- CN208442395U CN208442395U CN201821012688.5U CN201821012688U CN208442395U CN 208442395 U CN208442395 U CN 208442395U CN 201821012688 U CN201821012688 U CN 201821012688U CN 208442395 U CN208442395 U CN 208442395U
- Authority
- CN
- China
- Prior art keywords
- shaped
- tube
- hanger
- water pipe
- shaped channel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 88
- 230000002457 bidirectional effect Effects 0.000 title claims abstract description 26
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 99
- 239000010959 steel Substances 0.000 claims abstract description 99
- 238000009434 installation Methods 0.000 claims abstract description 7
- 238000013016 damping Methods 0.000 claims description 7
- 239000003814 drug Substances 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 5
- 239000007787 solid Substances 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 238000010008 shearing Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a kind of antidetonation water pipe lists to hang Bidirectional supporting, including including No.1 C-shaped channel steel, No. two C-shaped channel steels, No. three C-shaped channel steels, O-shaped beam tube and U-tube hanger, No.1 C-shaped channel steel upper end is fixed on top of building, its lower end is fixedly connected with water pipe by U tube hanger, No.1 C-shaped channel steel is completed to the radial diagonal brace of water pipe, No. two C-shaped channel steel upper ends are fixed on top of building, its lower end is fixedly connected with water pipe by O-shaped tube bank, No.1 C-shaped channel steel is completed to the radial diagonal brace of water pipe, two-way seismic support in different sides is realized by No.1 C-shaped channel steel and No. two C-shaped channel steels, the vibration of transmitting can effectively be decomposed, and the fixation water pipe that O-shaped tube bank and U tube hanger are detachably adjusted, it is easily installed operation and adjusting, improve the stability of water pipe installation, water supply pipe holder installation and repairing work simultaneously It offers convenience, the utility model structure is simple, practical, easy to operate, easy to use and popularization.
Description
Technical field
The utility model relates to a kind of field of fixation devices, specifically a kind of antidetonation water pipe list hangs Bidirectional supporting.
Background technique
Water pipe supports be otherwise known as water pipe support, pipe portion etc., is the support construction of water pipe, and common water pipe support is only solid
Positioning sets upper end equipped with vertical support, and anti seismic efficiency is general, when by high vibration, it is difficult to shaking force is effectively decomposed,
To be difficult to play the antihunt action to water pipe.
The support of existing antidetonation is usually unidirectional diagonal brace, and by channel steel inclined shore water pipe, but its anti seismic efficiency is only
It occurs over just in single acting surface, anti seismic efficiency has to be strengthened.
Utility model content
The purpose of this utility model is to provide a kind of antidetonation water pipe lists to hang Bidirectional supporting, to solve in above-mentioned background technique
The problem of proposition.
To achieve the above object, the utility model provides the following technical solutions:
A kind of antidetonation water pipe list hangs Bidirectional supporting, including includes No.1 C-shaped channel steel, No. two C-shaped channel steels, No. three C-shaped channel steels, O
Type beam tube and U-tube hanger, the water pipe are fixed in U-tube hanger, the upper end connecting screw of U-tube hanger, U-tube hanger
Side connect No.1 C-shaped channel steel, No.1 C-shaped channel steel and water pipe are vertical to be radially obliquely installed at an angle, No.1 C-shaped channel steel
Upper end be fixedly connected on concrete structure, the O-shaped beam tube is fixedly connected on water pipe, and O-shaped beam tube is hung positioned at U-tube
The side of frame connects No. two C-shaped channel steels on O-shaped beam tube, and No. two C-shaped channel steels tilt at an angle with water pipe horizontal axis to be set
It sets, the upper end of No. two C-shaped channel steels is fixedly connected on concrete structure.
As a further solution of the present invention: being fixed with No. three C-shaped channels by V word device of putting more energy on the screw rod
The upper end of steel, screw rod connects expansion bolt by hexagonal connector, and expansion bolt is fixedly connected in the building of top.
The No.1 C-shaped channel steel and the vertical radial angle of fixed water pipe as a further solution of the present invention,
It is 45 °.
The lower end of the No.1 C-shaped channel steel is connected by antidetonation switching hinge as a further solution of the present invention,
Connect U-tube hanger, antidetonation switching hinge is fixedly connected with the lower end of No.1 C-shaped channel steel by hex bolts, No.1 C-shaped channel steel it is upper
End is equipped with antidetonation switching hinge, and antidetonation switching hinge is fixedly connected on No.1 C-shaped channel steel upper end, No.1 c-type by hex bolts
The antidetonation switching hinge of channel steel upper end connection is fixedly connected with concrete structure by expansion bolt.
The angle of No. two C-shaped channel steels and fixed water pipe horizontal axis as a further solution of the present invention,
It is 45 °.
The lower end of No. two C-shaped channel steels is connected by antidetonation switching hinge as a further solution of the present invention,
O-shaped beam tube is connect, the upper end of No. two C-shaped channel steels is equipped with antidetonation switching hinge, and antidetonation switching hinge is fixedly connected by hex bolts
Antidetonation switching hinge in No. two C-shaped channel steel upper ends, No. two C-shaped channel steel upper end connections is fixedly connected with concrete by expansion bolt
Building.
The O-shaped beam tube includes No.1 connection ring and No. two connection rings, institute as a further solution of the present invention,
It states No.1 connection ring and No. two connection rings is equipped with the opposite groove that is open, two groove internal medicine fixed placement water pipes, No.1 connection
The upper and lower side both ends of ring are equipped with No.1 beam tube mounting plate, and the upper and lower ends of No. two connection rings are equipped with No. two beam tube mounting plates,
No. two beam tube mounting plates on No.1 beam tube mounting plate and No. two connection rings in No.1 connection ring are corresponded and are parallel to each other,
Beam tube mounting hole is equipped on No.1 beam tube mounting plate and No. two beam tube mounting plates, beam tube fixing bolt is installed across No.1 beam tube
Beam tube mounting hole on plate and No. two beam tube mounting plates, one end that beam tube fixing bolt passes through beam tube mounting hole are solid equipped with beam tube
Determine nut.
The U-tube hanger includes hanger frame, No.1 U-shaped frame and No. two U as a further solution of the present invention,
Type frame, No.1 U-shaped frame and No. two U-shaped frames are located at the lower end of hanger frame, and the upper end of No.1 U-shaped frame and No. two U-shaped frames is parallel to each other,
The lower end of No.1 U-shaped frame and No. two U-shaped frames is in arc-shaped and complements each other to form semicircle shape, and the lower end of No.1 U-shaped frame is equipped with one
Number U-shaped frame mounting plate, the lower end of No. two U-shaped frames are equipped with No. two U-shaped frame mounting plates, No.1 U-shaped frame mounting plate and No. two U-shaped frames peaces
Loading board corresponds to each other and parallel, and the installation of No.1 U-tube hanger is equipped on No.1 U-shaped frame mounting plate and No. two U-shaped frame mounting plates
Hole, No.1 U-tube hanger fixing bolt pass through the No.1 U-tube hanger on No.1 U-shaped frame mounting plate and No. two U-shaped frame mounting plates
Mounting hole, one end that No.1 U-tube hanger fixing bolt passes through No.1 U-tube hanger mounting hole are equipped with No.1 U-tube hanger
The inner wall of hanger frame is close in the upper end of fixture nut, No.1 U-shaped frame and No. two U-shaped frames, hanger frame with No.1 U-shaped frame and two
Number U-shaped frame contact position be equipped with No. two U-tube hanger mounting holes, No.1 U-shaped frame and No. two U-shaped frames with hanger frame inner wall contact position
No. three U-tube hanger mounting holes are equipped with, No. two U-tube hanger fixing bolts pass through No. two U-tube hanger mounting holes and No. three U
Type tube hanger mounting hole, No. two U-tube hanger fixing bolts are passing through No. two U-tube hanger mounting holes and No. three U-tube hangers
One end of mounting hole is equipped with No. two U-tube hanger fixture nuts, and hanger frame upper end is equipped with No. four U-tube hanger installations
Hole.
The U-tube hanger is equipped with O-shaped beam tube and water pipe junction as a further solution of the present invention,
Conduit saddle.
It is equipped in the No.1 C-shaped channel steel and No. two C-shaped channel steels as a further solution of the present invention, several
Damping spring.
Compared with prior art, the utility model has the beneficial effects that No.1 C-shaped channel steel upper end is fixed on building top
Portion, lower end are fixedly connected with water pipe by U tube hanger, complete radial diagonal brace of the No.1 C-shaped channel steel to water pipe, No. two C-shaped channels
Steel upper end is fixed on top of building, and lower end is fixedly connected with water pipe by O-shaped tube bank, completes No.1 C-shaped channel steel to water pipe
Radial diagonal brace, two-way seismic support in different sides is realized by No.1 C-shaped channel steel and No. two C-shaped channel steels, can effectively be divided
The vibration of transmitting, and the fixation water pipe that O-shaped tube bank and U tube hanger are detachably adjusted are solved, operation and adjusting is easily installed, mentions
The stability of high water pipe installation, while the work of water supply pipe holder installation and repairing offers convenience, the utility model structure is simple, practical
Property it is strong, easy to operate, it is easy to use and promote.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that antidetonation water pipe list hangs Bidirectional supporting.
Fig. 2 is that antidetonation water pipe list hangs side view in Bidirectional supporting.
Fig. 3 hangs in Bidirectional supporting for antidetonation water pipe list and overlooks.
Fig. 4 is the structural schematic diagram that antidetonation water pipe list hangs U-tube hanger in Bidirectional supporting.
Fig. 5 is the structural schematic diagram that antidetonation water pipe list hangs O-shaped beam tube in Bidirectional supporting.
Fig. 6 is the structural schematic diagram that antidetonation water pipe list hangs conduit saddle in Bidirectional supporting.
Fig. 7 is the structural schematic diagram that antidetonation water pipe list hangs damping spring in Bidirectional supporting.
Wherein: expansion bolt 1, antidetonation switching hinge 2, No.1 C-shaped channel steel 3, O-shaped beam tube 4, beam tube fixture nut 401, beam
405, No. two pipe fixing bolt 402,403, No. two connection rings 404 of No.1 connection ring, No.1 beam tube mounting plate beam tube mounting plates
406, beam tube mounting hole 407, hex bolts 5, V word are put more energy into device 6, screw rod 7, hexagonal connector 8, U-tube hanger 9, hanger frame
901,902, No. two U-shaped frames 903 of No.1 U-shaped frame, No.1 U-shaped frame mounting plate 904, No. two U-shaped frame mounting plates 905, No.1 U-tubes
Hanger mounting hole 906, the U-tube hanger of U-tube hanger fixing bolt 908, two of No.1 U-tube hanger fixing bolt 907, two
911, No. four U-tube hanger mounting holes of U-tube hanger fixture nut of U-tube hanger mounting hole 910, two of mounting hole 909, three
912, the C-shaped channel steel 10, three of No.1 U-tube hanger fixture nut 913, two C-shaped channel steel 11, conduit saddle 12, damping spring 13.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Embodiment 1:
Please refer to Fig. 1~4, in the utility model embodiment, a kind of antidetonation water pipe list hangs Bidirectional supporting, including No.1 c-type
The C-shaped channel steel 10, three of channel steel 3, two C-shaped channel steel 11, O-shaped beam tube 4 and U-tube hanger 9, the water pipe are fixed on U-tube and hang
In frame 9, the upper end connecting screw 7 of U-tube hanger 9 is fixedly connected on concrete structure, U-tube hanger 9 by screw rod 7
Side connect No.1 C-shaped channel steel 3, No.1 C-shaped channel steel 3 and water pipe are vertical to be radially obliquely installed at an angle, No.1 C-shaped channel
The upper end of steel 3 is fixedly connected on concrete structure, and the O-shaped beam tube 4 is fixedly connected on water pipe, and O-shaped beam tube 4 is located at U
The side of type tube hanger 9 connects No. two C-shaped channel steels 10 on O-shaped beam tube 4, and No. two C-shaped channel steels 10 and water pipe horizontal axis are in certain
Angle tilt setting, the upper end of No. two C-shaped channel steels 10 is fixedly connected on concrete structure.
No. three C-shaped channel steels 11 are fixed with by V word device 6 of putting more energy on the screw rod 7, are put more energy into device 6 and No. three C by V word
Type groove steel 11 improves the enabling capabilities of screw rod 7, and the upper end of screw rod 7 connects expansion bolt 1, expansion bolt 1 by hexagonal connector 8
It is fixedly connected in the building of top, by fixed screw rod 7 is that lower end is mentioned by the water pipe of the fixation of U-tube hanger 9 when work
For vertical support, guarantee the normal work of water pipe.
The No.1 C-shaped channel steel 3 is 45 ° with the vertical radial angle of fixed water pipe.
The lower end of the No.1 C-shaped channel steel 3 connects U-tube hanger 9 by antidetonation switching hinge 2, and antidetonation switching hinge 2 is logical
The lower end that hex bolts 5 is fixedly connected with No.1 C-shaped channel steel 3 is crossed, the upper end of No.1 C-shaped channel steel 3 is equipped with antidetonation switching hinge 2, resists
Shake switching hinge 2 is fixedly connected on 3 upper end of No.1 C-shaped channel steel, the antidetonation of 3 upper end of No.1 C-shaped channel steel connection by hex bolts 5
Switching hinge 2 is fixedly connected with concrete structure by expansion bolt 1, and expansion bolt 1 is moved using cone and the opposite of expansion piece
It is dynamic, promote expansion piece expansion, generates expansion extruding force with top concrete, and withdrawal resistance is generated by shearing friction power, make to connect
The No.1 C-shaped channel steel 3 for connecing antidetonation switching hinge 2 is firmly fixed on top of building, to complete No.1 C-shaped channel steel 3 to water
The radial diagonal brace of pipe.
The angle of No. two C-shaped channel steels 10 and fixed water pipe horizontal axis is 45 °.
The lower end of No. two C-shaped channel steels 10 connects O-shaped beam tube 4 by antidetonation hinge 2 of transferring, No. two C-shaped channel steels 10
Upper end is equipped with antidetonation switching hinge 2, and antidetonation switching hinge 2 is fixedly connected on No. two 10 upper ends of C-shaped channel steel by hex bolts 5,
The antidetonation switching hinge 2 of No. two 10 upper end of C-shaped channel steel connections is fixedly connected with concrete structure, expanding screw by expansion bolt 1
Bolt 1 promotes expansion piece expansion using the relative movement of cone and expansion piece, generates expansion extruding force with top concrete, and lead to
It crosses shearing friction power and generates withdrawal resistance, No. two C-shaped channel steels 10 for connecting antidetonation switching hinge 2 is made firmly to be fixed on building top
Portion, to complete No.1 C-shaped channel steel 3 to the radial diagonal brace of water pipe.
The O-shaped beam tube 4 includes No.1 connection ring 403 and No. two connection rings 404, the No.1 connection ring 403 and No. two
Connection ring 404 is equipped with the opposite groove that is open, two groove internal medicine fixed placement water pipes, the upper and lower side two of No.1 connection ring 403
End is equipped with No.1 beam tube mounting plate 405, and the upper and lower ends of No. two connection rings 404 are equipped with No. two beam tube mounting plates 406, No.1
No. two beam tube mounting plates 406 on No.1 beam tube mounting plate 405 and No. two connection rings 404 in connection ring 403 correspond and
It is parallel to each other, beam tube mounting hole 407, the fixed spiral shell of beam tube is equipped on No.1 beam tube mounting plate 405 and No. two beam tube mounting plates 406
Bolt 402 passes through the beam tube mounting hole 407 on No.1 beam tube mounting plate 405 and No. two beam tube mounting plates 406, beam tube fixing bolt
402 one end for passing through beam tube mounting hole 407 are equipped with beam tube fixture nut 401, beam tube fixing bolt 402 and beam tube fixture nut
401 by the beam tube mounting hole 407 on No.1 beam tube mounting plate 405 and No. two beam tube mounting plates 406 by 403 He of No.1 connection ring
No. two connection rings 404 are fixedly connected, so that the fixation of No.1 connection ring 403 and No. two 404 groove inner conduits of connection ring is completed, two
The antidetonation switching hinge 2 of number 10 lower end of C-shaped channel steel is fixedly connected on the beam of No.1 connection ring 403 and No. two 404 upper ends of connection ring
Between pipe fixing bolt 402 and beam tube fixture nut 401, make fixed between 10 No.1 connection rings 403 and No. two connection rings 404
Water pipe provides antidetonation diagonal brace, and entire O-shaped beam tube 4 is removably completed the fixation to water pipe, is easily installed, and can be by adjusting beam
The water pipe of pipe fixing bolt 402 and the fixed different tube diameters of beam tube fixture nut 401, increases the practicability of device.
The U-tube hanger 9 includes hanger frame 901, No.1 U-shaped frame 902 and No. two U-shaped frames 903,902 He of No.1 U-shaped frame
No. two U-shaped frames 903 are located at the lower end of hanger frame 901, and the upper end of No.1 U-shaped frame 902 and No. two U-shaped frames 903 is parallel to each other, No.1
The lower end of U-shaped frame 902 and No. two U-shaped frames 903 is in arc-shaped and complements each other to form semicircle shape, to solid in semicircle shape groove
Determine water pipe, the lower end of No.1 U-shaped frame 902 is equipped with No.1 U-shaped frame mounting plate 904, and the lower end of No. two U-shaped frames 903 is U-shaped equipped with No. two
Frame mounting plate 905, No.1 U-shaped frame mounting plate 904 is corresponded to each other with No. two U-shaped frame mounting plates 905 and parallel, No.1 U-shaped frame peace
No.1 U-tube hanger mounting hole 906, the fixed spiral shell of No.1 U-tube hanger are equipped in loading board 904 and No. two U-shaped frame mounting plates 905
No.1 U-tube hanger mounting hole 906 of the bolt 907 on No.1 U-shaped frame mounting plate 904 and No. two U-shaped frame mounting plates 905, one
One end that number U-tube hanger fixing bolt 907 passes through No.1 U-tube hanger mounting hole 906 is equipped with No.1 U-tube hanger and fixes
Nut 913 completes No.1 U-shaped frame by No.1 U-tube hanger fixing bolt 907 and No.1 U-tube hanger fixture nut 913
902 and No. two 903 lower ends of U-shaped frame fixation, hanger frame 901 is close in the upper end of No.1 U-shaped frame 902 and No. two U-shaped frames 903
Inner wall, hanger frame 901 are being equipped with No. two U-tube hanger mounting holes 909 with No.1 U-shaped frame 902 and No. two 903 contact positions of U-shaped frame,
No.1 U-shaped frame 902 and No. two U-shaped frames 903 are being equipped with No. three U-tube hanger mounting holes with 901 inner wall contact position of hanger frame
910, No. two U-tube hanger fixing bolts 908 pass through No. two U-tube hanger mounting holes 909 and No. three U-tube hanger mounting holes
910, No. two U-tube hanger fixing bolts 908 are passing through No. two U-tube hanger mounting holes 909 and No. three U-tube hanger mounting holes
910 one end is equipped with No. two U-tube hanger fixture nuts 911, U-shaped by No. two U-tube hanger fixing bolts 908 and No. two
Tube hanger fixture nut 911 completes the fixation of hanger frame 901, No.1 U-shaped frame 902 and No. two U-shaped frames 903, the No.1 C-shaped channel
The antidetonation switching hinge 2 of 3 lower end of steel connection is also by No. two U-tube hanger fixing bolts 908 and the fixed spiral shell of No. two U-tube hangers
Mother 911 is fixedly connected on U-tube hanger 9, makes 3 hanger frame 901 of No.1 C-shaped channel steel, No.1 U-shaped frame 902 and No. two U-shaped frames
Water pipe to be fixed between 903, and antidetonation diagonal brace is provided, entire U-tube hanger 9 is removably completed the fixation to water pipe, is easily installed,
And different tube diameters can be fixed by adjusting No. two U-tube hanger fixing bolts 908 and No.1 U-tube hanger fixing bolt 907
Water pipe, increases the practicability of device, and 901 upper end of hanger frame is equipped with No. four U-tube hanger mounting holes 912, passes through No. four U
Type tube hanger mounting hole 912 is fixedly connected with screw rod 7, and keeping screw rod 7 firm is that water pipe fixed in U-tube hanger 9 provides vertically
Support.
Embodiment 2:
Referring to Fig. 6, in the utility model embodiment, a kind of antidetonation water pipe list hangs Bidirectional supporting, in the U-tube hanger
9 are equipped with conduit saddle 12 with O-shaped beam tube 4 and water pipe junction, and the length of conduit saddle 12 is greater than the length of U-tube hanger 9 and O-shaped beam tube 4
Degree, O-shaped 4 inner wall of beam tube are close to water pipe and are fixedly connected on water pipe, increase U-tube hanger 9, O-shaped beam tube 4 by conduit saddle 12
On the one hand to the fixed mass of water pipe, on the other hand the forced area of fixed water pipe improves U-tube hanger 9 and O-shaped beam tube 4
Also protection water pipe is used for a long time, and avoids being squeezed damage water pipe for a long time.
Embodiment 3:
Referring to Fig. 7, in the utility model embodiment, a kind of antidetonation water pipe list hangs Bidirectional supporting, in the No.1 C-shaped channel
Several damping springs 13 are equipped in steel 3 and No. two C-shaped channel steels 10,13 left and right ends of damping spring are fixedly connected on C-shaped channel steel
Interior, damping spring 13 can effectively absorb the vibration by No.1 C-shaped channel steel 3 and No. two C-shaped channel steels 10, have by absorbing vibration
The reduction of effect and the transmitting for reducing vibration, play good auxiliary antihunt action.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and
And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms
Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new
The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in
All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting
Related claim.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiments being understood that.
Claims (10)
1. a kind of antidetonation water pipe list hangs Bidirectional supporting, including includes No.1 C-shaped channel steel (3), No. two C-shaped channel steels (10), No. three C-shaped channels
Steel (11), O-shaped beam tube (4) and U-tube hanger (9), which is characterized in that the water pipe is fixed in U-tube hanger (9), U-tube
The side of the upper end connecting screw (7) of hanger (9), U-tube hanger (9) connects No.1 C-shaped channel steel (3), No.1 C-shaped channel steel (3)
It is obliquely installed at an angle with the vertical radial direction of water pipe, the upper end of No.1 C-shaped channel steel (3) is fixedly connected on concrete structure
On, the O-shaped beam tube (4) is fixedly connected on water pipe, and O-shaped beam tube (4) is located at the side of U-tube hanger (9), O-shaped beam tube (4)
No. two C-shaped channel steels (10) of upper connection, No. two C-shaped channel steels (10) are obliquely installed at an angle with water pipe horizontal axis, No. two c-types
The upper end of channel steel (10) is fixedly connected on concrete structure.
2. antidetonation water pipe list according to claim 1 hangs Bidirectional supporting, which is characterized in that pass through V word on the screw rod (7)
Device (6) of putting more energy into is fixed with No. three C-shaped channel steels (11), and the upper end of screw rod (7) connects expansion bolt by hexagonal connector (8)
(1), expansion bolt (1) is fixedly connected in the building of top.
3. antidetonation water pipe list according to claim 1 hangs Bidirectional supporting, which is characterized in that the No.1 C-shaped channel steel (3) with
The fixed vertical radial angle of water pipe is 45 °.
4. antidetonation water pipe list according to claim 1 hangs Bidirectional supporting, which is characterized in that the No.1 C-shaped channel steel (3)
Lower end is connected by antidetonation switching hinge (2) connection U-tube hanger (9), antidetonation switching hinge (2) by the way that hex bolts (5) are fixed
The lower end of No.1 C-shaped channel steel (3) is connect, the upper end of No.1 C-shaped channel steel (3) is equipped with antidetonation switching hinge (2), antidetonation switching hinge
(2) it is fixedly connected on No.1 C-shaped channel steel (3) upper end by hex bolts (5), the antidetonation of No.1 C-shaped channel steel (3) upper end connection turns
It connects hinge (2) and concrete structure is fixedly connected with by expansion bolt (1).
5. antidetonation water pipe list according to claim 1 hangs Bidirectional supporting, which is characterized in that No. two C-shaped channel steels (10)
Angle with fixed water pipe horizontal axis is 45 °.
6. antidetonation water pipe list according to claim 1 hangs Bidirectional supporting, which is characterized in that No. two C-shaped channel steels (10)
Lower end O-shaped beam tube (4) is connected by antidetonation switching hinge (2), the upper end of No. two C-shaped channel steels (10) is equipped with antidetonation and transfers hinge
(2), antidetonation switching hinge (2) is fixedly connected on No. two C-shaped channel steel (10) upper ends, No. two C-shaped channel steels by hex bolts (5)
(10) antidetonation switching hinge (2) of upper end connection is fixedly connected with concrete structure by expansion bolt (1).
7. antidetonation water pipe list according to claim 1 hangs Bidirectional supporting, which is characterized in that the O-shaped beam tube (4) includes one
Number connection ring (403) and No. two connection rings (404), the No.1 connection ring (403) and No. two connection rings (404) are equipped with opening
Opposite groove, two groove internal medicine fixed placement water pipes, the upper and lower side both ends of No.1 connection ring (403) are equipped with No.1 beam tube peace
Loading board (405), the upper and lower ends of No. two connection rings (404) are equipped with No. two beam tube mounting plates (406), No.1 connection ring (403)
On No.1 beam tube mounting plate (405) and No. two connection rings (404) on No. two beam tube mounting plates (406) correspond and mutually
In parallel, beam tube mounting hole (407) are equipped on No.1 beam tube mounting plate (405) and No. two beam tube mounting plates (406), beam tube is fixed
Bolt (402) passes through the beam tube mounting hole (407) on No.1 beam tube mounting plate (405) and No. two beam tube mounting plates (406), beam tube
One end that fixing bolt (402) passes through beam tube mounting hole (407) is equipped with beam tube fixture nut (401).
8. antidetonation water pipe list according to claim 1 hangs Bidirectional supporting, which is characterized in that the U-tube hanger (9) includes
Hanger frame (901), No.1 U-shaped frame (902) and No. two U-shaped frames (903), No.1 U-shaped frame (902) and No. two U-shaped frames (903) are located at
The upper end of the lower end of hanger frame (901), No.1 U-shaped frame (902) and No. two U-shaped frames (903) is parallel to each other, No.1 U-shaped frame (902)
In arc-shaped and semicircle shape is complemented each other to form with the lower end of No. two U-shaped frames (903), the lower end of No.1 U-shaped frame (902) is equipped with one
Number U-shaped frame mounting plate (904), the lower end of No. two U-shaped frames (903) are equipped with No. two U-shaped frame mounting plates (905), the installation of No.1 U-shaped frame
Plate (904) is corresponded to each other with No. two U-shaped frame mounting plates (905) and parallel, No.1 U-shaped frame mounting plate (904) and No. two U-shaped frame peaces
No.1 U-tube hanger mounting hole (906) is equipped in loading board (905), No.1 U-tube hanger fixing bolt (907) passes through No.1 U
No.1 U-tube hanger mounting hole (906) on type frame mounting plate (904) and No. two U-shaped frame mounting plates (905), No.1 U-tube are hung
One end that frame fixing bolt (907) passes through No.1 U-tube hanger mounting hole (906) is equipped with No.1 U-tube hanger fixture nut
(913), the inner wall of hanger frame (901), hanger frame (901) are close in the upper end of No.1 U-shaped frame (902) and No. two U-shaped frames (903)
No. two U-tube hanger mounting holes (909) are being equipped with No.1 U-shaped frame (902) and No. two U-shaped frame (903) contact positions, No.1 is U-shaped
Frame (902) and No. two U-shaped frames (903) are being equipped with No. three U-tube hanger mounting holes with hanger frame (901) inner wall contact position
(910), No. two U-tube hanger fixing bolts (908) pass through No. two U-tube hanger mounting holes (909) and No. three U-tube hanger peaces
It fills hole (910), No. two U-tube hanger fixing bolts (908) are passing through No. two U-tube hanger mounting holes (909) and No. three U-tubes
One end of hanger mounting hole (910) is equipped with No. two U-tube hanger fixture nuts (911), and hanger frame (901) upper end is equipped with
No. four U-tube hanger mounting holes (912).
9. antidetonation water pipe list according to claim 1 hangs Bidirectional supporting, which is characterized in that the U-tube hanger (9) and O
Type beam tube (4) and water pipe junction are equipped with conduit saddle (12).
10. antidetonation water pipe list according to claim 1 hangs Bidirectional supporting, which is characterized in that the No.1 C-shaped channel steel (3)
Several damping springs (13) are equipped with in No. two C-shaped channel steels (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821012688.5U CN208442395U (en) | 2018-06-28 | 2018-06-28 | A kind of antidetonation water pipe list hangs Bidirectional supporting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821012688.5U CN208442395U (en) | 2018-06-28 | 2018-06-28 | A kind of antidetonation water pipe list hangs Bidirectional supporting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208442395U true CN208442395U (en) | 2019-01-29 |
Family
ID=65087838
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821012688.5U Expired - Fee Related CN208442395U (en) | 2018-06-28 | 2018-06-28 | A kind of antidetonation water pipe list hangs Bidirectional supporting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208442395U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111894307A (en) * | 2020-08-03 | 2020-11-06 | 浙江中天恒筑钢构有限公司 | Fully-assembled standardized temporary support structure and construction method |
CN117052990A (en) * | 2023-10-11 | 2023-11-14 | 上海倍安实业有限公司 | Water supply and drainage pipeline system and installation method |
-
2018
- 2018-06-28 CN CN201821012688.5U patent/CN208442395U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111894307A (en) * | 2020-08-03 | 2020-11-06 | 浙江中天恒筑钢构有限公司 | Fully-assembled standardized temporary support structure and construction method |
CN117052990A (en) * | 2023-10-11 | 2023-11-14 | 上海倍安实业有限公司 | Water supply and drainage pipeline system and installation method |
CN117052990B (en) * | 2023-10-11 | 2023-12-08 | 上海倍安实业有限公司 | Water supply and drainage pipeline system and installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208442395U (en) | A kind of antidetonation water pipe list hangs Bidirectional supporting | |
CN103296623A (en) | Tube busbar suspension fitting for converter station valve hall | |
CN208311664U (en) | A kind of gate antidetonation suspension and support | |
CN208442396U (en) | A kind of energy-absorption type water pipe shock-absorbing support | |
CN215061096U (en) | Multi-mode horizontal adjustment mounting bracket in pipe well | |
CN203301093U (en) | Pipe bus suspension fitting for converter station valve hall | |
CN209943687U (en) | Fixing device for indoor pipelines | |
CN218883208U (en) | Effectual antidetonation support of antidetonation | |
CN208311669U (en) | A kind of single tube antidetonation suspension and support | |
CN202791874U (en) | Adjustable lamp hoop | |
CN216430738U (en) | High antidetonation gallows of stability | |
CN208331455U (en) | A kind of novel earthquake-proof water pipe list hangs Bidirectional supporting | |
CN211715932U (en) | Anti-seismic support diagonal bracing and hoisting device | |
CN212978111U (en) | Pipeline installation mounting fixture convenient to adjust | |
CN206157907U (en) | Antidetonation connecting piece | |
CN213982484U (en) | Supporting and fixing device for installation of thermal anti-corrosion heat-insulation pipeline | |
CN210978758U (en) | Multi-tube double-lateral anti-seismic support | |
CN204692772U (en) | A kind of combination type supporting device for petroleum pipeline | |
CN208634532U (en) | A kind of adjustable water pipe shock-absorbing support | |
CN221348205U (en) | Building construction drainage pipeline clamp | |
CN212646597U (en) | Pillar tube supporting device | |
CN219432619U (en) | Steam pipeline heat insulation device | |
CN217177716U (en) | Adjustable shock-absorbing support for shock-absorbing type complete water supply equipment | |
CN221504320U (en) | Round metal pipeline anti-seismic support and hanger | |
CN220302971U (en) | Anti-seismic bracket with limiting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190129 |