CN208830716U - A concrete frame column pouring construction system - Google Patents

A concrete frame column pouring construction system Download PDF

Info

Publication number
CN208830716U
CN208830716U CN201821481871.XU CN201821481871U CN208830716U CN 208830716 U CN208830716 U CN 208830716U CN 201821481871 U CN201821481871 U CN 201821481871U CN 208830716 U CN208830716 U CN 208830716U
Authority
CN
China
Prior art keywords
template
square steel
sealing plate
concrete
construction system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821481871.XU
Other languages
Chinese (zh)
Inventor
李志慧
苏小东
李家新
葛争光
刘广
吴红伦
吕豪
张敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No7 Building Engineering Co Ltd Beijing Urban Construction Group
Original Assignee
No7 Building Engineering Co Ltd Beijing Urban Construction Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No7 Building Engineering Co Ltd Beijing Urban Construction Group filed Critical No7 Building Engineering Co Ltd Beijing Urban Construction Group
Priority to CN201821481871.XU priority Critical patent/CN208830716U/en
Application granted granted Critical
Publication of CN208830716U publication Critical patent/CN208830716U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本实用新型公开了一种混凝土框架柱浇筑施工系统,其包括:模板,钢筋地锚,所述模板内浇筑有混凝土柱,所述模板外侧底部设有海绵条,所述模板下方包裹有由两块匚形方钢管组成的框架,所述方钢管上设有膨胀螺丝;所述模板两端设有多个压紧板,所述压紧板之间设有拉紧螺栓,所述钢筋地锚上连接有斜撑与加固杆,所述斜撑与拉紧螺栓连接,所述方钢管外侧设有固定环,所述加固杆与固定环连接,所述模板上设有振捣口,所述振捣口外安装有密封板。在本实用新型的上述实施例中,可有效预防混凝土柱的漏浆、位移、涨模等质量通病,支撑性好,操作简单,节省返工、返修费用,且可对混凝土柱进行振捣,提高其强度。

The utility model discloses a concrete frame column pouring construction system, which comprises: a template and a steel anchorage; a concrete column is poured in the template; a sponge strip is arranged at the bottom of the outer side of the template; The frame is composed of block-shaped square steel pipes, and the square steel pipes are provided with expansion screws; the two ends of the formwork are provided with a plurality of compression plates, and tension bolts are arranged between the compression plates, and the reinforced ground anchors A diagonal bracing and a reinforcing rod are connected to the upper part, the diagonal bracing is connected with a tension bolt, a fixing ring is arranged on the outside of the square steel pipe, the reinforcing rod is connected with the fixing ring, a vibrating port is arranged on the template, and the A sealing plate is installed outside the vibrating port. In the above-mentioned embodiments of the present utility model, the common quality problems such as slurry leakage, displacement, and expansion of the concrete column can be effectively prevented, the support is good, the operation is simple, the cost of rework and repair is saved, and the concrete column can be vibrated to improve the performance. its strength.

Description

A kind of concrete frame trestle pouring construction system
Technical field
The utility model belongs to concrete column mould plate technique field, more particularly to a kind of concrete frame trestle pouring construction System.
Background technique
Concrete column template is a kind of temporary supporting structure, makes by design requirement, makes concrete structure by defined Position, geometric dimension molding, keep its correct position, and bear the external load of building template own wt and effect on it Lotus.
There are plank sheathing, aluminum alloy pattern plate, steel form in the common template of current building trade, especially highly super to frame column When crossing 3 meters of frame column construction, aluminum alloy pattern plate and steel form bottom are not done generally between independent processing template and structure there are gap, There is a situation where spillage, displacement it is more universal, and plank sheathing not only easily occur spillage, be displaced and be easy to happen the mould phenomenon that rises, influence Surface Quality of Concrete, and cause to do over again, reprocess and increase engineering cost.
In conclusion problem of the prior art is: often there is phenomena such as spillage, the mould that rises, displacement in frame column, influences concrete Presentation quality, and cause to do over again, reprocess and increase engineering cost.
Utility model content
The purpose of the utility model is to provide a kind of concrete frame trestle pouring construction systems, often occur with solution framework column Phenomena such as spillage, the mould that rises, displacement, Surface Quality of Concrete is influenced, and the technology for doing over again, reprocessing and increasing engineering cost is caused to ask Topic.
The technical solution that the utility model solves above-mentioned technical problem is as follows: a kind of concrete frame trestle pouring construction system System comprising: template, reinforcing bar earth anchor have poured concrete column in the template, and the template exterior bottom is equipped with sponge strip, The frame being made of two pieces of Contraband shape square steel tubes is enclosed with below the template, the square steel tube is equipped with setscrew, described swollen Swollen screw is installed in construction surface;The template both ends are equipped with multiple pressure plates, are equipped with turnbuckle, institute between the pressure plate It states and is connected with diagonal brace and reinforcing bar on reinforcing bar earth anchor, the diagonal brace is connect with turnbuckle, is equipped with and is fixed on the outside of the square steel tube Ring, the reinforcing bar are connect with fixed ring, and the template is equipped with the mouth that vibrates, and are equipped with sealing plate outside the mouth that vibrates.
For example above-mentioned concrete frame trestle pouring construction system of the utility model, further, the diagonal brace are equipped with two, institute State diagonal brace respectively at top, the turnbuckle of middle connect.
For example above-mentioned concrete frame trestle pouring construction system of the utility model, further, the pressure plate length is greater than Template corresponds to two sides between pressure plate and installs turnbuckle, and the turnbuckle is close to template.
For example above-mentioned concrete frame trestle pouring construction system of the utility model, further, the mouth that vibrates is located at template Sealing plate is installed by shaft in middle, mouthful left end of vibrating, and the sealing plate is slightly less than the mouth that vibrates, the sealing plate surrounding Equipped with seal rubber, snap ring is equipped with by shaft on the right side of the sealing plate, the template is equipped with card in fixed ring corresponding position Block, the fixed ring and fixture block are clamped.
For example above-mentioned concrete frame trestle pouring construction system of the utility model is further through on the square steel tube 4-9 bolt hole, the setscrew pass through bolt hole and are installed in construction surface, and the frame of square steel tube composition is by template top Hard-pressed bale is wrapped up in, and the reinforcing bar holds out against square steel tube.
The beneficial effects of the utility model are: by square steel tube, diagonal brace and adding in the above embodiments of the present invention Solid rod is reinforced, and cooperation sponge strip can effectively prevent the spillage of concrete column, be displaced, the common quality defects such as the mould that rises, and supportive is good, Easy to operate, saving does over again, reprocesses expense;And can be vibrated to concrete column by the mouth that vibrates, largely reduce coagulation Phenomena such as voids and pits of earth pillar, improves its intensity.
Detailed description of the invention
By made detailed description in conjunction with the following drawings, the above-mentioned and/or otherwise advantage of the utility model will It becomes more apparent upon and is easier to understand, these attached drawings are only schematical, are not intended to limit the utility model, in which:
Fig. 1 is a kind of concrete frame trestle pouring construction system schematic of embodiment of the utility model;
Fig. 2 is a kind of concrete column of embodiment, template, the connection schematic diagram of setscrew, square steel tube.
In attached drawing, parts list represented by the reference numerals are as follows:
1, concrete column;2, template;3, pressure plate;4, turnbuckle;5, diagonal brace;6, vibrate mouth;7, sealing plate;8, block Button;9, setscrew;10, square steel tube;11, sponge strip;12, fixed ring;13, reinforcing bar;14, reinforcing bar earth anchor.
Specific embodiment
Hereinafter, the embodiment of the concrete frame trestle pouring construction system of the utility model is described with reference to the accompanying drawings.
The embodiment recorded herein is the specific specific embodiment of the utility model, for illustrating the utility model Design, be it is explanatory and illustrative, should not be construed as the limit to the utility model embodiment and the scope of the utility model System.In addition to the embodiment recorded herein, those skilled in the art can also be public based on the claim of this application book and specification institute For the content opened using obvious other technical solutions, these technical solutions include using doing to the embodiment recorded herein The technical solution of any obvious substitutions and modifications out.
The attached drawing of this specification is schematic diagram, aids in illustrating the design of the utility model, it is schematically indicated each section Shape and its correlation.It note that for the ease of clearly showing the structure of each component of the utility model embodiment, respectively It is not drawn according to identical ratio between attached drawing.Identical reference marker is for indicating identical part.
Fig. 1 and concrete frame trestle pouring construction system Fig. 2 shows a kind of embodiment of the utility model comprising: mould Plate 2, reinforcing bar earth anchor 14 have poured concrete column 1 in template 2, and 2 exterior bottom of template is equipped with sponge strip 11, wraps up below template 2 By the frame being made of two pieces of Contraband shape square steel tubes 10, square steel tube 10 is equipped with setscrew 9, and setscrew 9 is installed to construction surface It is interior;2 both ends of template are equipped with multiple pressure plates 3, and turnbuckle 4 is equipped between pressure plate 3, is connected with diagonal brace 5 on reinforcing bar earth anchor 14 With reinforcing bar 13, diagonal brace 5 is connect with turnbuckle 4, and fixed ring 12 is equipped on the outside of square steel tube 10, and reinforcing bar 13 and fixed ring 12 connect It connects, template 2 is equipped with the mouth 6 that vibrates, and sealing plate 7 is equipped with outside the mouth 6 that vibrates.
In the utility model above-described embodiment, diagonal brace 5 be equipped with two, diagonal brace 5 respectively at top, the tension spiral shell of middle Bolt 4 connects.
In the utility model above-described embodiment, 3 length of pressure plate is greater than template 2, two sides installation between corresponding pressure plate 3 Turnbuckle 4, turnbuckle 4 are close to template 2.
In the utility model above-described embodiment, the mouth 6 that vibrates is located at 2 middle of template, and 6 left end of mouth of vibrating is pacified by shaft Sealing plate 7 is filled, sealing plate 7 is slightly less than the mouth 6 that vibrates, such as sealing board size ratio mouthful all directions size of vibrating distinguishes a small 2-5mm; Sealing plate 7 is surrounded by seal rubber, is equipped with snap ring by shaft on the right side of sealing plate 7, template 2 is equipped in snap ring corresponding position Fixture block, snap ring and fixture block are clamped.
In the utility model above-described embodiment, 4-9 bolt hole is through on square steel tube 10, setscrew 9 passes through spiral shell Keyhole is installed in construction surface, and 10 length and width specification of square steel tube is 100*100mm, and with a thickness of 3mm, the frame that square steel tube 10 forms will Template 2 holds out against package, and reinforcing bar 13 holds out against square steel tube 10.
It uses principle and process: setting sponge strip 11 around below the template 2, can largely reduce column root spillage situation hair It is raw, multiple pressure plates 3 are set on the outside of template 2, are fastened in 3 two sides of pressure plate by turnbuckle 4, and turnbuckle 4 is tight Mold plate 2, forms frame by two Contraband shape square steel tubes 10 and holds out against template 2, and setscrew 9 is passed through the bolt on square steel tube 10 Hole, and setscrew 9 is mounted in construction surface, avoid column root from being subjected to displacement, rise mould.
Fixed ring 12 is installed on the outside of square steel tube 10, reinforcing bar earth anchor 14 is installed in construction surface, is connected by reinforcing bar earth anchor 14 Connect two diagonal braces 5 and a reinforcing bar 13, by two diagonal braces 5 respectively at top, the turnbuckle 9 of middle be attached, it is right The whole further support of template 2, is connected and fixed ring 12 for reinforcing bar 13, reinforcing bar 13 is made to hold out against square steel tube 10, further other side Steel pipe 10 is reinforced.
After pouring half concrete in template 2, it can vibrate, subtract in the 6 pairs of concrete of mouth that vibrate of 2 middle of template Phenomena such as voids and pits of few concrete column, its intensity is improved, sealing plate 7 is closed after vibrating, and buckle 8 is clamped with fixture block, Cooperate the seal rubber around sealing plate 7, can prevent concrete from running out of at vibrate mouth 6 and 7 connection gap of sealing plate, then again Concreting is carried out to the top half in template 2.
Each technical characteristic of above-mentioned disclosure is not limited to disclosed and other feature combination, and those skilled in the art are also Other combinations between each technical characteristic can be carried out according to the purpose of invention, be subject to the purpose for realizing the utility model.

Claims (5)

1.一种混凝土框架柱浇筑施工系统,其特征在于,包括:模板,钢筋地锚,所述模板内浇筑有混凝土柱,所述模板外侧底部设有海绵条,所述模板下方包裹有由两块匚形方钢管组成的框架,所述方钢管上设有膨胀螺丝,所述膨胀螺丝安装到施工面内;所述模板两端设有多个压紧板,所述压紧板之间设有拉紧螺栓,所述钢筋地锚上连接有斜撑与加固杆,所述斜撑与拉紧螺栓连接,所述方钢管外侧设有固定环,所述加固杆与固定环连接,所述模板上设有振捣口,所述振捣口外安装有密封板。1. A concrete frame column pouring construction system is characterized in that, comprising: a template, a steel anchor, a concrete column is poured in the template, a sponge strip is provided at the bottom of the outer side of the template, and the lower part of the template is wrapped with two reinforced concrete columns. The frame is composed of block-shaped square steel pipes, the square steel pipes are provided with expansion screws, and the expansion screws are installed in the construction surface; the two ends of the formwork are provided with a plurality of compression plates, and the compression plates are arranged between the compression plates. There are tension bolts, the steel anchors are connected with diagonal braces and reinforcement rods, the diagonal braces are connected with tension bolts, a fixing ring is arranged on the outside of the square steel pipe, the reinforcement rods are connected with the fixing ring, the A vibrating port is arranged on the template, and a sealing plate is installed outside the vibrating port. 2.根据权利要求1所述的混凝土框架柱浇筑施工系统,其特征在于,所述斜撑设有两根,所述斜撑分别与顶处、中间处的拉紧螺栓连接。2 . The concrete frame column pouring construction system according to claim 1 , wherein two diagonal braces are provided, and the diagonal braces are respectively connected with the tension bolts at the top and the middle. 3 . 3.根据权利要求1所述的混凝土框架柱浇筑施工系统,其特征在于,所述压紧板长度大于模板,对应压紧板之间两侧安装拉紧螺栓,所述拉紧螺栓紧贴模板。3 . The concrete frame column pouring construction system according to claim 1 , wherein the length of the compression plate is greater than that of the template, and tension bolts are installed on both sides between the corresponding compression plates, and the tension bolts are closely attached to the template. 4 . . 4.根据权利要求1所述的混凝土框架柱浇筑施工系统,其特征在于,所述振捣口位于模板中间处,所述振捣口左端通过转轴安装密封板,所述密封板略小于振捣口,所述密封板四周设有密封橡胶,所述密封板右侧通过转轴安装有卡环,所述模板在固定环对应位置设有卡块,所述固定环与卡块卡接。4. The concrete frame column pouring construction system according to claim 1, wherein the vibrating port is located in the middle of the formwork, and the left end of the vibrating port is installed with a sealing plate through the rotating shaft, and the sealing plate is slightly smaller than the vibrating port. The sealing plate is provided with sealing rubber around the sealing plate, a snap ring is installed on the right side of the sealing plate through the rotating shaft, and the template is provided with a snap block at the corresponding position of the fixed ring, and the fixed ring is snapped with the snap block. 5.根据权利要求1所述的混凝土框架柱浇筑施工系统,其特征在于,所述方钢管上贯通有4-9个螺栓孔,所述膨胀螺丝穿过螺栓孔安装到施工面内,所述方钢管组成的框架将模板顶紧包裹,所述加固杆将方钢管顶紧。5 . The concrete frame column pouring construction system according to claim 1 , wherein 4-9 bolt holes pass through the square steel pipe, and the expansion screws are installed into the construction surface through the bolt holes. 6 . The frame composed of square steel pipes tightly wraps the formwork, and the reinforcing rods hold the square steel pipes tightly.
CN201821481871.XU 2018-09-11 2018-09-11 A concrete frame column pouring construction system Expired - Fee Related CN208830716U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821481871.XU CN208830716U (en) 2018-09-11 2018-09-11 A concrete frame column pouring construction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821481871.XU CN208830716U (en) 2018-09-11 2018-09-11 A concrete frame column pouring construction system

Publications (1)

Publication Number Publication Date
CN208830716U true CN208830716U (en) 2019-05-07

Family

ID=66312807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821481871.XU Expired - Fee Related CN208830716U (en) 2018-09-11 2018-09-11 A concrete frame column pouring construction system

Country Status (1)

Country Link
CN (1) CN208830716U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110344587A (en) * 2019-07-08 2019-10-18 江苏旺材科技有限公司 Mold device is sealed needed for a kind of root slip casting of assembling frame column
CN110552347A (en) * 2019-10-14 2019-12-10 中国电建集团贵州工程有限公司 Pile foundation construction template tool
CN110761554A (en) * 2019-10-24 2020-02-07 北京城建集团有限责任公司 Concrete ultrahigh column pouring construction method
CN116950395A (en) * 2023-08-01 2023-10-27 浙江长锦建设有限公司 A kind of house construction frame column formwork reinforcement device
CN117145209A (en) * 2023-09-07 2023-12-01 中国建筑第四工程局有限公司 Construction structure and construction method for plugging aluminum mould wall root

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110344587A (en) * 2019-07-08 2019-10-18 江苏旺材科技有限公司 Mold device is sealed needed for a kind of root slip casting of assembling frame column
CN110552347A (en) * 2019-10-14 2019-12-10 中国电建集团贵州工程有限公司 Pile foundation construction template tool
CN110761554A (en) * 2019-10-24 2020-02-07 北京城建集团有限责任公司 Concrete ultrahigh column pouring construction method
CN116950395A (en) * 2023-08-01 2023-10-27 浙江长锦建设有限公司 A kind of house construction frame column formwork reinforcement device
CN117145209A (en) * 2023-09-07 2023-12-01 中国建筑第四工程局有限公司 Construction structure and construction method for plugging aluminum mould wall root

Similar Documents

Publication Publication Date Title
CN208830716U (en) A concrete frame column pouring construction system
JP5012355B2 (en) Underwater structure reinforcement method, underwater structure
CN211923525U (en) A composite formwork of structural columns at right-angle corners of walls and the intersections of walls
CN209369031U (en) A prefabricated reinforced concrete frame node connection device
CN110509396A (en) A kind of production method of superimposed sheet, superimposed sheet production equipment and superimposed sheet
CN218779351U (en) A steel-concrete composite structure prefabricated box culvert
CN106149877B (en) Concrete frame structure prefabricated post and the docking structure and method at beam slab node
CN210289132U (en) Cross-shaped constructional column combined type aluminum alloy template assembly
CN206329032U (en) Template suitable for pouring section after assembled beam-column
CN105951987A (en) Sub-frame post-cast joint with external permanent aluminum plate outer mold
CN107237453A (en) A kind of concrete filled steel tube coupled column
CN103669831B (en) A kind of transformer station's cast-in-situ wall combined steel and construction method thereof
CN209163167U (en) A prefabricated floor connecting node structure
CN207739390U (en) Overlap wall and horizontal member connecting node
CN219099835U (en) A no pull rod hole template device for box culvert wall
CN211447004U (en) Reinforced GRC slab and its combined trench foundation formwork system
CN204455758U (en) Shape-setting clamp formula shuttering supporting leverage
CN115142354A (en) A kind of pre-embedded inner formwork and post-casting construction technology of tie beam for double-pier bridge pouring construction
CN203145461U (en) Reinforcing steel bar drawing wire
CN210797681U (en) Reinforced concrete foundation bearing platform reinforced structure
CN207647181U (en) A kind of wall hangs mould template reinforcing device
CN107386528A (en) Method for making the template free of demolition of beams of concrete and making beams of concrete
CN223410056U (en) Quick end-capping structure of box girder is assembled to festival section
CN222847562U (en) Reinforcing wall column and wall fixing structure
CN214615404U (en) Concrete retaining wall template connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190507