CN208472574U - A kind of Liftable type anchor ear installs the operating platform - Google Patents
A kind of Liftable type anchor ear installs the operating platform Download PDFInfo
- Publication number
- CN208472574U CN208472574U CN201820790095.5U CN201820790095U CN208472574U CN 208472574 U CN208472574 U CN 208472574U CN 201820790095 U CN201820790095 U CN 201820790095U CN 208472574 U CN208472574 U CN 208472574U
- Authority
- CN
- China
- Prior art keywords
- platform
- workbench
- arc
- anchor ear
- hydraulic stem
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000008602 contraction Effects 0.000 claims abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 8
- 239000010959 steel Substances 0.000 claims description 8
- 230000037431 insertion Effects 0.000 claims 1
- 238000003780 insertion Methods 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 10
- 230000007547 defect Effects 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 4
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000032258 transport Effects 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 230000010485 coping Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Forklifts And Lifting Vehicles (AREA)
Abstract
For above situation, for the defect for overcoming the prior art, the utility model provides a kind of Liftable type anchor ear and installs the operating platform;Preferably solves the problems such as convenience, safety, high efficiency of high pier construction anchor ear mounting platform;Its solve technical solution include include be horizontally arranged workbench, the center of workbench offers through-hole, workbench includes horizontal positioned arc platform, L-shaped movable platform has been respectively articulated on the rear and front end face of arc platform, two movable platforms turn to three when being bonded with arc platform and workbench are collectively formed, left side one end of arc platform is equipped with fixed block, the rear and front end of fixed block has been respectively articulated with first hydraulic stem, the other end of each first hydraulic stem is hinged in the movable platform of its respective side, the contraction of first hydraulic stem can push movable platform to rotate around arc platform, realize the combination and opening of workbench;The utility model is novel, clever structure.
Description
Technical field
The utility model relates to technical field of building construction, especially a kind of Liftable type anchor ear is installed the operating platform.
Background technique
Hold Hoop method using more universal, mainly has the advantage that 1 in the inter-tie, Coping Construction of bridge pier column, no
It is influenced by foundation condition, it is easy for construction, it is conducive to the duration;2, the materials such as anchor ear, fashioned iron are Ke Xunhuanliyong, save the cost;3, not by
Pier height influences, and can guarantee pier stud presentation quality.When pier is high lower, anchor ear installation can be used falsework and set up anchor ear installment work
Platform;Higher pier stud high for pier, is no longer applicable in falsework method, and widespread practice is the specific lifting construction of production at present
Platform is lifted using crane, is constructed time-consuming and laborious, and safety is difficult to ensure and has enough to meet the need inconvenience, cannot be given full play to and be embraced
The high efficiency of hoop method construction.
In the prior art, anchor ear mounting platform not can be well solved safe and efficient problem.
Utility model content
For above situation, for the defect for overcoming the prior art, the utility model provides a kind of Liftable type anchor ear peace
Fill operating platform;Preferably solves the problems such as convenience, safety, high efficiency of high pier construction anchor ear mounting platform;Construction
Platform carries out after edge protection that safety is available to be effectively ensured, while crane arm can also be used directly to transport worker flat up and down
Platform further enhances the safety of the high pier platform of worker or more.
Its technical solution solved include include horizontal positioned workbench, the center of workbench offers through-hole, work
Platform includes horizontal positioned arc platform, and L-shaped movable platform, two work have been respectively articulated on the rear and front end face of arc platform
Moving platform turns to three when being bonded with arc platform and workbench is collectively formed, and left side one end of arc platform is equipped with fixed block,
The rear and front end of fixed block has been respectively articulated with first hydraulic stem, and the other end of each first hydraulic stem is hinged on its respective side
Movable platform on, the contraction of the first hydraulic stem can push movable platform to rotate around arc platform, realize the combination of workbench with
It opens.
The utility model is novel, clever structure, well solved high pier construction anchor ear mounting platform convenience,
The problems such as safety, high efficiency.
Detailed description of the invention
Fig. 1 is the utility model assembled state top view.
Fig. 2 is the utility model assembled state top cross-sectional view.
Fig. 3 is the utility model main view.
Fig. 4 is the utility model and crane arm connection figure.
Fig. 5 is the utility model opening state top view.
Specific embodiment
Specific embodiment of the present utility model is described in further detail below in conjunction with attached drawing.
By Fig. 1-5 it is found that the utility model includes horizontal positioned workbench 1, the center of workbench 1 offers through-hole 2,
Workbench 1 includes horizontal positioned arc platform 3, has been respectively articulated with L-shaped movable platform on the rear and front end face of arc platform 3
4, two movable platforms 4 turn to three when being bonded with arc platform 3 and workbench 1, left side one end of arc platform 3 are collectively formed
Equipped with fixed block 5, the rear and front end of fixed block 5 has been respectively articulated with first hydraulic stem 6, each first hydraulic stem 6 it is another
End is hinged in the movable platform 4 of its respective side, and the contraction of the first hydraulic stem 6 can push movable platform 4 around 3 turns of arc platform
It is dynamic, realize the combination and opening of workbench 1.
For the ease of realizing the lifting of workbench 1, the workbench 1 is connected on crane arm 7, the lifting of crane arm 7
The rise and fall of workbench 1 can be driven.
For the ease of adjusting the horizontality of workbench 1, second is connected between the arc platform 3 and crane arm 7
Hydraulic stem 8,8 one end of the second hydraulic stem are hinged on crane arm 7, and the other end of the second hydraulic stem 8 is hinged on the bottom of arc platform 3
Portion.
In order to guarantee the safety when constructing on workbench, the outside four of the arc platform 3 and movable platform 4
It is equipped with guardrail 9 week, for guardrail 9 using the rectangular steel tube of 30 × 30 × 2.5mm, the outside of guardrail 9 is welded with 9 diagonal line of a guardrail
The brace 10 of setting, brace 10 use 40 × 40 × 3.0mm angle steel.
In order to fix workbench 1 preferably when combining, one of movable platform 4 is equipped with rotatable insert
Pin 11, another movable platform 4 is equipped with the pin hole 12 that can be matched with bolt 11, when workbench 1 is in assembled state, turns
Dynamic bolt 11 can be such that bolt 11 is inserted into pin hole 12, realize connection and fixation to two movable platforms 4.
The utility model is controlled the whole of workbench 1 by the hydraulic system of crane arm 7 first and risen when specifically used
Realization is finely adjusted to workbench 1 when dropping, and may be implemented to move to certain altitude to workbench 1 by the second hydraulic stem 8
Workbench 1 is in horizontality, when workbench 1 reaches the position for needing to construct, can be extended at this time by the first hydraulic stem 6
It rotates movable platform 4 around arc platform 3, realizes the opening state of workbench 1, after workbench 1 is opened, at this time by workbench
1 opening makes the arcwall face of arc platform 3 to positive bridge pier periphery on positive bridge pier, after in place, by adjusting the first hydraulic stem
6 rotate the movable platform 4 of two sides inwardly, and movable platform 4 is made mutually to fit with arc platform 3, form the workbench of sealing
1, since the center of workbench 1 offers through-hole 2, workbench 1 can be made to encase the outer circle of bridge pier well after workbench 1 is closed
It is empty that face, the upper surface of workbench and the periphery of bridge pier and the guardrail 9 of 1 surrounding of workbench form a closed job
Between, construction personnel can very easily carry out the installation of anchor ear, turn in two movable platforms 4 and paste with arc platform 3
After conjunction, the shaking of movable platform 4 in order to prevent makes two movable platforms 4 be connected as an entirety by bolt 11 at this time, can be with
The stability of workbench 1 is improved well.
In specific design, platform size is determined according to pier stud size, is generally advisable with most narrow place 80cm control.Platform bottom
Plate uses 8mm thickness checkered steel plate as worker operation platform, and bottom plate medial support structures are welded using 30 × 30 × 2.5mm rectangular steel tube
Connect to form reticular structure, surrounding using 60 × 60 × 3.0mm rectangular steel tube as skeleton, elevationally outward use 30 × 30 ×
2.5mm square steel pipe welded 1.5m's high faces side guardrail 9, and inside reserves platform according to pier stud size and closes up space, platform inside
Edge Distance pier stud surface 10-20cm is advisable;Inside edge vertically uses 20 reinforcement welding 1.2m high of Φ to face side guardrail 9.
The utility model is novel, clever structure, preferably solve high pier construction anchor ear mounting platform convenience,
The problems such as safety, high efficiency;Operation platform carries out after edge protection that safety is available to be effectively ensured, and can also be used simultaneously
Crane arm directly transports the upper lower platform of worker, further enhances the safety of the high pier platform of worker or more.
Claims (5)
1. a kind of Liftable type anchor ear installs the operating platform, which is characterized in that including horizontal positioned workbench (1), workbench
(1) center offers through-hole (2), and workbench (1) includes horizontal positioned arc platform (3), the front and back two of arc platform (3)
It has been respectively articulated on end face L-shaped movable platform (4), two movable platforms (4) turn to three when being bonded with arc platform (3)
It is collectively formed workbench (1), left side one end of arc platform (3) is equipped with fixed block (5), and the rear and front end of fixed block (5) is distinguished
It is hinged with first hydraulic stem (6), the other end of each first hydraulic stem (6) is hinged on the movable platform (4) of its respective side
On, the contraction of the first hydraulic stem (6) can push movable platform (4) to rotate around arc platform (3), realize the combination of workbench (1)
With opening.
2. a kind of Liftable type anchor ear according to claim 1 installs the operating platform, which is characterized in that the workbench
(1) it is connected on crane arm (7), the lifting of crane arm (7) can drive the rise and fall of workbench (1).
3. a kind of Liftable type anchor ear according to claim 2 installs the operating platform, which is characterized in that the arc is flat
It being connected between platform (3) and crane arm (7) the second hydraulic stem (8), the second hydraulic stem (8) one end is hinged on crane arm (7), the
The other end of two hydraulic stems (8) is hinged on the bottom of arc platform (3).
4. a kind of Liftable type anchor ear according to claim 1 installs the operating platform, which is characterized in that the arc is flat
The outside surrounding of platform (3) and movable platform (4) is equipped with guardrail (9), and guardrail (9) uses the rectangular steel tube of 30 × 30 × 2.5mm,
The brace (10) of a guardrail (9) diagonal line setting is welded on the outside of guardrail (9), brace (10) uses the angle 40 × 40 × 3.0mm
Steel.
5. a kind of Liftable type anchor ear according to claim 1 installs the operating platform, which is characterized in that described wherein one
A movable platform (4) is equipped with rotatable bolt (11), another movable platform (4) is equipped with and can match with bolt (11)
Pin hole (12), when workbench (1) is in assembled state, rotation bolt (11) can make bolt (11) insertion pin hole (12) in.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820790095.5U CN208472574U (en) | 2018-05-25 | 2018-05-25 | A kind of Liftable type anchor ear installs the operating platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820790095.5U CN208472574U (en) | 2018-05-25 | 2018-05-25 | A kind of Liftable type anchor ear installs the operating platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208472574U true CN208472574U (en) | 2019-02-05 |
Family
ID=65218724
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820790095.5U Expired - Fee Related CN208472574U (en) | 2018-05-25 | 2018-05-25 | A kind of Liftable type anchor ear installs the operating platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208472574U (en) |
-
2018
- 2018-05-25 CN CN201820790095.5U patent/CN208472574U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9527709B2 (en) | Overturning equipment for hoppers | |
CN203639095U (en) | Inner-side-column lifting device for reverse installation method | |
CN104895335A (en) | Method for mounting hanging pillar | |
CN208472574U (en) | A kind of Liftable type anchor ear installs the operating platform | |
CN204299147U (en) | The chimney top operating platform that a kind of construction cost is low | |
CN212506331U (en) | Telescopic arch framework formwork for pouring slope concrete | |
CN215048118U (en) | Auxiliary hoisting positioner for formwork prefabricated components | |
CN105239804A (en) | Assembly and lift-erecting method of indirect air-cooling system stretching platforms | |
CN201605589U (en) | Fixed end | |
CN107130783B (en) | The prefabricated sandwich heat preservation Side fascia of assembling type steel structure house protects frame construction method | |
CN203878989U (en) | Integral hoisting operation platform for steel pipe column concrete pouring of super high-rise buildings | |
CN203568661U (en) | Built-in tail-sliding lifting lug | |
CN113860189A (en) | Pin shaft type climbing beam of non-turnover internal climbing tower crane and use method thereof | |
CN208500281U (en) | The constructing device of prefabricating clear water concrete hanging plate | |
CN216074760U (en) | Municipal bridge construction strutting arrangement that stability is strong | |
CN205917615U (en) | Fixed manual integration limit for height frame | |
CN206616845U (en) | A kind of elevating scaffold corner device for erecting pole | |
CN218061536U (en) | Calibration positioning device for mounting assembly type building component | |
CN205676914U (en) | A kind of device of Fast Installation cement kiln end pylon pre-embedded bolt | |
CN104153709A (en) | Rotary drilling rig capable of being fully transported with drill pipe | |
CN208918067U (en) | A kind of windproof structure of shear wall | |
CN204299148U (en) | The chimney top operating platform that a kind of security is high | |
JPH04161565A (en) | Construction of large space building | |
CN209620241U (en) | Prefabricated balcony | |
CN208072172U (en) | Suitable for assembled protection trestle behind the dam of concrete dam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190205 |