CN208472889U - A kind of buried biological delaying basin based on original greenbelt - Google Patents
A kind of buried biological delaying basin based on original greenbelt Download PDFInfo
- Publication number
- CN208472889U CN208472889U CN201821126274.5U CN201821126274U CN208472889U CN 208472889 U CN208472889 U CN 208472889U CN 201821126274 U CN201821126274 U CN 201821126274U CN 208472889 U CN208472889 U CN 208472889U
- Authority
- CN
- China
- Prior art keywords
- rainwater
- delaying basin
- biological delaying
- buried
- filtering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sewage (AREA)
Abstract
The buried biological delaying basin that the utility model discloses a kind of based on original greenbelt, buried biology delaying basin includes: curb entrance by the rainwater after washing away road surface, is drained into biological delaying basin;Biological delaying basin completes the filtering and purification of rainwater;Rainwater-collecting pipeline is filtered according to the later period requirement of rainwater, by rainwater flow ipe, equipment or underground;Overflow pipe, the rainwater for will be above overflow pipe entrance are discharged.
Description
Technical field
The utility model relates to hydraulic engineerings, field of environment engineering more particularly to a kind of based on the buried of original greenbelt
Formula biology delaying basin.
Background technique
The urbanization in basin brings urban river syndrome, and symptom includes: that flow changes, fluvial morphology changes, water
Matter and sediment quality be impaired, the transformation of biotic component etc..Urban river syndrome Producing reason, one of them is city
Permeable meadow and soil before urbanization is substituted in construction, the impervious surfaces such as road, roof[1].It is arranged to improve urbanization to rainwater
Put, water quality deterioration the problems such as, China actively pushes forward sponge urban construction.Construction sponge city is a kind of based on low influence exploitation
The storm water management method of (Low Impact Development, LID) theory is referred to controlling theory by source, simulated
Under conditions of natural hydrologic condition principle, to realize the control and utilization to rainwater[2]。
The biological delaying basin that recent domestic rises is exactly a kind of low technological means for influencing exploitation.Biological delaying basin is
A kind of minitype rain water processing equipment, also referred to as Rain Garden mainly pass through the collective effect filtering of plant, filler and soil etc.
Purify water, achieve the purpose that restore infiltration, improve water quality, rainwater utilization, comprising: degradation, filtering, absorption, ion exchange and
Various bioprocess[3].The rainwater for washing away road surface can carry a large amount of pollutants, such as NO3—、SO4 2—, heavy metal[4][5], organic contamination
Object, total solid suspended particulate[6]Deng.But rainwater, can directly recharge of groundwater source, or company after the purification by biological delaying basin
It connects underground pipe network and collects and make other utilizations, such as agricultural irrigation, garden greening, lavatory water.
Existing biology delaying basin, has plenty of and plans in advance when greenbelt is not built, will when road or parking lot are built
Biological delaying basin is embedded in planning region together.Have plenty of on the basis of existing afforested areas, excavates and rebuild, will have greening
Area damages pour the biological delaying basin of production, then planting plants at the scene again, time-consuming, laborious, to the consumption of fund also compared with
Greatly.Utility model
Utility model content
The utility model provides a kind of buried biological delaying basin based on original greenbelt, and the utility model is being based on
On the basis of existing greenbelt, a kind of buried biological delaying basin is arranged, and existing vegetation is moved into biological delaying basin table
Layer, so that the existing greenbelt of influence of minimum and its vegetation in arrangement, postpone, integrated greening in biological delaying basin cloth
Appearance and original greenbelt are essentially identical, so that biological delaying basin is better blended into urban construction and pollution control,
It is described below:
A kind of buried biological delaying basin based on original greenbelt, the buried biological delaying basin includes: that curb enters
Mouth, biological delaying basin, filtering rainwater-collecting pipeline and overflow pipe,
The curb entrance is drained into biological delaying basin for that will wash away the rainwater behind road surface;
The biology delaying basin flows out to filtering rainwater-collecting pipeline for completing the filtering and purification of rainwater;
The filtering rainwater-collecting pipeline, according to the later period requirement of rainwater, by rainwater flow ipe, equipment or ground
Under;
The overflow pipe, the rainwater for will be above overflow pipe entrance are discharged.
Further, the biological delaying basin include: coating, filter layer, transition zone, drainage blanket, draining blind pipe and
Plant.
The beneficial effect of technical solution provided by the utility model is:
(1) biological delaying basin can filter, purify the rainwater for washing away road, improve Rainwater Quality and utilization rate, such as available
It pours in lavatory flushing, green land irrigation, agricultural, or is exhausted directly to underground, recharge groundwater;
(2) excavation of original afforested areas synchronous can be carried out with the production of biological delaying basin, saved the time, improved effect
Rate;
(3) biological delaying basin does not need to carry out cast in situs and production in infield, but after completing, will be at
The equipment of shape is placed directly in infield, avoids the occupancy and destruction constructed for afforested areas, simple quick;
(4) installation of biological delaying basin sufficiently combines original greenbelt, protects plant, does not destroy landscape design, changing
Greening aesthetics is respected while kind Rainwater Quality.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of buried biological delaying basin based on original greenbelt;
Fig. 2 is the in-built structural schematic diagram of biological delaying basin.
In attached drawing, parts list represented by the reference numerals are as follows:
1: curb entrance;2: biological delaying basin;
3: filtering rainwater-collecting pipeline;4: overflow pipe;
2-1: coating;2-2: filter layer;
2-3: transition zone;2-4: drainage blanket;
2-5: draining blind pipe;2-6: plant.
Specific embodiment
To keep the purpose of this utility model, technical solution and advantage clearer, below to the utility model embodiment
It is described in further detail.
Embodiment 1
A kind of buried biological delaying basin based on original greenbelt, i.e., the selected greenbelt for needing to be transformed determine its ruler
Very little and underground buried depth, designs and manufactures a kind of biological delaying basin of vertical current, by the topsoil of original greenbelt and its plant
Migrate to the filler surface layer of biological delaying basin, maintenance, plantation.It is buried to refer to biological delaying basin being arranged in original greenbelt
Place below ground.The utility model embodiment helps to improve the arrangement efficiency of biological delaying basin, improves the rainwater water of collection
Matter keeps original greening state.
The utility model embodiment discloses a kind of buried biological delaying basin based on original greenbelt, referring to Fig. 1, packet
It includes: curb entrance 1, biological delaying basin 2, filtering rainwater-collecting pipeline 3 and overflow pipe 4.
Referring to fig. 2, which includes: coating 2-1, filter layer 2-2, transition zone 2-3, drainage blanket 2-4, row
Water blind pipe 2-5 and plant 2-6.
(1) device working principle
Behind rain drop erosion road surface, entered in biological delaying basin 2 by the curb entrance 1 of road.Rainwater passes through vertical and water
Flat flow direction passes sequentially through coating 2-1, filter layer 2-2, transition zone 2-3, drainage blanket 2-4, passes through draining blind pipe 2-5 stream
Biological delaying basin 2 out, completes the filtering and purification of rainwater.The rainwater for flowing out biological delaying basin 2 enters filtering rainwater-collecting pipeline
3, according to the later period requirement of rainwater, flow ipe, equipment or underground.
Coating 2-1, filter layer 2-2, transition zone 2-3, drainage blanket 2-4 in biological delaying basin 2, draining blind pipe 2-5 and
Plant 2-6 is respectively as follows:
Coating 2-1: effect is 1. to protect filler (including filter layer 2-2, transition zone 2-3, the draining of biological delaying basin 2
Layer 2-4 and draining blind pipe 2-5) and plant 2-6, prevent rain drop erosion from leading to filler deformation and soil erosion;2. guaranteeing soil
There are enough moisture content, plant preferably grows;3. wetland environment can also allow microorganism to be more effectively carried out life
Object chemical reaction, improves purifying water effect.
Filter layer 2-2: being to contain planting soil, microorganism in filtering layer, 1. main function is most important one layer in filler
The filtering of biological delaying basin 2, purification, absorption, degradation function are completed in this layer substantially;2. root system of plant is generally embedded in this layer, because
This filter layer 2-2 provides well suitable growing environment for plant.
Transition zone 2-3: main function is 1. to prevent from the filler in filter layer from entering drainage blanket to cause line clogging and water and soil
It is lost, protects the draining blind pipe 2-5 in drainage blanket 2-4;2. uniformly transferring the pressure transmitted downwards from filter layer;
Drainage blanket 2-4: effect is the rainwater that 1. discharge is filtered by biological delaying basin 2;2. draining blind pipe 2-5 is laid on row
In water layer 2-4, therefore drainage blanket 2-4 also has the function of protection draining blind pipe 2-5, and the pollutant for such as avoiding shape sharp is to row
The cutting of water blind pipe 2-5;
Draining blind pipe 2-5: the water and soil that effect is to maintain in biological delaying basin 2 balances, and extra water in device for transferring makes net
Biological delaying basin 2 can be smoothly discharged in the rainwater of change;
Plant 2-6: being the important component of biological delaying basin 2, and function and feature include: 1. to adsorb, be enriched with pollution
Object;2. being conducive to microbe survival;3. providing oxygen and energy, the ecosystem is kept to stablize;4. accumulating organic matter.
To prevent from flowing into the amount of rainfall of biological delaying basin 2 beyond processing capacity, causes rainwater to overflow, pollute biological delaying basin
Region around 22, installs overflow pipe 4, and the rainwater higher than 4 entrance of overflow pipe can be arranged by the entrance of overflow pipe 4
Out.
(2) arrangement
Range in the determining place measurement greening region for needing to be transformed into biological delaying basin 2, size is biology
The size of delaying basin 2.According to the connection of resulting size and underground piping, by the producer of biological delaying basin 2 to equipment
It is produced and is processed, including curb entrance 1 and outer wall production, filler and the laying for draining blind pipe 2-5 etc..Wherein, filter layer
2-2 is only laid with certain thickness, does not need to be fully filled with;Coating 2-1 is not laid with temporarily.
By the plant planted in original afforested areas together with topsoil, root system together dig remove afforested areas it is spare, to the greatest extent
Amount protection changes its appearance not.
Excavate the remaining soil of original afforested areas, biological delaying basin 2, curb entrance 1 can be placed by making to hollow out area just
Height it is almost the same with road, so that road rain water is smoothly flowed into curb entrance 1.It is carrying out cleaning appropriate and is stablizing to add
Gu after, whole be placed in of the biological delaying basin 2 made is hollowed out into area, by the draining blind pipe 2-5 of biological delaying basin 2, filtering rain
Water collection pipe road 3, underground piping are rationally connected, so that purified rainwater is smoothly discharged, such as lead to water tank, garden fills
Irrigate pipeline, infiltration area etc..Plant 2-6 and the topsoil plantation for digging removal before are covered in packing area surface layer, then
Certain maintenance is carried out, it is appropriate to be laid with coating 2-1, so that from the appearance, plant 2-6 is almost the same before and after excavation.
The utility model embodiment discloses a kind of buried biological delaying basin based on original greenbelt and can filter, only
Change road rain water, improves Rainwater Quality and utilization rate;Meanwhile equipment is provided with overflow pipe, dirt caused by preventing rainwater from overflowing
Dye.
Embodiment 2
The scheme in embodiment 1 is further introduced below with reference to Fig. 1 and Fig. 2, described below:
(1) before using utility model device, installation site, the size for the greenbelt that measurement needs to be transformed are determined.
(2) design and production of biological delaying basin 2 are carried out according to gained size, subdrainage pipe network situation, comprising: be detained
Tank depth, the selection of the draining outlet port blind pipe 2-5, curb entrance 1 and outer wall production, filler and draining blind pipe 2-5 laying, overflow
Pipeline 4 it is embedded etc..
Wherein, coating 2-1 selects bark, leaf and fine sand mixture, and filter layer 2-2 selects soil, organic matter and micro-
Biology, transition zone 2-3 select bird's-eye gravel, and drainage blanket 2-4 selects gravel.Each layer filler material need according to water treatment index, when
Ground geography and climate and economic factor comprehensive selection, the utility model embodiment is with no restrictions.
(3) while making biological delaying basin 2, greenery patches is excavated.The plant that will be planted in original afforested areas
2-6 together with topsoil, root system together dig remove afforested areas it is spare, as far as possible protection change its appearance not.
(4) excavate the remaining soil of original afforested areas, biological delaying basin 2 can be placed by making to hollow out area just, and curb enters
The height of mouth 1 is almost the same with road, and road rain water is allow smoothly to flow into curb entrance 1.In progress cleaning appropriate and surely
After fixed reinforcing, whole be placed in of the biological delaying basin 2 made is hollowed out into area.By the filtering rainwater collection collector of biological delaying basin 2
Road 3, overflow pipe 4 and underground piping are rationally connected, so that purified rainwater is smoothly discharged, such as lead to water tank, flower
Garden irrigation conduit, infiltration area etc..
(5) plant 2-6 and the topsoil plantation for digging removal before are covered in packing area surface layer, then carry out certain support
Shield, it is appropriate to be laid with coating 2-1, so that from the appearance, plant 2-6 is almost the same before and after excavation.
Embodiment 3
Feasibility verifying is carried out to the scheme in Examples 1 and 2 below with reference to specific experimental data, it is as detailed below to retouch
State: according to the north side afforested areas of 42 building, University Of Tianjin northeast part of China garden school district, the length for designing biological delaying basin 2 is 28.7m, and width is
2.2m is highly 1.6m;The outer diameter for selecting draining blind pipe 2-5 is 100mm, with a thickness of 10mm specification;Select the outer of overflow pipe 4
Diameter is 60mm, with a thickness of 3.5mm.
In conjunction with the experimental result of filler, theoretically it is detained using the roofing vertical current biology of the utility model embodiment design
The removal rate in pond, TN (total nitrogen) and TP (total phosphorus) in rainwater can be up to 80% or more respectively.It is demonstrated by the experimental data
The feasibility of the buried biological delaying basin of original greenbelt of the utility model embodiment design, meets in practical application
A variety of needs.
To the model of each device in addition to doing specified otherwise, the model of other devices does not limit the utility model embodiment
System, as long as the device of above-mentioned function can be completed.
It will be appreciated by those skilled in the art that attached drawing is the schematic diagram of a preferred embodiment, above-mentioned the utility model is real
It is for illustration only to apply a serial number, does not represent the advantages or disadvantages of the embodiments.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all practical at this
Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model
Within the scope of shield.
Claims (2)
1. a kind of buried biological delaying basin based on original greenbelt, which is characterized in that the buried biological delaying basin packet
It includes:
Curb entrance, biological delaying basin, filtering rainwater-collecting pipeline and overflow pipe,
The curb entrance is drained into biological delaying basin for that will wash away the rainwater behind road surface;
The biology delaying basin flows out to filtering rainwater-collecting pipeline for completing the filtering and purification of rainwater;
The filtering rainwater-collecting pipeline, according to the later period requirement of rainwater, by rainwater flow ipe, equipment or underground;
The overflow pipe, the rainwater for will be above overflow pipe entrance are discharged.
2. a kind of buried biological delaying basin based on original greenbelt according to claim 1, which is characterized in that described
Biological delaying basin includes: coating, filter layer, transition zone, drainage blanket, draining blind pipe and plant.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821126274.5U CN208472889U (en) | 2018-07-15 | 2018-07-15 | A kind of buried biological delaying basin based on original greenbelt |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821126274.5U CN208472889U (en) | 2018-07-15 | 2018-07-15 | A kind of buried biological delaying basin based on original greenbelt |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208472889U true CN208472889U (en) | 2019-02-05 |
Family
ID=65211077
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821126274.5U Expired - Fee Related CN208472889U (en) | 2018-07-15 | 2018-07-15 | A kind of buried biological delaying basin based on original greenbelt |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208472889U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797757A (en) * | 2018-07-15 | 2018-11-13 | 天津大学 | A kind of buried biological delaying basin and its method for arranging based on original greenbelt |
-
2018
- 2018-07-15 CN CN201821126274.5U patent/CN208472889U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797757A (en) * | 2018-07-15 | 2018-11-13 | 天津大学 | A kind of buried biological delaying basin and its method for arranging based on original greenbelt |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204959952U (en) | Recessed formula greenery patches rainwater regulation dispatch pond and distributed rainwater regulation dispatch pond system | |
CN105089142A (en) | Low elevation greenbelt rainwater regulation scheduling pool and distributed rainwater regulation scheduling pool system | |
CN106088289A (en) | A kind of water storage system for sponge Front river course road and construction method | |
CN207567889U (en) | Residential quarters Rainwater collection system | |
CN109356225A (en) | A kind of Multifunctional rain ecological utilization system | |
CN205348351U (en) | Have quality of water purification performance's rainfall runoff control system concurrently | |
CN111919621B (en) | Cold region habitat recovery-based street tree pool structure and manufacturing method | |
CN105926709B (en) | It is multi-functional to store row's Rain Garden system | |
CN103938518A (en) | Method for constructing road runoff pollution control greening system | |
CN108951816B (en) | Ecological tree pool system and construction method | |
CN207958061U (en) | A kind of Mountainous City storm runoff is regulated and stored and rain processing system | |
CN104532942B (en) | Rainwater purification tree box system | |
CN206052850U (en) | A kind of roadside greening rainwater regulating pondage system | |
CN105464203A (en) | Interactive wet-deposition purification regulation and storage system | |
CN105174478A (en) | Biofilter | |
CN102926362A (en) | Pollution control and emission reduction method for farmland drainage | |
CN104005470A (en) | Gutter inlet structure with sewage stopping function and diversion function | |
CN208472889U (en) | A kind of buried biological delaying basin based on original greenbelt | |
CN106088295A (en) | Method and system for controlling and utilizing rainwater by modifying existing facilities | |
CN210559648U (en) | Step multi-section undercurrent artificial wet land treating pool | |
CN107354990A (en) | A kind of storage for roadside oozes net row's type rainwater reuse device | |
CN110012770B (en) | Rainwater garden capable of efficiently reducing runoff flow velocity and pollutants | |
CN104264773A (en) | Flow storage wetland system for treating parking lot rainwater and adjusting microclimate | |
CN207958057U (en) | Rain processing system | |
CN111424705A (en) | Utility tunnel and sponge city system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190205 Termination date: 20190715 |
|