CN208441864U - Composed bogie is used in a kind of spray maintenance of tunnel and detection - Google Patents
Composed bogie is used in a kind of spray maintenance of tunnel and detection Download PDFInfo
- Publication number
- CN208441864U CN208441864U CN201820304001.9U CN201820304001U CN208441864U CN 208441864 U CN208441864 U CN 208441864U CN 201820304001 U CN201820304001 U CN 201820304001U CN 208441864 U CN208441864 U CN 208441864U
- Authority
- CN
- China
- Prior art keywords
- spray
- tunnel
- detection
- trolley frame
- maintenance according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of spray maintenance of tunnel and detection composed bogies, including ladder, sprinkling curing system, trolley frame, oil cylinder jacking system and running gear, it is characterized in that, the two sides of trolley frame are arranged in the ladder, the sprinkling curing system is laid along the trolley frame, and the trolley frame has oil cylinder jacking system and running gear.The utility model is multiple functional, and construction interference is small.Combined trolley takes motor automatically walk, and it is current not influence Transport Machinery in tunnel when conserving, detect, backfilling slip casting, while can satisfy long range movement, the production that will not construct in tunnel and impacting, and can achieve the purpose that synchronous construction.
Description
Technical field
The utility model relates to tunnel maintenance fields, it particularly relates to a kind of spray maintenance of tunnel and detection combination
Trolley.
Background technique
At present it is known that taking the spray maintenance of fog gun machine, mainly in terms of tunnel lining concrete maintenance with artificial promotion change
It changes maintenance position and manual operation grasps spray direction and height, manual operation spray oval for tunnel-liner section
Face is limited, and maintenance is uneven, and majority, which will appear to support or leak, supports phenomenon, the condition of balanced maintenance is not had, to the strong of concrete
Degree and appearance can generate different degrees of influence.It is known mainly to utilize the homemade detection rack of I-steel in terms of Tunnel testing,
Overall weight is heavier to need machinery to be moved forward and backward, and damage frequency is higher, and safety coefficient is lower, and detection paragraph is limited, every inspection
One section of survey needs personnel, equipment, material etc. all to remove can be using Mechanical Moving, and complicated for operation, efficiency is lower.
For the problems in the relevant technologies, currently no effective solution has been proposed.
Utility model content
For above-mentioned technical problem in the related technology, the utility model proposes a kind of spray maintenance of tunnel and detection groups
Trolley is closed, above-mentioned deficiency can be overcome, a kind of simple structure, easy for installation, reliable performance, multiple functional tunnel-liner are provided
The combined trolley that spray maintenance, detection are integrated.
To realize the above-mentioned technical purpose, the technical solution of the utility model is achieved in that
A kind of spray maintenance of tunnel and detection composed bogie, including ladder, sprinkling curing system, trolley frame, oil cylinder
Jacking system and running gear, which is characterized in that the two sides of trolley frame are arranged in the ladder, and the spray conserves system
It unites and is laid along the trolley frame, the trolley frame has oil cylinder jacking system and running gear.
Further, the sprinkling curing system includes water pipeline, spray system and send water system.
Further, the water system of sending includes water tank and the booster pump between water tank and water pipeline.
Further, the spray system includes spray piping and spray head, the preferred Fine spray shower nozzle of spray head.
Further, the water pipeline uses 50 stainless steel tube of Ф, and the spray piping uses 32 stainless steel of Ф
Pipe, pipeline joins position using set fiber tube connection, and is sealed using sealant.
Further, the range of the oil cylinder jacking system is 1m.
Further, the running gear includes the traveling wheel of drive system and passive walking equipped with driving motor.
Further, the rack general frame of the trolley frame is used and is welded using I-steel, outer dimension are as follows:
Length 4.2m, width 11.7m, height 8.2m.
The utility model has the beneficial effects that
1, motor automatically walk improves construction efficiency.Integral trolley takes left and right double drive to walk, speed of travel 20m/
Min improves spray maintenance and detection efficiency.
2, multiple functional, construction interference is small.Combined trolley takes motor automatically walk, when conserving, detect, backfilling slip casting
It is current that Transport Machinery in tunnel is not influenced, while be can satisfy long range movement, the production that will not construct in tunnel and being impacted, energy
Enough achieve the purpose that synchronous construction.
3, operator is few.Only need a manipulator.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only the utility model
Some embodiments for those of ordinary skill in the art without creative efforts, can also be according to this
A little attached drawings obtain other attached drawings.
Fig. 1 is the front of a kind of spray maintenance of the tunnel according to the utility model embodiment and detection composed bogie
Schematic diagram.
Fig. 2 is the spray of a kind of spray maintenance of the tunnel according to the utility model embodiment and detection composed bogie
Conserve pipeline artwork.
Fig. 3 is the side of a kind of spray maintenance of the tunnel according to the utility model embodiment and detection composed bogie
Schematic diagram.
In figure: 1, ladder;2, sprinkling curing system;21, water pipeline;22, spray system;23, water system is sent;3, trolley
Frame;31, detection platform;32, frame supports;4, oil cylinder jacking system;5, running gear;51, drive system;52, traveling wheel.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art's every other embodiment obtained, all belongs to
In the range of the utility model protection.
As shown in Figure 1-3, a kind of spray maintenance of the tunnel according to the utility model embodiment and detection compound table
Vehicle, including ladder 1, sprinkling curing system 2, trolley frame 3, oil cylinder jacking system 4 and running gear 5, which is characterized in that described
Ladder 1 two sides of trolley frame 3 are set, the sprinkling curing system 2 is laid along the trolley frame 3, described
Trolley frame 3 has oil cylinder jacking system 4 and running gear 5.
Further, the sprinkling curing system 2 including water pipeline 21, spray system 22 and send water system 23.
Further, the water system 23 of sending includes water tank and the booster pump between water tank and water pipeline.
Further, the spray system 22 includes spray piping and spray head, the preferred Fine spray shower nozzle of spray head.
Further, the water pipeline 21 uses 50 stainless steel tube of Ф, and the spray piping is stainless using Ф 32
Steel pipe, pipeline joins position using set fiber tube connection, and is sealed using sealant.
Further, the range of the oil cylinder jacking system 4 is 1m.
Further, the running gear 5 includes the walking of drive system 51 and passive walking equipped with driving motor
Wheel 52.
Further, the rack general frame of the trolley frame 3 is used and is welded using I-steel, outer dimension
Are as follows: length 4.2m, width 11.7m, height 8.2m.
In order to facilitate the above-mentioned technical proposal for understanding the utility model, below by way of practical new to this in specifically used mode
The above-mentioned technical proposal of type is described in detail.
In specific production, using I-steel structural framing as a whole, length 4.2m, width 11.7m, height 8.2m,
A set of rail mounted automatically walk system is respectively set in rear end sides, plays support and power is walked.Traveling wheel is respectively set in front end
Hydraulic cylinder jacking system is arranged in (without driving device), front end and rear end, and adjustable height 1m is adjusted by hydraulic lifting system
Trolley height.A set of spray tube and spray head is respectively arranged in front end, rear end respectively in spray maintenance device, delivery pipe prolong door type frame and
Cross-brace is laid, and main water pipeline uses 32 stainless steel tube of Ф, main pipeline, branch pipe using 50 stainless steel tube of Ф, spray piping
Road and spray piping handover position are sealed using set fiber tube connection using sealant, and two sides of the bottom stringer respectively installs one
0.4m3 water tank conserves water burst for spray, a 2kw booster pump is installed between water tank and delivery pipe, guarantees that water and pressure are sent in spray maintenance
Power;Spray head takes Fine spray shower nozzle, and circumferential spacing 1m guarantees that water spray for mist, achievees the purpose that uniformly to conserve.
Working principle of the utility model is: having performed after lining cutting section is completed, is in place in tunnel, every plate lining cutting is poured
It builds and completes demoulding removal lining trolley, starting maintenance trolley running gear is run in lining section, starts hydraulic lifting immediately
Spray maintenance arc spray head is risen to away from the position spray face 46cm, starts sprinkling curing system, carry out fog curing by system,
The general maintenance phase is 7 days;In the detection process, it is laid with I24 rail in tunnel floor face, starting automatically walk system runs to inspection
It is in place to survey section, trolley is integrally risen to operating platform away from detection faces 1.8m by starting raise-lower hydraulic oil cylinder, and personnel stand flat in operation
Detections of radar equipment is installed on platform, after ready, starting automatically walk manual operation detection device is walked with trolley and moved
Detection paragraph is detected;Thickness according to detection and situation of coming to nothing simultaneously, equally take that detection program is in place by trolley, rises
Drop, personnel put grouting equipment, material to detection platform, carry out backfill slip casting on the operational platform, do not need to occupy tunnel
Space;Spray maintenance, detection, backfill three construction contents of slip casting can be realized using combined trolley, realize a tractor serves several purposes
Function.
Its concrete function is as follows:
1, the combined trolley that a kind of tunnel-liner spray maintenance, tunnel-liner percussion and radar sensing system are integrated,
Easy to operate, security performance is high, and function is complete and construction efficiency is high.
2, it can integrate power supply system, sprinkling curing system, whole electric walkings, spray, the disposable installation in scene,
Debugging.
3, using double drive running gear, the speed of travel is fast (20m/min).
4, computer push button controls, simple and fast, and operability is high.
5, spray and detection process take electric up-down, and spray can increase 50cm when conserving, make spray head away from maintenance face
46cm, detection platform will not impact construction section process while meeting operating space, each process can away from detection faces 1.8m
Form synchronous construction.
6, multiple functional, integrate double drive walking, the combination of automatic lifting, spray system, detection platform, control cabinet
Trolley belongs to the utility model protection.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model
Protection scope within.
Claims (8)
1. a kind of tunnel spray maintenance and detection composed bogie, including ladder (1), sprinkling curing system (2), trolley frame
(3), oil cylinder jacking system (4) and running gear (5), which is characterized in that the ladder (1) is arranged in trolley frame (3)
Two sides, the sprinkling curing system (2) are laid along the trolley frame (3), and the trolley frame (3) has oil cylinder
Jacking system (4) and running gear (5).
2. a kind of tunnel spray maintenance according to claim 1 and detection composed bogie, which is characterized in that the spray
Leaching curing system (2) includes water pipeline (21), spray system (22) and send water system (23).
3. a kind of tunnel spray maintenance according to claim 2 and detection composed bogie, which is characterized in that described send
Water system (23) includes water tank and the booster pump between water tank and water pipeline.
4. a kind of tunnel spray maintenance according to claim 2 and detection composed bogie, which is characterized in that the spray
Leaching system (22) includes spray piping and spray head, the preferred Fine spray shower nozzle of spray head.
5. a kind of tunnel spray maintenance according to claim 4 and detection composed bogie, which is characterized in that described send
Waterpipe (21) uses 50 stainless steel tube of Ф, and the spray piping uses 32 stainless steel tube of Ф, and pipeline joins position using set
Fiber tube connection, and sealed using sealant.
6. a kind of tunnel spray maintenance according to claim 1 and detection composed bogie, which is characterized in that the oil
The range of cylinder jacking system (4) is 1m.
7. a kind of tunnel spray maintenance according to claim 1 and detection composed bogie, which is characterized in that the row
Walking apparatus (5) includes the traveling wheel (52) of drive system (51) and passive walking equipped with driving motor.
8. a kind of tunnel spray maintenance according to claim 1 and detection composed bogie, which is characterized in that the platform
The rack general frame of frame (3) is used and is welded using I-steel, outer dimension are as follows: and length 4.2m, width 11.7m are high
Spend 8.2m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820304001.9U CN208441864U (en) | 2018-03-06 | 2018-03-06 | Composed bogie is used in a kind of spray maintenance of tunnel and detection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820304001.9U CN208441864U (en) | 2018-03-06 | 2018-03-06 | Composed bogie is used in a kind of spray maintenance of tunnel and detection |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208441864U true CN208441864U (en) | 2019-01-29 |
Family
ID=65096597
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820304001.9U Active CN208441864U (en) | 2018-03-06 | 2018-03-06 | Composed bogie is used in a kind of spray maintenance of tunnel and detection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208441864U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110185475A (en) * | 2019-06-28 | 2019-08-30 | 中铁隧道集团二处有限公司 | A kind of lining of multifunctional tunnel two construction equipment |
CN112360498A (en) * | 2020-11-25 | 2021-02-12 | 国家电网有限公司 | Underground cavern moving operation platform and operation method thereof |
CN114407183A (en) * | 2022-03-10 | 2022-04-29 | 中铁大桥局第九工程有限公司 | Spraying maintenance trolley |
CN116591726A (en) * | 2023-07-17 | 2023-08-15 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | Portable tunnel lining nourishing and detecting integrated equipment |
-
2018
- 2018-03-06 CN CN201820304001.9U patent/CN208441864U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110185475A (en) * | 2019-06-28 | 2019-08-30 | 中铁隧道集团二处有限公司 | A kind of lining of multifunctional tunnel two construction equipment |
CN112360498A (en) * | 2020-11-25 | 2021-02-12 | 国家电网有限公司 | Underground cavern moving operation platform and operation method thereof |
CN114407183A (en) * | 2022-03-10 | 2022-04-29 | 中铁大桥局第九工程有限公司 | Spraying maintenance trolley |
CN116591726A (en) * | 2023-07-17 | 2023-08-15 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | Portable tunnel lining nourishing and detecting integrated equipment |
CN116591726B (en) * | 2023-07-17 | 2023-09-26 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | Portable tunnel lining nourishing and detecting integrated equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208441864U (en) | Composed bogie is used in a kind of spray maintenance of tunnel and detection | |
CN204149309U (en) | Tunnel double-lining maintenance dedusting spray chassis | |
CN203463112U (en) | Self-propelled tunnel lining concrete curing rack | |
CN103758541B (en) | Anchor bar of waterproof plate in tunnels lays chassis and laying method thereof | |
CN208633841U (en) | Fully-automatic intelligent spraying steam maintenance trolley | |
CN108678800B (en) | Tunnel health preserving dust removing device and dust removing method | |
CN102337905B (en) | Open type TBM (Tunnel Boring Machine) fullface synchronous lining trolley for hydraulictunnel | |
CN205677634U (en) | Tunnel concrete maintenance spraying chassis | |
CN102825237B (en) | Horizontal centrifugal casting machine pull out trustship, cleaning, spraying combined unit | |
CN208251003U (en) | Highway engineering construction conserves depositing dust multiservice car | |
CN210370677U (en) | Two lining concrete intelligence curing means in tunnel | |
CN107642105A (en) | A kind of piping lane automatic spray dolly curing means and its spraying method | |
CN204877520U (en) | Subway overlaps synchronous strutting arrangement in tunnel | |
CN110685715B (en) | Automatic change tunnel secondary lining and spray maintenance platform truck | |
CN203958293U (en) | A kind of hydro-steering laying ballastless track long steel rail tractor truck | |
CN105822325A (en) | Tunnel secondary lining arch crown concrete filling machine and construction method thereof | |
CN111706364A (en) | Tunnel two lining concrete health preserving trolley | |
CN208010364U (en) | Fully-automatic sprinkling equipment for conserving tunnel | |
CN111058871A (en) | Two lining concrete self-propelled spray curing means in tunnel | |
CN109487647A (en) | Track-laying machine main track and shield section running track traveling process become automatically across method | |
CN207685857U (en) | A kind of piping lane automatic spray trolley curing means | |
CN103008155B (en) | Inner wall of welded pipe automatic spray-paint device | |
CN108617475A (en) | A kind of liquid automation spray casting machine | |
CN109555537A (en) | A kind of lining of railway tunnel two construction working rig | |
CN204851281U (en) | Device is confirmed to tunnel construction lining cutting volume |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Ma Dong Inventor after: Liu Hairong Inventor after: Qian Fulin Inventor after: Zhu Guanglei Inventor after: Qi Shaohua Inventor after: Tang Changwang Inventor after: Wang Zuo Inventor after: Yu Chaocai Inventor before: Ma Dong |
|
CB03 | Change of inventor or designer information |