CN208456646U - A kind of pipe arranging device for rock bolting jumbo - Google Patents

A kind of pipe arranging device for rock bolting jumbo Download PDF

Info

Publication number
CN208456646U
CN208456646U CN201821085268.XU CN201821085268U CN208456646U CN 208456646 U CN208456646 U CN 208456646U CN 201821085268 U CN201821085268 U CN 201821085268U CN 208456646 U CN208456646 U CN 208456646U
Authority
CN
China
Prior art keywords
bracket
arranging device
strand wires
steel strand
rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821085268.XU
Other languages
Chinese (zh)
Inventor
刘飞香
郑大桥
刘在政
邹海炎
邹黎勇
刘建亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Heavy Industry Group Co Ltd
Original Assignee
China Railway Construction Heavy Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Heavy Industry Group Co Ltd filed Critical China Railway Construction Heavy Industry Group Co Ltd
Priority to CN201821085268.XU priority Critical patent/CN208456646U/en
Application granted granted Critical
Publication of CN208456646U publication Critical patent/CN208456646U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model provides a kind of pipe arranging device for rock bolting jumbo, including the bracket being arranged on forward beam girder and the steel strand wires assembly being arranged on bracket.Wherein, steel hinge line assembly is equipped with the fixation member for fixed hydraulic pipeline, and one end on steel hinge line assembly far from bracket is connect with rock drill pallet or anchor pole propeller pallet.Steel strand wires assembly is located at the top of rock drill or anchor pole propeller.Drilling and the propulsion of anchor pole are neither influenced, and can be improved drilling and beat the efficiency of anchor pole.

Description

A kind of pipe arranging device for rock bolting jumbo
Technical field
The utility model belongs to construction of underground tunnel technical field, and in particular to a kind of stringing dress for rock bolting jumbo It sets.
Background technique
Anchor Care operation is one of key link of drill bursting construction, is had the characteristics that safely, quickly, efficiently.Suspension roof support In operation process, beating anchor pole is its important link.In general, beating anchor pole is that employment station carries out on hanging basket, operating efficiency is slow, And person works' environment is poor, though the rock bolting jumbo for drilling anchor note one greatly developed at present can realize mechanization anchor bolt construction, But since Rockbolt element movement is more and complicated, so fluid pressure line is also more complicated.Since Rockbolt element fluid pressure line does not conform to The arrangement of reason hinders drilling, beats anchor pole, slip casting, and moves retracting for pallet.
Utility model content
The technical problems to be solved in the utility model be overcome the deficiencies of the prior art and provide it is a kind of neither influence drilling and The propulsion of anchor pole, and can be improved drilling and beat the pipe arranging device for rock bolting jumbo of the efficiency of anchor pole.
In order to solve the above technical problems, the utility model proposes technical solution are as follows:
A kind of pipe arranging device for rock bolting jumbo including the bracket being arranged on forward beam girder and is arranged on bracket Steel strand wires assembly.Wherein, steel hinge line assembly is equipped with the fixation member for fixed hydraulic pipeline, and on steel hinge line assembly One end far from bracket is connect with rock drill pallet or anchor pole propeller pallet.Steel strand wires assembly is located at rock drill or anchor pole promotes The top of device.
Pipe arranging device according to the present utility model for rock bolting jumbo is passed through using steel hinge line assembly support hydraulic pressure pipeline Fixation member fixes fluid pressure line, floats on the fluid pressure line of Rockbolt element all above Rockbolt element, therefore rock drill or anchor When bar propeller promotes, it will not interfere with fluid pressure line, therefore will not influence drilling and the propulsion of anchor pole.Due to hydraulic oil pipe by To the support of steel strand wires assembly, rock drill pallet and anchor pole propeller pallet not will receive hydraulic when switching on mobile pallet The obstruction of oil pipe, so as to quickly complete switching raising drilling and beat the efficiency of anchor pole.
For above-mentioned technical proposal, the further improvement that can also be discussed below.
Pipe arranging device according to the present utility model for rock bolting jumbo, in one preferred embodiment, bracket packet Include upper bracket and lower bracket, wherein upper bracket is connect with forward beam girder, and lower bracket is arranged in upper bracket bottom, and steel strand wires are total At being arranged on upper bracket.The rack form formed using upper bracket and lower bracket is meeting the same of fluid pressure line arrangement height When, the strength and stability of bracket can be increased.
Further, in one preferred embodiment, lower bracket is equipped with the positioning region for arranging fluid pressure line Part.By positioning element, it can preferably make the arrangement of fluid pressure line in good order, so that fluid pressure line be avoided to influence anchor pole The work of trolley.
Further, in one preferred embodiment, positioning element includes clip.The positioning element of yoke configurations makes The fixing-stable for obtaining fluid pressure line is reliable, simple and convenient.
Further, in one preferred embodiment, positioning element includes card slot.By the positioning action of card slot, It can further make the fixing-stable of fluid pressure line reliable, arrange in good order.
Further, in one preferred embodiment, bracket is equipped with the first limiting component.First limiting component position It is arranged in parallel above forward beam girder with forward beam girder.Also, the first limiting component is located on bracket close to rock drill Side.
When rock drill or anchor pole propeller are advanced to front, since forward beam can carry out ± 180 ° of revolutions, incline when it is in When ramp-like state, steel strand wires and wirerope can generate moderate finite deformation from gravity of experiencing, and can be limited by the way that the first limiting component is arranged The deflection of steel strand wires processed is unlikely to excessive, influences the propulsion or drilling of anchor pole.
Further, in one preferred embodiment, bracket is equipped with the second limiting component.Second limiting component position It is arranged in parallel above forward beam girder with forward beam girder.Also, the second limiting component is arranged on bracket far from rock drill Side.
When rock drill or anchor pole propeller are advanced to front, since forward beam can carry out ± 180 ° of revolutions, incline when it is in When ramp-like state, steel strand wires and wirerope can generate moderate finite deformation from gravity of experiencing, and can be limited by the way that the second limiting component is arranged The deflection of steel strand wires processed is unlikely to excessive, influences the propulsion or drilling of anchor pole.
Specifically, in one preferred embodiment, the first limiting component includes the support interconnected by connecting rod Frame and the limited block for arranging the end far from connecting rod on the support frame.Since the first limiting component mainly prevents rock bolting jumbo When boring areole, steel strand wires assembly is stretched active force sinking and generates interference with rock drill or anchor pole propeller, influences to drill With the propulsion of anchor pole, therefore the structure type that the first limiting component is formed using support frame and limited block is mutual by connecting rod The support frame of connection can provide steel strand wires assembly most enough support forces, and limited block can prevent well steel strand wires total It is slid at from support frame.
Specifically, in one preferred embodiment, the second limiting component includes that support rod and opposite support rod are upward The bar of extension.The limiting component being made of support rod and bar can not only well play well steel strand wires assembly Position-limiting action, and structure is simple, so that the manufacturing is simple and convenient, it is at low cost.
Further, in one preferred embodiment, upper bracket is equipped with reinforcing rod.It, can by the way that reinforcing rod is arranged To increase the structural strength and mounting stability of upper bracket so that the installation of steel strand wires and fluid pressure line and it is fixed it is more stable can It leans on.
Compared with the prior art, the advantages of the utility model are: neither influencing drilling and the propulsion of anchor pole, and can mention Height drilling and the efficiency for beating anchor pole.
Detailed description of the invention
Hereinafter the utility model will be described in more detail based on the embodiments and with reference to the accompanying drawings.Wherein:
Fig. 1 schematically illustrates the installation condition of the pipe arranging device for rock bolting jumbo of the utility model embodiment;
Fig. 2 schematically illustrates the overall structure of the pipe arranging device for rock bolting jumbo of the utility model embodiment;
Fig. 3 schematically illustrates the structure of the steel strand wires assembly of the utility model embodiment.
In the accompanying drawings, identical component uses identical appended drawing reference.The attached drawing is not drawn according to the actual ratio.
Specific embodiment
Further detailed utility model is made to the utility model below in conjunction with the drawings and specific embodiments, but not therefore And limit the protection scope of the utility model.
Fig. 1 schematically illustrates the installation condition of the pipe arranging device 10 for rock bolting jumbo of the utility model embodiment. Fig. 2 schematically illustrates the overall structure of the pipe arranging device 10 for rock bolting jumbo of the utility model embodiment.Fig. 3 is schematic Show the structure of the steel strand wires assembly 2 of the utility model embodiment.
As shown in Figure 1 to Figure 3, the pipe arranging device 10 for rock bolting jumbo of the utility model embodiment, including be arranged in Bracket 1 on forward beam girder 7 and the steel strand wires assembly 2 being arranged on bracket 1.Wherein, steel hinge line assembly 2 is equipped with for solid Determine the fixation member 3 of fluid pressure line, and one end and rock drill pallet 8 or anchor pole propulsion on steel hinge line assembly 2 far from bracket 1 Device pallet 9 connects.Steel strand wires assembly 2 is located at the top of rock drill 101 or anchor pole propeller 102.Implemented according to the utility model The pipe arranging device for rock bolting jumbo of example, is consolidated fluid pressure line by fixation member using steel hinge line assembly support hydraulic pressure pipeline It is fixed, float on the fluid pressure line of Rockbolt element all above Rockbolt element, therefore when rock drill or the propulsion of anchor pole propeller, Bu Huiyu Fluid pressure line interference, therefore will not influence drilling and the propulsion of anchor pole.Support due to hydraulic oil pipe by steel strand wires assembly, chisel Rock machine pallet and anchor pole propeller pallet not will receive the obstruction of hydraulic oil pipe, when switching on mobile pallet so as to fast Speed completes switching and improves drilling and beat the efficiency of anchor pole.
As shown in Figure 1 to Figure 3, in the present embodiment, steel strand wires assembly 2 is made of several steel strand wires, steel strand wires assembly It can arrange several groups.Preferably, steel strand wires assembly 2 includes two groups, and every group of steel strand wires assembly includes four steel strand wires.It is preferred that Ground is uniformly arranged several groups fixation member 3 on every group of steel strand wires assembly 2, on the one hand for fixing steel strand wires assembly 2, on the one hand For fixed hydraulic pipeline.In one preferred embodiment, type of attachment of the fixation member 3 using clamping, fixation member 3 It is made of the first buckle 31 and second 32 two parts of buckle, wherein 31 arrangement steel strand wires assembly of the first buckle, 2 top, the second buckle 32 are arranged in 2 lower section of steel strand wires assembly, and the first buckle 31 and the second buckle 32 are clamped mutually the annular for forming a closure, therefore It can be easily along steel strand wires assembly fixed hydraulic pipeline.
As depicted in figs. 1 and 2, the pipe arranging device 10 for rock bolting jumbo of the utility model embodiment, preferably at one Embodiment in, bracket 1 include upper bracket 11 and lower bracket 12, wherein upper bracket 11 is connect with forward beam girder 7, lower branch Frame 12 is arranged in 11 bottom of upper bracket, and steel strand wires assembly 2 is arranged on upper bracket 11.The branch formed using upper bracket and lower bracket Frame form can increase the strength and stability of bracket while meeting fluid pressure line arrangement height.Preferably, upper bracket 11 include crossbeam 111 and vertical beam 112, is formed by transverse direction and the steel-pipe welding being vertically arranged, and steel strand wires assembly is arranged in On the crossbeam 111 at 11 top of bracket.Further, in one preferred embodiment, it is set between crossbeam 111 and vertical beam 112 There is reinforcing rod 113.By be arranged reinforcing rod, the structural strength and mounting stability of upper bracket can be increased so that steel strand wires and The installation and fixation of fluid pressure line are more reliable and more stable.Specifically, in one preferred embodiment, lower bracket 12 hangs down mutually That directly arranges is made of top plate 121 and side plate 122, enables to the installation of lower bracket highly stable reliable in this way.
Further, as shown in Fig. 2, in one preferred embodiment, lower bracket 12 is equipped with hydraulic for arranging The positioning element 4 of pipeline.By positioning element, it can preferably make the arrangement of fluid pressure line in good order, to avoid liquid The work of pressure pipe road influence rock bolting jumbo.Further, in one preferred embodiment, positioning element 4 includes clip 41. The positioning element of yoke configurations makes the fixing-stable of fluid pressure line reliable, simple and convenient.Further, preferably at one Embodiment in, positioning element 4 include card slot 42.By the positioning action of card slot, it can further make fluid pressure line Fixing-stable it is reliable, arrange it is in good order.
Preferably, as shown in Figure 1, wherein one end of one group of steel strand wires assembly 2 is fixed on the crossbeam 111 of upper bracket 11, The other end is fixed on moveable rock drill pallet 8.One end of another group of steel strand wires assembly 2 is fixed on the crossbeam of upper bracket 11 On 111, the other end is fixed on moveable anchor pole propeller pallet 9, and two groups of steel strand wires assemblies 2 are arranged in parallel.Preferably, steel Twisted wire assembly 2 is removably installed, and can be convenient the installation and removal of entire pipe arranging device in this way.Hydraulic oil pipe is logical The clip 41 and card slot 42 crossed on lower bracket 12 arrange that a part of hydraulic oil pipe is connected to rock drilling along steel strand wires assembly 2 upwards The oil inlet and oil outlet of machine 101, another part are connected to the oil inlet and oil outlet of anchor pole propeller 102.Preferably, under The removably that bracket 12 is bolted is fixedly mounted.
Further, in one preferred embodiment, bracket 1 is equipped with the first limiting component 5.First limiting component 5 are located at 7 top of forward beam girder is arranged in parallel with forward beam girder 7.Also, the first limiting component 5 is located on bracket 1 close to chisel The side of rock machine 101.When rock drill or anchor pole propeller are advanced to front, since forward beam can carry out ± 180 ° of revolutions, when it When in heeling condition, steel strand wires and wirerope can generate moderate finite deformation, by the way that the first limiting section is arranged from gravity of experiencing The deflection that part can limit steel strand wires is unlikely to excessive, influences the propulsion or drilling of anchor pole.Specifically, in a preferred implementation In mode, the first limiting component 5 includes the support frame 52 interconnected by connecting rod 51 and is arranged on support frame 52 far from even The limited block 53 of the end of bar 51.Preferably, support frame 52 is formed by transverse direction and the steel-pipe welding being vertically arranged.Due to first Limiting component mainly prevent rock bolting jumbo steel strand wires assembly when boring areole be stretched active force sink and rock drill or Anchor pole propeller generates interference, influences drilling and the propulsion of anchor pole, therefore the first limiting component uses support frame and limited block The structure type of composition, the support frame interconnected by connecting rod can provide steel strand wires assembly most enough support forces, and limit Position block can prevent well steel strand wires assembly from sliding from support frame.
Further, in one preferred embodiment, bracket 1 is equipped with the second limiting component 6.Second limiting component 6 are located at 7 top of forward beam girder is arranged in parallel with forward beam girder 7.Also, the setting of the second limiting component 6 is separate on bracket 1 The side of rock drill 101.When rock drill or anchor pole propeller are advanced to front, since forward beam can carry out ± 180 ° of revolutions, when When it is in heeling condition, steel strand wires and wirerope can generate moderate finite deformation from gravity of experiencing, and pass through the first limit of setting The deflection that component can limit steel strand wires is unlikely to excessive, influences the propulsion or drilling of anchor pole.Specifically, preferred real at one It applies in mode, the second limiting component 6 includes the bar 62 that support rod 61 and opposite support rod 61 upwardly extend.By support rod and gear The limiting component of bar composition, can not only play good position-limiting action to steel strand wires assembly well, and structure is simple, makes Must manufacture it is simple and convenient, it is at low cost.
According to above-described embodiment, it is seen that the utility model relates to the stringing mechanism for rock bolting jumbo, neither influence bore The propulsion of hole and anchor pole, and can be improved drilling and beat the efficiency of anchor pole.
Although the present utility model has been described by reference to the preferred embodiments, but the scope of the utility model is not being departed from In the case where, various improvement can be carried out to it and can replace component therein with equivalent.Especially, as long as being not present Structural conflict, items technical characteristic mentioned in the various embodiments can be combined in any way.The utility model is simultaneously It is not limited to specific embodiment disclosed herein, but all technical solutions including falling within the scope of the claims.

Claims (10)

1. a kind of pipe arranging device for rock bolting jumbo, which is characterized in that including the bracket and cloth being arranged on forward beam girder Set steel strand wires assembly on the bracket, wherein
The steel strand wires assembly is equipped with the fixation member for fixed hydraulic pipeline, and far from institute on the steel strand wires assembly The one end for stating bracket is connect with rock drill pallet or anchor pole propeller pallet;
The steel strand wires assembly is located at the top of rock drill or anchor pole propeller.
2. the pipe arranging device according to claim 1 for rock bolting jumbo, which is characterized in that the bracket includes upper bracket And lower bracket, wherein the upper bracket is connect with forward beam girder, and the lower bracket is arranged in the upper bracket bottom, described Steel strand wires assembly is arranged on the upper bracket.
3. the pipe arranging device according to claim 2 for rock bolting jumbo, which is characterized in that the lower bracket, which is equipped with, to be used In the positioning element of arrangement fluid pressure line.
4. the pipe arranging device according to claim 3 for rock bolting jumbo, which is characterized in that the positioning element includes card Hoop.
5. the pipe arranging device according to claim 3 or 4 for rock bolting jumbo, which is characterized in that the positioning element packet Include card slot.
6. the pipe arranging device according to any one of claim 1 to 4 for rock bolting jumbo, which is characterized in that the branch Frame is equipped with the first limiting component, and first limiting component is located above forward beam girder to be arranged in parallel with forward beam girder, First limiting component is located at the side on the bracket close to rock drill.
7. the pipe arranging device according to claim 6 for rock bolting jumbo, which is characterized in that the bracket is equipped with second Limiting component, second limiting component is located above forward beam girder to be arranged in parallel with forward beam girder, also, described second Limiting component is arranged on the bracket far from the side of rock drill.
8. the pipe arranging device according to claim 6 for rock bolting jumbo, which is characterized in that the first limiting component packet The limited block for including the support frame interconnected by connecting rod and being arranged in the end on support frame as described above far from the connecting rod.
9. the pipe arranging device according to claim 7 for rock bolting jumbo, which is characterized in that the second limiting component packet Include the bar that support rod and the relatively described support rod upwardly extend.
10. the pipe arranging device according to any one of claim 2 to 4 for rock bolting jumbo, which is characterized in that on described Bracket is equipped with reinforcing rod.
CN201821085268.XU 2018-07-09 2018-07-09 A kind of pipe arranging device for rock bolting jumbo Active CN208456646U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821085268.XU CN208456646U (en) 2018-07-09 2018-07-09 A kind of pipe arranging device for rock bolting jumbo

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821085268.XU CN208456646U (en) 2018-07-09 2018-07-09 A kind of pipe arranging device for rock bolting jumbo

Publications (1)

Publication Number Publication Date
CN208456646U true CN208456646U (en) 2019-02-01

Family

ID=65170574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821085268.XU Active CN208456646U (en) 2018-07-09 2018-07-09 A kind of pipe arranging device for rock bolting jumbo

Country Status (1)

Country Link
CN (1) CN208456646U (en)

Similar Documents

Publication Publication Date Title
CN203403418U (en) Steel casing double-layer guide frame structure
CN102975818A (en) Aluminum alloy superstructure block hoisting method
CN208456646U (en) A kind of pipe arranging device for rock bolting jumbo
CN105752855A (en) Windproof stable gantry crane
CN202530823U (en) Prestressing force truss type tube tower
CN209099804U (en) A kind of construction steel structure supporting beam
CN209128888U (en) Anchor head traction device after a kind of suspension bridge dorsal funciculus
CN201990945U (en) Cable-stayed bridge anchor draw plate type girder anchoring structure
CN204252839U (en) The spliced crownblock beam of a kind of level
CN201133219Y (en) Sea derrick for drilling and repairing
CN205653068U (en) Reinforcement type gantry crane
CN208183770U (en) A kind of hydraulic engineering slope protection net fixing piece
CN205840903U (en) Temporary support device is visited before a kind of overlength
CN214356750U (en) Unmanned aerial vehicle recovery unit
CN202099747U (en) Main girder suspension device for downlink-type hanging basket and downlink-type hanging basket adopting same
CN101457516B (en) Multilayer horizontal stay fixing method
CN203065046U (en) Self-stabilizing double-rocker-arm lifting device for installation of high-rise tower
CN105752843A (en) Anti-shake gantry crane
CN204919525U (en) Strong machine that rams and combination formula top arm frame structure thereof
CN111706060A (en) Steel wire rope inclined-pulling type hanging basket device
CN206426873U (en) A kind of high headroom section contact net cantilever beam of urban track traffic
CN220519974U (en) Tensioning jack supporting device
CN101798798A (en) Special catwalk hung with multilayer horizontal inhaul cables
CN208105052U (en) A kind of lifting-up support for highway bridge
CN220643884U (en) Stay cable primary tensioning construction platform on large-section cantilever filling bridge fabrication machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 410100 No. 88 East 7 Line, Changsha Economic and Technological Development Zone, Hunan Province

Patentee after: China Railway Construction Heavy Industry Co.,Ltd.

Address before: 410100 88 East seven road, Changsha economic and Technological Development Zone, Hunan

Patentee before: China Railway Construction Heavy Industry Co.,Ltd.