CN208458988U - Open measuring device in duct pieces of shield tunnel gap - Google Patents

Open measuring device in duct pieces of shield tunnel gap Download PDF

Info

Publication number
CN208458988U
CN208458988U CN201820651761.7U CN201820651761U CN208458988U CN 208458988 U CN208458988 U CN 208458988U CN 201820651761 U CN201820651761 U CN 201820651761U CN 208458988 U CN208458988 U CN 208458988U
Authority
CN
China
Prior art keywords
water
pressure
water pocket
tunnel
pocket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820651761.7U
Other languages
Chinese (zh)
Inventor
张稳军
李瑶
朱战魁
张琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201820651761.7U priority Critical patent/CN208458988U/en
Application granted granted Critical
Publication of CN208458988U publication Critical patent/CN208458988U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model relates to a kind of duct pieces of shield tunnel gaps to open measuring device, for by according to the hydraulic pressure at certain depth, calculate duct pieces of shield tunnel gap joint open size and infiltration rate, including the water pocket being clipped between the gap of two sections of jurisdiction, it is characterized in that, water pocket is connected with outer conduit and inner conduit, wherein, water pocket is divided into interconnected middle part water pocket, three parts of external water capsule and interior water pocket, middle part water pocket is clipped between two sections of jurisdiction, external water capsule is located on the outside of tunnel and is connected to outer conduit, interior water pocket is located on the inside of tunnel, and it is connected to inner conduit;Outer conduit is extracted water in the first pond to the pressure pump of water pocket using pressure pump, and the pressure gauge of measurement water pressure is connected on pressure pump;Inner conduit is connected with the pressure-control valve and flowmeter that can measure water pressure, for the water of exudation to be drained into the second pond., can be by the hydraulic pressure of actual measurement somewhere certain depth using the device of the utility model, infiltration rate between computer tube piece gap joint open size and tunnel duct piece gap, so that the well in advance precautionary measures, reduce the loss of the brings such as leak.

Description

Open measuring device in duct pieces of shield tunnel gap
Technical field
The utility model belongs to Tunnel Engineering technical field, is related to a kind of duct pieces of shield tunnel gap opening measurement dress It sets.
Background technique
Shield tunnel liner is assembled generally by prefabricated pipe section, and section of jurisdiction seam is divided into longitudinal seam and circumferential direction Seam, edge joint position are the weak links of liner structure stress.Shield tunnel will appear seam due to various reasons in construction work Gap, including trolley vibration load, leakage, different geology, different buried depth, different construction factors, constraint difference, Different Ground The various factors such as load and different surrounding enviroment variations.The deformation behaviour of shield tunnel is mainly shown as subtended angle and faulting of slab ends, Deformability is very fragile, and inhomogeneous deformation and its influence to tunnel structure internal force, deformation are to cannot be neglected, and usually to tunnel Road structure is unfavorable, after deformation or curvature reach a certain amount value, tunnel i.e. be likely to occur gap joint open it is excessive and seep water or Section of jurisdiction tensile failure, causes stress excessively to concentrate, tunnel local damage, influences the safety and usability of shield tunnel.
Especially in construction time, since ground disturbance initial stage shield tunnel differential settlement is more serious, tunnel adjacent tubes The engineering problems such as the opening deformation occurred between piece and water seepage of tunnel may be more pronounced.At present for gap at segment joint Processing is primarily present discovery not in time, repairs not in time, the problems such as easily having an accident.
Utility model content
The purpose of the utility model is to provide a kind of duct pieces of shield tunnel gaps to open measuring device, can pass through reality The hydraulic pressure of measurement somewhere certain depth, the infiltration rate between computer tube piece gap joint open size and tunnel duct piece gap, To the well in advance precautionary measures, the loss of the brings such as leak is reduced.Technical solution is as follows:
A kind of duct pieces of shield tunnel gap opening measuring device, for by calculating according to the hydraulic pressure at certain depth Duct pieces of shield tunnel gap joint open size and infiltration rate, including the water pocket being clipped between the gap of two sections of jurisdiction, which is characterized in that Water pocket is connected with outer conduit and inner conduit, wherein
Water pocket is divided into three interconnected middle part water pocket, external water capsule and interior water pocket parts, and middle part water pocket is clipped in two pipes Between piece, external water capsule is located on the outside of tunnel and is connected to outer conduit, and interior water pocket is located on the inside of tunnel, and connects with inner conduit It is logical.
Outer conduit is extracted water in the first pond to the pressure pump of water pocket using pressure pump, is connected with measurement on pressure pump The pressure gauge of water pressure;
Inner conduit is connected with the pressure-control valve and flowmeter that can measure water pressure, for draining into the water of exudation Second pond.
Detailed description of the invention
Fig. 1 is overall schematic
Fig. 2 is water pocket 1)
Include in Fig. 1~2:
1- water pocket, water pocket in the middle part of 11-, 12- external water capsule, water pocket in 13-
2- outer conduit
3- inner conduit
4- pressure gauge
5- pressure pump
6- pressure-control valve
7- flowmeter
The section of jurisdiction 8-
The pond 9-
The pond 10-
Specific embodiment
The utility model is described in detail in the following with reference to the drawings and specific embodiments.The present embodiment is with the utility model Implemented premised on technical solution, the detailed implementation method and specific operation process are given, but the guarantor of the utility model Shield range is not limited to the following embodiments.
Now in conjunction with above-mentioned each attached drawing, the case study on implementation that device for calculating is opened in duct pieces of shield tunnel gap is provided.
As shown in Figure 1, the measuring device of the utility model, including water pocket 1, conduit 2 and pressure gauge 4, pressure pump 5, pond 9, conduit 3 and pressure-control valve 6, flowmeter 7, pond 10 pass through the hydraulic pressure at the certain depth of actual measurement somewhere, calculate shield Structure tunnel duct piece gap joint open size and infiltration rate.As shown in Fig. 2, water pocket 1 divides for middle part water pocket 11, external water capsule 12 and interior Water pocket 13.Middle part water pocket 11 is between the gap of two sections of jurisdiction.External water capsule 12 is located on the outside of tunnel, and connects outer conduit 2.It is interior Water pocket 13 is located on the inside of tunnel, and connects inner conduit 3.
Water pocket 1 is rubber material, and inside is equipped with water, is divided into middle part 13,3 water pocket 11, external water capsule 12 and interior water pocket water pockets It is interconnected.Middle part water pocket 11 is clipped between two sections of jurisdiction.External water capsule 12 is located on the outside of tunnel, and connects middle part water pocket 11 and outer Side conduit 2.Interior water pocket 13 is located on the inside of tunnel, and connects middle part water pocket 11 and inner conduit 3.
Outer conduit 2 is irony conduit, for conveying water, is connected with the pressure pump 5 of water in pressurization pond 9, pressure pump 5 On be connected with measurement water pressure pressure gauge 4.
Inner conduit 3 is irony conduit, is connected with the pressure-control valve 6 of measurement water pressure, measures the stream of water flow flow velocity Scale 7 and pond 10.
Pressure gauge 4 is using elastic element as sensing element, for measuring the hydraulic pressure numerical value of pressure (hydraulic) water in pressure pump 5.
Pressure pump 5 is used to pump the water in pond 9, and can increase water pressure.
Pressure-control valve 6 connects interior water pocket 12 and flowmeter 7, and measures the water pressure of water in interior water pocket 12.
Flowmeter 7 can measure water instantaneous velocity rate and accumulative water flow total amount.
In the lab, pressure-control valve 6 is closed, is previously implanted one into water pocket 1 in the case where section of jurisdiction 8 is fitted closely Quantitative water makes water pocket 1 be in full swelling state.It is pressurizeed by pressure pump 5 to the water in pond 9, and water is pumped Into water pocket 1, pressure gauge 4 can measure the hydraulic pressure of 5 outflow water of pressure pump, since pressure-control valve 6 is to close, water pocket 1 In water pressure, including middle part water pocket 11 everywhere, water pressure is equal in external water capsule 12 and interior water pocket 13, records launching stress.This When with water pressure increase, section of jurisdiction gap can gradually increase, and section of jurisdiction gap joint open can be directly measured with tools such as tape measures Size, and record numerical values recited.Repeatedly adjusting pressure pump 5 obtains multiple groups difference hydraulic pressure and its corresponding section of jurisdiction gap joint open is big It is small, the described point in plane right-angle coordinate, and linked up each point with curve, it is approached with curvilinear function, obtains hydraulic pressure Relationship 1 between the joint open size of section of jurisdiction gap.
In the lab, pressure-control valve 6 is opened, is previously implanted one into water pocket 1 in the case where section of jurisdiction 8 is fitted closely Quantitative water makes water pocket 1 be in full swelling state.It is pressurizeed by pressure pump 5 to the water in pond 9, and water is pumped Into water pocket 1, pressure gauge 4 can measure the hydraulic pressure of 5 outflow water of pressure pump, since pressure-control valve 6 is open, pressure gauge at this time 4 hydraulic pressure measured are the water pressure in external water capsule 12, and water flow passes through middle part water pocket 11 and has certain head loss, pass through pressure Control valve 6 can measure the water pressure in interior water pocket 13, record the water pressure in external water capsule 12 and interior water pocket 13 respectively.At this time with The increase of water pressure, flowmeter 7 measure water flow flow velocity accordingly also will increase, record flow rate of water flow numerical values recited.It is more Secondary adjusting pressure pump 5 obtains multiple groups difference hydraulic pressure and its corresponding flow rate of water flow numerical values recited, retouches in plane right-angle coordinate Point, and linked up each point with curve, it is approached with curvilinear function, obtains the relationship between hydraulic pressure and flow rate of water flow size 2。
In practical projects, it will do it geological prospecting before constructing tunnel, it can be big by consulting certain local depth water pressure It is small, by relationship 1 and relationship 2, tunnel duct piece gap joint open size and water seepage of tunnel rate are calculated, so as to construct Before carry out the precautionary measures, reduce the loss of the brings such as leak.

Claims (1)

1. measuring device is opened in a kind of duct pieces of shield tunnel gap, for by calculating shield according to the hydraulic pressure at certain depth Structure tunnel duct piece gap joint open size and infiltration rate, including the water pocket being clipped between two tunnel duct piece gaps, feature exists In water pocket is connected with outer conduit and inner conduit, wherein
Water pocket is divided into three interconnected middle part water pocket, external water capsule and interior water pocket parts, middle part water pocket be clipped in two sections of jurisdiction it Between, external water capsule is located on the outside of tunnel duct piece and is connected to outer conduit, and interior water pocket is located on the inside of tunnel duct piece, and and inner conduit Connection;
Outer conduit is extracted water in the first pond to the pressure pump of water pocket using pressure pump, is connected with measurement hydraulic pressure on pressure pump The pressure gauge of power;
Inner conduit is connected with the pressure-control valve and flowmeter that can measure water pressure, for the water of exudation to be drained into second Pond.
CN201820651761.7U 2018-05-03 2018-05-03 Open measuring device in duct pieces of shield tunnel gap Active CN208458988U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820651761.7U CN208458988U (en) 2018-05-03 2018-05-03 Open measuring device in duct pieces of shield tunnel gap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820651761.7U CN208458988U (en) 2018-05-03 2018-05-03 Open measuring device in duct pieces of shield tunnel gap

Publications (1)

Publication Number Publication Date
CN208458988U true CN208458988U (en) 2019-02-01

Family

ID=65150639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820651761.7U Active CN208458988U (en) 2018-05-03 2018-05-03 Open measuring device in duct pieces of shield tunnel gap

Country Status (1)

Country Link
CN (1) CN208458988U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109000899A (en) * 2018-05-03 2018-12-14 天津大学 Open measuring device in duct pieces of shield tunnel gap

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109000899A (en) * 2018-05-03 2018-12-14 天津大学 Open measuring device in duct pieces of shield tunnel gap

Similar Documents

Publication Publication Date Title
CN103926383B (en) Tunnel gushing water is dashed forward mud and Grouting three-dimensional model pilot system and test method thereof
WO2020056993A1 (en) Main drive high-pressure sealing system for shield machine and slurry balance shield machine
CN103644940A (en) Coal seam gas pressure, gas flow and crustal stress monitoring device and monitoring method
CN108643891B (en) Single-loop overburden fracture double-end plugging and leakage detection method
CN104297128A (en) Triaxial stress seepage experiment device under high pressure water and subpressure loading condition
CN103411868A (en) Measuring method for coal seam gas permeability coefficient
CN102778337A (en) Waterproof ability testing system of three-directional loaded shield tunnel duct piece joint seam
CN208458988U (en) Open measuring device in duct pieces of shield tunnel gap
CN109165434B (en) Analytical calculation method for stability analysis of rheological property soft rock of high-stress underground cavern
DE69910201D1 (en) LEAK DETECTION IN LIQUID-TUBE
CN112485125B (en) Tunnel model test device and method capable of controlling soil loss rate
Nourani et al. Numerical investigation of the optimum location for vertical drains in gravity dams
CN103741717A (en) Immersed tunnel flexible joint
CN108645774B (en) Single-loop overburden fracture double-end plugging leakage detection system
CN103510943A (en) Instrument for measuring initial velocity of gas discharged from deep drill hole for coal mine outburst prediction
CN109736779A (en) A kind of pressure break radius measurement method of this coal seam hydraulic fracture
CN109000899A (en) Open measuring device in duct pieces of shield tunnel gap
CN109029308A (en) Duct pieces of shield tunnel gap joint open prediction technique
CN110082220A (en) A kind of porous guiding fracturing experiments device of true triaxial
CN109001094A (en) A kind of shield tunnel infiltration rate prediction method
CN104612703A (en) Anti-gushing device for sludge discharge of screw conveyor during earth pressure balancing type shield excavation
CN206311600U (en) A kind of geological stress changes liquid-phase detection device
CN203081454U (en) Shield machine tail structure facilitating replacement of shield tail brushes
CN207246802U (en) A kind of multifunctional pipe leakage monitoring experiment porch
CN108756953A (en) Guarded drainage system with secondary lining shield tunnel