CN208456172U - For building the protection channel in place - Google Patents

For building the protection channel in place Download PDF

Info

Publication number
CN208456172U
CN208456172U CN201821075553.3U CN201821075553U CN208456172U CN 208456172 U CN208456172 U CN 208456172U CN 201821075553 U CN201821075553 U CN 201821075553U CN 208456172 U CN208456172 U CN 208456172U
Authority
CN
China
Prior art keywords
lateral plate
support
components
plate component
length
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821075553.3U
Other languages
Chinese (zh)
Inventor
刘洋
刘沁杰
唐雪俊
陈风驰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Jinhu Construction Engineering Co Ltd
Original Assignee
Hubei Jinhu Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Jinhu Construction Engineering Co Ltd filed Critical Hubei Jinhu Construction Engineering Co Ltd
Priority to CN201821075553.3U priority Critical patent/CN208456172U/en
Application granted granted Critical
Publication of CN208456172U publication Critical patent/CN208456172U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model provides the protection channel for building place, comprising: two lateral plate components arranged in parallel, be arranged between two lateral plate components and two support components arranged up and down and the buffer subsystem being laid at the top of two lateral plate components, the opposite side of two lateral plate components are respectively equipped with connector;Support component includes that the support rod mechanism that is multiple horizontally disposed and being located at sustained height being fixedly connected between two lateral plate components and the support plate mechanism being laid on above support rod mechanism, the length of support plate mechanism are consistent with the length of two lateral plate components;The length of buffer subsystem is not less than the length of lateral plate component, and the distance between its width and two lateral plate components match, and buffer subsystem is fixed on the top of lateral plate component by retaining mechanism.The utility model can buffer pendant object by buffer subsystem, and the support component on top then can further stop pendant object after buffering, and by double protection, pedestrains safety has been effectively ensured.

Description

For building the protection channel in place
Technical field
The utility model relates to the construction place in construction facility field, more particularly, to guarantee pedestrains safety is logical Road.
Background technique
Site safety channel is common protective equipment during construction project carries out, and the building site of construction project is arranged in On, for temporarily passing through building site for pedestrian or entering building site for worker or material, and peace is provided for pedestrian or worker Full protection, to avoid falling object from high altitude etc. surprisingly occurs and causes safety accident.
Notification number is that the patent document of CN207296478U discloses a kind of working exit passageway in construction site, is wrapped Stair ontology is included, the left and right side of the stair ontology has been respectively fixedly connected with the first connecting plate and the second connecting plate, described First connecting plate and the mutually close side of the second connecting plate are fixedly connected with U-board, and are plugged with installation between two U-boards Plate, opens up at the top of the mounting plate fluted, and the bottom of the groove inner wall is fixedly connected with cushion, passes through setting installation Plate, groove and cushion buffer the mud-rock flow and sandstone of whereabouts, to protect the personnel safety inside exit passageway. However, its shortcoming is that, due to having opened up multiple grooves on the mounting plate at the top of it, the intensity of mounting plate will necessarily be weakened, led Cause the protective performance decline of mounting plate;And cushion is installed only in groove, then and other are fitted without the position of cushion then There is no buffer function, cause its cushion performance limited, therefore the protective performance of above-mentioned exit passageway is extremely limited.
Utility model content
For the deficiency in the presence of the prior art, the utility model provides the protection channel for building place, Solve the problems, such as that buffer function deficiency of the existing technology and safeguard function are limited.
To achieve the above object, the utility model uses the following technical solution:
For building the protection channel in place comprising:
Lateral plate component, the lateral plate component are two and are set in parallel to each other, opposite the one of described two lateral plate components Side is respectively equipped with connector, and the top both ends of the lateral plate component further respectively have retaining mechanism;
It is arranged between two lateral plate components and two support components arranged up and down, the support component includes fixed connect It connects the support rod mechanism that is multiple horizontally disposed and being located at sustained height between two lateral plate components and is laid on support rod The length of support plate mechanism above mechanism, the support plate mechanism is consistent with the length of two lateral plate components;
The buffer subsystem being laid at the top of two lateral plate components, the length of the buffer subsystem are not less than the length of lateral plate component, And the distance between its width and two lateral plate components match, the buffer subsystem is fixed on lateral plate component by retaining mechanism Top.
Compared with the prior art, the utility model has the following beneficial effects: passing through two lateral plate components and two supports Component constitutes the channel of both ends open, and buffer subsystem is laid at the top of lateral plate component by retaining mechanism, can pendant object to larger part Buffered, meanwhile, the support component of middle and upper part can also be used in secondary protection, thus guarantee channel entirety protective performance and The safety of pedestrian;In addition, the support component of lower part then can also be used to support pedestrian's walking, to play the role of water proof anti-soil.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the partial enlarged view of part A in Fig. 1.
Fig. 3 is the partial enlarged view of part B in Fig. 1.
Specific embodiment
The technical solution in the utility model is further illustrated with reference to the accompanying drawings and embodiments.
As shown in Figure 1, the utility model proposes the protection channels for building place comprising lateral plate component, support Component and buffer subsystem 5, in which:
The lateral plate component is two and is vertically arranged in parallel to each other that the lateral plate component includes mounting plate 11 and is set to The bar shaped mounting base 12 of 11 upper end of mounting plate, 12 lower end surface of mounting base are equipped with the card to match with 11 upper end thickness of mounting plate Slot is simultaneously mounted on 11 top of mounting plate by card slot, and the upper and lower part of the mounting plate 11 and the side wall of mounting base 12 are all provided with There are several mounting holes;As shown in figure 3, the opposite side of described two lateral plate components is respectively equipped with connector, the connector is It is fixed on the corner brace 13 at the both ends of the opposite side of lateral plate component, and the first flat part of the corner brace 13 passes through screw and mounting plate 11 are fixedly connected, and the second flat part of the corner brace 13 is equipped with connecting hole 131, if as shown in Figure 1, when need by dry passage according to It is secondary first successively to put each protection channel when connecting, then it is inserted into two angles of adjacency channel respectively by U-shaped steel muscle 14 In the connecting hole 131 of code 13, can adjacent protection channel be locked and be connected;
As shown in Fig. 2, the top both ends of the lateral plate component further respectively have retaining mechanism, if the retaining mechanism includes It annular preform 22 of the dry tie down screw 21, movable set for being fixedly connected on the top of mounting base 12 on tie down screw 21 and is used for The locking cap 23 of annular preform 22 is locked, there is internal diameter to be greater than the through-hole of 21 diameter of tie down screw simultaneously at 22 center of annular preform It is covered on tie down screw 21 by through-hole, 23 lower end of locking cap is equipped with tapped blind hole 231 and passes through 231 screw thread of tapped blind hole It is connected to the upper end of tie down screw 21, the fin 232 that 23 side wall upper part of locking cap is equipped with evagination turns locking cap 23 to facilitate, The sum of the depth of middle tapped blind hole 231 and the thickness of annular preform 22 are not less than the height of tie down screw 21, it can be achieved that by annular Tabletting 22 is pressed on the upper surface of mounting base 12;Further, since tapped blind hole 231 is arranged in 23 lower end of locking cap, it can avoid Inner inlet and generate corrosion, to guarantee its service life;
The support component is two and between two lateral plate components in arrangement up and down, and the support component includes fixing The support rod mechanisms that are multiple horizontally disposed and being located at sustained height that are connected between two lateral plate components and it is laid on support Support plate mechanism above linkage, the support rod mechanism include that both ends are respectively equipped with externally threaded several connecting rods 31, use In several sleeves 32 for being attached adjacent connecting rod 31 and several pads for being used to be mounted on connecting rod 31 in mounting hole Piece 33 and several nuts 34;It is connected as an entirety due to passing through sleeve 32 between several connecting rods 31, then can be adjusted as needed The distance between two lateral plate components are saved, is realized with this and protection channel width is adjusted, make it have good applicability; The support rod mechanism for being wherein arranged in top is installed to side plate group by the mounting hole of 12 side wall of 11 top of mounting plate and mounting base On part, 12 two sides of mounting base pass through gasket 33 respectively and nut 34 is locked, and then can consolidate mounting base 12 and mounting plate 11 Surely it is connected as an entirety;The support rod mechanism for being arranged in lower section is then directly installed by the mounting hole on mounting plate 11; The length of the support plate mechanism is consistent with the length of two lateral plate components, and wherein it is consistent that multiple length can be used in support plate mechanism Support plate 35 place side by side laying, and the quantity of support plate 35 can be increased and decreased according to the width in channel, bamboo knot can be used in support plate 35 Structure can play further buffer function, while quality is also relatively light since bamboo material has good toughness and intensity;
Flexible material structure such as nylon wire can be used in the buffer subsystem 5, is laid on the top of two lateral plate components, described The length of buffer subsystem 5 is not less than the length of lateral plate component, and the distance between its width and two lateral plate components match, described Buffer subsystem 5 is fixed on the top of lateral plate component by retaining mechanism, specifically, as shown in Fig. 2, can be in the setting on buffer subsystem 5 Perforation passes through tie down screw 21 by the mesh of buffer subsystem 5 itself, and then annular preform 22 is pressed on buffer subsystem 5 again, Finally buffer subsystem 5 is clipped between 22 lower end surface of 12 upper surface of mounting base and annular preform using by the realization of locking cap 23, from And buffer subsystem 5 is fixed, and dismantle and replace also very convenient.
Finally, it is stated that above embodiments are merely intended for describing the technical solutions of the present application, but not for limiting the present application, although ginseng The utility model is described in detail according to preferred embodiment, those skilled in the art should understand that, it can be to this The technical solution of utility model is modified or replaced equivalently, without departing from the objective and model of technical solutions of the utility model It encloses, should all cover in the scope of the claims of the utility model.

Claims (5)

1. the protection channel for building place characterized by comprising
Lateral plate component, the lateral plate component are two and are set in parallel to each other that the opposite side of described two lateral plate components is divided Not She You connector, the top both ends of the lateral plate component further respectively have retaining mechanism;
It is arranged between two lateral plate components and two support components arranged up and down, the support component includes being fixedly connected on Support rod mechanisms that are multiple horizontally disposed and being located at sustained height between two lateral plate components and it is laid on support rod mechanism The length of the support plate mechanism of top, the support plate mechanism is consistent with the length of two lateral plate components;
The buffer subsystem being laid at the top of two lateral plate components, the length of the buffer subsystem are not less than the length of lateral plate component, and its The distance between width and two lateral plate components match, and the buffer subsystem is fixed on the upper of lateral plate component by retaining mechanism Side.
2. as described in claim 1 for building the protection channel in place, it is characterised in that: the retaining mechanism includes several It is fixedly connected on annular preform of the tie down screw, movable set at the top of lateral plate component on tie down screw and for locking annular The locking cap of tabletting, the annular preform center, which has through-hole of the internal diameter greater than tie down screw diameter and covered by through-hole, is locking On screw rod, the locking cap lower end is equipped with tapped blind hole and is threaded in the upper end of tie down screw by tapped blind hole, to It is realized by locking cap and buffer subsystem is clipped between lateral plate component upper surface and annular preform lower end surface.
3. as described in claim 1 for building the protection channel in place, it is characterised in that: the lateral plate component includes installation Plate and bar shaped mounting base set on mounting plate upper end, the mounting base lower end surface are equipped with the card to match with mounting plate upper end thickness Slot is simultaneously mounted at the top of mounting plate by card slot, and the retaining mechanism is set to mounting base upper surface.
4. as described in claim 1 for building the protection channel in place, it is characterised in that: if the lateral plate component is equipped with Dry mounting hole, the support rod mechanism include both ends be respectively equipped with externally threaded several connecting rods, for by adjacent connecting rod into Several sleeves that row connects and several gaskets and several nuts for being mounted on connecting rod in mounting hole.
5. as described in claim 1 for building the protection channel in place, it is characterised in that: the connector is to be fixed on side The corner brace at the both ends of the opposite side of board group part, and the first flat part of the corner brace is fixedly connected by bolt with lateral plate component, Second flat part of the corner brace is equipped with connecting hole.
CN201821075553.3U 2018-07-09 2018-07-09 For building the protection channel in place Expired - Fee Related CN208456172U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821075553.3U CN208456172U (en) 2018-07-09 2018-07-09 For building the protection channel in place

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821075553.3U CN208456172U (en) 2018-07-09 2018-07-09 For building the protection channel in place

Publications (1)

Publication Number Publication Date
CN208456172U true CN208456172U (en) 2019-02-01

Family

ID=65171155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821075553.3U Expired - Fee Related CN208456172U (en) 2018-07-09 2018-07-09 For building the protection channel in place

Country Status (1)

Country Link
CN (1) CN208456172U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852064A (en) * 2020-06-24 2020-10-30 深圳龙源精造建设集团有限公司 Movable lifting type closed channel enclosure for interior decoration and reconstruction project
CN112009618A (en) * 2020-08-27 2020-12-01 上海外高桥造船有限公司 Anti-skid cargo compartment area structure gap bridge platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852064A (en) * 2020-06-24 2020-10-30 深圳龙源精造建设集团有限公司 Movable lifting type closed channel enclosure for interior decoration and reconstruction project
CN112009618A (en) * 2020-08-27 2020-12-01 上海外高桥造船有限公司 Anti-skid cargo compartment area structure gap bridge platform
CN112009618B (en) * 2020-08-27 2021-12-17 上海外高桥造船有限公司 Anti-skid cargo compartment area structure gap bridge platform

Similar Documents

Publication Publication Date Title
CN208456172U (en) For building the protection channel in place
CH697825B1 (en) Collecting fence for avalanches rock or felling.
DE202010016190U1 (en) Disc railings
EP2423409A1 (en) Protective wall
CN201567844U (en) Protective guard for building construction
EP3234271A1 (en) Railing system
CN107339012A (en) A kind of high construction enclosing of security performance
CN205637555U (en) A fixing device for coiling detain external safety net of formula scaffold frame
CN205804171U (en) A kind of overpass guard rail with steel wire rope fastening piece
CN205908105U (en) Electric power facility rail guard
CN209413422U (en) A kind of anti-climbing formula guardrail net
CN205024700U (en) Follow -on flexible passive protection net
CN205188845U (en) Three -dimensional pulling wind sand prevention device
CN211229809U (en) Building guardrail for civil engineering
DE202012004135U1 (en) Snow guard device for a roof structure with solar modules, in particular with photovoltaic modules
CN205444474U (en) Lightweight steel wall body and concrete foundation's mounting structure
DE102012022255B4 (en) Frame for mounting devices on a flat roof
CN207974620U (en) A kind of gardens protective fence convenient for assembling
CN211622563U (en) Rail guard is used in construction for high-rise building engineering
CN206205475U (en) A kind of vertical opening protective device of shear wall structure
CN205637798U (en) Can improve stand iron tower foot of stationarity of climbing person
CN206267019U (en) A kind of bridge for preventing pedestrian from falling protects fence
CN205529885U (en) Rail guard for bridge engineering of angularly adjustable
CN215443430U (en) Adjustable protective fence
CN217201783U (en) Tower crane passageway device with adjustable assembled

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190201

Termination date: 20190709

CF01 Termination of patent right due to non-payment of annual fee