CN208441692U - A kind of assembled integral window frame for steel construction - Google Patents
A kind of assembled integral window frame for steel construction Download PDFInfo
- Publication number
- CN208441692U CN208441692U CN201820848882.0U CN201820848882U CN208441692U CN 208441692 U CN208441692 U CN 208441692U CN 201820848882 U CN201820848882 U CN 201820848882U CN 208441692 U CN208441692 U CN 208441692U
- Authority
- CN
- China
- Prior art keywords
- plate
- frame
- fixedly connected
- semicircle orifice
- window frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model discloses a kind of assembled integral window frames for steel construction, it is related to window frame, its drip irrigation device includes frame member, lower frame component and two side frame components, the frame member includes bottom plate and the side plate for being fixedly connected on bottom plate two sides, the lower frame element structure is identical with frame member, the side frame component includes support plate and the fixed plate for being fixedly connected on support plate two sides, connecting plate is provided between the adjacent fixed plate and side plate, the side of the connecting plate towards side plate is fixedly connected with snap-gauge, the side plate is towards the card slot for being provided with snap-gauge on the inside of the side of bottom plate and being caught in, the connecting plate and the opposite side of fixed plate are respectively arranged with the first semicircle orifice and the second semicircle orifice, plectane is provided between first semicircle orifice and the second semicircle orifice.Installation process is easily simple, is not necessarily to casting concrete, rapid and convenient;Window frame is detachable with respect to steel construction, and serious forgiveness when installation is high, is replaced convenient for the part of damage.
Description
Technical field
The utility model relates to window frame, in particular to a kind of assembled integral window frame for steel construction.
Background technique
Steel construction is the structures such as a kind of building construction types, including the girder steel made of fashioned iron and steel plate, steel column, steel truss
Part, frequently with weld seam, bolt or rivet interlacement between each component.Window frame is one of component part of window, be used for fixed sash, one
As be in box shape.When window frame is in steel construction, it is fixedly connected by welding or being bolted with the girder steel of H-type and steel column.Dress
Then refer to that window frame each section component assembles at the construction field (site) with monoblock type window frame.
Notification number is that the Chinese patent of CN203334879U discloses a kind of assembled integral window frame for steel construction, often
A assembled integral window frame is by window frame under a prefabricated ferro-cement upper window frame and a prefabricated ferro-cement
And two prefabricated ferro-cement side window frames, four component connection compositions, in prefabricated ferro-cement upper window frame, in advance
The H profile steel that steel construction is put for card is equipped on window frame and prefabricated ferro-cement side window frame under ferro-cement processed
Card slot, and window frame and prefabricated steel wire water under prefabricated ferro-cement upper window frame, prefabricated ferro-cement
A side of cement mortar side window frame is equipped with edge outside window.
When above-mentioned window frame assembles at the construction field (site), the card slot of four sash members is buckled in four H to form window respectively
On fashioned iron, then in the card slot of upper window frame and lower window frame pea gravel concreten is poured, so that window frame and steel construction are linked together, thus
Complete installation.The inefficiency for needing that pea gravel concreten is waited to solidify in installation process, therefore installing, and it is installed rear window
Frame can not remove again, have much room for improvement.
Utility model content
In view of the above technical defects, the purpose of the utility model is to provide a kind of assembled integral windows for steel construction
Frame, assembled in situ installation it is high-efficient, it is time saving and energy saving, and window frame be installed after it is still detachable.
To achieve the above object, the utility model provides following technical solution:
A kind of assembled integral window frame for steel construction, including frame member, lower frame component and two side frame components, institute
The section for stating frame member, lower frame component and side frame component is in U-shape and can be caught in for I-shaped steel column, the frame member
Including bottom plate and it is fixedly connected on the side plates of bottom plate two sides, the lower frame element structure is identical with frame member, described
Side frame component includes support plate and the fixed plate for being fixedly connected on support plate two sides, is set between the adjacent fixed plate and side plate
It is equipped with connecting plate, the side of the connecting plate towards side plate is fixedly connected with snap-gauge, and the side plate is towards in the side of bottom plate
Side is provided with the card slot that snap-gauge is caught in, and the connecting plate and the opposite side of fixed plate are respectively arranged with the first semicircle orifice and the second half
Circular hole is provided with plectane between first semicircle orifice and the second semicircle orifice.
By using above-mentioned technical proposal, when window frame is installed, frame member, lower frame component are first respectively fitted over two up and down
On i section steel beam, then two side frame component sets are respectively fitted over and are controlled on two I-shaped steel columns, then connecting plate is placed on side
Until snap-gauge is caught in card slot between plate and fixed plate, finally plectane is put into the first semicircle orifice and the second semicircle orifice.Peace
Dress process is easily simple, is not necessarily to casting concrete, rapid and convenient;Window frame is detachable with respect to steel construction, and serious forgiveness when installation is high,
It is replaced convenient for the part of damage.
The utility model is further arranged to: the support plate is located between two bottom plates.
By using above-mentioned technical proposal, two side frame components can play a supporting role to frame member, so that
The structural strength of window frame increases.
The utility model is further arranged to: the fixed plate and side plate side are fixedly connected to edge plate.
By using above-mentioned technical proposal, convenient for being laid with lightweight wall plate in four side of window frame.
The utility model is further arranged to: is fixedly connected between the edge plate and side plate back to the several of card slot and is added
Strengthening tendons.
By using above-mentioned technical proposal, so that the structural strength between edge plate and side plate increases, so that side plate
It is not easy opposed bottom bending.
The utility model is further arranged to: the bottom plate is provided with the limiting slot being caught in for i section steel beam.
By using above-mentioned technical proposal, the compactness connected between frame member, lower frame component and i section steel beam is mentioned
Height, while by side plate alignment and fixation plate when being easily installed, it is time saving and energy saving.
The utility model is further arranged to: being fixedly connected to L-shaped consolidate in limiting slot two sides on the inside of the bottom plate
Determine frame, the plate that can be extended at limiting slot is provided between the fixed frame and bottom plate.
It,, will after frame member is covered on the i section steel beam of upside in installation process by using above-mentioned technical proposal
Plate be inserted into fixed frame so that frame member by plate limit and be not easy to fall, and then without installation side frame component
When manpower lift, it is time saving and energy saving.
The utility model is further arranged to: fanning strip is fixedly connected on the outside of the plectane, on first semicircle orifice
Side is communicated with the through-hole being caught in for fanning strip, and first semicircle orifice and the second semicircle orifice are communicated with for fanning strip around plectane axle center
The rotation slot of line rotation.
By using above-mentioned technical proposal, when plectane is installed, fanning strip is first directed at through-hole, then plectane is caught in the first half
Circular hole and the second semicircle orifice, then rotate plectane, so that fanning strip and through-hole dislocation, so that plectane can not be with the first semicircle
Hole and the separation of the second semicircle orifice, the trouble for avoiding plectane from unintentionally falling out.
The utility model is further arranged to: side is fixedly connected with handler to the plectane outwardly.
By using above-mentioned technical proposal, rotated convenient for plectane.
In conclusion the utility model has the following beneficial effects: frame member, lower frame component and two side frame components are logical
Firm window frame can be spliced by crossing connecting plate and plectane, be not necessarily to placing concrete, and installation process rapid and convenient is time saving and energy saving,
And dismountable window frame structure can be improved the serious forgiveness of installation process.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of steel construction in embodiment;
Fig. 2 is the structural schematic diagram of frame member in embodiment;
Fig. 3 is the structural schematic diagram of side frame component in embodiment;
Fig. 4 is the enlarged diagram of a-quadrant in Fig. 3;
Fig. 5 is that window frame is mounted on the structural schematic diagram on steel construction in embodiment;
Fig. 6 is the enlarged diagram of B area in Fig. 5;
Fig. 7 is the perspective view of the explosion under the visual angle Fig. 6.
Description of symbols: 1, frame member;11, bottom plate;111, limiting slot;12, side plate;121, card slot;13, fixed
Frame;14, plate;2, lower frame component;3, side frame component;31, support plate;32, fixed plate;321, the second semicircle orifice;4, connecting plate;
41, snap-gauge;42, the first semicircle orifice;43, through-hole;5, plectane;51, fanning strip;52, handler;6, edge plate;7, reinforcing rib;8,
Rotation slot;9, i section steel beam;10, I-shaped steel column.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
As shown in Figure 1, steel construction includes two parallel I-shaped steel columns 10, fixed between two I-shaped steel columns 10
There are two parallel i section steel beams 9 for connection.A rectangular window is formed between I-shaped steel column 10 and i section steel beam 9
Mouthful.
A kind of assembled integral window frame for steel construction, as shown in Fig. 2, including frame member 1, lower frame component 2 and two
A side frame component 3.Frame member 1 includes the bottom plate 11 being close to i section steel beam 9, and 11 two sides of bottom plate are fixedly connected to side plate
12.Bottom plate 11 and two side plates 12 form U-shaped, and the web length that the distance between two side plates 12 are equal to i section steel beam 9 adds
Upper two wing plate thickness, the length of frame member 1 are equal to the spacing of two I-shaped steel columns 10.It is provided in the middle part of bottom plate 11 for work
The limiting slot 111 that font girder steel 9 is caught in, fixes the position of frame member 1 when being easily installed.2 structure of lower frame component and upper ledge
Component 1 is identical, and details are not described herein.
As shown in figure 3, side frame component 3 includes the support plate 31 being close to I-shaped steel column 10,31 two sides of support plate are solid
Surely it is connected with fixed plate 32, support plate 31 and two fixed plates 32 form U-shaped, and the distance between two fixed plates 32 are equal to two
The distance between side plate 12.The length of support plate 31 is equal to 9 spacing of i section steel beam and subtracts bottom plate 11 at two limiting slots 111
Thickness, therefore support plate 31 can be located between two bottom plates 11 when installation, and then play a supporting role, structure is more firm.
When window frame is installed, between frame member 1 and lower frame component 2 are first caught in two I-shaped steel columns 10, then by upper ledge structure
Part 1 moves up, lower frame component 2 moves down, until i section steel beam 9 is caught in limiting slot 111, two side plates 12 are located at i section steel beam 9
Two sides.Then two side frame components 3 are caught between frame member 1 and lower frame component 2, backwards by two side frame components 3 finally
It pushes, until I-shaped steel column 10 is caught between two fixed plates 32.Frame member 1, lower frame component 2 and two side frame components 3
It is able to maintain under no external force at this time relatively fixed.
As shown in Figure 5, Figure 6, rectangular connecting plate 4, the length of connecting plate 4 are provided between adjacent fixed plate 32 and side plate 12
The width that degree is equal to side plate 12 adds the thickness of bottom plate 11, and the width of connecting plate 4 is equal to the width of fixed plate 32.4 court of connecting plate
It is as shown in Figure 7 that snap-gauge 41(is fixedly connected with to the side of side plate 12), side plate 12 is towards being provided on the inside of the side of bottom plate 11
The card slot 121(that snap-gauge 41 is caught in is as shown in Figure 2).The cooperation of snap-gauge 41 and card slot 121, so that connecting plate 4 is only capable of along side plate 12
Length direction is mobile until snap-gauge 41 is separated with card slot 121.Connecting plate 4 and the opposite side of fixed plate 32 are respectively arranged with the first half
Circular hole 42 and the second semicircle orifice 321, the first semicircle orifice 42 and the second semicircle orifice 321 are combined into a complete circle, the first semicircle orifice
42 and second are provided with plectane 5 between semicircle orifice 321.Plectane 5 plays position-limiting action to connecting plate 4, makes connecting plate 4 can not be along side
12 length direction of plate is mobile.Relatively, side frame component 3 by plectane 5 limit and can not move so that entire window frame with
Steel construction is linked together.Installation process is easily simple, is not necessarily to casting concrete, rapid and convenient;Window frame is detachable with respect to steel construction,
Serious forgiveness when installation is high, is replaced convenient for the part of damage.
As shown in Fig. 4, Fig. 7, it is fixedly connected with fanning strip 51 on the outside of plectane 5, is communicated on the upside of the first semicircle orifice 42 for fan
The through-hole 43 that shape plate 51 is caught in, the first semicircle orifice 42 and the second semicircle orifice 321, which are communicated with, to be turned for fanning strip 51 around 5 axial line of plectane
Dynamic rotation slot 8.When plectane 5 is installed, fanning strip 51 is first directed at through-hole 43, then plectane 5 is caught in the first semicircle orifice 42 and the
Two semicircle orifices 321 then rotate plectane 5, so that fanning strip 51 and through-hole 43 misplace, so that plectane 5 can not be with the first half
Circular hole 42 and the separation of the second semicircle orifice 321, the trouble for avoiding plectane 5 from unintentionally falling out.Plectane 5 outwardly side be fixedly connected with it is rectangular
The handler 52 of strip rotates convenient for plectane 5.
As shown in Figure 2 and Figure 3, fixed plate 32 and 12 side of side plate are fixedly connected to edge plate 6, therefore frame member 1,
Lower frame component 2 and 3 section of side frame component are in F shape.It is fixedly connected with several reinforcing ribs 7 between edge plate 6 and side plate 12, reinforces
The position of muscle 7 is corresponding with card slot 121.Structural strength between edge plate 6 and side plate 12 increases, so that side plate 12 is not easy
Opposed bottom 11 is bent.
As shown in Fig. 2, 11 inside of bottom plate is fixedly connected to L-shaped fixed frame 13 in 111 two sides of limiting slot, two solid
Determine frame 13 to be oppositely arranged and can pass through for i section steel beam 9, limit can be extended to by being provided between fixed frame 13 and bottom plate 11
Plate 14 at slot 111.In installation process, by 1 set of frame member on the i section steel beam 9 of upside after, plate 14 is inserted into
Fixed frame 13, plate 14 are close to bottom plate 11 and 9 wing plate of i section steel beam so that frame member 1 by plate 14 limit and
It is not easy to fall, and then is not necessarily to the manpower when installing side frame component 3 and lifts, it is time saving and energy saving.
The course of work:
When window frame is installed, between frame member 1 and lower frame component 2 are first caught in two I-shaped steel columns 10, then by upper ledge structure
Part 1 moves up, lower frame component 2 moves down, until i section steel beam 9 is caught in limiting slot 111, plate 14 is then inserted into fixed frame 13
In.Then two side frame components 3 are caught between frame member 1 and lower frame component 2, then two side frame components 3 are pushed backwards,
Until I-shaped steel column 10 is caught between two fixed plates 32.Snap-gauge 41 is finally inserted into card slot 121, so that connecting plate 4 is located at
Between side plate 12 and fixed plate 32, fanning strip 51 is directed at through-hole 43, plectane 5 is inserted into the first semicircle orifice 42 and the second semicircle orifice
180 degree is rotated after 321.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability
Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but
As long as all by the protection of Patent Law in the scope of the claims of the utility model.
Claims (8)
1. a kind of assembled integral window frame for steel construction, including frame member (1), lower frame component (2) and two side frame structures
Part (3), it is characterised in that: the section of the frame member (1), lower frame component (2) and side frame component (3) is in U-shape and can
It is caught in for I-shaped steel column (10), the frame member (1) includes bottom plate (11) and is fixedly connected on bottom plate (11) two sides
Side plate (12), lower frame component (2) structure is identical with frame member (1), and the side frame component (3) includes support plate
(31) and it is fixedly connected on the fixed plate (32) of support plate (31) two sides, between the adjacent fixed plate (32) and side plate (12)
It is provided with connecting plate (4), the side of connecting plate (4) towards the side plate (12) is fixedly connected with snap-gauge (41), the side plate
(12) towards the card slot (121) for being provided with snap-gauge (41) on the inside of the side of bottom plate (11) and being caught in, the connecting plate (4) and fixed
The opposite side of plate (32) is respectively arranged with the first semicircle orifice (42) and the second semicircle orifice (321), first semicircle orifice (42) and
Plectane (5) are provided between second semicircle orifice (321).
2. a kind of assembled integral window frame for steel construction according to claim 1, it is characterised in that: the support plate
(31) it is located between two bottom plates (11).
3. a kind of assembled integral window frame for steel construction according to claim 1, it is characterised in that: the fixed plate
(32) and side plate (12) side is fixedly connected to edge plate (6).
4. a kind of assembled integral window frame for steel construction according to claim 3, it is characterised in that: the edge plate
(6) several reinforcing ribs (7) back to card slot (121) are fixedly connected between side plate (12).
5. a kind of assembled integral window frame for steel construction according to claim 1, it is characterised in that: the bottom plate
(11) it is provided with the limiting slot (111) being caught in for i section steel beam (9).
6. a kind of assembled integral window frame for steel construction according to claim 5, it is characterised in that: the bottom plate
(11) inside is fixedly connected to L-shaped fixed frame (13) in limiting slot (111) two sides, the fixed frame (13) and bottom plate
(11) plate (14) that can be extended at limiting slot (111) is provided between.
7. a kind of assembled integral window frame for steel construction according to claim 1, it is characterised in that: the plectane
(5) outside is fixedly connected with fanning strip (51), is communicated on the upside of first semicircle orifice (42) and is led to for what fanning strip (51) was caught in
Hole (43), first semicircle orifice (42) and the second semicircle orifice (321), which are communicated with, to be turned for fanning strip (51) around plectane (5) axial line
Dynamic rotation slot (8).
8. a kind of assembled integral window frame for steel construction according to claim 7, it is characterised in that: the plectane
(5) side is fixedly connected with handler (52) outwardly.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820848882.0U CN208441692U (en) | 2018-06-02 | 2018-06-02 | A kind of assembled integral window frame for steel construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820848882.0U CN208441692U (en) | 2018-06-02 | 2018-06-02 | A kind of assembled integral window frame for steel construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208441692U true CN208441692U (en) | 2019-01-29 |
Family
ID=65092597
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820848882.0U Active CN208441692U (en) | 2018-06-02 | 2018-06-02 | A kind of assembled integral window frame for steel construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208441692U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109848898A (en) * | 2019-03-25 | 2019-06-07 | 深圳市明信测试设备有限公司 | One kind exempting from screw rapid installation device |
CN110863609A (en) * | 2019-11-20 | 2020-03-06 | 河北水利电力学院 | Latch hook connected H-shaped steel and channel steel assembled cross-shaped special-shaped column |
CN111119660A (en) * | 2019-12-30 | 2020-05-08 | 佛山市均林人防工程有限公司 | High-strength door frame assembly module and installation method thereof |
-
2018
- 2018-06-02 CN CN201820848882.0U patent/CN208441692U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109848898A (en) * | 2019-03-25 | 2019-06-07 | 深圳市明信测试设备有限公司 | One kind exempting from screw rapid installation device |
CN110863609A (en) * | 2019-11-20 | 2020-03-06 | 河北水利电力学院 | Latch hook connected H-shaped steel and channel steel assembled cross-shaped special-shaped column |
CN111119660A (en) * | 2019-12-30 | 2020-05-08 | 佛山市均林人防工程有限公司 | High-strength door frame assembly module and installation method thereof |
CN111119660B (en) * | 2019-12-30 | 2021-12-31 | 佛山市均林人防工程有限公司 | High-strength door frame assembly module and installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208441692U (en) | A kind of assembled integral window frame for steel construction | |
CN106121113A (en) | Truss floor support plate | |
CN103711201B (en) | A kind of large-span prestressed concrete beam slab frame structure system | |
CN211421882U (en) | Reinforcing bar net piece ligature positioner | |
CN107355037A (en) | Assembling type steel structure builds self-bearing type steel truss form bracing system and construction method | |
CN109680993A (en) | A kind of removable box-type room | |
US10480172B2 (en) | Building structure, building, and building construction method | |
CN208122301U (en) | A kind of floor support plate supporting apparatus | |
CN107587638A (en) | Steel bar truss floor support plate and combined type floor support plate | |
CN214884370U (en) | Aluminum alloy supporting beam for movable board house | |
CN110748063B (en) | Assembled steel bar truss floor support plate with support | |
CN110241974B (en) | Full-bolt-connection truss type steel reinforced concrete beam and construction method | |
CN208845309U (en) | The support platform and wind power generating set of tower | |
CN214994728U (en) | Steel structure beam column connecting structure | |
JP2019112904A (en) | Building construction method | |
CN112337997B (en) | Integral bending forming device and method for cable tower reinforcing mesh with super-large arc section | |
CN211470571U (en) | Assembled prefabricated component turning device | |
CN209799003U (en) | house steel structure supporting structure | |
CN208965744U (en) | For the steel roof truss of single story building and the connecting node of reinforced column | |
CN206722069U (en) | It is a kind of to be used to be arranged on the removably bracket that support is provided on frame column | |
CN207244966U (en) | Steel bar truss floor support plate and combined type floor support plate | |
CN108442520B (en) | Large-span truss support structure and system and roof support system | |
CN205894425U (en) | Truss building carrier plate | |
DE2923176A1 (en) | EXTERIOR WALL CONSTRUCTION FOR PRE-FABRICATED HOUSES | |
CN217437543U (en) | Combined support for fish-bellied beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |