system for coal-fired boiler coal mill
CN104344398B (en) Middle warehouse formula pulverized coal carried by hot air pulverized coal preparation system
CN209495349U (en) A kind of biomass molding fuel and coal direct-coupling pulverized coal preparation system
CN107013902A (en) Lignite couples boiler combustion system with biomass
CN201582846U (en) Combustion control system of lignite unit
CN104180384A (en) System and method of blending combustion of coal type with low ash melting point in coal-fired utility boiler
CN204534555U (en) A kind of flue gas recirculation device for reducing NO_x formation
CN206771325U (en) Lignite couples boiler combustion system with biomass
CN210638067U (en) Stable combustion energy-saving efficiency-improving system for boiler of thermal power plant
CN103206717B (en) Cold and hot flue gas drying brown coal medium-speed milling pulverization system
CN203036634U (en) Fractional combustion low-nitrogen oxide rotational flow burner
CN203024179U (en) Intelligent control system of pulverized coal burner
CN209588082U (en) A kind of the ball type pulverizer system using furnace cigarette Single Medium
CN203586193U (en) Middle storing bin type hot wind powder feeding and manufacturing system
CN204404212U (en) A kind of power station brown coal drying integrated system based on flue gas recirculating technique
CN205859997U (en) A kind of vent pulverized coal handling system
CN206724142U (en) A kind of biomass fuel combustion with reduced pollutants system with blower mill powder
CN211450991U (en) Direct-blowing type two-medium drying pulverizing system for high-moisture lignite
CN204165042U (en) Middle Low Temperature Thermal flue gas powder feeding coal powder burner
CN209893377U (en) Fly ash and slag reburning system suitable for coal-fired boiler with horizontally-arranged hearth
CN208398113U (en) A kind of pulverized coal preparation system of medium-speed pulverizer warehouse formula pulverized-coal fired boiler
CN108386865B (en) A kind of 300MW coal unit reduces the control device and method of unburned carbon in flue dust
CN201434578Y (en) Drying furnace gas inlet system for coal injection and pulverized coal preparation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant