CN208456108U - Body flexible connection of building a wall after a kind of seismic crack pours mold - Google Patents

Body flexible connection of building a wall after a kind of seismic crack pours mold Download PDF

Info

Publication number
CN208456108U
CN208456108U CN201821043368.6U CN201821043368U CN208456108U CN 208456108 U CN208456108 U CN 208456108U CN 201821043368 U CN201821043368 U CN 201821043368U CN 208456108 U CN208456108 U CN 208456108U
Authority
CN
China
Prior art keywords
die
mould plate
flexible connection
wall
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821043368.6U
Other languages
Chinese (zh)
Inventor
吴昌辉
白长海
龚连刚
贾强
廖琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Juneng Construction Group Sichuan Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821043368.6U priority Critical patent/CN208456108U/en
Application granted granted Critical
Publication of CN208456108U publication Critical patent/CN208456108U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses building a wall after a kind of seismic crack, body flexible connection pours mold, including the first Die and mould plate and the second Die and mould plate, the equal movable sleeve of the four corners of first Die and mould plate and the second Die and mould plate is connected to connecting rod, the both ends of connecting rod are threaded with fastening nut, and the top performance of the first Die and mould plate pours pipe by fixed be communicated with of bearing.Body of building a wall after seismic crack flexible connection pours mold, top performance by the way that the first Die and mould plate is arranged pours pipe by fixed be communicated with of bearing, reach and has poured without dead angle to pouring mouth and carry out 360 degree rotation, it can effectively avoid and pour the problem of mouth is limited by headspace, sealing leather washer simultaneously can effectively prevent concrete to enter the problem of Bearing inner is gone, so that it is simple and practical to have the characteristics that flexible connection pours mold.

Description

Body flexible connection of building a wall after a kind of seismic crack pours mold
Technical field
The utility model relates to technical field of buildings, more specifically, it relates to body flexibility of building a wall after a kind of seismic crack Connection pours mold.
Background technique
The wall of frame structure is filling wall, rises and goes along with sb. to guard him and compartmentation, weight are undertaken by beam column, fills wall not load-bearing. Frame structure divides pure frame and half frame, and pure frame does not have load bearing wall, and half frame has load bearing wall.Volume calculates: filling wall is by setting It counts illustrated dimensions in terms of volume, deducts door-window opening area and beam includes volume shared by (lintel, collar tie beam, outrigger).
During block filling wall sets up defences structural measure of the column degree more than or equal to 8 degree after at present, wall must be used with main structure Flexible connection, it is most of in flexible connection all to use concreting, but when rear blocks is filled wall top portion and poured, due to by The space at top limits, and casting space often only has 6cm or so, concrete according to common casting method be difficult to pour into It goes.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide body of building a wall after a kind of seismic crack is soft Property connection pour mold, have the characteristics that be flexibly connected that pour mold simple and practical.
To achieve the above object, the utility model provides following technical solution:
Body flexible connection of building a wall after a kind of seismic crack pours mold, including the first Die and mould plate and the second Die and mould plate, and first The equal movable sleeve of the four corners of Die and mould plate and the second Die and mould plate is connected to connecting rod, and the both ends of connecting rod are threaded with fastening spiral shell The top performance of mother, the first Die and mould plate pour pipe by fixed be communicated with of bearing.
Further, the inner surface fixing sleeve for pouring pipe close to the first Die and mould plate is connected to sealing leather washer.
In conclusion the utility model has the following beneficial effects:
1, it is communicated with by bearing fixation by the way that the top performance of the first Die and mould plate is arranged and pours pipe, reached to pouring mouth 360 degree rotation pouring without dead angle is carried out, can effectively avoid and pour the problem of mouth is limited by headspace, while sealing leather washer Concrete can be effectively prevent to enter the problem of Bearing inner is gone, to have flexible connection to pour the simple and practical spy of mold Point.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model.
In figure: 1, the first Die and mould plate;2, the second Die and mould plate;3, connecting rod;4, fastening nut;5, pipe is poured;6, skin is sealed Washer.
Specific embodiment
Embodiment:
The utility model is described in further detail below in conjunction with attached drawing 1.
Body flexible connection of building a wall after a kind of seismic crack pours mold, as shown in Figure 1, including the first Die and mould plate 1 and second The equal movable sleeve of four corners of Die and mould plate 2, the first Die and mould plate 1 and the second Die and mould plate 2 is connected to connecting rod 3, the equal spiral shell in the both ends of connecting rod 3 Line is connected with fastening nut 4, and the top performance of the first Die and mould plate 1 pours pipe 5 by fixed be communicated with of bearing, it is close to pour pipe 5 The inner surface fixing sleeve of first Die and mould plate 1 is connected to sealing leather washer 6, and the top performance by the way that the first Die and mould plate 1 is arranged passes through Fixed be communicated with of bearing pours pipe 5, has reached and has been poured without dead angle to pouring mouth and carry out 360 degree rotation, can effectively avoid and pour The problem of mouth is limited by headspace, while sealing leather washer 6 can effectively prevent concrete to enter the problem of Bearing inner is gone, To have the characteristics that it is simple and practical that flexible connection pours mold.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (2)

1. a kind of body of building a wall after seismic crack flexible connection pours mold, including the first Die and mould plate (1) and the second Die and mould plate (2), It is characterized by: the equal movable sleeve of four corners of first Die and mould plate (1) and the second Die and mould plate (2) is connected to connecting rod (3), it is described The both ends of connecting rod (3) are threaded with fastening nut (4), and the top performance of first Die and mould plate (1) is solid by bearing Surely it is communicated with and pours pipe (5).
2. body of building a wall after seismic crack according to claim 1 flexible connection pours mold, it is characterised in that: described to pour Inner surface fixing sleeve of the pipe (5) close to the first Die and mould plate (1) is connected to sealing leather washer (6).
CN201821043368.6U 2018-07-03 2018-07-03 Body flexible connection of building a wall after a kind of seismic crack pours mold Expired - Fee Related CN208456108U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821043368.6U CN208456108U (en) 2018-07-03 2018-07-03 Body flexible connection of building a wall after a kind of seismic crack pours mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821043368.6U CN208456108U (en) 2018-07-03 2018-07-03 Body flexible connection of building a wall after a kind of seismic crack pours mold

Publications (1)

Publication Number Publication Date
CN208456108U true CN208456108U (en) 2019-02-01

Family

ID=65171673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821043368.6U Expired - Fee Related CN208456108U (en) 2018-07-03 2018-07-03 Body flexible connection of building a wall after a kind of seismic crack pours mold

Country Status (1)

Country Link
CN (1) CN208456108U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113685027A (en) * 2021-09-02 2021-11-23 天蓬智慧建造(广东)科技有限公司 Pouring opening sealing device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113685027A (en) * 2021-09-02 2021-11-23 天蓬智慧建造(广东)科技有限公司 Pouring opening sealing device

Similar Documents

Publication Publication Date Title
CN206174120U (en) Prefabricated constructional column and structure thereof
CN107724533A (en) A kind of Super High Core Walls Structure beam and vertical structure connection method
CN208456108U (en) Body flexible connection of building a wall after a kind of seismic crack pours mold
CN104931338B (en) The fixing device and its making and use method of arbitrarily angled rebound test concrete test block
CN208830716U (en) A kind of concrete frame trestle pouring construction system
CN108612224A (en) Exposed inversion reinforcing bar grout sleeve concrete shear force wall and construction method
CN208343121U (en) Prefabricated assembled steel structure concrete wallboard mould
CN104911999B (en) Buried anchor construction method
CN207847399U (en) A kind of window construction of house
CN107975152A (en) The ductility connecting structure and construction method of first floor vertical member and basement roof
CN209652990U (en) The antiseepage plugging structure of the hole for hoist of basement computer room
CN209509482U (en) A kind of indoor wall formwork for placing preventing deformation
CN103321413A (en) Bolt sleeve and waterproof through-wall bolt device for formwork support
CN207079913U (en) A kind of structure for preventing cast-in-place vertical member bottom spillage
CN205954706U (en) Processing apparatus of super dark underground garage wall body construction joint
CN105401725B (en) Construction technology with soft sandwich concrete doubly-linked beam
CN207846677U (en) The ductility connecting structure of first floor vertical member and basement roof
CN207513167U (en) Convex template component and concave template component of arc building and template system formed by convex template component and concave template component
CN209521041U (en) A kind of dismountable external wall pours mold
CN207647181U (en) A kind of wall hangs mould template reinforcing device
CN208830582U (en) A kind of secondary structure PCization construction masonry
CN209228032U (en) Regularization formwork inside-corner reinforcing device
CN208563755U (en) A kind of precast hollow constructional column for wall connecting
CN208604640U (en) A kind of quick construction structure of post-pouring belt of outer wall
CN208379644U (en) A kind of post-cast strip built for basement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200508

Address after: 610000 building 3, no.239, Guangfu Road, Qingyang District, Chengdu City, Sichuan Province

Patentee after: CHONGQING JUNENG CONSTRUCTION GROUP SICHUAN Co.,Ltd.

Address before: 610000 Chengfei Avenue, Qingyang District, Chengdu City, Sichuan Province

Co-patentee before: Jia Qiang

Patentee before: Liao Lin

Co-patentee before: Wu Changhui

Co-patentee before: Bai Changhai

Co-patentee before: Gong Liangang

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190201

Termination date: 20210703

CF01 Termination of patent right due to non-payment of annual fee