CN208441056U - A kind of rock - Google Patents

A kind of rock Download PDF

Info

Publication number
CN208441056U
CN208441056U CN201820382205.4U CN201820382205U CN208441056U CN 208441056 U CN208441056 U CN 208441056U CN 201820382205 U CN201820382205 U CN 201820382205U CN 208441056 U CN208441056 U CN 208441056U
Authority
CN
China
Prior art keywords
area
mud stone
rockfill area
rockfill
dam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820382205.4U
Other languages
Chinese (zh)
Inventor
刘昊
胡娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Zhongnan Engineering Corp Ltd
Original Assignee
PowerChina Zhongnan Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Zhongnan Engineering Corp Ltd filed Critical PowerChina Zhongnan Engineering Corp Ltd
Priority to CN201820382205.4U priority Critical patent/CN208441056U/en
Application granted granted Critical
Publication of CN208441056U publication Critical patent/CN208441056U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of rocks, including the transition zone, bed course and panel set gradually from inside to outside in upstream side, it is equipped with main rockfill area in the downstream side of transition zone, the downstream side against main rockfill area is equipped with time rockfill area, is equipped with the area Zeng Mo at the top of main rockfill area and time rockfill area;Main rockfill area is mainly built up by hard rock, and the filler of secondary rockfill area is the blend composition of rock and mud stone;The mud stone slag area after the downstream side of the area Zeng Mo and time rockfill area is equipped with dam;The chimney drainage area being connected to is equipped between transition zone downstream side and main rockfill area upstream side and behind main rockfill area, secondary rockfill area, dam between mud stone slag area bottom and ground;Mud stone slag area bottom is equipped with loaded filter behind main rockfill area, secondary rockfill area and dam.The utility model is built a dam using mud stone to greatest extent while guaranteeing dam stability, such that mud stone is built a dam in practical engineering applications, reduce waste, reduce the destruction to environment.

Description

A kind of rock
Technical field
The utility model belongs to water conservancy and hydropower technology, and in particular to a kind of rock.
Background technique
Rock-fill dams are applied more and more widely in hydraulic and hydroelectric engineering construction, but some engineerings, due to natural geology item Part influence, local material is based on mud stone, if mud stone is given up at this time, by force find or the higher dam material of outsourcing intensity, The increase of project amount and investment can be directly resulted in, and will increase the scale of Dumping Sites, environment is adversely affected.
Patent CN201420137258.1 discloses a kind of rock using mud stone dam material, belongs to power station base Plinth field of engineering technology, upstream side are followed successively by transition zone, bed course and upstream slope-protection from inside to outside, the upstream apron layer and upper Trip rock ballast loading layer is located at upstream side lower section, and the special bed course is located at bed course end, dam body rockfill area including drain rockfill area, Mud stone rockfill area and hard rock rockfill area, the draining rockfill area are located under transition zone on one side, horizontal on one side to distinguish mud stone enrockment At upper and lower two parts, lower part mud stone rockfill area is located on the dam foundation, and upper part mud stone rockfill area is located at the level of tail water or more Dry section is equipped with loaded filter in the top and bottom of upper part mud stone rockfill area and downstream side.Mud stone is arranged in program proposition It in dam body dry section, can fully be built a dam using mud stone, material used in mud stone rockfill area is mud stone entirely, it is well known that mud Rock meets water easy disintegrating, softens and intensity is caused to decline and collapse, and especially mud stone rockfill area is close to the region of draining rockfill area, more Be easy disintegration, cause in fact the independent arrangement of this mud stone be difficult to apply in practical projects.
How to efficiently use mud stone to build a dam and overcome its disadvantage, it is urgently to be solved to become hydraulic and hydroelectric engineering technical staff Problem.
Utility model content
In view of the above-mentioned problems, the utility model is intended to provide, a kind of stability is good, highly-safe is built a dam using mud stone Rock.
The technical solution that the utility model solves the problems, such as is: a kind of rock, be included in upstream side from inside to outside according to Transition zone, bed course and the panel of secondary setting are equipped with main rockfill area in the downstream side of transition zone, and the downstream side against main rockfill area is set There is secondary rockfill area, is equipped with the area Zeng Mo at the top of main rockfill area and time rockfill area;
The main rockfill area is mainly built up by hard rock, and the filler of secondary rockfill area is the blend composition of rock and mud stone;
The mud stone slag area after the downstream side of the area Zeng Mo and time rockfill area is equipped with dam, mud stone slag area downstream side is equipped with behind dam Downstream protection slope;
Mud stone slag between transition zone downstream side and main rockfill area upstream side and behind main rockfill area, secondary rockfill area, dam The chimney drainage area being connected to is equipped between area bottom and ground;
Mud stone slag area bottom is equipped with loaded filter behind main rockfill area, secondary rockfill area and dam.
Ground is passed to by main rockfill area after passing through bed course and transition zone due to most water ballast(ing)s in the main rockfill area of upstream In base, it plays a supportive role to panel, it is desirable that it has enough compactness and necessary deformation modulus, therefore is preferably filled out using hard rock It builds.
Downstream time rockfill area, it is smaller due to being influenced by water ballast(ing) far from panel, mud stone material can be made full use of, mud stone can be adopted With strong, weak weathered mudstone, mud stone mixed ratio can be used 70%~100%.
Since different materials has been filled in primary and secondary rockfill area, it is also contemplated that the sedimentation in mud stone later period, uneven to reduce dam body Even sedimentation improves anti-seismic performance, and the area Zeng Mo is arranged on primary and secondary rockfill area, and the new of weak weathering and gentle breeze can be used in the area Zeng Mo Fresh hard rock.
Mud stone slag area behind dam, maximizing dissolve mud stone and protect the secondary heap in downstream at the same time as dam adverse grade ballast Stone area stablizes safety.
Mud stone reclamation district is protected by chimney drainage area and loaded filter, significantly reduce dam body seepage failure can It can, it is ensured that the security reliability of dam body.
Further, the main rockfill area is built up by the blend composition of hard rock and mud stone, mud stone ratio shared by main rockfill area Example is less than mud stone ratio shared by secondary rockfill area.It, can be in main rockfill area hard rock when such case is suitable for that mud stone need to be dissolved Appropriate blending mud stone, mud stone must be using weak weathering and the fresh mud stone of gentle breeze, and mixing proportion is no more than 30%.
Preferably, the top at the top and the area Zeng Mo of the chimney drainage area is contour.
Further, in panel upstream side, be successively arranged upstream clay bedding layer and mud from inside to outside against panel lower section Rock waste loading layer.
Further, toe board is equipped at upstream face slope foot, on the ground positioned at panel periphery, in upstream face slope foot and toe Plate junction is equipped with special bed course.Though special bed course described here has " special " two word, this noun belongs to this field Technical term, there is no smudgy.
The remarkable result of the utility model is:
1. by the subregion arrangement of dam body and the blending of mud stone and hard rock, and effective filter material and draining knot is arranged Structure is built a dam using mud stone to greatest extent while guaranteeing dam stability, overcome mud stone meet water easy disintegrating, softening and The problem of causing intensity to decline and collapse, dam structure are stablized, such that mud stone is built a dam in practical engineering applications, subtract Lack waste, reduces the destruction to environment.
2. excavated material and local materials can be efficiently used, solves engineering cubic metre of earth and stone equilibrium problem, reduce construction investment And cost.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawing.
Fig. 1 is rock sectional view.
In figure: 1-panel;2-bed courses;3-transition zones;4-main rockfill areas;5-secondary rockfill areas;6-the areas Zeng Mo;7— Mud stone slag area behind dam;8-downstream protection slopes;9-grounds;10-chimney drainage areas;11-loaded filters;12-upstream clays paving Cap rock;13-mud stone waste loading layers;14-toe boards;15-special bed courses.
Specific embodiment
As shown in Figure 1, a kind of rock, including transition zone 3, the bed course 2 set gradually from inside to outside in upstream side With panel 1.In 1 upstream side of panel, it is successively arranged upstream clay bedding layer 12 and mud stone waste from inside to outside against 1 lower section of panel Loading layer 13.At upstream face slope foot, toe board 14 is equipped on the ground 9 on 1 periphery of panel.In upstream face slope foot and toe board 14 Junction is equipped with special bed course 15.
It is equipped with main rockfill area 4 in the downstream side of transition zone 3, the downstream side against main rockfill area 4 is equipped with time rockfill area 5.? The top of main rockfill area 4 and time rockfill area 5 is equipped with the area Zeng Mo 6.
The main rockfill area 4 is mainly built up by hard rock.When need to dissolve mud stone, the main rockfill area 4 is by hard rock and mud stone Blend composition is built up, and mud stone must be using weak weathering and the fresh mud stone of gentle breeze, and mixing proportion is no more than 30%.
The filler of secondary rockfill area 5 is the blend composition of rock and mud stone, and strong, weak weathered mudstone, mud stone incorporation can be used in mud stone Ratio can be used 70%~100%.
The mud stone slag area 7 after the downstream side of the area Zeng Mo 6 and time rockfill area 5 is equipped with dam, behind dam 7 downstream side of mud stone slag area Equipped with downstream protection slope 8.
Mud stone between 4 upstream side of 3 downstream side of transition zone and main rockfill area and behind main rockfill area 4, secondary rockfill area 5, dam The chimney drainage area 10 being connected to is equipped between 7 bottom of slag area and ground 9.The top and the area Zeng Mo 6 of the chimney drainage area 10 Top it is contour.
7 bottom of mud stone slag area is equipped with loaded filter 11 behind main rockfill area 4, secondary rockfill area 5 and dam.

Claims (5)

1. a kind of rock, including the transition zone (3), bed course (2) and panel set gradually from inside to outside in upstream side (1), it is characterised in that: be equipped with main rockfill area (4) in the downstream side of transition zone (3), the downstream side against main rockfill area (4) is equipped with Secondary rockfill area (5) is equipped with the area Zeng Mo (6) at the top of main rockfill area (4) and time rockfill area (5);
The main rockfill area (4) is mainly built up by hard rock, and the filler of secondary rockfill area (5) is the blend composition of rock and mud stone;
The mud stone slag area (7) after the downstream side of the area Zeng Mo (6) and time rockfill area (5) is equipped with dam, behind dam under mud stone slag area (7) It swims side and is equipped with downstream protection slope (8);
Between transition zone (3) downstream side and main rockfill area (4) upstream side and behind main rockfill area (4), secondary rockfill area (5), dam The chimney drainage area (10) being connected to is equipped between mud stone slag area (7) bottom and ground (9);
Mud stone slag area (7) bottom is equipped with loaded filter (11) behind main rockfill area (4), secondary rockfill area (5) and dam.
2. rock according to claim 1, it is characterised in that: the main rockfill area (4) is by hard rock and mud stone Blend composition is built up, and mud stone ratio shared by main rockfill area (4) is less than mud stone ratio shared by secondary rockfill area (5).
3. rock according to claim 1, it is characterised in that: the top of the chimney drainage area (10) and increasing mould The top in area (6) is contour.
4. rock according to claim 1, it is characterised in that: in panel (1) upstream side, under panel (1) Section is successively arranged upstream clay bedding layer (12) and mud stone waste loading layer (13) from inside to outside.
5. rock according to claim 1, it is characterised in that: at upstream face slope foot, be located at panel (1) periphery Ground (9) be equipped with toe board (14), be equipped with special bed course (15) in upstream face slope foot and toe board (14) junction.
CN201820382205.4U 2018-03-21 2018-03-21 A kind of rock Active CN208441056U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820382205.4U CN208441056U (en) 2018-03-21 2018-03-21 A kind of rock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820382205.4U CN208441056U (en) 2018-03-21 2018-03-21 A kind of rock

Publications (1)

Publication Number Publication Date
CN208441056U true CN208441056U (en) 2019-01-29

Family

ID=65092874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820382205.4U Active CN208441056U (en) 2018-03-21 2018-03-21 A kind of rock

Country Status (1)

Country Link
CN (1) CN208441056U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110295576A (en) * 2019-07-22 2019-10-01 长江勘测规划设计研究有限责任公司 Improve the concrete face rockfill dam of stress and deformations of concrete face slab state

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110295576A (en) * 2019-07-22 2019-10-01 长江勘测规划设计研究有限责任公司 Improve the concrete face rockfill dam of stress and deformations of concrete face slab state
CN110295576B (en) * 2019-07-22 2024-04-12 长江勘测规划设计研究有限责任公司 Concrete face rockfill dam for improving face stress deformation state

Similar Documents

Publication Publication Date Title
CN205077453U (en) Dam structure that panel rock -fill dam and upstream cofferdam combine
CN108193648B (en) Plastic panel homogenizing dam
CN207959132U (en) A kind of core wall rockfill dam
CN106368176B (en) The high dam structure being built on earth material scarcity area deeply covered layer
CN208441056U (en) A kind of rock
CN207537975U (en) Deep covering layer top panel Rockfill Dam based moisture barrier structure
CN110080232A (en) A kind of deep basal pit earth-filling method of underground high water level
CN106087880A (en) Dam that a kind of 300 meter levels are high and construction technology thereof
CN109371919A (en) The native stone water-retaining structure of seepage prevention of core wall
CN104695455B (en) High-flow and high-head antiscour and anti-seepage overflow cofferdam structure and construction method thereof
CN209429056U (en) The native stone water-retaining structure of seepage prevention of core wall
Emiroglu Influences on selection of the type of dam
CN108589661A (en) A kind of core wall rockfill dam
CN213143069U (en) Pouring type impervious core earth-rock dam structure
CN103938585A (en) Arrangement structure of mixed dam composed of earth dams and gravity dam
CN113123301A (en) Partition structure of gravel soil core wall dam
CN208563267U (en) A kind of earth and rockfill dam pressure slope body discharge structure
CN209482321U (en) A kind of slope retaining structure
CN208009374U (en) A kind of core wall rockfill dam
CN207700204U (en) A kind of french drain structure for Slope Prevention
CN206015617U (en) A kind of double-drainage body rock
CN206157755U (en) Carry on anti - seepage prevention of dam foundation system of straining structure of double -deck level in deep overburden high dam
CN106065655B (en) The method that flood diversion equipment and application flood diversion equipment solve urban waterlogging
CN204804064U (en) Building waterproof board for outer wall
CN215888097U (en) Flood control protective dam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant