CN208451598U CN201820922832.2U CN201820922832U CN208451598U CN 208451598 U CN208451598 U CN 208451598U CN 201820922832 U CN201820922832 U CN 201820922832U CN 208451598 U CN208451598 U CN 208451598U
Authority
CN
China
Prior art keywords
plate
fixed
support rod
steel ontology
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820922832.2U
Other languages
Chinese (zh)
Inventor
邓贤挺
张善壮
李永虎
刘家瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201820922832.2U priority Critical patent/CN208451598U/en
Application granted granted Critical
Publication of CN208451598U publication Critical patent/CN208451598U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of construction site mobile brackets of assembled Rapid Combination, including I-steel ontology, detachable support plate and it is detachably fixed bar, the upper cross plate both ends of the I-steel ontology are equipped with connection through-hole, and the one end for being detachably fixed bar is equipped with driven connection through-hole, connection through-hole is fixedly connected with driven connection through-hole by standing screw, the other end of the detachable support plate is fixedly installed with plate, and universal wheel is installed below plate, it can be according to on-site actual situations, two or more, which are combined to be formed, increases the live placing of material demand of bracket satisfaction, it can also be used as mobile stockyard, other area's material codes of scene are put on the mobile bracket of assembled Rapid Combination, direct labor is pushed into placing of material area.Stacking situation according to scene can easily classify stackings, improve the working efficiency of live civilized construction, and it is vivid to promote live civilized construction.

Description

A kind of construction site mobile bracket of assembled Rapid Combination
Technical field
The utility model relates to technical field of buildings, specially a kind of construction site mobile branch of assembled Rapid Combination Frame.
Background technique
The construction site of this novel practical mobile bracket of assembled Rapid Combination, rationally, structure is simple for design, can be arbitrarily The advantages that combination moves, convenient and practical.In building trade, live civilized construction is more and more important, a project scene text Bright construction focuses on placing of material and material consolidation, in practice of construction production process, we only in materials arrival according to Specify a placing of material area in on-site according to on-site actual situations, with laydown area material is more and more and material into It uses out, just more and more disorderly, the especially materials such as template, steel pipe, wooden a tree, used in making timber for boats need to be transported and be arranged back and forth at scene, consume a large amount of people How power material resources solve the above problems, it has also become this field problem urgently to be resolved.
Utility model content
The purpose of this utility model is to provide a kind of construction site mobile brackets of assembled Rapid Combination, on solving State the problem of proposing in background technique.
To achieve the above object, the utility model provides the following technical solutions: a kind of quick group of construction site assembled It closes mobile bracket, including I-steel ontology, detachable support plate and is detachably fixed bar, the upper cross plate two of the I-steel ontology End is equipped with connection through-hole, and the one end for being detachably fixed bar is equipped with driven connection through-hole, connects through-hole and driven connection through-hole It is fixedly connected by standing screw, the lower end surface two sides of the upper cross plate of I-steel ontology are respectively symmetrically set there are two mounting groove, institute It states in mounting groove and connecting plate is connected with by standing screw, one end of connecting plate is fixedly connected with one end of detachable support plate, The other end of the detachable support plate is fixedly installed with plate, and universal wheel is equipped with below plate;
The upper surface of the lower cross plate of the I-steel ontology symmetrically offers two support rod fixed chutes, two support rods Fixed chute is separately positioned on the riser two sides of I-steel ontology, and is arranged against riser, the vertical section of support rod fixed chute Fixed sliding block is equipped with for convex character shape structure, and inside support rod fixed chute, under the upper end and support rod of the fixed sliding block End is fixedly connected, and the upper end of the support rod, which is run through support rod fixed chute and is located at, to be auxiliarily fixed inside sliding slot, the I-shaped The upper cross plate lower surface two sides of steel ontology symmetrically offer two and sliding slot are auxiliarily fixed, and two are auxiliarily fixed sliding slot and two branch Strut fixed chute is vertical corresponding one by one in the vertical direction, and the upper parallel of the support rod is equipped with fixed plate, and fixed The upper surface of plate is fitted and connected the lower surface of plate.
Preferably, the bar that is detachably fixed is divided into upper half and lower half, and wherein lower half is horizontally arranged at I-steel ontology Upper cross plate on, upper half and lower half are inclination installation, and the detachable support plate, plate and connecting plate are an integral molding structure, And plate and connecting plate are parallel to each other, detachable support plate tilts connection plate and connecting plate.
Preferably, the upper angled of the support rod is equipped with brace, and brace one end and fixed plate far from support rod It is fixedly connected on the downside of outer end, and is equipped with shock structure between brace and fixed plate, the quantity of shock structure is not less than two.
Preferably, four end of upper surface of the upper cross plate of the I-steel ontology is equipped with link slot, when two pieces of I-steel sheets When body work in combination, the link slot being in contact is connected by I-shaped connector.
Compared with prior art, the utility model has the beneficial effects that the construction site is mobile with assembled Rapid Combination Bracket, can be according to on-site actual situations, two or more, which are combined to be formed, increases the live placing of material demand of bracket satisfaction, It can also be used as mobile stockyard, other area's material codes of scene be put on the mobile bracket of assembled Rapid Combination, direct labor It is pushed into placing of material area.Stacking situation according to scene can easily classify stacking, improve the working efficiency of live civilized construction, Promote live civilized construction image.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the support rod schematic diagram of the utility model;
Fig. 3 is the fixed plate schematic diagram of the utility model;
Fig. 4 is the detachable support plate schematic diagram of the utility model;
Fig. 5 is the fabricated structure schematic diagram of the utility model;
Fig. 6 is the I-shaped connector schematic diagram of the utility model.
In figure: I-steel ontology 1, detachable support plate 2, be detachably fixed bar 3, support rod fixed chute 4, support rod 5, Sliding slot 7, brace 8, fixed plate 9, connecting plate 10 is auxiliarily fixed in I-shaped connector 6.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-6 is please referred to, the utility model provides a kind of technical solution: a kind of construction site assembled Rapid Combination shifting Dynamic bracket, including I-steel ontology 1, detachable support plate 2 and it is detachably fixed bar 3, the upper cross plate both ends of I-steel ontology 1 are equal Equipped with connection through-hole, and the one end for being detachably fixed bar 3 is equipped with driven connection through-hole, connects through-hole and driven connection through-hole passes through Standing screw is fixedly connected, and the lower end surface two sides of the upper cross plate of I-steel ontology 1 are respectively symmetrically set there are two mounting groove, mounting groove Interior to be connected with connecting plate 10 by standing screw, one end of connecting plate 10 is fixedly connected with one end of detachable support plate 2, removable The other end for unloading support plate 2 is fixedly installed with plate, and universal wheel is equipped with below plate;
The upper surface of the lower cross plate of I-steel ontology 1 symmetrically offers two support rod fixed chutes 4, and two support rods are solid Determine the riser two sides that sliding slot 4 is separately positioned on I-steel ontology 1, and is arranged against riser, the vertical section of support rod fixed chute 4 Fixed sliding block, the upper end of fixed sliding block and the lower end of support rod 5 are equipped with for convex character shape structure, and inside support rod fixed chute 4 It is fixedly connected, the upper end of support rod 5, which is run through support rod fixed chute 4 and is located at, to be auxiliarily fixed inside sliding slot 7, I-steel ontology 1 Upper cross plate lower surface two sides symmetrically offer two sliding slot 7 be auxiliarily fixed, and two are auxiliarily fixed sliding slot 7 and two support rods Fixed chute 4 is vertical corresponding one by one in the vertical direction, and the upper parallel of support rod 5 is equipped with fixed plate 9, and fixed plate 9 Upper surface is fitted and connected the lower surface of plate 10.
It is detachably fixed bar 3 and is divided into upper half and lower half, wherein lower half is horizontally arranged at the upper cross plate of I-steel ontology 1 On, upper half and lower half are inclination installation, and detachable support plate 2, plate and connecting plate 10 are an integral molding structure, and plate and company Fishplate bar 10 is parallel to each other, and detachable support plate 2 tilts connection plate and connecting plate 10.
The upper angled of support rod 5 is equipped with brace 8, and under the one end of brace 8 far from support rod 5 and the outer end of fixed plate 9 Side is fixedly connected, and shock structure is equipped between brace 8 and fixed plate 9, and the quantity of shock structure is not less than two.
Four end of upper surface of the upper cross plate of I-steel ontology 1 is equipped with link slot, when two pieces of 1 work in combination of I-steel ontology When, the link slot being in contact is connected by I-shaped connector 6.
Working principle: when material enters construction site, using I-steel ontology 1 as rack body, pass through screw rod The upper cross plate both ends for being detachably fixed bar 3 and being mounted on I-steel ontology 1, then detachable support plate 2 is being pacified by screw rod Mounted in the two sides of I-steel ontology 1, consolidate since the upper surface of the lower cross plate in I-steel ontology 1 symmetrically offers two support rods Determine sliding slot 4, the upper cross plate lower surface two sides of I-steel ontology 1 symmetrically offer two and sliding slot 7 is auxiliarily fixed, it is possible to very light The control support rod 5 of pine slidably reciprocates in support rod fixed chute 4 and being auxiliarily fixed in sliding slot 7, when detachable support plate 2 is installed When finishing, by controlling the position of support rod 5, so that fixed plate 9 is located at the lower section of connecting plate 10, and it is fitted and connected plate 10, so as to further stabilize connecting plate 10, so that the detachable installation of support plate 2 is more stable;It constructs when entering When the material in place is excessive, it is referred to Fig. 5 and Fig. 6, can be according to on-site actual situations, two or more are combined It is formed and increases the live placing of material demand of bracket satisfaction, can also be used as mobile stockyard, other area's material codes are put into scene On the mobile bracket of assembled Rapid Combination, direct labor is pushed into placing of material area.Stacking situation according to scene can easily classify It stacks, improves the working efficiency of live civilized construction, promote live civilized construction image.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of construction site mobile bracket of assembled Rapid Combination, including I-steel ontology (1), detachable support plate (2) Be detachably fixed bar (3), it is characterised in that: the upper cross plate both ends of the I-steel ontology (1) are equipped with connection through-hole, and can The one end for dismantling fixed link (3) is equipped with driven connection through-hole, connects through-hole and driven connection through-hole and connects by the way that standing screw is fixed It connects, the lower end surface two sides of the upper cross plate of I-steel ontology (1) are respectively symmetrically set there are two mounting groove, and the mounting groove is interior by solid Determine screw rod to be connected with connecting plate (10), one end of connecting plate (10) is fixedly connected with one end of detachable support plate (2), it is described can The other end of disassembly support plate (2) is fixedly installed with plate, and universal wheel is equipped with below plate;
The upper surface of the lower cross plate of the I-steel ontology (1) symmetrically offers two support rod fixed chutes (4), two supports Bar fixed chute (4) is separately positioned on the riser two sides of I-steel ontology (1), and is arranged against riser, support rod fixed chute (4) vertical section is convex character shape structure, and fixed sliding block is equipped with inside support rod fixed chute (4), the fixed sliding block it is upper End is fixedly connected with the lower end of support rod (5), and the upper end of the support rod (5) through support rod fixed chute (4) and is located at auxiliary Help fixed chute (7) internal, the upper cross plate lower surface two sides of the I-steel ontology (1) symmetrically offer two and cunning is auxiliarily fixed Slot (7), and two are auxiliarily fixed sliding slot (7) and two support rod fixed chutes (4) are vertical corresponding one by one in the vertical direction, institute It states the upper parallel of support rod (5) to be equipped with fixed plate (9), and the upper surface of fixed plate (9) is fitted and connected the following table of plate (10) Face.
2. a kind of construction site according to claim 1 mobile bracket of assembled Rapid Combination, it is characterised in that: described It is detachably fixed bar (3) and is divided into upper half and lower half, wherein lower half is horizontally arranged on the upper cross plate of I-steel ontology (1), on Half installs with lower half for inclination, and the detachable support plate (2), plate and connecting plate (10) are an integral molding structure, and plate It is parallel to each other with connecting plate (10), detachable support plate (2) tilts connection plate and connecting plate (10).
3. a kind of construction site according to claim 1 mobile bracket of assembled Rapid Combination, it is characterised in that: described The upper angled of support rod (5) is equipped with brace (8), and the outer end of brace (8) one end and fixed plate (9) far from support rod (5) Downside is fixedly connected, and shock structure is equipped between brace (8) and fixed plate (9), and the quantity of shock structure is not less than two.
4. a kind of construction site according to claim 1 mobile bracket of assembled Rapid Combination, it is characterised in that: described Four end of upper surface of the upper cross plate of I-steel ontology (1) is equipped with link slot, when two pieces of I-steel ontology (1) work in combination, The link slot being in contact is connected by I-shaped connector (6).
CN201820922832.2U 2018-06-14 2018-06-14 A kind of construction site mobile bracket of assembled Rapid Combination Expired - Fee Related CN208451598U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820922832.2U CN208451598U (en) 2018-06-14 2018-06-14 A kind of construction site mobile bracket of assembled Rapid Combination

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820922832.2U CN208451598U (en) 2018-06-14 2018-06-14 A kind of construction site mobile bracket of assembled Rapid Combination

Publications (1)

Publication Number Publication Date
CN208451598U true CN208451598U (en) 2019-02-01

Family

ID=65159974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820922832.2U Expired - Fee Related CN208451598U (en) 2018-06-14 2018-06-14 A kind of construction site mobile bracket of assembled Rapid Combination

Country Status (1)

Country Link
CN (1) CN208451598U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110967053A (en) * 2019-11-12 2020-04-07 福建省永正工程质量检测有限公司 Building engineering monitoring facilities based on thing networking transmission

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110967053A (en) * 2019-11-12 2020-04-07 福建省永正工程质量检测有限公司 Building engineering monitoring facilities based on thing networking transmission

Similar Documents

Publication Publication Date Title
CN208668817U (en) A kind of light-duty armored concrete formula precast stair
CN208451598U (en) A kind of construction site mobile bracket of assembled Rapid Combination
CN203160732U (en) Building stacking composite floor slab adjustable supporting frame
CN204001416U (en) For the assemble type truss of the factory building of constructing
CN202416854U (en) Table form concrete formwork device
CN202226451U (en) Paper sorting machine
CN205077730U (en) High strength steel muscle support frame
CN202707066U (en) Manual hole digging pile wall-protecting integral template
CN105178447B (en) The concealed energy consumption connector of rectangular-ambulatory-plane timber structure
CN204703511U (en) High residential building wall column formwork is general perpendicular stupefied
CN204782018U (en) Constructional steel constructs conveying frame
CN209539398U (en) A kind of evacuation platform of Fast Installation
CN204401986U (en) Building corner coating apparatus
CN208310366U (en) Timber structure beam column combines energy dissipation node
CN207314820U (en) A kind of new-type aluminum alloy mould plate structure
CN203213569U (en) Scaffold pedal device for buildings
CN203514751U (en) Convenient-to-move scaffold for building interior wall construction
CN207314821U (en) A kind of new aluminum alloy pattern plate
CN204979545U (en) Tray is moulded to simple and easy portable steel
CN205736062U (en) A kind of support for process for extruding glass fibre reinforced plastic
CN206189829U (en) Auto -lock lifting foot hand rack
CN102444283A (en) Lateral bracing structure of building formwork
CN205296814U (en) Novel concrete form structure
CN202431000U (en) Horizontal supporting structure of building formwork
CN204531394U (en) Steel bar truss floor support plate suspension type support system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190201

Termination date: 20200614

CF01 Termination of patent right due to non-payment of annual fee