- Prior art keywords
- bracket
- arranging device
- strand wires
- steel strand
- rock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000011435 rock Substances 0.000 title claims abstract description 56
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 60
- 239000010959 steel Substances 0.000 claims abstract description 60
- 239000012530 fluid Substances 0.000 claims description 22
- 230000003014 reinforcing effect Effects 0.000 claims description 5
- 239000004744 fabric Substances 0.000 claims 1
- 238000005553 drilling Methods 0.000 abstract description 19
- 238000009434 installation Methods 0.000 description 6
- 239000010720 hydraulic oil Substances 0.000 description 5
- 239000003921 oil Substances 0.000 description 5
- 230000009471 action Effects 0.000 description 4
- 230000005484 gravity Effects 0.000 description 4
- 238000010009 beating Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 230000006872 improvement Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 230000009172 bursting Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000007569 slipcasting Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model provides a kind of pipe arranging device for rock bolting jumbo, including the bracket being arranged on forward beam girder and the steel strand wires assembly being arranged on bracket.Wherein, steel hinge line assembly is equipped with the fixation member for fixed hydraulic pipeline, and one end on steel hinge line assembly far from bracket is connect with rock drill pallet or anchor pole propeller pallet.Steel strand wires assembly is located at the top of rock drill or anchor pole propeller.Drilling and the propulsion of anchor pole are neither influenced, and can be improved drilling and beat the efficiency of anchor pole.
Description
Technical field
The utility model belongs to construction of underground tunnel technical field, and in particular to a kind of stringing dress for rock bolting jumbo
It sets.
Background technique
Anchor Care operation is one of key link of drill bursting construction, is had the characteristics that safely, quickly, efficiently.Suspension roof support
In operation process, beating anchor pole is its important link.In general, beating anchor pole is that employment station carries out on hanging basket, operating efficiency is slow,
And person works' environment is poor, though the rock bolting jumbo for drilling anchor note one greatly developed at present can realize mechanization anchor bolt construction,
But since Rockbolt element movement is more and complicated, so fluid pressure line is also more complicated.Since Rockbolt element fluid pressure line does not conform to
The arrangement of reason hinders drilling, beats anchor pole, slip casting, and moves retracting for pallet.
Utility model content
The technical problems to be solved in the utility model be overcome the deficiencies of the prior art and provide it is a kind of neither influence drilling and
The propulsion of anchor pole, and can be improved drilling and beat the pipe arranging device for rock bolting jumbo of the efficiency of anchor pole.
In order to solve the above technical problems, the utility model proposes technical solution are as follows:
A kind of pipe arranging device for rock bolting jumbo including the bracket being arranged on forward beam girder and is arranged on bracket
Steel strand wires assembly.Wherein, steel hinge line assembly is equipped with the fixation member for fixed hydraulic pipeline, and on steel hinge line assembly
One end far from bracket is connect with rock drill pallet or anchor pole propeller pallet.Steel strand wires assembly is located at rock drill or anchor pole promotes
The top of device.
Pipe arranging device according to the present utility model for rock bolting jumbo is passed through using steel hinge line assembly support hydraulic pressure pipeline
Fixation member fixes fluid pressure line, floats on the fluid pressure line of Rockbolt element all above Rockbolt element, therefore rock drill or anchor
When bar propeller promotes, it will not interfere with fluid pressure line, therefore will not influence drilling and the propulsion of anchor pole.Due to hydraulic oil pipe by
To the support of steel strand wires assembly, rock drill pallet and anchor pole propeller pallet not will receive hydraulic when switching on mobile pallet
The obstruction of oil pipe, so as to quickly complete switching raising drilling and beat the efficiency of anchor pole.
For above-mentioned technical proposal, the further improvement that can also be discussed below.
Pipe arranging device according to the present utility model for rock bolting jumbo, in one preferred embodiment, bracket packet
Include upper bracket and lower bracket, wherein upper bracket is connect with forward beam girder, and lower bracket is arranged in upper bracket bottom, and steel strand wires are total
At being arranged on upper bracket.The rack form formed using upper bracket and lower bracket is meeting the same of fluid pressure line arrangement height
When, the strength and stability of bracket can be increased.
Further, in one preferred embodiment, lower bracket is equipped with the positioning region for arranging fluid pressure line
Part.By positioning element, it can preferably make the arrangement of fluid pressure line in good order, so that fluid pressure line be avoided to influence anchor pole
The work of trolley.
Further, in one preferred embodiment, positioning element includes clip.The positioning element of yoke configurations makes
The fixing-stable for obtaining fluid pressure line is reliable, simple and convenient.
Further, in one preferred embodiment, positioning element includes card slot.By the positioning action of card slot,
It can further make the fixing-stable of fluid pressure line reliable, arrange in good order.
Further, in one preferred embodiment, bracket is equipped with the first limiting component.First limiting component position
It is arranged in parallel above forward beam girder with forward beam girder.Also, the first limiting component is located on bracket close to rock drill
Side.
When rock drill or anchor pole propeller are advanced to front, since forward beam can carry out ± 180 ° of revolutions, incline when it is in
When ramp-like state, steel strand wires and wirerope can generate moderate finite deformation from gravity of experiencing, and can be limited by the way that the first limiting component is arranged
The deflection of steel strand wires processed is unlikely to excessive, influences the propulsion or drilling of anchor pole.
Further, in one preferred embodiment, bracket is equipped with the second limiting component.Second limiting component position
It is arranged in parallel above forward beam girder with forward beam girder.Also, the second limiting component is arranged on bracket far from rock drill
Side.
When rock drill or anchor pole propeller are advanced to front, since forward beam can carry out ± 180 ° of revolutions, incline when it is in
When ramp-like state, steel strand wires and wirerope can generate moderate finite deformation from gravity of experiencing, and can be limited by the way that the second limiting component is arranged
The deflection of steel strand wires processed is unlikely to excessive, influences the propulsion or drilling of anchor pole.
Specifically, in one preferred embodiment, the first limiting component includes the support interconnected by connecting rod
Frame and the limited block for arranging the end far from connecting rod on the support frame.Since the first limiting component mainly prevents rock bolting jumbo
When boring areole, steel strand wires assembly is stretched active force sinking and generates interference with rock drill or anchor pole propeller, influences to drill
With the propulsion of anchor pole, therefore the structure type that the first limiting component is formed using support frame and limited block is mutual by connecting rod
The support frame of connection can provide steel strand wires assembly most enough support forces, and limited block can prevent well steel strand wires total
It is slid at from support frame.
Specifically, in one preferred embodiment, the second limiting component includes that support rod and opposite support rod are upward
The bar of extension.The limiting component being made of support rod and bar can not only well play well steel strand wires assembly
Position-limiting action, and structure is simple, so that the manufacturing is simple and convenient, it is at low cost.
Further, in one preferred embodiment, upper bracket is equipped with reinforcing rod.It, can by the way that reinforcing rod is arranged
To increase the structural strength and mounting stability of upper bracket so that the installation of steel strand wires and fluid pressure line and it is fixed it is more stable can
It leans on.
Compared with the prior art, the advantages of the utility model are: neither influencing drilling and the propulsion of anchor pole, and can mention
Height drilling and the efficiency for beating anchor pole.
Detailed description of the invention
Hereinafter the utility model will be described in more detail based on the embodiments and with reference to the accompanying drawings.Wherein:
Fig. 1 schematically illustrates the installation condition of the pipe arranging device for rock bolting jumbo of the utility model embodiment;
Fig. 2 schematically illustrates the overall structure of the pipe arranging device for rock bolting jumbo of the utility model embodiment;
Fig. 3 schematically illustrates the structure of the steel strand wires assembly of the utility model embodiment.
In the accompanying drawings, identical component uses identical appended drawing reference.The attached drawing is not drawn according to the actual ratio.
Specific embodiment
Further detailed utility model is made to the utility model below in conjunction with the drawings and specific embodiments, but not therefore
And limit the protection scope of the utility model.
Fig. 1 schematically illustrates the installation condition of the pipe arranging device 10 for rock bolting jumbo of the utility model embodiment.
Fig. 2 schematically illustrates the overall structure of the pipe arranging device 10 for rock bolting jumbo of the utility model embodiment.Fig. 3 is schematic
Show the structure of the steel strand wires assembly 2 of the utility model embodiment.
As shown in Figure 1 to Figure 3, the pipe arranging device 10 for rock bolting jumbo of the utility model embodiment, including be arranged in
Bracket 1 on forward beam girder 7 and the steel strand wires assembly 2 being arranged on bracket 1.Wherein, steel hinge line assembly 2 is equipped with for solid
Determine the fixation member 3 of fluid pressure line, and one end and rock drill pallet 8 or anchor pole propulsion on steel hinge line assembly 2 far from bracket 1
Device pallet 9 connects.Steel strand wires assembly 2 is located at the top of rock drill 101 or anchor pole propeller 102.Implemented according to the utility model
The pipe arranging device for rock bolting jumbo of example, is consolidated fluid pressure line by fixation member using steel hinge line assembly support hydraulic pressure pipeline
It is fixed, float on the fluid pressure line of Rockbolt element all above Rockbolt element, therefore when rock drill or the propulsion of anchor pole propeller, Bu Huiyu
Fluid pressure line interference, therefore will not influence drilling and the propulsion of anchor pole.Support due to hydraulic oil pipe by steel strand wires assembly, chisel
Rock machine pallet and anchor pole propeller pallet not will receive the obstruction of hydraulic oil pipe, when switching on mobile pallet so as to fast
Speed completes switching and improves drilling and beat the efficiency of anchor pole.
As shown in Figure 1 to Figure 3, in the present embodiment, steel strand wires assembly 2 is made of several steel strand wires, steel strand wires assembly
It can arrange several groups.Preferably, steel strand wires assembly 2 includes two groups, and every group of steel strand wires assembly includes four steel strand wires.It is preferred that
Ground is uniformly arranged several groups fixation member 3 on every group of steel strand wires assembly 2, on the one hand for fixing steel strand wires assembly 2, on the one hand
For fixed hydraulic pipeline.In one preferred embodiment, type of attachment of the fixation member 3 using clamping, fixation member 3
It is made of the first buckle 31 and second 32 two parts of buckle, wherein 31 arrangement steel strand wires assembly of the first buckle, 2 top, the second buckle
32 are arranged in 2 lower section of steel strand wires assembly, and the first buckle 31 and the second buckle 32 are clamped mutually the annular for forming a closure, therefore
It can be easily along steel strand wires assembly fixed hydraulic pipeline.
As depicted in figs. 1 and 2, the pipe arranging device 10 for rock bolting jumbo of the utility model embodiment, preferably at one
Embodiment in, bracket 1 include upper bracket 11 and lower bracket 12, wherein upper bracket 11 is connect with forward beam girder 7, lower branch
Frame 12 is arranged in 11 bottom of upper bracket, and steel strand wires assembly 2 is arranged on upper bracket 11.The branch formed using upper bracket and lower bracket
Frame form can increase the strength and stability of bracket while meeting fluid pressure line arrangement height.Preferably, upper bracket
11 include crossbeam 111 and vertical beam 112, is formed by transverse direction and the steel-pipe welding being vertically arranged, and steel strand wires assembly is arranged in
On the crossbeam 111 at 11 top of bracket.Further, in one preferred embodiment, it is set between crossbeam 111 and vertical beam 112
There is reinforcing rod 113.By be arranged reinforcing rod, the structural strength and mounting stability of upper bracket can be increased so that steel strand wires and
The installation and fixation of fluid pressure line are more reliable and more stable.Specifically, in one preferred embodiment, lower bracket 12 hangs down mutually
That directly arranges is made of top plate 121 and side plate 122, enables to the installation of lower bracket highly stable reliable in this way.
Further, as shown in Fig. 2, in one preferred embodiment, lower bracket 12 is equipped with hydraulic for arranging
The positioning element 4 of pipeline.By positioning element, it can preferably make the arrangement of fluid pressure line in good order, to avoid liquid
The work of pressure pipe road influence rock bolting jumbo.Further, in one preferred embodiment, positioning element 4 includes clip 41.
The positioning element of yoke configurations makes the fixing-stable of fluid pressure line reliable, simple and convenient.Further, preferably at one
Embodiment in, positioning element 4 include card slot 42.By the positioning action of card slot, it can further make fluid pressure line
Fixing-stable it is reliable, arrange it is in good order.
Preferably, as shown in Figure 1, wherein one end of one group of steel strand wires assembly 2 is fixed on the crossbeam 111 of upper bracket 11,
The other end is fixed on moveable rock drill pallet 8.One end of another group of steel strand wires assembly 2 is fixed on the crossbeam of upper bracket 11
On 111, the other end is fixed on moveable anchor pole propeller pallet 9, and two groups of steel strand wires assemblies 2 are arranged in parallel.Preferably, steel
Twisted wire assembly 2 is removably installed, and can be convenient the installation and removal of entire pipe arranging device in this way.Hydraulic oil pipe is logical
The clip 41 and card slot 42 crossed on lower bracket 12 arrange that a part of hydraulic oil pipe is connected to rock drilling along steel strand wires assembly 2 upwards
The oil inlet and oil outlet of machine 101, another part are connected to the oil inlet and oil outlet of anchor pole propeller 102.Preferably, under
The removably that bracket 12 is bolted is fixedly mounted.
Further, in one preferred embodiment, bracket 1 is equipped with the first limiting component 5.First limiting component
5 are located at 7 top of forward beam girder is arranged in parallel with forward beam girder 7.Also, the first limiting component 5 is located on bracket 1 close to chisel
The side of rock machine 101.When rock drill or anchor pole propeller are advanced to front, since forward beam can carry out ± 180 ° of revolutions, when it
When in heeling condition, steel strand wires and wirerope can generate moderate finite deformation, by the way that the first limiting section is arranged from gravity of experiencing
The deflection that part can limit steel strand wires is unlikely to excessive, influences the propulsion or drilling of anchor pole.Specifically, in a preferred implementation
In mode, the first limiting component 5 includes the support frame 52 interconnected by connecting rod 51 and is arranged on support frame 52 far from even
The limited block 53 of the end of bar 51.Preferably, support frame 52 is formed by transverse direction and the steel-pipe welding being vertically arranged.Due to first
Limiting component mainly prevent rock bolting jumbo steel strand wires assembly when boring areole be stretched active force sink and rock drill or
Anchor pole propeller generates interference, influences drilling and the propulsion of anchor pole, therefore the first limiting component uses support frame and limited block
The structure type of composition, the support frame interconnected by connecting rod can provide steel strand wires assembly most enough support forces, and limit
Position block can prevent well steel strand wires assembly from sliding from support frame.
Further, in one preferred embodiment, bracket 1 is equipped with the second limiting component 6.Second limiting component
6 are located at 7 top of forward beam girder is arranged in parallel with forward beam girder 7.Also, the setting of the second limiting component 6 is separate on bracket 1
The side of rock drill 101.When rock drill or anchor pole propeller are advanced to front, since forward beam can carry out ± 180 ° of revolutions, when
When it is in heeling condition, steel strand wires and wirerope can generate moderate finite deformation from gravity of experiencing, and pass through the first limit of setting
The deflection that component can limit steel strand wires is unlikely to excessive, influences the propulsion or drilling of anchor pole.Specifically, preferred real at one
It applies in mode, the second limiting component 6 includes the bar 62 that support rod 61 and opposite support rod 61 upwardly extend.By support rod and gear
The limiting component of bar composition, can not only play good position-limiting action to steel strand wires assembly well, and structure is simple, makes
Must manufacture it is simple and convenient, it is at low cost.
According to above-described embodiment, it is seen that the utility model relates to the stringing mechanism for rock bolting jumbo, neither influence bore
The propulsion of hole and anchor pole, and can be improved drilling and beat the efficiency of anchor pole.
Although the present utility model has been described by reference to the preferred embodiments, but the scope of the utility model is not being departed from
In the case where, various improvement can be carried out to it and can replace component therein with equivalent.Especially, as long as being not present
Structural conflict, items technical characteristic mentioned in the various embodiments can be combined in any way.The utility model is simultaneously
It is not limited to specific embodiment disclosed herein, but all technical solutions including falling within the scope of the claims.
Claims (10)
1. a kind of pipe arranging device for rock bolting jumbo, which is characterized in that including the bracket and cloth being arranged on forward beam girder
Set steel strand wires assembly on the bracket, wherein
The steel strand wires assembly is equipped with the fixation member for fixed hydraulic pipeline, and far from institute on the steel strand wires assembly
The one end for stating bracket is connect with rock drill pallet or anchor pole propeller pallet;
The steel strand wires assembly is located at the top of rock drill or anchor pole propeller.
2. the pipe arranging device according to claim 1 for rock bolting jumbo, which is characterized in that the bracket includes upper bracket
And lower bracket, wherein the upper bracket is connect with forward beam girder, and the lower bracket is arranged in the upper bracket bottom, described
Steel strand wires assembly is arranged on the upper bracket.
3. the pipe arranging device according to claim 2 for rock bolting jumbo, which is characterized in that the lower bracket, which is equipped with, to be used
In the positioning element of arrangement fluid pressure line.
4. the pipe arranging device according to claim 3 for rock bolting jumbo, which is characterized in that the positioning element includes card
Hoop.
5. the pipe arranging device according to claim 3 or 4 for rock bolting jumbo, which is characterized in that the positioning element packet
Include card slot.
6. the pipe arranging device according to any one of claim 1 to 4 for rock bolting jumbo, which is characterized in that the branch
Frame is equipped with the first limiting component, and first limiting component is located above forward beam girder to be arranged in parallel with forward beam girder,
First limiting component is located at the side on the bracket close to rock drill.
7. the pipe arranging device according to claim 6 for rock bolting jumbo, which is characterized in that the bracket is equipped with second
Limiting component, second limiting component is located above forward beam girder to be arranged in parallel with forward beam girder, also, described second
Limiting component is arranged on the bracket far from the side of rock drill.
8. the pipe arranging device according to claim 6 for rock bolting jumbo, which is characterized in that the first limiting component packet
The limited block for including the support frame interconnected by connecting rod and being arranged in the end on support frame as described above far from the connecting rod.
9. the pipe arranging device according to claim 7 for rock bolting jumbo, which is characterized in that the second limiting component packet
Include the bar that support rod and the relatively described support rod upwardly extend.
10. the pipe arranging device according to any one of claim 2 to 4 for rock bolting jumbo, which is characterized in that on described
Bracket is equipped with reinforcing rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821085268.XU CN208456646U (en) | 2018-07-09 | 2018-07-09 | A kind of pipe arranging device for rock bolting jumbo |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821085268.XU CN208456646U (en) | 2018-07-09 | 2018-07-09 | A kind of pipe arranging device for rock bolting jumbo |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208456646U true CN208456646U (en) | 2019-02-01 |
Family
ID=65170574
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821085268.XU Active CN208456646U (en) | 2018-07-09 | 2018-07-09 | A kind of pipe arranging device for rock bolting jumbo |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208456646U (en) |
-
2018
- 2018-07-09 CN CN201821085268.XU patent/CN208456646U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203403418U (en) | Steel casing double-layer guide frame structure | |
CN102975818A (en) | Aluminum alloy superstructure block hoisting method | |
CN208456646U (en) | A kind of pipe arranging device for rock bolting jumbo | |
CN105752855A (en) | Windproof stable gantry crane | |
CN202530823U (en) | Prestressing force truss type tube tower | |
CN209099804U (en) | A kind of construction steel structure supporting beam | |
CN209128888U (en) | Anchor head traction device after a kind of suspension bridge dorsal funciculus | |
CN201990945U (en) | Cable-stayed bridge anchor draw plate type girder anchoring structure | |
CN204252839U (en) | The spliced crownblock beam of a kind of level | |
CN201133219Y (en) | Sea derrick for drilling and repairing | |
CN205653068U (en) | Reinforcement type gantry crane | |
CN208183770U (en) | A kind of hydraulic engineering slope protection net fixing piece | |
CN205840903U (en) | Temporary support device is visited before a kind of overlength | |
CN214356750U (en) | Unmanned aerial vehicle recovery unit | |
CN202099747U (en) | Main girder suspension device for downlink-type hanging basket and downlink-type hanging basket adopting same | |
CN101457516B (en) | Multilayer horizontal stay fixing method | |
CN203065046U (en) | Self-stabilizing double-rocker-arm lifting device for installation of high-rise tower | |
CN105752843A (en) | Anti-shake gantry crane | |
CN204919525U (en) | Strong machine that rams and combination formula top arm frame structure thereof | |
CN111706060A (en) | Steel wire rope inclined-pulling type hanging basket device | |
CN206426873U (en) | A kind of high headroom section contact net cantilever beam of urban track traffic | |
CN220519974U (en) | Tensioning jack supporting device | |
CN101798798A (en) | Special catwalk hung with multilayer horizontal inhaul cables | |
CN208105052U (en) | A kind of lifting-up support for highway bridge | |
CN220643884U (en) | Stay cable primary tensioning construction platform on large-section cantilever filling bridge fabrication machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 410100 No. 88 East 7 Line, Changsha Economic and Technological Development Zone, Hunan Province Patentee after: China Railway Construction Heavy Industry Co.,Ltd. Address before: 410100 88 East seven road, Changsha economic and Technological Development Zone, Hunan Patentee before: China Railway Construction Heavy Industry Co.,Ltd. |