CN208455608U - The anti-floating cage assembly of one kind - Google Patents

The anti-floating cage assembly of one kind Download PDF

Info

Publication number
CN208455608U
CN208455608U CN201820625857.6U CN201820625857U CN208455608U CN 208455608 U CN208455608 U CN 208455608U CN 201820625857 U CN201820625857 U CN 201820625857U CN 208455608 U CN208455608 U CN 208455608U
Authority
CN
China
Prior art keywords
main
flange frame
reinforcement
cage
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820625857.6U
Other languages
Chinese (zh)
Inventor
魏海涛
肖汉
邹超群
齐嘉伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AVIC GEOTECHNICAL ENGINEERING INSTITUTE Co Ltd
Original Assignee
AVIC GEOTECHNICAL ENGINEERING INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AVIC GEOTECHNICAL ENGINEERING INSTITUTE Co Ltd filed Critical AVIC GEOTECHNICAL ENGINEERING INSTITUTE Co Ltd
Priority to CN201820625857.6U priority Critical patent/CN208455608U/en
Application granted granted Critical
Publication of CN208455608U publication Critical patent/CN208455608U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model is a kind of anti-floating cage assembly, the device includes that two main reinforcements (1) are respectively perpendicular in the grid for being symmetrically inserted into flange frame (6) two sides of perfusion platform, spacer bar (2) is horizontally arranged on two main reinforcements (1) to be installed on flange frame (6), for positioning clamping position of two main reinforcements (1) on flange frame (6), the steel pipe (5) of a top seal is connected by welding in the lower end of two main reinforcements (1), and downward opening steel pipe (5) is inserted into the top of steel reinforcement cage main reinforcement (7).The device prevents rising of steel cage using perfusion platform elevating hopper inner concrete self weight.Device production is simple, carries and operation is all very convenient, can accurately fixed steel bars cage location, and it is versatile, can repeatedly use, can effectively prevent rising of steel cage.

Description

The anti-floating cage assembly of one kind
Technical field
The utility model is a kind of anti-floating cage assembly, belongs to technical field of building construction.
Background technique
In construction, often there is the phenomenon that rising of steel cage in perfusion in foundation pile.The in situ face of stake top absolute altitude with Under cast-in-situ bored pile, the case where to avoid the occurrence of rising of steel cage, generally use and spot welding distinguished at several root thickness reinforcing bars both ends Way in steel reinforcement cage cage body and perfusion platform is become using the floating that the concrete gravity in hopper when perfusion pushes down steel reinforcement cage Steel reinforcement cage can be effectively fixed in gesture.But there is also following deficiencies for this method: (1) between the different stake of emptying aperture length often without Method shares material, and stock utilization is low to lead to material cost height;It (2) will be using aperture welding installation bar reinforcement, perfusion before being perfused After need to remove reinforcing bar, process flow complication cause the increase of cost of labor and the reduction of construction efficiency.In consideration of it, mesh Before need to design a kind of anti-floating cage assembly to solve the above problems, provide convenience for pouring construction.
Summary of the invention
The utility model exactly designs in view of the above-mentioned deficiencies in the prior art and provides a kind of anti-floating cage assembly, The purpose is to solve stock utilization present in existing steel reinforcement cage anti-floating system and the low disadvantage of construction efficiency.
The purpose of this utility model is achieved through the following technical solutions:
This kind is prevented floating cage assembly, it is characterised in that: the device is respectively perpendicular symmetrically to be inserted into be perfused including two main reinforcements 1 and put down In the grid of 6 two sides of flange frame of platform, spacer bar 2 is horizontally arranged in two main reinforcements 1 and is installed in flange frame 6, for fixed Clamping position of two main reinforcements 1 in position in flange frame 6, connects a top in the lower end of two main reinforcements 1 by welding The steel pipe 5 of sealing, downward opening steel pipe 5 are inserted into the top of steel reinforcement cage main reinforcement 7.
Main reinforcement 1 is segmentation connection composition, is connected between adjacent two sections by an active joint 3, is had on active joint 3 One hinge joint and a jack, jack are inserted into bolt 4 and lock hinge joint.
Main reinforcement 1 chooses the spiral of 28mm or more, and 2 diameter of spacer bar is less than main reinforcement 1.
It includes flange frame 6, hopper 8 and conduit 9 that platform, which is perfused,.
Compared with currently used anti-floating cage measure, the beneficial effects of the utility model are:
1, materials convenience, is easy to make, and material therefor can gather materials on the spot at the scene or directly purchase, and live can add Work production, it is time-consuming short;
2, operating process is easily understood, strong operability, reduces cost of labor, while improving construction efficiency;
3, versatile, active joint only is adjusted by extracting bolt, that is, is applicable to a variety of emptying aperture length, has saved material Expect cost.
Detailed description of the invention
Fig. 1 is the schematic perspective view of device described in the utility model
Fig. 2 is the structural schematic diagram in device described in the utility model under active joint lock state
Fig. 3 is the structural schematic diagram in device described in the utility model under active joint unlocked state
Fig. 4 is the structural schematic diagram of active joint lock state
Fig. 5 is the structural schematic diagram of active joint unlocked state
Specific embodiment
The utility model is further described below with reference to drawings and examples:
Referring to shown in attached drawing 1~5, this kind is prevented floating cage assembly, it is characterised in that: the device includes that two main reinforcements 1 are hung down respectively It is directly symmetrically inserted into the grid of 6 two sides of flange frame of perfusion platform, the clamping of spacer bar 2 is horizontally arranged in two main reinforcements 1 In flange frame 6, for positioning clamping position of two main reinforcements 1 in flange frame 6, pass through welding in the lower end of two main reinforcements 1 Mode connect the steel pipe 5 of a top seal, downward opening steel pipe 5 is inserted into the top of steel reinforcement cage main reinforcement 7.
Main reinforcement 1 is segmentation connection composition, is connected between adjacent two sections by an active joint 3, is had on active joint 3 One hinge joint and a jack, jack are inserted into bolt 4 and lock hinge joint.
Main reinforcement 1 chooses the spiral of 28mm or more, and 2 diameter of spacer bar is less than main reinforcement 1.
It includes flange frame 6, hopper 8 and conduit 9 that platform, which is perfused,.
Steps are as follows for the use of utility model device:
Step 1: the spiral of two diameter 28mm or more as device main reinforcement 1, is arranged in main reinforcement 1 perpendicular to main reinforcement Spacer bar 2,2 one end of spacer bar is fixed in main reinforcement 1;
Step 2: lockable active joint 3 is arranged in the middle part of main reinforcement 1, the installation number of active joint 3 is according to emptying aperture length It determines, jack is arranged on active joint 3 using being mechanically connected in 3 both ends of active joint and main reinforcement 1, is inserted into jack lock with bolt 4 It is fixed, emptying aperture length is calculated before use, determines main reinforcement length to be used, can extract the bolt 4 on active joint when necessary, is solved Except locking, wouldn't use one section of main reinforcement 1 is flipped to the outside, avoids the normal placement for influencing perfusion platform elevating hopper 8;
Step 3: one section of seamless steel pipe 5 is arranged in 1 bottom end of main reinforcement, 5 internal diameter of steel pipe is greater than steel reinforcement cage main reinforcement 7, and steel pipe 5 is radial Parallel 1 low side of main reinforcement is by being welded to connect, and 5 top of steel pipe is shut with thick iron plate, and steel pipe 5 is opening down;
Step 4: main reinforcement 1 is symmetrically placed, is transferred respectively to bottom end steel pipe 5 and be steadily inserted into 7 top of steel reinforcement cage main reinforcement;
Step 5: rotating main reinforcement 1 when mounting flange frame 6, making parallel 6 grid of flange frame of spacer bar 2, so as to flange frame 6 It is installed in place, then rotates main reinforcement 1, be installed on spacer bar 2 on the grid of flange frame, thus the fixed present apparatus;
Step 6: successively transferring conduit 9, hopper 8, then concrete perfusion.
Step 7: rotating main reinforcement 1 after the completion of perfusion, so that spacer bar 2 is released fixation from flange frame 6, then successively mention Hopper 8, conduit 9 and flange frame 6 are played, finally takes out present apparatus main reinforcement 1.
Above-mentioned anti-floating cage assembly materials convenience, is easy to make, operating process is easily understood, and versatile, only passes through pumping It takes bolt to adjust active joint, that is, is applicable to a variety of emptying aperture length, while reducing material cost and cost of labor, improve Construction efficiency.

Claims (4)

1. a kind of prevent floating cage assembly, it is characterised in that: the device is respectively perpendicular symmetrically to be inserted into be perfused including two main reinforcements (1) and put down In the grid of flange frame (6) two sides of platform, spacer bar (2) is horizontally arranged on two main reinforcements (1) and is installed on flange frame (6) On, for positioning clamping position of two main reinforcements (1) on flange frame (6), pass through the side of welding in the lower end of two main reinforcements (1) Formula connects the steel pipe (5) of a top seal, and downward opening steel pipe (5) is inserted into the top of steel reinforcement cage main reinforcement (7).
2. anti-floating cage assembly according to claim 1, it is characterised in that: main reinforcement (1) is that segmentation connection forms, adjacent two It is connected between section by an active joint (3), has a hinge joint and a jack, jack bolt on active joint (3) (4) insertion locks hinge joint.
3. anti-floating cage assembly according to claim 1, it is characterised in that: main reinforcement (1) chooses the spiral of 28mm or more, Spacer bar (2) diameter is less than main reinforcement (1).
4. anti-floating cage assembly according to claim 1, it is characterised in that: perfusion platform includes flange frame (6), hopper (8) With conduit (9).
CN201820625857.6U 2018-04-27 2018-04-27 The anti-floating cage assembly of one kind Active CN208455608U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820625857.6U CN208455608U (en) 2018-04-27 2018-04-27 The anti-floating cage assembly of one kind

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820625857.6U CN208455608U (en) 2018-04-27 2018-04-27 The anti-floating cage assembly of one kind

Publications (1)

Publication Number Publication Date
CN208455608U true CN208455608U (en) 2019-02-01

Family

ID=65151584

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820625857.6U Active CN208455608U (en) 2018-04-27 2018-04-27 The anti-floating cage assembly of one kind

Country Status (1)

Country Link
CN (1) CN208455608U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622213A (en) * 2020-05-26 2020-09-04 中国十七冶集团有限公司 Bored concrete pile positioner

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622213A (en) * 2020-05-26 2020-09-04 中国十七冶集团有限公司 Bored concrete pile positioner

Similar Documents

Publication Publication Date Title
CN104929148B (en) The upside-down mounting hardened system of generation power foundation of wind power ring group plinth and reinforcement means thereof
CN208455608U (en) The anti-floating cage assembly of one kind
CN106182364A (en) A kind of detachable steel core and the method making pre-stressed concrete hollow beam
CN201411899Y (en) Template structure for tower-silo reinforcement construction
CN205676882U (en) A kind of novel supporting construction
CN208884849U (en) A kind of self-locking reinforcing bar connection grout sleeve
CN206289873U (en) Spacing oblique grout outlet type semi-connection grouting sleeve
CN105464401A (en) One-side support formwork structure for enlarging section and strengthening construction and construction method
CN208701698U (en) A kind of foundation pit recoverable concrete support
CN203320703U (en) Connecting node of reinforced concrete column and newly added steel beam
CN208815540U (en) Deep foundation pit support structure
CN208563658U (en) A kind of prefabricated lattice compound shear wall assembly monomer
CN110468939A (en) A kind of concrete reinforcement for seal for pipe joints junction
CN220927931U (en) Tubular prefabricated bolt hole die
CN209128990U (en) A kind of bolt type detachable steel reinforcement cage hanging steel bar device
CN216238605U (en) Well plugging device for dewatering well
CN205954657U (en) Pile foundation steel reinforcement cage skeleton strutting arrangement
CN110817688A (en) Hoisting device and installation method for prefabricated beam of inclined roof with prefabricated concrete structure
CN220908320U (en) Reinforcing structure of gate embedded part in gate embedded part and culvert gate integrated construction
CN219793944U (en) Structure is handled to foundation ditch lateral wall crack
CN219261090U (en) Prefabricated pipe pile foundation for steam pipeline support
CN214614116U (en) A bearing structure behind wall that leads for underground continuous wall construction
CN214082053U (en) Template fixing device for concrete pipe pile
CN214577071U (en) Formwork structure for reinforcing tunnel lining
CN219344030U (en) Pre-buried opposite-pulling screw device for lining wall